SlideShare a Scribd company logo
1 of 19
Download to read offline
Stormwater Pollution Reduction
Requirements in Pennsylvania
Beth Uhler
Program Manager
REGULATORY
PROCESS
PARTNERSHIPS
EDUCATION AND
OUTREACH
BANG FOR YOUR
BUCK
FUNDING
MECHANISMS
$$
2
Background
National Pollutant Discharge Elimination System
(NPDES) Municipal Separate Storm Sewer System (MS4)
Program
– Phase I – Medium MS4s (100,000 – 249,999) and Large
MS4s (≥ 250,000).
– Phase II – Small MS4s
A regulated Small MS4 is any MS4 that is not already covered by
Phase I and is located within the Urbanized Area boundaries as
defined by the U.S. Census Bureau.
3
Pennsylvania Phase II MS4s
4
Boroughs, Townships, Cities, and a Town
941 Small MS4s + 180 more
2 Large MS4s
0 Medium MS4s
New MS4 Permit Cycle
Pollutant Reduction
Planning required:
• Chesapeake Bay
• Surface waters considered
impaired for sediment or
nutrients, and/or
• Surface waters with a wasteload
allocation in an Environmental
Protection Agency (EPA)-
approved Total Maximum Daily
Load for sediment or nutrients.
5
6
1) Delineating storm sewersheds;
2) Determining existing pollutant loads;
3) Identifying proposed Best Management
Practices (BMPs);
1) Operations and maintenance of BMPs;
2) Funding mechanisms, and
3) Public participation.
Pollutant Reduction Planning
Methodology
Delineating Storm Sewersheds
7
Determining Existing
Pollutant Loads
8
Pollutant Chesapeake Bay
Impaired Surface
Waters
Surface Waters with a
TMDL
Sediment 10% 10%
10%- short-term
WLA- long-term
Phosphorous 5% 5%
5%- short-term
WLA- long-term
Nitrogen 3% n/a n/a
Identifying Proposed
Best Management Practices
• Identify potential project sites;
• Conduct a desktop review and field
investigations for site suitability;
• Propose candidate Best Management
Practices (BMPs); and
• Quantify pollutant reductions.
9
Operations and Maintenance
10
• Identify the responsible party
• Identify the required maintenance activities
Funding Mechanisms
11
• Identify funding source for each BMP
• Identify project sponsors and partners
Public Participation
12
• Make a copy of PRP available to the public for review
• Publish a public notice in a newspaper describing the plan
and where it may be viewed
• Accept comments for a minimum of 30 days
• Accept comments from any interested member of the public
at a public meeting or hearing.
• Record of consideration of each timely comment received
must be included in the PRP.
REGULATORY
PROCESS
PARTNERSHIPS
EDUCATION AND
OUTREACH
BANG FOR YOUR
BUCK
FUNDING
MECHANISMS
$$
13
Regulatory Process
14
September 2016 –
PA DEP guidance
workshops on the PRP
September 2017 –
PRPs and TMDL Plans
were due with the
Notice of Intent
(NOI)/application for
the 2018 permit
Municipalities did not
budget the
development of the
plans for 2017
Thus, had to
incorporate the
expense into the 2018
budget, which did not
allow work to
commence until
January 2017 at the
earliest
Allowed only ~6.5
months to prepare a
plan that utilizes
thousands/millions of
dollar in taxpayer
money
This time frame did not
allow for a
comprehensive
approach of planning,
coordination and
partnership
development for
implementation
15
The local government structure in the state of Pennsylvania
contributes to the challenge of implementing quality pollutant
reduction projects:
• Municipalities are small
• Projects are not as economical as if implemented on a more
regional scale
• The PA DEP promotes partnerships across municipal boundaries
but do not suggest framework for their formation
• Municipalities are left to burden the expense of implementing
projects on their own
• Limited timeframe did not provide adequate time to develop
partnerships
Partnerships
Education and Outreach
16
Bang for Your Buck
1717
BEST PROJECT TYPES USING DEP METHODOLOGY
Basin Retrofit:
• Also low cost per pounds of sediment
reduction
• Challenge: marrying projects that
have the greatest need for retrofit
with those that provide the greatest
reduction
o municipalities will prioritize cost
effective projects over water
quality benefits
Stream Restoration :
• Lowest cost per pounds of sediment
reduction
• Challenge: applicants may not
understand the level of technical
expertise needed to design and
construct these types of projects.
o projects proposed may not get
through the PA DEP permitting
process
Funding Mechanisms
18
Grants
Low Interest
Loans
Stormwater Fees
Public-Private Partnerships
19
Contact CEG for all of your stormwater management needs!
CEDARVILLE Engineering Group, LLC
159 E. High Street, Suite 500, Pottstown, PA 19464
610-705-4500
info@cedarvilleeng.com
©2018

