Offshore industry & value chain | Jornada “Eólica Offshore: Oportunidades empresariales" | 25/11/21
1. 1 www.navantia.es
[*(Confidencial Navantia)*]
[*(Navantia Confidential)*]
CONFIDENCIAL NAVANTIA
ESTE DOCUMENTO Y LA INFORMACIÓN QUE CONTIENE SON PROPIEDAD DE
NAVANTIA. NO PUEDE SER REPRODUCIDO PARCIAL O TOTALMENTE NI DIVULGADO A
TERCEROS SIN AUTORIZACIÓN ESCRITA DE NAVANTIA. UNA VEZ FINALIZADA LA
RAZÓN DE SU TRANSFERENCIA, DEBERÁ SER DEVUELTO A NAVANTIA.
NAVANTIA CONFIDENTIAL
THIS DOCUMENT AND THE INFORMATION HEREIN IS PROPERTY OF NAVANTIA.
IT CANNOT BE PARTIALLY OR TOTALLY REPRODUCED NOR DISCLOSED TO THIRD
PARTIES WITHOUT WRITTEN PERMISSION FROM NAVANTIA. ONCE THE REASON FOR
WHICH IT WAS TRANSFERED IS OVER, IT MUST BE RETURNED TO NAVANTIA.
INFORMACIÓN CLASIFICADA POR NAVANTIA
CTA Meeting
Offshore industry & value chain
November 25th, 2021
2. 2 www.navantia.es
Products & Services-Green Energy Division
Offshore Wind: Design &
Construction
Foundations:
Transition pieces,
Jackets & Floating
Offshore substations:
HVAC & HVDC
Grounded Foundation:
Jackets and TPs
Experts in Floating Foundation solutions
Offshore substation: HVAC Offshore substation: HVDC
5. 5 www.navantia.es
29 Jacket Structures
Steel structure, formed by tubular lattice
with 4 longitudinal legs and bracings.
Unit weight:
602 Tons: Jacket
508 Tons: Piles
Dimensions:
Height: 58.7 m
Base width: 27 m
Project’s global magnitudes:
31.000 Tons of Steel
1.541.00 manhours
42% performed in
Asturias
Remaining 58%
performed in Ferrol
area.
Turbine ADWEN 5MW
2. Programs
a
JACKETS WIKINGER (IBERDROLA)
11. 11 www.navantia.es
HYWIND SPARS (STATOIL)
2. Programs
5 SPAR Structures. Total length 91 m.
Diameter: 14,8 m.
Unit Weight:
1970 Tons Spar
1250 Tons fixed ballast
Dimensions:
Length: 91 m
Diameter: 14,8 m
Project’s Global Magnitudes :
9,850 Tons of Steel
750.000 manhours
30% performed in
Asturias
Remaining 70%
performed in Ferrol
area
a
12. 12 www.navantia.es
Hywind Scotland Pilot Park, Statoil AS
Park located in the UK. It is formed by the
following equipment and elements :
• 5 Wind offshore turbines SWP 154
(6MW) installed over SPAR floating
structures
• An onshore substation (Transformers
placed in each of the Wind Generators
are not included )
This Project is the first pre-comercial
series worldwide of a concept of
floating Wind Farm.
HYWIND SPARS (STATOIL)
2. Programs
a
14. 14 www.navantia.es
Steel Floating Structure formed by 3 tanks joint by a
a tubular lattice structure
Unit Weight:
2600 Tons
Dimensions:
Height: 27 m
Width of the base: 66 m
Project’s Global Magnitudes:
2600 Tons of Steel
245.000 manhours
20% performed in Asturias
Remaining 80% performed in
Ferrol area
Turbine Vestas 8 MW
2. Programs WINDFLOAT ATLANTICA (EDPr)
a
16. 16 www.navantia.es
KINCARDINE (COBRA WIND LIMITED)
Estructura Flotante de Acero, formada por tres tanques
unidos mediante estructura de celosía tubular
Peso Unitario:
2600 Tons
Dimensiones:
Altura: 27 m
Ancho de la base: 66 m
Magnitudes Globales del Proyecto:
2600 Tons de Acero
245.000 horas-hombre
20% se realizan en Asturias
80% restante en la comarca de Ferrol
Turbina Vestas 9,2 MW
17. 17
[*(Navantia Confidential)*]
CONFIDENTIAL
JOHAN SVERDRUP PROCESS PLATFORM 2
HVDC MODULE
• HVDC Module: Subestación Corriente Continua
• Cliente: Aibel (Contractor) / Equinor (Company)
• Peso:
✓ 3.900 Toneladas (Grillage incluido)
✓ 4.600 Toneladas (Equipamiento completo)
• Plazo de ejecución: 11 meses
• Entrega: 1 mayo 2020
Puerto Real Shipyard
Programas
18. 18 www.navantia.es
Navantia has passed in recent years from a PC contract in
which we only make purchases and construction to an EPCIC
contract (Engineering, Purchasing, Construction, Installation
and Commissioning) in which the main contractor assumes
the risks of the project, and therefore, we minimize these
risks through effective contracting strategies.
a