SlideShare a Scribd company logo
1 of 1
Download to read offline
14
13
12
11
10
9
8
7
6
5
4
3
2
1
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
13
12
11
10
9
8
7
6
5
4
3
2
125
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
224
23
22
21
20
19
18
17
16
15
14
1st FLOOR
0
BASEMENT
-5000
5th FLOOR
17825
ROOF
22100
456
TOP OF P.H.
26375
9
6
26
10
M
K
4
3
24
6
6
7
K
25
26
27
24752525
915150
1080
360
8920 1080
3605140
1500
4250
1550
228519903670605265
4765 4765
915
2nd FLOOR
5000
BASEMENT
-5000
ROOF
22100
7
TOP OF P.H.
26375
ELEVATOR SHAFT
-6500
1501350150
360
2390
195
2135
2405
2135
325 550 1150 300
3595
2nd FLOOR
5000
5
305
175
915
220125
150
305
170
1st FLOOR
0
7
125300
135
BASEMENT
-5000
5
425
650
150175
915350
150
M
4
5
6
9
A-501
1500 3920 4220
15507201550
3820
R@17729
M
1550 3910 4430
3920330
16007201600
3920
R@17729
M
3920
16007201600
1550 3075 5270
R@17125
M
3920
16007201550
1550 3075 5270
R@16625
F
7
2405
2475
PROJECT NO:
DRAWN BY:
CHECKED BY:
STUDENT:
SHEET OF
SHEET TITLE
COPYRIGHT:
PROJECT ARCHITECT:
PROJECT MANAGER:
CONSULTANTS:
SCHOOL OF
ARCHITECTURE
SOUTHERN ILLINOIS UNIVERSITY
ARCHITECTURE 342: BUILDING TECHNOLOGY III
MIDWEST MECHANICAL ENGINEERS
NATIONAL FIRE PROTECTION, LLC
SOUTHERN CONSULTING, INC.
SALUKI ENGINEERING, INC.
CARBONDALE, ILLINOIS
MARION, ILLINOIS
CARBONDALE, ILLINOIS
MT. VERNON, ILLINOIS
CREATEDFOREDUCATIONALUSEONLY.
BOARD OF TRUSTEES
3/31/20159:23:46AM
A-501
BUILDING EGRESS
SYSTEMS
007
COMMERCIAL BUILDING
Author
Checker
BRYAN BIETSCH
QUIGLEY HALL
1 : 50
2
STAIRWELL SECTION
1 : 50
1
ELEVATOR SHAFT SECTION
1 : 20
8
Stair Detail At Floor
1 : 20
7
Stair Detail At Landing
1 : 20
10
ELEVATOR SHAFT DETAIL
1 : 20
9
STAIR DETAIL AT BASEMENT
GENERAL NOTES
1. ALL DIMENSIONS IN
MILLIMETERS
UNLESS
OTHERWISE NOTED.
2. INTERIOR WALL
DIMENSIONS TO
FACE OF STUD.
3. ALL COLUMNS
COVERED IN SPRAY
ON FIRE PROOFING.
4. DRAWING NOT TO
SCALE USE
DIMENSIONS
5. PROVIDE BLOCKING
IN WALL FOR ALL
CASEWORK,
FIXTURES, AND
ACCESORIES
6. FASTEN BEAMS
BEFORE FIRE
PROOFING
SHEET KEY NOTES
1. STRUCTURAL STEEL COLUMN
2. STRUCTURAL STEEL C-ANGLE
3. STRUCTURAL STEEL BAR
JOIST
4. STRUCTURAL STEEL BEAM
5. CMU FOUNDATION WALL
6. CONCRETE SLAB WITH METAL
DECK
7. CONCRETE SLAB
8. GRANULAR FILL
9. HANDRAIL
10. METAL STAIR TREAD AND
RISER
11. ELEVATOR GUIDE RAIL
12. ELVATOR CAR
13. ELEVATOR MOTOR
14. STRUCTURAL STEEL HOIST
BEAM
15. PIT LADDER
16. ELEVATOR BUMPER
17. ELVATOR MOTOR
18. PIT SUMP PUMP
19. LIGHT WEIGHT CONCRETE
TOPPING
20. SUMP PUMP
21. STEEL TIE ROD
22. COLE JOINT
23. PIT LADDER
24. LIGHT WEIGHT CONCRETE ON
RIDGID INSULATION W/ VAPOR
BARRIER
25. CONCRETE FOOTING
26. STEEL CROSS BRACING
27. CONCRETE FOUNDATION
WALL
REFERENCE KEY NOTES
A. REINFORCING STEEL
B. STEEL W BEAM
C. LIGHT WEIGHT CONCRETE
ON METAL DECK
D. METAL FASTENERS
E. STRUCTURAL CONCRETE
F. BACKFILL
G. GRANULAR FILL
H. HANDRAILS AND
GUARDRAILS
I. STAIR TREAD AND NOSING
J. 37MM SPRAY ON FIRE
PROOFING
K. COMPOSITE DECK
L. SHELF ANGLE
M. STRINGER
H
K
J
I
H
C
B
I
H
I
E
G
THICKEND SLAB
2-15MM GWB ON
METAL STUD ON
15MM GWB
L
J
B
C
20
7
5
22
21
21
11
1
6
3
17
12
24
B
B
J
25MM LINER
PANEL ON
METAL STUD ON
15MM GWB
M
M
23
6
4
4
9
9
9
9
1
1
1
27
25
26
1 : 50
11
Callout of ELEVATOR SHAFT
23
20
16
9
A-501
8
A-501
1
A-501
2
A-501
2
A-501
2
A-501
2
A-501
BASEMENT STAIR PLAN
3
1 : 50
FIRST FLOOR STAIR PLAN
4
1 : 50
TYPICAL STAIR PLAN
5
1 : 50
PENTHOUSE STAIR PLAN
6
1 : 50

