Proceedings of 4th European Business Research Conference
9 - 10 April 2015, Imperial College, London, UK, ISBN: 978-1-922069-72-6
Management Flexibility and Its Real Option Pricing in
Expansion Project of a Metal Mine: Actual Case Study in
Selibe Phikwe Mine, Botswana, Africa
Dineo Florence SEFEMO1
and Tsuyoshi ADACHI2
The application of real options to mining investments is being widely discussed
and acknowledged that the real strategic value of a project should be realized
when uncertainties and all flexibilities that can be embedded into a project
are being analyzed. In this regard, the optimal decision strategies in the
expansion option of the current operating Cu-Ni project in Selibe Phikwe mine,
Botswana, has been evaluated with Real Options Analysis (ROA). The projects
value that can vary in the future due to commodity market or any unresolved
technical uncertainty is being evaluated in the binomial option pricing
methodology. The optimal investment timing, decisions making under
uncertainty at different times of the current operating project and expansion
option value of the project are calculated under the context of ROA. The project
has been evaluated on three different scenarios that can be visualized by
management in decision making. a) Expansion of the current operating project
to increase life of mine. b) Stand-alone evaluation of the expansion project in a
delay option case. c) Expansion option of concurrently bringing the two projects
into production shortening life of mine evaluated with real options. The results
for life of mine extension presented 12% increase from the current operating
projects net present value with 28% internal rate of return. The delay option
case yielded $9 million option value, requiring a 6% Cu-Ni price increase from
the 2014 average London metal exchange. The expansion option valuation
increasing production capacity resulted in a high option value of $286 million.
This indicate a longer waiting period for expansion thus making the life of mine
extension case the ideal scenario for expansion under real option evaluation.
Keywords; Real options, Flexibility, Optimal investment timing, Binomial option
pricing
______________________________________________
1 MSc Student, Graduate School of Engineering and Resources Sciences, Akita University, 1-1 Tegata-Gakuenmachi
Akita City, 010-0825, Japan.
Email: dineo.sefemo@yahoo.com.Tel:(+8180-6010-1998 ) Fax: (+81-18-889-2468)
Mineral Economics
2Proffessor, Faculty of International Resource Sciences, Akita University, Akita, 0101-0825, Japan

More Related Content

Viewers also liked

Viewers also liked (11)

2º Processo 3123 2000
2º Processo 3123 20002º Processo 3123 2000
2º Processo 3123 2000
 
pamvendselresumern
pamvendselresumernpamvendselresumern
pamvendselresumern
 
Libro15 14feb ias_ttres3
Libro15 14feb ias_ttres3Libro15 14feb ias_ttres3
Libro15 14feb ias_ttres3
 
Fotos de Jeanhii
Fotos de JeanhiiFotos de Jeanhii
Fotos de Jeanhii
 
Map tokyo
Map tokyoMap tokyo
Map tokyo
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Abbas CV
Abbas CVAbbas CV
Abbas CV
 
Ittan foro
Ittan foroIttan foro
Ittan foro
 
Momsal2016111 2
Momsal2016111 2Momsal2016111 2
Momsal2016111 2
 
Каталог Farmasi февраль 2016
Каталог Farmasi февраль 2016Каталог Farmasi февраль 2016
Каталог Farmasi февраль 2016
 
CASTILLO GALAZ BEATRIZ GUADALUPE
CASTILLO GALAZ BEATRIZ GUADALUPECASTILLO GALAZ BEATRIZ GUADALUPE
CASTILLO GALAZ BEATRIZ GUADALUPE
 

Similar to Management Flexibility and Its real option Pricing in the Expansion of a metal mine ;Actual Case study in Selebi Phikwe Mine Botswana,Botswana,Africa Dineo Florence Sefemo and Tsuyoshi Adachi

PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIPLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIIRJET Journal
 
Development and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy SourcesDevelopment and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy SourcesACX
 
Procurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projectsProcurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projectseSAT Publishing House
 
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...Steve Burks
 
Chunnel project project cost management
Chunnel  project project cost managementChunnel  project project cost management
Chunnel project project cost managementSagar Rana
 
Crimson Publishers-Production Scheduling in Block Caving with Consideration o...
Crimson Publishers-Production Scheduling in Block Caving with Consideration o...Crimson Publishers-Production Scheduling in Block Caving with Consideration o...
Crimson Publishers-Production Scheduling in Block Caving with Consideration o...CrimsonPublishersAMMS
 
Economic Assessment and Value Maximizations of a Mining Operation based on an...
Economic Assessment and Value Maximizations of a Mining Operation based on an...Economic Assessment and Value Maximizations of a Mining Operation based on an...
Economic Assessment and Value Maximizations of a Mining Operation based on an...Academia de Ingeniería de México
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...Steve Jones
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET Journal
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviewsNick Pelham
 
EU Energy Focus Bulletin - Jan 2016
EU Energy Focus Bulletin - Jan 2016EU Energy Focus Bulletin - Jan 2016
EU Energy Focus Bulletin - Jan 2016David Young
 
The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...
The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...
The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...OECD Governance
 
Analytics for effective investment in early stage diamond projects by Dr Cowa...
Analytics for effective investment in early stage diamond projects by Dr Cowa...Analytics for effective investment in early stage diamond projects by Dr Cowa...
Analytics for effective investment in early stage diamond projects by Dr Cowa...James AH Campbell
 
Brad Page - The Global Status of CCS: 2014
Brad Page - The Global Status of CCS: 2014Brad Page - The Global Status of CCS: 2014
Brad Page - The Global Status of CCS: 2014Global CCS Institute
 

Similar to Management Flexibility and Its real option Pricing in the Expansion of a metal mine ;Actual Case study in Selebi Phikwe Mine Botswana,Botswana,Africa Dineo Florence Sefemo and Tsuyoshi Adachi (20)

B2B PURCHASE.PDF
B2B PURCHASE.PDFB2B PURCHASE.PDF
B2B PURCHASE.PDF
 
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVIPLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
PLANNING AND COST ANALYSIS FOR SETTING UP OF A NEW RMCPLANT NEAR BELAGAVI
 
Development and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy SourcesDevelopment and Utilization of Alternative Energy Sources
Development and Utilization of Alternative Energy Sources
 
Procurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projectsProcurement principle towards effective management of construction projects
Procurement principle towards effective management of construction projects
 
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
Case Studies of Simultaneous M&M Operations in the Platinum Industry - SAIMM ...
 
