Valley Crest is a large landscape and site construction company that has expanded into central Florida. Their Orlando location has completed several large projects for Disney, including landscaping for hotels and theme parks. They are currently transforming 800 acres for Disney's Animal Kingdom theme park. The article also briefly describes a project Valley Crest completed to landscape the California Speedway racetrack within 150 days, installing turf, trees and irrigation across the large site.
Commerce Resources Corp. (TSXv: CCE) announced that drilling is underway on the company's Eldor Tantalum-Niobium and Rare Earth Element Project located in northern Quebec. Up to 15 holes totaling 3,000 meters will be completed. The exploration program will also include prospecting, mapping, soil sampling, a ground magnetic survey and trenching.
Peter Parsons is a partner at Farris LLP who specializes in labour and employment law. He represents several pulp and paper mills in British Columbia as well as forest companies, logging operations, and sawmills. Peter is a member of the Vancouver and Canadian Bar Associations and has received high ratings from Martindale-Hubbell for his legal abilities.
Commerce Resources Corp. (TSXv: CCE, FSE: D7H, OTCQX: CMRZF) reports that it is nearing completion of its winter drilling program at the Ashram Rare Earth Element Deposit at the Eldor Property in northern Quebec.
The drilling was designed to expand the deposit by testing the northeastern half of the Ashram Zone as well as expanding its depth extent with deeper drilling. Drilling also aimed to continue to define areas where significant near-surface enrichment in the valuable, middle and heavy REEs were encountered in 2010.
Irene Ward has over 20 years of experience in land negotiation and management for oil and gas companies. She has successfully acquired mineral rights and negotiated contracts in multiple states. Her roles have included lead landman, regional land manager, and staff land negotiator for various energy companies. Ward has strong skills in negotiations, regulatory permitting, and using land systems like GIS to manage oil and gas properties.
The document contains summaries of various architectural projects including:
1) The largest green roof in the world covering Ford's truck assembly plant in Michigan.
2) Hyundai KIA's technical center in Michigan housing R&D offices and labs.
3) A highly classified 50,000 sq ft facility in Georgia with advanced security and fire suppression.
4) The multi-billion dollar CityCenter complex in Las Vegas with hotels, casinos, residences and retail.
Port Royal Holdings, LLC announced plans to develop a $145 million waterpark resort and conference center in Jasper, Pickens County, Georgia. The resort will include a 400-room hotel, indoor and outdoor waterparks, restaurants, meeting spaces, and other amenities spread across 176 acres. It is projected to create over 1,200 construction jobs and 1,000 permanent positions, in addition to generating millions in tax revenue for the local economy. The development team aims to break ground in 2014 and open in 2016.
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Sam Stribling
The document summarizes an award-winning mine reclamation project in Raton, New Mexico led by 814 Solutions, LLC. 814 Solutions was responsible for creating and implementing erosion control plans, amending soils, seeding, and planting materials harvested onsite. Challenges included limited workspace and preserving archaeological sites. Onsite materials like wood waste were repurposed as compost and for erosion control. The project restored creek channels and vegetation to the pre-mining landscape. 814 Solutions was recognized for their successful reclamation work.
Commerce Resources Corp. (TSXv: CCE) announced that drilling is underway on the company's Eldor Tantalum-Niobium and Rare Earth Element Project located in northern Quebec. Up to 15 holes totaling 3,000 meters will be completed. The exploration program will also include prospecting, mapping, soil sampling, a ground magnetic survey and trenching.
Peter Parsons is a partner at Farris LLP who specializes in labour and employment law. He represents several pulp and paper mills in British Columbia as well as forest companies, logging operations, and sawmills. Peter is a member of the Vancouver and Canadian Bar Associations and has received high ratings from Martindale-Hubbell for his legal abilities.
Commerce Resources Corp. (TSXv: CCE, FSE: D7H, OTCQX: CMRZF) reports that it is nearing completion of its winter drilling program at the Ashram Rare Earth Element Deposit at the Eldor Property in northern Quebec.
The drilling was designed to expand the deposit by testing the northeastern half of the Ashram Zone as well as expanding its depth extent with deeper drilling. Drilling also aimed to continue to define areas where significant near-surface enrichment in the valuable, middle and heavy REEs were encountered in 2010.
