Submit Search
Upload
CHT BIM MODELING PRESENTATION
•
1 like
•
132 views
C
Cedrik padiernos
Follow
Report
Share
Report
Share
1 of 19
Download now
Download to read offline
Recommended
SERVICES STUDIO - Preparation of plumbing layout of a single storey building & working drawings of various fittings and fixtures of water supply and sanitary installations
Interior services unit 5
Interior services unit 5
ctlachu
Execution of Project Works on 1st 4 km of the Motorway
Presentation 1 st 4 km
Presentation 1 st 4 km
Svet Dotchev
The simple projects improving process time & ergonomics in sub assembly line
Process Time & Ergonomics - Case Study
Process Time & Ergonomics - Case Study
Rashidi Asari
Engineering Testing and Commissioning
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning job
joseph william
Risk assessment
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
Sandeep Bhowmick
Deck Drainage
Deck Drainage
Deck Drainage
Faza Ramadhani
Call for Papers for the upcomming 2017 Eurobanking meeting at Grad Mokrice, Slovenia – May 28th – 31st
Eurobanking 2017 - Call for Papers
Eurobanking 2017 - Call for Papers
Jakob Hyttel-Sørensen
Sistema nervioso central liseth
Sistema nervioso central liseth
Sistema nervioso central liseth
Lizeth Ruiz
Recommended
SERVICES STUDIO - Preparation of plumbing layout of a single storey building & working drawings of various fittings and fixtures of water supply and sanitary installations
Interior services unit 5
Interior services unit 5
ctlachu
Execution of Project Works on 1st 4 km of the Motorway
Presentation 1 st 4 km
Presentation 1 st 4 km
Svet Dotchev
The simple projects improving process time & ergonomics in sub assembly line
Process Time & Ergonomics - Case Study
Process Time & Ergonomics - Case Study
Rashidi Asari
Engineering Testing and Commissioning
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning job
joseph william
Risk assessment
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
Sandeep Bhowmick
Deck Drainage
Deck Drainage
Deck Drainage
Faza Ramadhani
Call for Papers for the upcomming 2017 Eurobanking meeting at Grad Mokrice, Slovenia – May 28th – 31st
Eurobanking 2017 - Call for Papers
Eurobanking 2017 - Call for Papers
Jakob Hyttel-Sørensen
Sistema nervioso central liseth
Sistema nervioso central liseth
Sistema nervioso central liseth
Lizeth Ruiz
• These equipments are used for climatic and durability tests of electrical and electronic components, corrosion test on mechanical assemblies, tests on packages, paints and varnishes, cement plants, apparatus and materials for simulated tropical and extreme tropical conditions and for botanical and zoological investigations, testing of chemicals, drugs, pharmaceutical, cosmetics, medicine, capsules, etc.
Environmental test chamber
Environmental test chamber
ashwin yeshodharan
Kantoorpresentatie NL 19122016
Kantoorpresentatie NL 19122016
Leon Peeters
Fisiologia trabajo
Fisiologia escaneado2 (1)
Fisiologia escaneado2 (1)
Lizeth Ruiz
COMPANY
COMPANY
SANHITA SINGHAL
tablas de termodinamica
Tablas para imprimir
Tablas para imprimir
YANET ANGELICA LOPEZ ARIAS
Principles of interactive for understanding
Principles of Interactive Design
Principles of Interactive Design
Karen Krull
Dating-tradities in Nederland
Dating-tradities in Nederland
Hanneke Teunissen
More Related Content
Viewers also liked
• These equipments are used for climatic and durability tests of electrical and electronic components, corrosion test on mechanical assemblies, tests on packages, paints and varnishes, cement plants, apparatus and materials for simulated tropical and extreme tropical conditions and for botanical and zoological investigations, testing of chemicals, drugs, pharmaceutical, cosmetics, medicine, capsules, etc.
