Ergonomics, Inc OM761 Zhiyun(Kevin) Kuang

Problem:
During the time Ergonomics is deciding when to include ERM issues in the new product
design process, as the new product team, we will make the decision choosing from one of
the four options.

Option:
We choose to wait to include all of the environmental concerns. AHP method confirms
our decision is correct.

Major Issues:
1. Opting to wait will cause problems for recycling and refurbishing.
2. Supplier A is financially strapped and experiencing some cash flow problems, opting
   to wait and finally not choose to cooperate with Supplier A might have adverse
   influence on the current business with Supplier A.
3. The Sage chair is constrained by a one-year deadline for release into the marketplace
   and full production ramp-up. Opting to wait will cause shorter time to develop the
   new chair.
4. Even waiting for a period of time, more environmental concerns will still come out.
   The new product still can not include every concern.

Recommendations:
1. Making two different designs based on two approaches (ERM or existence
   technologies) is appropriated.
2. Communicate with Supplier A and provide more information to them such as waiting
   time limitation and waiting goals. Providing more information will help them
   estimate how long they might experience the financial problem due to the R&D
   expense on new technologies.
3. Develop two possible designs for the new chair.
4. List the expectation of waiting and set an ultimate date for waiting, this will help to
   prevent losing profits without any control.

Limitations:
1. The product team may not have enough personnel and time to develop two designs
   during the time of waiting.
2. Supplier A could still have more severe financial problems if they don’t have the
   financial ability to endure during the time of waiting.
3. Same limitation if not enough resource to develop both designs.
4. It’s possible that in a short period of time, no environmental concerns can be
   concluded. Or, the concerns appear more obviously near the date of stopping waiting.
   It will cause another tradeoff situation.

More Related Content

Similar to Ergonomics

Practical approaches to address government contracting problems
Practical approaches to address government contracting problemsPractical approaches to address government contracting problems
Practical approaches to address government contracting problemsJohn Gilligan
 
Discussion Forum Week 5Hello Class! For this discussion you can c.docx
Discussion Forum Week 5Hello Class! For this discussion you can c.docxDiscussion Forum Week 5Hello Class! For this discussion you can c.docx
Discussion Forum Week 5Hello Class! For this discussion you can c.docxmickietanger
 
POM: Product design and development
POM: Product design and developmentPOM: Product design and development
POM: Product design and developmentKishor Tayade
 
Ethics in EngineeringLecture #2 Ethical Dilemmas, Cho
Ethics in EngineeringLecture #2 Ethical Dilemmas, ChoEthics in EngineeringLecture #2 Ethical Dilemmas, Cho
Ethics in EngineeringLecture #2 Ethical Dilemmas, ChoBetseyCalderon89
 
PCA13 Product Camp - Product Council
PCA13 Product Camp - Product CouncilPCA13 Product Camp - Product Council
PCA13 Product Camp - Product CouncilLance Ellisor
 
Product design and development
Product design and developmentProduct design and development
Product design and developmentKishor Tayade
 
Analyzing Project Failure Modes: Lessons learnt from the field
Analyzing Project Failure Modes: Lessons learnt from the fieldAnalyzing Project Failure Modes: Lessons learnt from the field
Analyzing Project Failure Modes: Lessons learnt from the fieldcssa
 
Back to the Future
Back to the FutureBack to the Future
Back to the Futurecssa
 
Product and service design
Product and service designProduct and service design
Product and service designGrace Falcis
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdfmengist4
 
Product design
Product designProduct design
Product designRaina Zia
 
3M optical systems case study solution of super five team team led by V.V.L.N...
3M optical systems case study solution of super five team team led by V.V.L.N...3M optical systems case study solution of super five team team led by V.V.L.N...
3M optical systems case study solution of super five team team led by V.V.L.N...Dr.V.V.L.N. Sastry
 
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...Phillip Chan
 
3-Product-and-Service-Design in operation management pptx
3-Product-and-Service-Design in operation management pptx3-Product-and-Service-Design in operation management pptx
3-Product-and-Service-Design in operation management pptxaljhuntapia
 

