Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
ABD WORK SERVICE
1. 0
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
L.H.S. R.H.S.
R.H.S.L.H.S.
BARA T POINT
DWG NO.
DRAWN BY
CHECKED BY (Const)
APPROVED BY (Q.A.)
APPROVED BY
LEGEND:
CULVERT/BRIDGE
PETROL PUMP
ROAD UNDER RLY BRIDGE
KILOMETER STONE
C COLLEGE/SCHOOL
RAILWAY CROSSING
BUS STAND/GOV. BUILDINGBS
PS POLICE STATION
HOSPITAL
INDUSTRIES
TAMPLE
WATER BODY
H HOTEL/DHABA
PLANTATIONS
GRAVE YARD
96-F-(RIBBON CABLE)
ROAD ALIGMENT
ET ELECTRIC TRANSFORMER
LC
JC
LOOP CHAMBER
JOINT CHAMBER
COUPLER
OTHER CABLE CROSSING
ROUTE INDICATOR
DUCT WITH SIMPLE PLUG
GI PIPE+PCC
ELECTRIC POLE
TELEPHONE POLE
DWC PIPE+PCC
OFC LAID GFGNL
(Design)
NOTE : -
ALL DIMENSONS ARE IN METERS
00
PROJECT :
NTS
SCALEREV.
ASBUILT DIAGRAM OF CIVIL WORK
1
Trench Distance = 250.00 Mtrs.
S
E
N
W ALL OVER DEPTH TO BE
CONSIDERED = 1.33
SHEET NO. 01
GREEN DUCT
BLUE DUCT
RED DUCT
BROWN DUCT
JOINT INDICATOR
DWC PIPE
GI PIPE
PCC
EHT
ROADWAY
48-F-(RIBBON CABLE)
JI
HDPE 40/33mm BLUE
HDPE 40mm RED 250.00
-
DWC PIPE Ø 63 MM -
G.I. PIPE Ø 63 MM -
HDPE 40/33mm GREEN -
ITEM DESCRIPTION IN Mtrs.
LENGTH
ITEM DESCRIPTION
QTY
IN Nos.
-
-
COUPLER 40mm
SIMPLE PLUG 40mm
HDPE END CAP 40mm
ROUTE INDICATOR
-
-LOOP CHAMBER
JOINT CHAMBER 1
BARA T
POINT TO
BARA GP
TO BARA GP
OPEN TRENCH
3 GDR016
HARD ROCK
GPS
22.89667,
74.04816
1.30 1.33
BARA T POINT TO BARA GP
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250
1.31 1.32 1.31 1.33 1.31 1.32 1.33 1.31 1.32 1.33 1.33 1.33 1.31 1.33 1.31 1.32 1.31 1.30 1.31 1.33 1.32 1.31 1.31 1.33
GPS
22.89679
74.04769
GPS
22.89684,
74.04717
GPS
22.89691,
74.04664
GPS
22.89695,
74.04619
GPS
22.89714,
74.04572
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
5.3 5.2 5.1
3.2 3.4 3.4 3.2 2.9 2.7 2.1 2.1 2.1 2.0 2.0 2.0 2.2 2.1 2.1 2.0 2.0 2.0 2.0 2.0 2.0 2.2 2.1
TJC
RM
RM-01
DISTRIBUTION ROUTE
RM
2. 0
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
L.H.S. R.H.S.
R.H.S.L.H.S.
DWG NO.
DRAWN BY
CHECKED BY (Const)
APPROVED BY (Q.A.)
APPROVED BY
LEGEND:
CULVERT/BRIDGE
PETROL PUMP
ROAD UNDER RLY BRIDGE
KILOMETER STONE
C COLLEGE/SCHOOL
RAILWAY CROSSING
BUS STAND/GOV. BUILDINGBS
PS POLICE STATION
HOSPITAL
INDUSTRIES
TAMPLE
WATER BODY
H HOTEL/DHABA
PLANTATIONS
GRAVE YARD
96-F-(RIBBON CABLE)
ROAD ALIGMENT
ET ELECTRIC TRANSFORMER
LC
JC
LOOP CHAMBER
JOINT CHAMBER
COUPLER
OTHER CABLE CROSSING
ROUTE INDICATOR
DUCT WITH SIMPLE PLUG
GI PIPE+PCC
ELECTRIC POLE
TELEPHONE POLE
DWC PIPE+PCC
OFC LAID GFGNL
(Design)
NOTE : -
ALL DIMENSONS ARE IN METERS
00
PROJECT :
NTS
SCALEREV.
ASBUILT DIAGRAM OF CIVIL WORK
2
Trench Distance = 210.00 Mtrs.
S
E
N
W
GREEN DUCT
BLUE DUCT
BROWN DUCT
JOINT INDICATOR
DWC PIPE
GI PIPE
PCC
EHT
ROADWAY
48-F-(RIBBON CABLE)
JI
HDPE 40/33mm BLUE -
DWC PIPE Ø 63 MM -
G.I. PIPE Ø 63 MM -
HDPE 40/33mm GREEN -
ITEM DESCRIPTION IN Mtrs.
LENGTH
ITEM DESCRIPTION
QTY
IN Nos.
-
1
COUPLER 40mm
SIMPLE PLUG 40mm
HDPE END CAP 40mm
ROUTE INDICATOR
-
-LOOP CHAMBER
JOINT CHAMBER -
OPEN TRENCH
-
HARD ROCK
260 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460270250
1.33 1.30 131 1.32 1.33 1.31 1.32 1.31 1.32 1.33 1.31 1.32 1.32 1.33 1.31 1.31 1.31 1.32 1.33 1.31 1.32 1.33
SHEET NO. 02
260
280
290
300
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
270
250
ALL OVER DEPTH TO BE
CONSIDERED = 1.33
2.0 2.1 2.1
2.9 2.2 2.2 2.0 1.8 1.7 1.9 1.9 2.0 2.1 2.1 2.2 2.2 2.3 2.2 2.0 2.2 2.4 2.4
TO BARA T POINT
RED DUCT
HDPE 40mm RED 210.00
BARA GP
GDR016
BARA T POINT TO BARA GP
BARA T
POINT TO
BARA GP
RM
RM-02
GPS
22.89714,
74.04572
DISTRIBUTION ROUTE
RM
GPS
22.89756,
74.04394