Dollar_driven_mine_pl.pdf
Dollar_driven_mine_pl.pdfDollar_driven_mine_pl.pdf
Dollar_driven_mine_pl.pdf
 
Chunnel project project cost management
Chunnel  project project cost managementChunnel  project project cost management
Chunnel project project cost management
 
Crimson Publishers-Production Scheduling in Block Caving with Consideration o...
Crimson Publishers-Production Scheduling in Block Caving with Consideration o...Crimson Publishers-Production Scheduling in Block Caving with Consideration o...
Crimson Publishers-Production Scheduling in Block Caving with Consideration o...
 
Economic Assessment and Value Maximizations of a Mining Operation based on an...
Economic Assessment and Value Maximizations of a Mining Operation based on an...Economic Assessment and Value Maximizations of a Mining Operation based on an...
Economic Assessment and Value Maximizations of a Mining Operation based on an...
 
Introduction to UK-China (Guangdong) CCUS Centre Activities - presentation by...
Introduction to UK-China (Guangdong) CCUS Centre Activities - presentation by...Introduction to UK-China (Guangdong) CCUS Centre Activities - presentation by...
Introduction to UK-China (Guangdong) CCUS Centre Activities - presentation by...
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...Quantity surveying dissertation effectiveness of life cycle costing in sustai...
Quantity surveying dissertation effectiveness of life cycle costing in sustai...
 
D012522433
D012522433D012522433
D012522433
 
IRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building ProjectIRJET- Developing Cost Prediction Model for Building Project
IRJET- Developing Cost Prediction Model for Building Project
 
3rd party independant reviews
3rd party independant reviews3rd party independant reviews
3rd party independant reviews
 
EU Energy Focus Bulletin - Jan 2016
EU Energy Focus Bulletin - Jan 2016EU Energy Focus Bulletin - Jan 2016
EU Energy Focus Bulletin - Jan 2016
 
The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...
The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...
The governance of mega infrastructure projects - Juliane JANSEN, OECD Secreta...
 
O18_ CBFM2
O18_ CBFM2O18_ CBFM2
O18_ CBFM2
 
Analytics for effective investment in early stage diamond projects by Dr Cowa...
Analytics for effective investment in early stage diamond projects by Dr Cowa...Analytics for effective investment in early stage diamond projects by Dr Cowa...
Analytics for effective investment in early stage diamond projects by Dr Cowa...
 
Brad Page - The Global Status of CCS: 2014
Brad Page - The Global Status of CCS: 2014Brad Page - The Global Status of CCS: 2014
Brad Page - The Global Status of CCS: 2014
 

Management Flexibility and Its real option Pricing in the Expansion of a metal mine ;Actual Case study in Selebi Phikwe Mine Botswana,Botswana,Africa Dineo Florence Sefemo and Tsuyoshi Adachi

  • 1. Proceedings of 4th European Business Research Conference 9 - 10 April 2015, Imperial College, London, UK, ISBN: 978-1-922069-72-6 Management Flexibility and Its Real Option Pricing in Expansion Project of a Metal Mine: Actual Case Study in Selibe Phikwe Mine, Botswana, Africa Dineo Florence SEFEMO1 and Tsuyoshi ADACHI2 The application of real options to mining investments is being widely discussed and acknowledged that the real strategic value of a project should be realized when uncertainties and all flexibilities that can be embedded into a project are being analyzed. In this regard, the optimal decision strategies in the expansion option of the current operating Cu-Ni project in Selibe Phikwe mine, Botswana, has been evaluated with Real Options Analysis (ROA). The projects value that can vary in the future due to commodity market or any unresolved technical uncertainty is being evaluated in the binomial option pricing methodology. The optimal investment timing, decisions making under uncertainty at different times of the current operating project and expansion option value of the project are calculated under the context of ROA. The project has been evaluated on three different scenarios that can be visualized by management in decision making. a) Expansion of the current operating project to increase life of mine. b) Stand-alone evaluation of the expansion project in a delay option case. c) Expansion option of concurrently bringing the two projects into production shortening life of mine evaluated with real options. The results for life of mine extension presented 12% increase from the current operating projects net present value with 28% internal rate of return. The delay option case yielded $9 million option value, requiring a 6% Cu-Ni price increase from the 2014 average London metal exchange. The expansion option valuation increasing production capacity resulted in a high option value of $286 million. This indicate a longer waiting period for expansion thus making the life of mine extension case the ideal scenario for expansion under real option evaluation. Keywords; Real options, Flexibility, Optimal investment timing, Binomial option pricing ______________________________________________ 1 MSc Student, Graduate School of Engineering and Resources Sciences, Akita University, 1-1 Tegata-Gakuenmachi Akita City, 010-0825, Japan. Email: dineo.sefemo@yahoo.com.Tel:(+8180-6010-1998 ) Fax: (+81-18-889-2468) Mineral Economics 2Proffessor, Faculty of International Resource Sciences, Akita University, Akita, 0101-0825, Japan