Irene Ward has over 20 years of experience in land negotiation and management for oil and gas companies. She has successfully acquired mineral rights and negotiated contracts in multiple states. Her roles have included lead landman, regional land manager, and staff land negotiator for various energy companies. Ward has strong skills in negotiations, regulatory permitting, and using land systems like GIS to manage oil and gas properties.
The document contains summaries of various architectural projects including:
1) The largest green roof in the world covering Ford's truck assembly plant in Michigan.
2) Hyundai KIA's technical center in Michigan housing R&D offices and labs.
3) A highly classified 50,000 sq ft facility in Georgia with advanced security and fire suppression.
4) The multi-billion dollar CityCenter complex in Las Vegas with hotels, casinos, residences and retail.
Port Royal Holdings, LLC announced plans to develop a $145 million waterpark resort and conference center in Jasper, Pickens County, Georgia. The resort will include a 400-room hotel, indoor and outdoor waterparks, restaurants, meeting spaces, and other amenities spread across 176 acres. It is projected to create over 1,200 construction jobs and 1,000 permanent positions, in addition to generating millions in tax revenue for the local economy. The development team aims to break ground in 2014 and open in 2016.
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Sam Stribling
The document summarizes an award-winning mine reclamation project in Raton, New Mexico led by 814 Solutions, LLC. 814 Solutions was responsible for creating and implementing erosion control plans, amending soils, seeding, and planting materials harvested onsite. Challenges included limited workspace and preserving archaeological sites. Onsite materials like wood waste were repurposed as compost and for erosion control. The project restored creek channels and vegetation to the pre-mining landscape. 814 Solutions was recognized for their successful reclamation work.
Port Royal Holdings, LLC announced plans to develop a $145 million waterpark resort and conference center in Jasper, Pickens County, Georgia. The resort will include a 400-room hotel, indoor and outdoor waterparks, restaurants, meeting spaces, and other amenities spread across 176 acres. It is projected to create over 1,200 construction jobs and 1,000 permanent positions, generating $11.9 million annually in tax revenue. The developers aim to break ground in 2014 and open in 2016.
A new pipeline is being constructed to deliver cool water from the Hudson River to help cool the World Trade Center site. The pipeline will deliver up to 30,000 gallons of water per minute to the site's new chiller plant. The $200 million chiller plant will use the water to cool various public spaces being constructed at the site, including the memorial museum and transportation hub. Environmentalists had objected to the original plan to use river water to cool the entire complex, but agreed that the new reduced plan would significantly decrease the number of fish impacted.
The Facebook headquarters in Menlo Park, California consists of eight buildings totaling 1,266,790 square feet across a 1,533,840 square foot site. The buildings have a floor area ratio of 0.7 and are three stories or 40 feet tall. Parking is provided for 1,572 vehicles with a ratio of 1.2 spaces per 1,000 square feet. Open space totals 11 acres across the landscaped site.
The article discusses the new Rogers Place arena and ICE District development in Edmonton, Alberta. The $2 billion project includes the 819,000 square foot Rogers Place arena, 1.3 million square feet of office space, over 1,000 residential units, 70,000 square feet of retail space, and a 356-room JW Marriott hotel. The development is a public-private partnership between the City of Edmonton and the Katz Group, owners of the Edmonton Oilers NHL team, and is seen as catalyzing other development in the downtown core.
The document describes several significant landscape architecture and design projects completed by W. Palmer over 30 years of experience. Key projects include The Wild Center in Tupper Lake, NY, which used water features and trails to connect ecosystems. The AT&T Global Network Operations Center featured landscaping elements representing continents and data flows. Battery Park City Ballfields in NYC provided much-needed sports fields after 9/11 with sustainable design.
The Lawn Club on Celebrity Solstice opened in 2008, featuring the first real grass lawn on a cruise ship. The half-acre lawn allows guests to enjoy activities like bocce ball, croquet, and putting, as well as relaxing on the grass while sailing the oceans. Extensive research was conducted to determine grass varieties that could withstand winds, temperatures, foot traffic, and other stresses of being on a ship at sea. The project involved landscape architects, irrigation specialists, and turf scientists to design, install, and maintain the green roof system keeping the grass alive while sailing globally.