More Related Content

Similar to SEC01_BRYAN_BIETSCH_A501-EGRESS & ELEVATOR

Working drawing of a residential building.
Working drawing of a residential building.Working drawing of a residential building.
Working drawing of a residential building.Nehal Gherwada
 
capitalaim , mcx
capitalaim , mcx  capitalaim , mcx
capitalaim , mcx capitalaim
 
Versocald - VERSOL steam boiler
Versocald - VERSOL steam boilerVersocald - VERSOL steam boiler
Versocald - VERSOL steam boilerPVijayP1
 
capitalaim , mcx
capitalaim , mcxcapitalaim , mcx
capitalaim , mcxcapitalaim
 
ac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motor
ac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motorac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motor
ac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motorLance Shi NER GROUP
 
ROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic Actuator
ROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic ActuatorROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic Actuator
ROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic ActuatorROTEX Controls USA
 
Current Portfolio_6MB
Current Portfolio_6MBCurrent Portfolio_6MB
Current Portfolio_6MBChas Barrott
 
1401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.01401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.0Tessa Hewlett
 
FIKSAR COMBINE PRICE
FIKSAR COMBINE PRICEFIKSAR COMBINE PRICE
FIKSAR COMBINE PRICEfiksar valve
 
capitalaim ......bonzer equity
capitalaim ......bonzer equitycapitalaim ......bonzer equity
capitalaim ......bonzer equitycapitalaim
 
Capitalaim Bonzer cash
Capitalaim Bonzer cashCapitalaim Bonzer cash
Capitalaim Bonzer cashcapitalaim
 
FeeDemand23-24.pdf
FeeDemand23-24.pdfFeeDemand23-24.pdf
FeeDemand23-24.pdfKINGGaming71
 
Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis Ayon Pal
 
Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis ayonpal
 
Elecon Wrom Gear Catalogue| Sumit Engineers
Elecon  Wrom Gear Catalogue| Sumit EngineersElecon  Wrom Gear Catalogue| Sumit Engineers
Elecon Wrom Gear Catalogue| Sumit EngineersSUMITCHUGH8
 

Similar to SEC01_BRYAN_BIETSCH_A501-EGRESS & ELEVATOR (20)

Working drawing of a residential building.
Working drawing of a residential building.Working drawing of a residential building.
Working drawing of a residential building.
 
Strip mall
Strip mallStrip mall
Strip mall
 
Africa Avantu Lodge
Africa Avantu LodgeAfrica Avantu Lodge
Africa Avantu Lodge
 
capitalaim , mcx
capitalaim , mcx  capitalaim , mcx
capitalaim , mcx
 
Versocald - VERSOL steam boiler
Versocald - VERSOL steam boilerVersocald - VERSOL steam boiler
Versocald - VERSOL steam boiler
 
capitalaim , mcx
capitalaim , mcxcapitalaim , mcx
capitalaim , mcx
 
ac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motor
ac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motorac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motor
ac motor speed reducer,AC vertical electro motor with 30:1 gearbox,ac motor
 
Insight product ppt
Insight product pptInsight product ppt
Insight product ppt
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
ROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic Actuator
ROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic ActuatorROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic Actuator
ROTEX Controls ECV Rack and Pinion Industrial Valve Pneumatic Actuator
 
