SlideShare a Scribd company logo
1 of 1
Download to read offline
Lifting Operations and Lifting
Equipment Regulations 1998 (LOLER)
and Provision and Use of Work
Equipment Regulations 1998 (PUWER)
Gas appliances
/ boilers
Air receivers
Oil/fuel storage tanks
Petrol pumps
Electrical system inspection
Electricity at Work Regulations 1989
Portable Appliance Testing*
Paint/spray booths/ovens
Control of Substances Hazardous to
Health Regulations 2002 (COSHH)
Exhaust fume extraction units
Control of Substances Hazardous to
Health Regulations 2002 (COSHH)**
Pressure
vessels
Others
Lifting
equipment
Motor vehicle lifting tables
Lifting tackle (slings etc)
Relevant legislation:
Pressure Systems Safety
Regulations 2000 (PSSR).
Gas Safety (Installation and
Use) Regulations 1998
Approved Code of Practice
Motor trade renewal date
For an alternative quote on your insurance or inspection requirements, please give us a call
Aston Scott Group combines the commercial insurance skills of Aston Scott Ltd with the risk management expertise of ASG Risk Management Ltd. Aston Scott Group plc is registered in England and Wales,
No. 5639290. Registered office: Malling House, West Malling, Kent, ME19 6QL. Aston Scott Ltd is authorised and regulated by the Financial Conduct Authority (Reg No. 308048).
Tel: 01732 872899 | westmalling@astonscott.com | www.astonscott.com
Inspection contract renewal
Bottle jacks
Trolley jacks
Engine hoists
Axle stands*
Spectacle lifts
Breakdown cranes (on lorry)
PS
WS
PS
14
126
6
12
14
26
PS
* Recommended	 ** 6 months for shot blasting units
6 months
12 months
14 months
26 months
Please speak with us
inspection
requirements
This is intended as a guide only. The regulations can be complex and we recommend you take expert advice to ensure compliance.
Please speak with is if you are uncertain about the regulatory requirements for any specific piece of equipment.
WS Written scheme of
examination required.

More Related Content

Similar to Motor-Trade-Graphic-FINAL

ENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.ppt
ENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.pptENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.ppt
ENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.pptJoeDragOn2
 
Tr60 tier3 operator manual
Tr60 tier3 operator manualTr60 tier3 operator manual
Tr60 tier3 operator manualEbrahim Sabouri
 
Safety of cross country pipelines
Safety of cross country pipelinesSafety of cross country pipelines
Safety of cross country pipelinesajal jose
 
Applicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unitApplicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unitWintry Textile & Engg co.
 
Complete ppt on companies (cost records and audit) amended rules,2014..
Complete ppt on companies (cost records and audit) amended rules,2014..Complete ppt on companies (cost records and audit) amended rules,2014..
Complete ppt on companies (cost records and audit) amended rules,2014..Manish Kandpal
 
Catálogo-Yarmax Power.pdf
Catálogo-Yarmax Power.pdfCatálogo-Yarmax Power.pdf
Catálogo-Yarmax Power.pdfElvisCulma
 
September 2015 EHS Regulatory Update
September 2015 EHS Regulatory UpdateSeptember 2015 EHS Regulatory Update
September 2015 EHS Regulatory Updatedhuxl
 
Cost audit & records statutory compliances
Cost audit & records   statutory compliancesCost audit & records   statutory compliances
Cost audit & records statutory compliancesVAIBHAVBANSAL73
 
04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx
04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx
04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docxHRDFCI
 
Cost audit Report & Record Rules 2014
Cost audit Report & Record Rules  2014Cost audit Report & Record Rules  2014
Cost audit Report & Record Rules 2014Darshan Vora
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docMirza Saifullah Baig
 
Fma 1967 & the regulations
Fma 1967 & the regulationsFma 1967 & the regulations
Fma 1967 & the regulationsLucynda Ho
 
Enhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulationsEnhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulationsRidzwan Hj Hussain
 
Cost Audit under CA, 2013
Cost Audit under CA, 2013Cost Audit under CA, 2013
Cost Audit under CA, 2013Praveen Soni
 
Tier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptx
Tier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptxTier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptx
Tier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptxe05dinuka
 
Investor presentation deck q1 v2 short
Investor presentation deck q1 v2 shortInvestor presentation deck q1 v2 short
Investor presentation deck q1 v2 shortEd Stahl
 

Similar to Motor-Trade-Graphic-FINAL (20)

ENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.ppt
ENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.pptENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.ppt
ENT300_Module06 - BUSINESS REGULATIONS AND SUPPORT.ppt
 
Regulatory regime
Regulatory regimeRegulatory regime
Regulatory regime
 
Tr60 tier3 operator manual
Tr60 tier3 operator manualTr60 tier3 operator manual
Tr60 tier3 operator manual
 
Safety of cross country pipelines
Safety of cross country pipelinesSafety of cross country pipelines
Safety of cross country pipelines
 
Applicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unitApplicable laws or legal requirements for textile unit
Applicable laws or legal requirements for textile unit
 
Complete ppt on companies (cost records and audit) amended rules,2014..
Complete ppt on companies (cost records and audit) amended rules,2014..Complete ppt on companies (cost records and audit) amended rules,2014..
Complete ppt on companies (cost records and audit) amended rules,2014..
 