This document provides information on Mariano Corral, a landscape architect based in Miami, Florida. It includes his contact information and descriptions of several projects he has worked on. Some of the major projects mentioned are the design of parks and landscapes for churches, cities, airports, and residential communities. The budgets for the projects range from hundreds of thousands to tens of millions of dollars. Locations of the projects include Florida, the Bahamas, Ecuador, New York, and Venezuela.
This document provides a portfolio of selected projects for an architecture and design firm. It includes summaries and photos of various completed and in-progress projects including an environmental nature center, streetscape redevelopments, urban design studies, landscape architectural designs for parks and outdoor spaces, and master plans for communities. The projects cover a range of scales and locations in California and other areas.
Canada: Calgary: Currie Barracks Goes Green with Rain GardensSotirakou964
The developers of the Currie Barracks residential neighborhood in Calgary implemented an award-winning urban stormwater management system using low-impact development techniques such as rain gardens, vegetated swales, and gravel infiltration trenches to manage stormwater runoff in an environmentally-friendly way. The system allows rainwater to soak into the ground rather than running off into streams or the storm sewer system, reducing pollution and preventing flooding. It has transformed underused areas of the former military base into a model of sustainable stormwater management.
TSWAlloy Wheels sold its Huntington Beach headquarters building for $10 million to move to a larger location in Brea. The 62,639 square foot industrial building was purchased by an affiliate of Zadro Products, another manufacturer based in Huntington Beach. With low vacancy and high demand driving up prices in Orange County, TSWAlloy Wheels was able to get $160 per square foot for the building. TSWAlloy Wheels will relocate its operations to a new 155,000 square foot building in Brea that it purchased for an estimated $21 million.
Ken Dart founded his family investment group Dart Management in the Cayman Islands in 1993 after falling in love with the island during family vacations. He began developing the massive 600-acre Camana Bay master-planned community on Grand Cayman in 2005, with the goal of establishing the Cayman Islands as a premier financial center and destination. Camana Bay employs the urban planning concept of new urbanism, featuring a walkable town center surrounded by mixed uses. It has been highly successful, attracting major tenants and helping retain expatriate financial professionals by offering an amenity-rich community. Dart plans to continue expanding Camana Bay with additional phases costing over $1 billion, establishing a lasting legacy for his family in the Caymans.
The Cascade and Chinook oil fields in the Gulf of Mexico were discovered deeper than originally planned. They contain oil in high-pressure reservoirs in the Lower Tertiary formation. Petrobras developed an innovative plan to produce the oil using subsea wells connected to the first floating production, storage and offloading vessel (FPSO) in the Gulf of Mexico. The FPSO processes and stores the oil offshore before tankers transport it to shore, providing a flexible production system for the remote and high-pressure reservoirs.
The Cascade and Chinook project is developing two ultra-deepwater oil fields in the Gulf of Mexico using innovative technologies. Petrobras is using a phased development approach with subsea wells connected to the first floating production, storage and offloading (FPSO) vessel in the Gulf of Mexico. This will allow for flexible production of oil from the remote fields located in over 8,000 feet of water. The multi-phase plan processes oil and gas aboard the FPSO before offloading via shuttle tankers and pipelines. This pioneering project safely pushes the boundaries of deepwater exploration and production.
The document summarizes several reclamation and restoration projects completed by Western States Reclamation, Inc. (WSRI) in 2014-2015. It describes projects to rebuild an eroded riverbank in Greeley, Colorado; reclaim an 800-acre pipeline right-of-way in Wyoming; reclaim oil and gas well pad stockpiles to restore native grasslands in Pawnee Buttes National Grassland; and create a nature park along the Poudre River as part of a new technology campus development in Fort Collins, Colorado. It also announces that WSRI achieved a perfect safety record with no OSHA violations in 2014.
The document summarizes a project where CEC helped Industrial Scientific Corporation consolidate their headquarters into a single new building in Pittsburgh, Pennsylvania. Some key points:
- Industrial Scientific was previously spread across four buildings which caused inefficiencies; the new building consolidated their operations into a single 204,000 square foot building.
- CEC helped find a suitable site and handled various engineering challenges for developing the property, including stabilizing previously mined land and designing utilities and stormwater management.
- The new building allows Industrial Scientific to improve collaboration between employees and implement more flexible manufacturing operations to better handle peak demand.