More Related Content

What's hot

Policy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the PhilippinesPolicy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the Philippinesinfosanitasi
 
John Hollister - Practical Matters
John Hollister - Practical MattersJohn Hollister - Practical Matters
John Hollister - Practical MattersPAS_Team
 
Chesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning ProcessChesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning ProcessMarti Donley
 
Franklin Dept Public Works -storm water
Franklin Dept Public Works -storm waterFranklin Dept Public Works -storm water
Franklin Dept Public Works -storm waterFranklin Matters
 
GASB Case Study Prince William County
GASB Case Study Prince William CountyGASB Case Study Prince William County
GASB Case Study Prince William CountyMarthaMarshall
 
2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...Neil Dufty
 
Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for websitepixellence
 
RutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentationRutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentationPAS_Team
 
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...Iwl Pcu
 
SMPDC Brownfields Program - GSMSummit 2014, Chuck Morgan
SMPDC Brownfields Program - GSMSummit 2014, Chuck MorganSMPDC Brownfields Program - GSMSummit 2014, Chuck Morgan
SMPDC Brownfields Program - GSMSummit 2014, Chuck MorganGrowSmart Maine
 
Franklin (MA) Public Schools - Budget Hearing - 03/23/21
Franklin (MA) Public Schools - Budget Hearing - 03/23/21Franklin (MA) Public Schools - Budget Hearing - 03/23/21
Franklin (MA) Public Schools - Budget Hearing - 03/23/21Franklin Matters
 

What's hot (17)

2 - Characterising Catchments - a shared approach. Jenny Deakin
2 - Characterising Catchments - a shared approach. Jenny Deakin2 - Characterising Catchments - a shared approach. Jenny Deakin
2 - Characterising Catchments - a shared approach. Jenny Deakin
 
Policy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the PhilippinesPolicy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the Philippines
 
DNR Idle Reduction Presentation
DNR Idle Reduction PresentationDNR Idle Reduction Presentation
DNR Idle Reduction Presentation
 
John Hollister - Practical Matters
John Hollister - Practical MattersJohn Hollister - Practical Matters
John Hollister - Practical Matters
 
3. Outcome of Characterisation to date - Jenny Deakin
3. Outcome of Characterisation to date - Jenny Deakin3. Outcome of Characterisation to date - Jenny Deakin
3. Outcome of Characterisation to date - Jenny Deakin
 
Chesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning ProcessChesapeake Bay Watershed Implementation Planning Process
Chesapeake Bay Watershed Implementation Planning Process
 
Franklin Dept Public Works -storm water
Franklin Dept Public Works -storm waterFranklin Dept Public Works -storm water
Franklin Dept Public Works -storm water
 
Strategic watershed scale outreach
Strategic watershed scale outreachStrategic watershed scale outreach
Strategic watershed scale outreach
 
GASB Case Study Prince William County
GASB Case Study Prince William CountyGASB Case Study Prince William County
GASB Case Study Prince William County
 
2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...2016-21 State of the Environment Report for Councils in the Greater Central W...
2016-21 State of the Environment Report for Councils in the Greater Central W...
 
Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for website
 
RutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentationRutlandCC neighbourhood planning presentation
RutlandCC neighbourhood planning presentation
 
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
 
2015 State of the Sound
2015 State of the Sound 2015 State of the Sound
2015 State of the Sound
 
8. National Dairy Sustainability Initiative - Joe Crockett
8. National Dairy Sustainability Initiative - Joe Crockett8. National Dairy Sustainability Initiative - Joe Crockett
8. National Dairy Sustainability Initiative - Joe Crockett
 
SMPDC Brownfields Program - GSMSummit 2014, Chuck Morgan
SMPDC Brownfields Program - GSMSummit 2014, Chuck MorganSMPDC Brownfields Program - GSMSummit 2014, Chuck Morgan
SMPDC Brownfields Program - GSMSummit 2014, Chuck Morgan
 
Franklin (MA) Public Schools - Budget Hearing - 03/23/21
Franklin (MA) Public Schools - Budget Hearing - 03/23/21Franklin (MA) Public Schools - Budget Hearing - 03/23/21
Franklin (MA) Public Schools - Budget Hearing - 03/23/21
 

Similar to CEG 2018 StormCon Presentation

Will Brooks, Kerr Tar Regional Council of Governments
Will Brooks, Kerr Tar Regional Council of GovernmentsWill Brooks, Kerr Tar Regional Council of Governments
Will Brooks, Kerr Tar Regional Council of Governmentsnado-web
 
