10,055 SF fit-up with an open ceiling concept, Spiral ductwork, barn doors, sealed concrete floors, LED pendants, reception brick veneer wall, cloud ceiling, black ACT, open office workstations, conference room projectors and TVs
2. The expansion consisted of 10,055 SF of first floor space. The design,
engineering and project management team were all local from the
Triangle area. Trinity Partners represented the Landlord.
4. WAITING ROOM
- SEALED CONCRETE
FLOORING EXPOSING THE
ORIGINAL CONDITION OF SLAB
FOR AN INDUSTRIAL THEME
- 96”x4”x4” WHITE LINEAR LED
LIGHTING FIXTURES BY
FINELITE
5. CATERING ROOM
• SLIDING BARN DOORS FOR THE MAJORITY OF
ROOMS
• QUARTZ COUNTERTOP FROM LG, COLOR
MINUET
• PLASTIC LAMINATE CABINETS/DRAWERS FROM
FORMICA, COLOR STORM TEAKWOOD
6. OPEN OFFICE
• OPEN CEILING CONCEPT WITH EXPOSED
CONDUIT, PLUMBING AND DUCTWORK
• CARPET INSERTS BY MILLIKEN, ARCADIA
TERRAIN, COLOR HALCYON WHERE
WORKSTATIONS ARE LOCATED
• DECK, PIPING AND CONDUIT PAINT IS
SHERWIN WILLIAMS, COLOR IRON ORE.
WALLS ARE SHERWIN WILLIAMS COLOR
REPOSE GRAY
8. • CARPET THROUGHOUT OFFICES AND
CONFERENCE ROOMS
• FLAT BLACK ACOUSTICAL TILES AND 2’x4’
LED LIGHT FIXTURES
• PROJECTORS AND TV’S FOR ALL
CONFERENCE ROOMS AND SOME OFFICES
• FLOOR BOXES FOR POWER AND DATA FOR
CONFERENCE ROOM FURNITURE FOR EASY
PLUG AND PLAY CAPABILITY
OFFICE & CONFERENCE ROOM