CN will start serving a new 550,000 ton per year frac sand transloading terminal north of Grande Prairie, Alberta in November 2013. The new facility built by Di-Corp will have an annual throughput capacity of 550,000 tons of frac sand and be able to hold 44 rail cars for unloading. Di-Corp and CN expect growing demand for frac sand in Western Canada's oil and gas industry. CN aims to help customers like Di-Corp move more frac sand through terminals and other infrastructure improvements.
This document summarizes the redevelopment of the former Buick City site in Flint, Michigan. The 394-acre site was originally developed in 1903 for automobile production and housed various manufacturing plants until 2010. American SpiralWeld Pipe Co. purchased 18 acres of the brownfield site and built a 180,000 square foot facility, pledging to create 60 new jobs. This is the first company to redevelop the Buick City site, and redevelopment is ongoing with the goal of creating further investment and jobs in the Flint region.
Lee County, Iowa had struggled economically for years but has recently experienced a resurgence due to new manufacturing and renewable energy jobs. The $1.8 billion Iowa Fertilizer Co. plant currently under construction is one of the largest in the Midwest and will create over 700 indirect jobs and 165 permanent jobs. Altorfer Power Systems and International Supply Co. worked together to install backup generators at the plant, overcoming challenges from the large scale of the construction site. A CAT C175-20 generator was the first of its kind installed by Altorfer and will help ensure a reliable power supply for the fertilizer plant.
The Gardens by the Mandalay Towers in Irving, Texas underwent a redesign to update the dated hardscape and enhance the tenant experience. The goal was to create an outdoor living space for tenants as if in their own yard, connecting the indoor and outdoor spaces. The original 1970s roof garden was reimagined with rolling greens, an outdoor kitchen, fire pit, koi pond, fountain, and seating areas to make an inviting space for meetings, celebrations, or relaxation with views from surrounding offices. Before and after images show the transformation from mostly paved surfaces with limited seating to a landscaped park-like setting.
Port Royal Holdings, LLC announced plans to develop a $145 million waterpark resort and conference center in Jasper, Pickens County, Georgia. The resort will include a 400-room hotel, indoor and outdoor waterparks, restaurants, meeting spaces, and other amenities spread across 176 acres. It is projected to create over 1,200 construction jobs and 1,000 permanent positions, generating $11.9 million annually in tax revenue. The developers aim to break ground in 2014 and open in 2016.
A new pipeline is being constructed to deliver cool water from the Hudson River to help cool the World Trade Center site. The pipeline will deliver up to 30,000 gallons of water per minute to the site's new chiller plant. The $200 million chiller plant will use the water to cool various public spaces being constructed at the site, including the memorial museum and transportation hub. Environmentalists had objected to the original plan to use river water to cool the entire complex, but agreed that the new reduced plan would significantly decrease the number of fish impacted.
The Facebook headquarters in Menlo Park, California consists of eight buildings totaling 1,266,790 square feet across a 1,533,840 square foot site. The buildings have a floor area ratio of 0.7 and are three stories or 40 feet tall. Parking is provided for 1,572 vehicles with a ratio of 1.2 spaces per 1,000 square feet. Open space totals 11 acres across the landscaped site.
The article discusses the new Rogers Place arena and ICE District development in Edmonton, Alberta. The $2 billion project includes the 819,000 square foot Rogers Place arena, 1.3 million square feet of office space, over 1,000 residential units, 70,000 square feet of retail space, and a 356-room JW Marriott hotel. The development is a public-private partnership between the City of Edmonton and the Katz Group, owners of the Edmonton Oilers NHL team, and is seen as catalyzing other development in the downtown core.
The document describes several significant landscape architecture and design projects completed by W. Palmer over 30 years of experience. Key projects include The Wild Center in Tupper Lake, NY, which used water features and trails to connect ecosystems. The AT&T Global Network Operations Center featured landscaping elements representing continents and data flows. Battery Park City Ballfields in NYC provided much-needed sports fields after 9/11 with sustainable design.
The Lawn Club on Celebrity Solstice opened in 2008, featuring the first real grass lawn on a cruise ship. The half-acre lawn allows guests to enjoy activities like bocce ball, croquet, and putting, as well as relaxing on the grass while sailing the oceans. Extensive research was conducted to determine grass varieties that could withstand winds, temperatures, foot traffic, and other stresses of being on a ship at sea. The project involved landscape architects, irrigation specialists, and turf scientists to design, install, and maintain the green roof system keeping the grass alive while sailing globally.