Developing a Regional WIP Response
Developing a Regional WIP ResponseDeveloping a Regional WIP Response
Developing a Regional WIP ResponseCleanH2O
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingFairfax County
 
Tools in the Toolbox: An Overview to Start the Conversation
Tools in the Toolbox: An Overview to Start the ConversationTools in the Toolbox: An Overview to Start the Conversation
Tools in the Toolbox: An Overview to Start the ConversationChesapeake Bay Foundation
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingFairfax County
 
NJFuture Redevelopment Forum 2015 Toohey
NJFuture Redevelopment Forum 2015 TooheyNJFuture Redevelopment Forum 2015 Toohey
NJFuture Redevelopment Forum 2015 TooheyNew Jersey Future
 
Euclid integrated planning opportunity rev12
Euclid integrated planning opportunity rev12Euclid integrated planning opportunity rev12
Euclid integrated planning opportunity rev12Kelly Quinn Sands
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-webJennifer Dingman, PhD
 
Chesapeake TMDL- CCW conference
Chesapeake TMDL- CCW conferenceChesapeake TMDL- CCW conference
Chesapeake TMDL- CCW conferenceChoose Clean Water
 
Kim Marousek - Setting the Stage for Regional Resilience
Kim Marousek - Setting the Stage for Regional ResilienceKim Marousek - Setting the Stage for Regional Resilience
Kim Marousek - Setting the Stage for Regional Resiliencenado-web
 
Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationIwl Pcu
 
NJ Future Redevelopment Forum 2020 - Agid
NJ Future Redevelopment Forum 2020 - AgidNJ Future Redevelopment Forum 2020 - Agid
NJ Future Redevelopment Forum 2020 - AgidNew Jersey Future
 
NJFuture Redevelopment Forum 2016 Mitchell
NJFuture Redevelopment Forum 2016 MitchellNJFuture Redevelopment Forum 2016 Mitchell
NJFuture Redevelopment Forum 2016 MitchellNew Jersey Future
 
Off-Site BMP Implementation Program
Off-Site BMP Implementation ProgramOff-Site BMP Implementation Program
Off-Site BMP Implementation ProgramKatie Pekarek
 

Similar to CEG 2018 StormCon Presentation (20)

Will Brooks, Kerr Tar Regional Council of Governments
Will Brooks, Kerr Tar Regional Council of GovernmentsWill Brooks, Kerr Tar Regional Council of Governments
Will Brooks, Kerr Tar Regional Council of Governments
 
Developing a Regional WIP Response
Developing a Regional WIP ResponseDeveloping a Regional WIP Response
Developing a Regional WIP Response
 
January 2010 Presentation to MMA Conference
January 2010 Presentation to MMA ConferenceJanuary 2010 Presentation to MMA Conference
January 2010 Presentation to MMA Conference
 
January 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association PresentationJanuary 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association Presentation
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Tools in the Toolbox: An Overview to Start the Conversation
Tools in the Toolbox: An Overview to Start the ConversationTools in the Toolbox: An Overview to Start the Conversation
Tools in the Toolbox: An Overview to Start the Conversation
 
Moore
MooreMoore
Moore
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
NJFuture Redevelopment Forum 2015 Toohey
NJFuture Redevelopment Forum 2015 TooheyNJFuture Redevelopment Forum 2015 Toohey
NJFuture Redevelopment Forum 2015 Toohey
 
Euclid integrated planning opportunity rev12
Euclid integrated planning opportunity rev12Euclid integrated planning opportunity rev12
Euclid integrated planning opportunity rev12
 
May 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forumMay 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forum
 
Municipal Stormwater Permit Compliance
Municipal Stormwater Permit ComplianceMunicipal Stormwater Permit Compliance
Municipal Stormwater Permit Compliance
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web
 
Chesapeake TMDL- CCW conference
Chesapeake TMDL- CCW conferenceChesapeake TMDL- CCW conference
Chesapeake TMDL- CCW conference
 
Kim Marousek - Setting the Stage for Regional Resilience
Kim Marousek - Setting the Stage for Regional ResilienceKim Marousek - Setting the Stage for Regional Resilience
Kim Marousek - Setting the Stage for Regional Resilience
 
Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project Presentation
 
Mars april 2010 final
Mars april 2010 finalMars april 2010 final
Mars april 2010 final
 
NJ Future Redevelopment Forum 2020 - Agid
NJ Future Redevelopment Forum 2020 - AgidNJ Future Redevelopment Forum 2020 - Agid
NJ Future Redevelopment Forum 2020 - Agid
 