Environmental test chamber
Environmental test chamber
ashwin yeshodharan
Kantoorpresentatie NL 19122016
Kantoorpresentatie NL 19122016
Leon Peeters
Fisiologia trabajo
Fisiologia escaneado2 (1)
Fisiologia escaneado2 (1)
Lizeth Ruiz
COMPANY
COMPANY
SANHITA SINGHAL
tablas de termodinamica
Tablas para imprimir
Tablas para imprimir
YANET ANGELICA LOPEZ ARIAS
Principles of interactive for understanding
Principles of Interactive Design
Principles of Interactive Design
Karen Krull
Dating-tradities in Nederland
Dating-tradities in Nederland
Hanneke Teunissen
Viewers also liked
(7)
Environmental test chamber
Environmental test chamber
Kantoorpresentatie NL 19122016
Kantoorpresentatie NL 19122016
Fisiologia escaneado2 (1)
Fisiologia escaneado2 (1)
COMPANY
COMPANY
Tablas para imprimir
Tablas para imprimir
Principles of Interactive Design
Principles of Interactive Design
Dating-tradities in Nederland
Dating-tradities in Nederland
CHT BIM MODELING PRESENTATION
1.
MEP PROJECT LEADER:
Andrew Kelly BIM Engineer: Cedrik Padiernos BIM Modeller: Marvin Andal Elmer Villarin Praveen Muhamad Shafi
2.
BASEMENT LEVEL MEP Coordination OVERALL
LAYOUT WATER TANK PLANT ROOM BOH CIRC. PUMP ROOM CORRIDOR AREA LV ROOM ELEC RISER SUBSTATION DFMA MODULE PLANNED IMPLEMENTATION 5NOS.
3.
BASEMENT LEVEL MEP Coordination BASEMENT
WATER TANK WATER TANK B1-DFMA-MODULE 1 B1-DFMA-MODULE 2
4.
BASEMENT LEVEL MEP Coordination PLANT
ROOM
5.
BASEMENT LEVEL MEP Coordination CORRIDOR
AREA GL 3-6 B1-DFMA-MODULE 1 B1-DFMA-MODULE 2
6.
BASEMENT LEVEL MEP Coordination LV
ROOM AREA/ LIFT PIT/CORRIDOR 6-7 LIFT PIT LV ROOM B1-DFMA-MODULE 3 B1-DFMA-MODULE 4
7.
BASEMENT LEVEL MEP Coordination CORRIDOR
RISER DUCT AND PIPE RISER DFMA-MODULE 5
8.
BASEMENT LEVEL MEP Coordination SUBSTATION
9.
GROUND LEVEL MEP Coordination OVERALL
PLAN DFMA MODULE PLANNED IMPLEMENTATION 7NOS.
10.
GROUND LEVEL MEP Coordination CORE
AREA MODULE LOCATION GF-DFMA-MODULE 2 GF-DFMA-MODULE 1 GF-DFMA-MODULE 3 GF-DFMA-MODULE 4 GF-DFMA-MODULE 5 GF-DFMA-MODULE 6
11.
LEVEL 1 MEP Coordination OVERALL
PLAN
12.
LEVEL 6 MEP Coordination OVERALL
PLAN
13.
LEVEL 6 MEP Coordination TYPICAL
MODULE TYPICAL MODULE 3.6m STRUCTURAL BEAM
14.
LEVEL 6 MEP Coordination TYPICAL
MODULE TYPICAL MODULE 4.8m
15.
LEVEL 6 MEP Coordination KING
AND TWIN ROOM PODS MEP PODS MEP SHAFT
16.
LEVEL 5 MEP LOGISTIC PODS
AND MODULE
17.
ROOF LEVEL MEP Coordination OVERALL
PLAN
18.
ROOF LEVEL MEP Coordination AREA
1 ROOF MODULE WITH SOLAR PANEL 36NOS
19.
ROOF LEVEL MEP Coordination BOILER
ROOM AND PLANT ROOM
Download now