This document provides information on Mariano Corral, a landscape architect based in Miami, Florida. It includes his contact information and descriptions of several projects he has worked on. Some of the major projects mentioned are the design of parks and landscapes for churches, cities, airports, and residential communities. The budgets for the projects range from hundreds of thousands to tens of millions of dollars. Locations of the projects include Florida, the Bahamas, Ecuador, New York, and Venezuela.
This document provides a portfolio of selected projects for an architecture and design firm. It includes summaries and photos of various completed and in-progress projects including an environmental nature center, streetscape redevelopments, urban design studies, landscape architectural designs for parks and outdoor spaces, and master plans for communities. The projects cover a range of scales and locations in California and other areas.
Canada: Calgary: Currie Barracks Goes Green with Rain GardensSotirakou964
The developers of the Currie Barracks residential neighborhood in Calgary implemented an award-winning urban stormwater management system using low-impact development techniques such as rain gardens, vegetated swales, and gravel infiltration trenches to manage stormwater runoff in an environmentally-friendly way. The system allows rainwater to soak into the ground rather than running off into streams or the storm sewer system, reducing pollution and preventing flooding. It has transformed underused areas of the former military base into a model of sustainable stormwater management.
TSWAlloy Wheels sold its Huntington Beach headquarters building for $10 million to move to a larger location in Brea. The 62,639 square foot industrial building was purchased by an affiliate of Zadro Products, another manufacturer based in Huntington Beach. With low vacancy and high demand driving up prices in Orange County, TSWAlloy Wheels was able to get $160 per square foot for the building. TSWAlloy Wheels will relocate its operations to a new 155,000 square foot building in Brea that it purchased for an estimated $21 million.
Ken Dart founded his family investment group Dart Management in the Cayman Islands in 1993 after falling in love with the island during family vacations. He began developing the massive 600-acre Camana Bay master-planned community on Grand Cayman in 2005, with the goal of establishing the Cayman Islands as a premier financial center and destination. Camana Bay employs the urban planning concept of new urbanism, featuring a walkable town center surrounded by mixed uses. It has been highly successful, attracting major tenants and helping retain expatriate financial professionals by offering an amenity-rich community. Dart plans to continue expanding Camana Bay with additional phases costing over $1 billion, establishing a lasting legacy for his family in the Caymans.
The Cascade and Chinook oil fields in the Gulf of Mexico were discovered deeper than originally planned. They contain oil in high-pressure reservoirs in the Lower Tertiary formation. Petrobras developed an innovative plan to produce the oil using subsea wells connected to the first floating production, storage and offloading vessel (FPSO) in the Gulf of Mexico. The FPSO processes and stores the oil offshore before tankers transport it to shore, providing a flexible production system for the remote and high-pressure reservoirs.
The Cascade and Chinook project is developing two ultra-deepwater oil fields in the Gulf of Mexico using innovative technologies. Petrobras is using a phased development approach with subsea wells connected to the first floating production, storage and offloading (FPSO) vessel in the Gulf of Mexico. This will allow for flexible production of oil from the remote fields located in over 8,000 feet of water. The multi-phase plan processes oil and gas aboard the FPSO before offloading via shuttle tankers and pipelines. This pioneering project safely pushes the boundaries of deepwater exploration and production.
The document summarizes several reclamation and restoration projects completed by Western States Reclamation, Inc. (WSRI) in 2014-2015. It describes projects to rebuild an eroded riverbank in Greeley, Colorado; reclaim an 800-acre pipeline right-of-way in Wyoming; reclaim oil and gas well pad stockpiles to restore native grasslands in Pawnee Buttes National Grassland; and create a nature park along the Poudre River as part of a new technology campus development in Fort Collins, Colorado. It also announces that WSRI achieved a perfect safety record with no OSHA violations in 2014.
The document summarizes a project where CEC helped Industrial Scientific Corporation consolidate their headquarters into a single new building in Pittsburgh, Pennsylvania. Some key points:
- Industrial Scientific was previously spread across four buildings which caused inefficiencies; the new building consolidated their operations into a single 204,000 square foot building.