NJFuture Redevelopment Forum 2016 Mitchell
NJFuture Redevelopment Forum 2016 MitchellNJFuture Redevelopment Forum 2016 Mitchell
NJFuture Redevelopment Forum 2016 Mitchell
 
Off-Site BMP Implementation Program
Off-Site BMP Implementation ProgramOff-Site BMP Implementation Program
Off-Site BMP Implementation Program
 

Recently uploaded

Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...rajputriyana310
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Koregaon Park ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Read...
Koregaon Park ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Read...Koregaon Park ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Read...
Koregaon Park ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Read...tanu pandey
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 

Recently uploaded (20)

Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Koregaon Park ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Read...
Koregaon Park ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Read...Koregaon Park ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Read...
Koregaon Park ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Read...
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 

CEG 2018 StormCon Presentation

  • 1. Stormwater Pollution Reduction Requirements in Pennsylvania Beth Uhler Program Manager
  • 3. Background National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Program – Phase I – Medium MS4s (100,000 – 249,999) and Large MS4s (≥ 250,000). – Phase II – Small MS4s A regulated Small MS4 is any MS4 that is not already covered by Phase I and is located within the Urbanized Area boundaries as defined by the U.S. Census Bureau. 3
  • 4. Pennsylvania Phase II MS4s 4 Boroughs, Townships, Cities, and a Town 941 Small MS4s + 180 more 2 Large MS4s 0 Medium MS4s
  • 5. New MS4 Permit Cycle Pollutant Reduction Planning required: • Chesapeake Bay • Surface waters considered impaired for sediment or nutrients, and/or • Surface waters with a wasteload allocation in an Environmental Protection Agency (EPA)- approved Total Maximum Daily Load for sediment or nutrients. 5
  • 6. 6 1) Delineating storm sewersheds; 2) Determining existing pollutant loads; 3) Identifying proposed Best Management Practices (BMPs); 1) Operations and maintenance of BMPs; 2) Funding mechanisms, and 3) Public participation. Pollutant Reduction Planning Methodology
  • 8. Determining Existing Pollutant Loads 8 Pollutant Chesapeake Bay Impaired Surface Waters Surface Waters with a TMDL Sediment 10% 10% 10%- short-term WLA- long-term Phosphorous 5% 5% 5%- short-term WLA- long-term Nitrogen 3% n/a n/a
  • 9. Identifying Proposed Best Management Practices • Identify potential project sites; • Conduct a desktop review and field investigations for site suitability; • Propose candidate Best Management Practices (BMPs); and • Quantify pollutant reductions. 9
  • 10. Operations and Maintenance 10 • Identify the responsible party • Identify the required maintenance activities
  • 11. Funding Mechanisms 11 • Identify funding source for each BMP • Identify project sponsors and partners
  • 12. Public Participation 12 • Make a copy of PRP available to the public for review • Publish a public notice in a newspaper describing the plan and where it may be viewed • Accept comments for a minimum of 30 days • Accept comments from any interested member of the public at a public meeting or hearing. • Record of consideration of each timely comment received must be included in the PRP.
  • 14. Regulatory Process 14 September 2016 – PA DEP guidance workshops on the PRP September 2017 – PRPs and TMDL Plans were due with the Notice of Intent (NOI)/application for the 2018 permit Municipalities did not budget the development of the plans for 2017 Thus, had to incorporate the expense into the 2018 budget, which did not allow work to commence until January 2017 at the earliest Allowed only ~6.5 months to prepare a plan that utilizes thousands/millions of dollar in taxpayer money This time frame did not allow for a comprehensive approach of planning, coordination and partnership development for implementation
  • 15. 15 The local government structure in the state of Pennsylvania contributes to the challenge of implementing quality pollutant reduction projects: • Municipalities are small • Projects are not as economical as if implemented on a more regional scale • The PA DEP promotes partnerships across municipal boundaries but do not suggest framework for their formation • Municipalities are left to burden the expense of implementing projects on their own • Limited timeframe did not provide adequate time to develop partnerships Partnerships
  • 17. Bang for Your Buck 1717 BEST PROJECT TYPES USING DEP METHODOLOGY Basin Retrofit: • Also low cost per pounds of sediment reduction • Challenge: marrying projects that have the greatest need for retrofit with those that provide the greatest reduction o municipalities will prioritize cost effective projects over water quality benefits Stream Restoration : • Lowest cost per pounds of sediment reduction • Challenge: applicants may not understand the level of technical expertise needed to design and construct these types of projects. o projects proposed may not get through the PA DEP permitting process
  • 19. 19 Contact CEG for all of your stormwater management needs! CEDARVILLE Engineering Group, LLC 159 E. High Street, Suite 500, Pottstown, PA 19464 610-705-4500 info@cedarvilleeng.com ©2018