ILA and Ordinance for Industrial
Wastewater Pre-Treatment Program
for the City Council
November 25, 2013
Swap of Sewer Service Area (CCN)
Bio-Corridor Inter-Local Agreement
Industrial Wastewater
Pre-Treatment Program
• Required by:
– 40 CFR part 403 and 30 TAC Chapter 315

• Only if a city has ...
Provisions of
Proposed ILA
• Bryan will administer all day-to-day aspects of the IPP to
protect their wastewater system
• ...
Upcoming SlideShare
Loading in …5
×

Interlocal Agreement for Sewer Use and Pretreatment

298 views

Published on

Published in: News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
298
On SlideShare
0
From Embeds
0
Number of Embeds
125
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Interlocal Agreement for Sewer Use and Pretreatment

  1. 1. ILA and Ordinance for Industrial Wastewater Pre-Treatment Program for the City Council November 25, 2013
  2. 2. Swap of Sewer Service Area (CCN) Bio-Corridor Inter-Local Agreement
  3. 3. Industrial Wastewater Pre-Treatment Program • Required by: – 40 CFR part 403 and 30 TAC Chapter 315 • Only if a city has certain types of industrial customers • Formal program to control/monitor WW discharges • Run by the TX Commission on Environmental Quality • Bryan is required to have an IPP • College Station is NOT • CS must assist Bryan within the CS City Limits • Bryan City Council approved the ILA on Nov 18th
  4. 4. Provisions of Proposed ILA • Bryan will administer all day-to-day aspects of the IPP to protect their wastewater system • However, Bryan does not have legal jurisdiction with the College Station City limits • CS will take legal enforcement actions if required • College Station must adopt all of Bryan’s IPP ordinances to be applicable only where Bryan provides sewer service inside CS City limits • Our Ordinance needs TCEQ review and approval • Will likely need to revise the Ordinance in the near future

×