- CEC helped find a suitable site and handled various engineering challenges for developing the property, including stabilizing previously mined land and designing utilities and stormwater management.
- The new building allows Industrial Scientific to improve collaboration between employees and implement more flexible manufacturing operations to better handle peak demand.
CN will start serving a new 550,000 ton per year frac sand transloading terminal north of Grande Prairie, Alberta in November 2013. The new facility built by Di-Corp will have an annual throughput capacity of 550,000 tons of frac sand and be able to hold 44 rail cars for unloading. Di-Corp and CN expect growing demand for frac sand in Western Canada's oil and gas industry. CN aims to help customers like Di-Corp move more frac sand through terminals and other infrastructure improvements.
This document summarizes the redevelopment of the former Buick City site in Flint, Michigan. The 394-acre site was originally developed in 1903 for automobile production and housed various manufacturing plants until 2010. American SpiralWeld Pipe Co. purchased 18 acres of the brownfield site and built a 180,000 square foot facility, pledging to create 60 new jobs. This is the first company to redevelop the Buick City site, and redevelopment is ongoing with the goal of creating further investment and jobs in the Flint region.
Lee County, Iowa had struggled economically for years but has recently experienced a resurgence due to new manufacturing and renewable energy jobs. The $1.8 billion Iowa Fertilizer Co. plant currently under construction is one of the largest in the Midwest and will create over 700 indirect jobs and 165 permanent jobs. Altorfer Power Systems and International Supply Co. worked together to install backup generators at the plant, overcoming challenges from the large scale of the construction site. A CAT C175-20 generator was the first of its kind installed by Altorfer and will help ensure a reliable power supply for the fertilizer plant.
The Gardens by the Mandalay Towers in Irving, Texas underwent a redesign to update the dated hardscape and enhance the tenant experience. The goal was to create an outdoor living space for tenants as if in their own yard, connecting the indoor and outdoor spaces. The original 1970s roof garden was reimagined with rolling greens, an outdoor kitchen, fire pit, koi pond, fountain, and seating areas to make an inviting space for meetings, celebrations, or relaxation with views from surrounding offices. Before and after images show the transformation from mostly paved surfaces with limited seating to a landscaped park-like setting.
1. candscape sooundaries in Florida
By RON HALL/ Managing
Editor
alley Crest is expanding the
traditional view of landscape
contracting. The "contracting"
part gets bigger and bigger.
"Landscaping now is, maybe, 50 per-
cent of our business," says Charles Parker,
operations manager of the Valley Crest lo-
cation in Orlando. "Concrete and related
site work make up the balance."
Valley Crest is the nation's largest land-
scape and site construction company. Or-
lando is one of nine company locations in
the United States. The central Florida op-
eration is coming off of a $30 million year.
But everything seems to be getting bigger
in central Florida in the 1990s.
Orlando, of course, is home to mega-at-
tractions like Disney World, Universal Stu-
dios, and Sea World. All are beautifully
and massively landscaped. They're pres-
ence has dramatically changed the local
landscape industry. Both its scope and its
quality.
Valley Crest is among a handful of cen-
tral Florida companies capable of delivering
the "big" landscape project. This, at first
view, is remarkable since Valley Crest has
competed in central Florida only since
about 1992. It entered that market by pur-
chasing Oyler Construction. (Tom Oyler
remains part of the overall operation with
sister company U.S. Lawns.)
Parker began managing the Orlando lo-
Charles Parker, operations manager for Val-
ley Crest in Orlando, says he sometimes
feels 'like a kid in a candy store'.
Valley Crest has the personnel to tackle
tough jobs like this themed concrete work
at a hotel at Walt Disney World.
cation about four years ago. He credits
much of the Orlando site's rapid growth to
the vision of Valley Crest President
Richard Sperber, and the experience and
support of the parent company headquar-
tered in Calabasas, Calif.
"We have a $300 million company
backing us with a vision that is wide open,"
says Parker. "I sometimes feel like a kid in a
candy store. Where else can we do the
kind of work we're doing and have this
kind of support?"
The projects that Orlando's Valley
Crest location have completed in a few
short years is, by any measure, impressive:
2. • providing the site work and landscap-
ing, including irrigation, for the Wilderness
Lodge and Coronado Springs hotels at Dis-
ney World.