Similar to Ergonomics (20)

Practical approaches to address government contracting problems
Practical approaches to address government contracting problemsPractical approaches to address government contracting problems
Practical approaches to address government contracting problems
 
Discussion Forum Week 5Hello Class! For this discussion you can c.docx
Discussion Forum Week 5Hello Class! For this discussion you can c.docxDiscussion Forum Week 5Hello Class! For this discussion you can c.docx
Discussion Forum Week 5Hello Class! For this discussion you can c.docx
 
POM: Product design and development
POM: Product design and developmentPOM: Product design and development
POM: Product design and development
 
Pacific case
Pacific casePacific case
Pacific case
 
Production 2
Production 2Production 2
Production 2
 
Ethics in EngineeringLecture #2 Ethical Dilemmas, Cho
Ethics in EngineeringLecture #2 Ethical Dilemmas, ChoEthics in EngineeringLecture #2 Ethical Dilemmas, Cho
Ethics in EngineeringLecture #2 Ethical Dilemmas, Cho
 
H.Lumber.Group.Work
H.Lumber.Group.WorkH.Lumber.Group.Work
H.Lumber.Group.Work
 
PCA13 Product Camp - Product Council
PCA13 Product Camp - Product CouncilPCA13 Product Camp - Product Council
PCA13 Product Camp - Product Council
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
Analyzing Project Failure Modes: Lessons learnt from the field
Analyzing Project Failure Modes: Lessons learnt from the fieldAnalyzing Project Failure Modes: Lessons learnt from the field
Analyzing Project Failure Modes: Lessons learnt from the field
 
Back to the Future
Back to the FutureBack to the Future
Back to the Future
 
Product and service design
Product and service designProduct and service design
Product and service design
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
Product design
Product designProduct design
Product design
 
Project management
Project managementProject management
Project management
 
Project management
Project managementProject management
Project management
 
3M optical systems case study solution of super five team team led by V.V.L.N...
3M optical systems case study solution of super five team team led by V.V.L.N...3M optical systems case study solution of super five team team led by V.V.L.N...
3M optical systems case study solution of super five team team led by V.V.L.N...
 
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
 
Final Project.pptx
Final Project.pptxFinal Project.pptx
Final Project.pptx
 
3-Product-and-Service-Design in operation management pptx
3-Product-and-Service-Design in operation management pptx3-Product-and-Service-Design in operation management pptx
3-Product-and-Service-Design in operation management pptx
 

Ergonomics

  • 1. Ergonomics, Inc OM761 Zhiyun(Kevin) Kuang Problem: During the time Ergonomics is deciding when to include ERM issues in the new product design process, as the new product team, we will make the decision choosing from one of the four options. Option: We choose to wait to include all of the environmental concerns. AHP method confirms our decision is correct. Major Issues: 1. Opting to wait will cause problems for recycling and refurbishing. 2. Supplier A is financially strapped and experiencing some cash flow problems, opting to wait and finally not choose to cooperate with Supplier A might have adverse influence on the current business with Supplier A. 3. The Sage chair is constrained by a one-year deadline for release into the marketplace and full production ramp-up. Opting to wait will cause shorter time to develop the new chair. 4. Even waiting for a period of time, more environmental concerns will still come out. The new product still can not include every concern. Recommendations: 1. Making two different designs based on two approaches (ERM or existence technologies) is appropriated. 2. Communicate with Supplier A and provide more information to them such as waiting time limitation and waiting goals. Providing more information will help them estimate how long they might experience the financial problem due to the R&D expense on new technologies. 3. Develop two possible designs for the new chair. 4. List the expectation of waiting and set an ultimate date for waiting, this will help to prevent losing profits without any control. Limitations: 1. The product team may not have enough personnel and time to develop two designs during the time of waiting. 2. Supplier A could still have more severe financial problems if they don’t have the financial ability to endure during the time of waiting. 3. Same limitation if not enough resource to develop both designs. 4. It’s possible that in a short period of time, no environmental concerns can be concluded. Or, the concerns appear more obviously near the date of stopping waiting. It will cause another tradeoff situation.