Current Portfolio_6MB
Current Portfolio_6MBCurrent Portfolio_6MB
Current Portfolio_6MB
 
1401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.01401-ROYAL-VISTAWAY-A-2.0
1401-ROYAL-VISTAWAY-A-2.0
 
FIKSAR COMBINE PRICE
FIKSAR COMBINE PRICEFIKSAR COMBINE PRICE
FIKSAR COMBINE PRICE
 
capitalaim ......bonzer equity
capitalaim ......bonzer equitycapitalaim ......bonzer equity
capitalaim ......bonzer equity
 
Capitalaim Bonzer cash
Capitalaim Bonzer cashCapitalaim Bonzer cash
Capitalaim Bonzer cash
 
FeeDemand23-24.pdf
FeeDemand23-24.pdfFeeDemand23-24.pdf
FeeDemand23-24.pdf
 
Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis
 
Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis
 
Apartment_Red
Apartment_RedApartment_Red
Apartment_Red
 
Elecon Wrom Gear Catalogue| Sumit Engineers
Elecon  Wrom Gear Catalogue| Sumit EngineersElecon  Wrom Gear Catalogue| Sumit Engineers
Elecon Wrom Gear Catalogue| Sumit Engineers
 

More from Bryan Bietsch

SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4Bryan Bietsch
 
SEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdf
SEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdfSEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdf
SEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdfBryan Bietsch
 
SEC01_BRYAN,BIETSCH_A102-PLAN
SEC01_BRYAN,BIETSCH_A102-PLANSEC01_BRYAN,BIETSCH_A102-PLAN
SEC01_BRYAN,BIETSCH_A102-PLANBryan Bietsch
 
SEC01_BRYAN,BIETSCH_A101-axonometric
SEC01_BRYAN,BIETSCH_A101-axonometricSEC01_BRYAN,BIETSCH_A101-axonometric
SEC01_BRYAN,BIETSCH_A101-axonometricBryan Bietsch
 
hotel exterior final flattend
hotel exterior final flattendhotel exterior final flattend
hotel exterior final flattendBryan Bietsch
 
bar rendering flattend
bar rendering flattendbar rendering flattend
bar rendering flattendBryan Bietsch
 
interior hotel final flattend
interior hotel final flattendinterior hotel final flattend
interior hotel final flattendBryan Bietsch
 
final restaurant rendering flattend
final restaurant rendering flattendfinal restaurant rendering flattend
final restaurant rendering flattendBryan Bietsch
 

More from Bryan Bietsch (8)

SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
 
SEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdf
SEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdfSEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdf
SEC01_BRYAN,BIETSCH_A108-ROOFPLAN.pdf
 
SEC01_BRYAN,BIETSCH_A102-PLAN
SEC01_BRYAN,BIETSCH_A102-PLANSEC01_BRYAN,BIETSCH_A102-PLAN
SEC01_BRYAN,BIETSCH_A102-PLAN
 
SEC01_BRYAN,BIETSCH_A101-axonometric
SEC01_BRYAN,BIETSCH_A101-axonometricSEC01_BRYAN,BIETSCH_A101-axonometric
SEC01_BRYAN,BIETSCH_A101-axonometric
 
hotel exterior final flattend
hotel exterior final flattendhotel exterior final flattend
hotel exterior final flattend
 
bar rendering flattend
bar rendering flattendbar rendering flattend
bar rendering flattend
 
interior hotel final flattend
interior hotel final flattendinterior hotel final flattend
interior hotel final flattend
 
final restaurant rendering flattend
final restaurant rendering flattendfinal restaurant rendering flattend
final restaurant rendering flattend
 