Catálogo-Yarmax Power.pdf
Catálogo-Yarmax Power.pdfCatálogo-Yarmax Power.pdf
Catálogo-Yarmax Power.pdf
 
September 2015 EHS Regulatory Update
September 2015 EHS Regulatory UpdateSeptember 2015 EHS Regulatory Update
September 2015 EHS Regulatory Update
 
Cost audit & records statutory compliances
Cost audit & records   statutory compliancesCost audit & records   statutory compliances
Cost audit & records statutory compliances
 
04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx
04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx
04_Identifikasi_Peraturan_LL_dan_K3 (4).id.en.docx
 
Cost audit Report & Record Rules 2014
Cost audit Report & Record Rules  2014Cost audit Report & Record Rules  2014
Cost audit Report & Record Rules 2014
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
Fma 1967 & the regulations
Fma 1967 & the regulationsFma 1967 & the regulations
Fma 1967 & the regulations
 
Enhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulationsEnhancement module lecture 4-fma and regulations
Enhancement module lecture 4-fma and regulations
 
Cost Audit under CA, 2013
Cost Audit under CA, 2013Cost Audit under CA, 2013
Cost Audit under CA, 2013
 
Tier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptx
Tier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptxTier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptx
Tier 4 Final Emissions Regulations for Electric Power_SIB_no notes_ar 1.pptx
 
Fma 1967 & the regulations
Fma 1967 & the regulationsFma 1967 & the regulations
Fma 1967 & the regulations
 
ute engenharia
 ute engenharia  ute engenharia
ute engenharia
 
Fact_sheet_UK
Fact_sheet_UKFact_sheet_UK
Fact_sheet_UK
 
Investor presentation deck q1 v2 short
Investor presentation deck q1 v2 shortInvestor presentation deck q1 v2 short
Investor presentation deck q1 v2 short
 

More from Chris Evans

aston-scott-awarded-chartered-status
aston-scott-awarded-chartered-statusaston-scott-awarded-chartered-status
aston-scott-awarded-chartered-statusChris Evans
 
NAMA-Certificate-of-Membership-2015
NAMA-Certificate-of-Membership-2015NAMA-Certificate-of-Membership-2015
NAMA-Certificate-of-Membership-2015Chris Evans
 
Contract Guarantee Bonds
Contract Guarantee BondsContract Guarantee Bonds
Contract Guarantee BondsChris Evans
 
Cyber liability FINAL
Cyber liability FINALCyber liability FINAL
Cyber liability FINALChris Evans
 
Motor Trade referral letter - exisiting clients
Motor Trade referral letter - exisiting clientsMotor Trade referral letter - exisiting clients
Motor Trade referral letter - exisiting clientsChris Evans
 

More from Chris Evans (6)

£100
£100£100
£100
 
aston-scott-awarded-chartered-status
aston-scott-awarded-chartered-statusaston-scott-awarded-chartered-status
aston-scott-awarded-chartered-status
 
NAMA-Certificate-of-Membership-2015
NAMA-Certificate-of-Membership-2015NAMA-Certificate-of-Membership-2015
NAMA-Certificate-of-Membership-2015
 
Contract Guarantee Bonds
Contract Guarantee BondsContract Guarantee Bonds
Contract Guarantee Bonds
 
Cyber liability FINAL
Cyber liability FINALCyber liability FINAL
Cyber liability FINAL
 
Motor Trade referral letter - exisiting clients
Motor Trade referral letter - exisiting clientsMotor Trade referral letter - exisiting clients
Motor Trade referral letter - exisiting clients
 

Motor-Trade-Graphic-FINAL

  • 1. Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) and Provision and Use of Work Equipment Regulations 1998 (PUWER) Gas appliances / boilers Air receivers Oil/fuel storage tanks Petrol pumps Electrical system inspection Electricity at Work Regulations 1989 Portable Appliance Testing* Paint/spray booths/ovens Control of Substances Hazardous to Health Regulations 2002 (COSHH) Exhaust fume extraction units Control of Substances Hazardous to Health Regulations 2002 (COSHH)** Pressure vessels Others Lifting equipment Motor vehicle lifting tables Lifting tackle (slings etc) Relevant legislation: Pressure Systems Safety Regulations 2000 (PSSR). Gas Safety (Installation and Use) Regulations 1998 Approved Code of Practice Motor trade renewal date For an alternative quote on your insurance or inspection requirements, please give us a call Aston Scott Group combines the commercial insurance skills of Aston Scott Ltd with the risk management expertise of ASG Risk Management Ltd. Aston Scott Group plc is registered in England and Wales, No. 5639290. Registered office: Malling House, West Malling, Kent, ME19 6QL. Aston Scott Ltd is authorised and regulated by the Financial Conduct Authority (Reg No. 308048). Tel: 01732 872899 | westmalling@astonscott.com | www.astonscott.com Inspection contract renewal Bottle jacks Trolley jacks Engine hoists Axle stands* Spectacle lifts Breakdown cranes (on lorry) PS WS PS 14 126 6 12 14 26 PS * Recommended ** 6 months for shot blasting units 6 months 12 months 14 months 26 months Please speak with us inspection requirements This is intended as a guide only. The regulations can be complex and we recommend you take expert advice to ensure compliance. Please speak with is if you are uncertain about the regulatory requirements for any specific piece of equipment. WS Written scheme of examination required.