• completing about $10 million in pro-
jects in Disney's new Celebration City in
Kissimmee, FL, including installing streets,
parks, the Town Center and much of the
lakeside entertainment area.
• And now Valley Crest is working
hand-in-hand with Disney to transform
800 acres of raw land on the Disney World
property into Animal Kingdom, the resort's
fourth major theme park. Valley Crest, in
addition to installing a bewildering variety
and number of plants, is doing the themed
concrete and other hardscaping.
Parker says he has more than 100 pieces
of equipment and about 160 people at the
Disney site. They work out of a fourplex
office. When they're done with their part
of the "Africa" section of Animal Kingdom,
they begin the "Asia" section. Disney's Ani-
mal Kingdom will have four separate
themed areas when it's completed.
"We have an agreement with them
(Disney) to maintain everything that we
Valley Crest landscape and site construc-
tion company had a race with the clock
this year as it worked to complete the
landscaping for the California Speedway in
less than 150 days.
The Speedway is located in Fontana,
Calif., on near-desert land that was previ-
ously the site of the Kaiser Steel mill yard.
Valley Crest worked hard to bring in turf,
trees and ornamental plants to give
sparkle to the Speedway oasis.
The Valley Crest people were used to
the short timetable. It had to resod the At-
lanta Olympic Stadium in 36 hours after
the opening ceremonies tore up the turf.
Valley Crest used 150 landscape person-
nel, divided into round the clock crews.
Leading the way were Operations Man-
ager Dick Bruttig and Regional Vice Presi-
dent Chuck de Garmo. Bruttig is now
Valley Crest installed this landscape at the
Coronado Springs Hotel at the Walt Disney
Resort near Orlando, Fla.
plant until the end of our project, then
they will maintain it. They have great ex-
pertise," says Parker.
Parker thinks Valley Crest's diversifica-
tion gives clients the advantage of working
with a single contractor. This makes the
contractor more accessible, and more ac-
countable. From the contractor's stand-
point, it provides several advantages, in-
cluding more control of a project.
"What often hurts a landscape contractor
the most is scheduling. Maybe the irrigation
contractor doesn't do his job just right, and
the landscaper ends up hitting a pipe," says
Parker. "Or the electrical contractor comes
in after the landscaper is done and tears up
some of his work. The lonely landscaper can
be doing his work again and again, and not
be getting paid for it.
"We've diversified to handle more and
more of that exterior work so that we can
control, as much as we can, our own des-
branch manager of Valley Crest's Los An-
geles office.
Sixty-five pieces of heavy equipment
and more than 30 vehicles were used on
the job.
Material acquisition challenge
The infield was sodded with enough
dwarf tall fescue to cover more than 190
football fields. A total of 7.8 million sq. ft.
of turf was used for the site.
Entrances and roadways throughout
the facility were lined with 345, 30-foot
Palm Trees and miles of Waxy Privet Ligus-
trum hedges. The flower beds were
planted with photinias and blooming yel-
low and red day lilies, and more than
29,000 shrubs. Valley Crest installed more
than 1000 trees and 430,000 sq. ft. of
ground covers.
tiny until the project is complete," he says.
While Parker isn't expecting the Or-
lando landscape construction market to re-
main as hot as it is now, he's confident that
Valley Crest has established itself and will
continue to expand in the Florida market-
place.
The project demanded an extraordinary
irrigation system, and again, Valley Crest
was up to the task, as it pulled 280 miles of
irrigation wire. Seventy-five miles of irriga-
tion pipe was installed.
The irrigation is a 600-hp system, which
can produce 2000 gallons of water each
minute. The system uses an initial 300 hp
pump to push water up from a 900-ft.
deep well located 1.5 miles away.
The water travels through a 16-inch cas-
ing to a 600,000 gallon underground reser-
voir located at the base of an old Kaiser
Steel tower at the center of the raceway.
From there, four 75-hp variable-speed
pumps energize the system, to distribute
the water through 14,000 sprinkler heads.
At the center of it all is the race track, a
2-mile, 14-degree oval. Aggregate for the
track surface was brought in from Michi-
gan. More than 300,000 tons of asphalt
were poured at the track.
Speedway a test of time, material