SEC01_BRYAN_BIETSCH_A501-EGRESS & ELEVATOR

  • 1. 14 13 12 11 10 9 8 7 6 5 4 3 2 1 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 13 12 11 10 9 8 7 6 5 4 3 2 125 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 224 23 22 21 20 19 18 17 16 15 14 1st FLOOR 0 BASEMENT -5000 5th FLOOR 17825 ROOF 22100 456 TOP OF P.H. 26375 9 6 26 10 M K 4 3 24 6 6 7 K 25 26 27 24752525 915150 1080 360 8920 1080 3605140 1500 4250 1550 228519903670605265 4765 4765 915 2nd FLOOR 5000 BASEMENT -5000 ROOF 22100 7 TOP OF P.H. 26375 ELEVATOR SHAFT -6500 1501350150 360 2390 195 2135 2405 2135 325 550 1150 300 3595 2nd FLOOR 5000 5 305 175 915 220125 150 305 170 1st FLOOR 0 7 125300 135 BASEMENT -5000 5 425 650 150175 915350 150 M 4 5 6 9 A-501 1500 3920 4220 15507201550 3820 R@17729 M 1550 3910 4430 3920330 16007201600 3920 R@17729 M 3920 16007201600 1550 3075 5270 R@17125 M 3920 16007201550 1550 3075 5270 R@16625 F 7 2405 2475 PROJECT NO: DRAWN BY: CHECKED BY: STUDENT: SHEET OF SHEET TITLE COPYRIGHT: PROJECT ARCHITECT: PROJECT MANAGER: CONSULTANTS: SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY ARCHITECTURE 342: BUILDING TECHNOLOGY III MIDWEST MECHANICAL ENGINEERS NATIONAL FIRE PROTECTION, LLC SOUTHERN CONSULTING, INC. SALUKI ENGINEERING, INC. CARBONDALE, ILLINOIS MARION, ILLINOIS CARBONDALE, ILLINOIS MT. VERNON, ILLINOIS CREATEDFOREDUCATIONALUSEONLY. BOARD OF TRUSTEES 3/31/20159:23:46AM A-501 BUILDING EGRESS SYSTEMS 007 COMMERCIAL BUILDING Author Checker BRYAN BIETSCH QUIGLEY HALL 1 : 50 2 STAIRWELL SECTION 1 : 50 1 ELEVATOR SHAFT SECTION 1 : 20 8 Stair Detail At Floor 1 : 20 7 Stair Detail At Landing 1 : 20 10 ELEVATOR SHAFT DETAIL 1 : 20 9 STAIR DETAIL AT BASEMENT GENERAL NOTES 1. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE NOTED. 2. INTERIOR WALL DIMENSIONS TO FACE OF STUD. 3. ALL COLUMNS COVERED IN SPRAY ON FIRE PROOFING. 4. DRAWING NOT TO SCALE USE DIMENSIONS 5. PROVIDE BLOCKING IN WALL FOR ALL CASEWORK, FIXTURES, AND ACCESORIES 6. FASTEN BEAMS BEFORE FIRE PROOFING SHEET KEY NOTES 1. STRUCTURAL STEEL COLUMN 2. STRUCTURAL STEEL C-ANGLE 3. STRUCTURAL STEEL BAR JOIST 4. STRUCTURAL STEEL BEAM 5. CMU FOUNDATION WALL 6. CONCRETE SLAB WITH METAL DECK 7. CONCRETE SLAB 8. GRANULAR FILL 9. HANDRAIL 10. METAL STAIR TREAD AND RISER 11. ELEVATOR GUIDE RAIL 12. ELVATOR CAR 13. ELEVATOR MOTOR 14. STRUCTURAL STEEL HOIST BEAM 15. PIT LADDER 16. ELEVATOR BUMPER 17. ELVATOR MOTOR 18. PIT SUMP PUMP 19. LIGHT WEIGHT CONCRETE TOPPING 20. SUMP PUMP 21. STEEL TIE ROD 22. COLE JOINT 23. PIT LADDER 24. LIGHT WEIGHT CONCRETE ON RIDGID INSULATION W/ VAPOR BARRIER 25. CONCRETE FOOTING 26. STEEL CROSS BRACING 27. CONCRETE FOUNDATION WALL REFERENCE KEY NOTES A. REINFORCING STEEL B. STEEL W BEAM C. LIGHT WEIGHT CONCRETE ON METAL DECK D. METAL FASTENERS E. STRUCTURAL CONCRETE F. BACKFILL G. GRANULAR FILL H. HANDRAILS AND GUARDRAILS I. STAIR TREAD AND NOSING J. 37MM SPRAY ON FIRE PROOFING K. COMPOSITE DECK L. SHELF ANGLE M. STRINGER H K J I H C B I H I E G THICKEND SLAB 2-15MM GWB ON METAL STUD ON 15MM GWB L J B C 20 7 5 22 21 21 11 1 6 3 17 12 24 B B J 25MM LINER PANEL ON METAL STUD ON 15MM GWB M M 23 6 4 4 9 9 9 9 1 1 1 27 25 26 1 : 50 11 Callout of ELEVATOR SHAFT 23 20 16 9 A-501 8 A-501 1 A-501 2 A-501 2 A-501 2 A-501 2 A-501 BASEMENT STAIR PLAN 3 1 : 50 FIRST FLOOR STAIR PLAN 4 1 : 50 TYPICAL STAIR PLAN 5 1 : 50 PENTHOUSE STAIR PLAN 6 1 : 50