SlideShare a Scribd company logo
1 of 32
China Telecom China Data Center
Overview
2
Industry Leader
NO.1
The largest data center
service provider in China
300+
Over 20 years of experience in
data center operation
20+
1000+
Serve over 1000+ Government,
Finance, IT, Internet, Logistics,
Manufacture customers in China
China largest IP network
All DC(s) CT network node
TOP
Full
Service
Connectivity, ICT, Cloud
Operating DC in all
provinces of China
Tier 3 and above: 94
High-availability Data Center Services
Colocation
Service
• Customized services
• Guarantee for operation &
maintenance of data
center infrastructure
Network
Service
• access and end-to-end
circuit
• Inter-campus connectivity
• Network value-added
services
Smart Hands
Service
• Hosting client support
service
• Optional hosting O&M
service
• Tape media management
service
Managed
Hosting Service
• Turn-key solution
• Managing the colocation
service together with in-
rack equipment and
network services
• Customized integration
Site Resource
Service
• Disaster recovery and
business continuity
work area
• On-site seats and
storage
Nationwide Data Center Coverage
*BJ
*SH
*GZ
*ChengDu
*HangZhou
NJ
TJ
WH
XA
China Telecom Chinanet – Core Nodes/latency
ms BJ SH GZ HZ
SH 30
GZ 45 33
HZ 40 9 30
CD 37 42 40 45
Data Center Cluster –Beijing
IDC: 2 racks
1x 10G Internet, BGP
and static, 2 options
IDC: 1 rack
1x 100M Internet, static
IDC: 1 rack
1x 100M Internet,
static
CT Chinanet
Core node
ITMC
Peering point
Blue sign CT Shanghai operated DC
Data Center Cluster -Shanghai
Data Center Cluster -Guangzhou
Chinanet Core Node
ITMC,
Peering
Data Center Cluster -Chengdu
Proposed DC: Yunjin Sichuan
(1)T3+
(2)CT Owned/Managed
(3)Carrier Neutral
(4)Colo Capacity: 2800 racks
(5)POP of CT IDC Network
(6)Latency to Chinanet Core Node: 1-2ms
CT Chengdu IDC Network
ChinaNet Core Node
IDC –Key parameters
Uptime
Tier Ⅰ
I
Uptime Tier
Ⅱ
Uptime
Tier Ⅲ
Uptime
Tier Ⅳ
CT Star 5 IDC
Building Type Tenant Tenant Stand-alone Stand-alone Stand-alone
Staffing Non 1 Shift 1 +Shift “24×by forever” “24×by forever”
Useable for Critical Load 100%N 100%N 90%N 90%N <90%N
Initial Build-Out
(Gross Watt/Square meter)
216-323 431-539 431-646 539-862 800
Ultimate Gross Watt/Square Meter 216-323 431-539 1077-1615 ≥1615
Support dynamically
upgrading
Class A uninterruptable Cooling No No Maybe Yes Yes
Raised Floor Height(mm) 305 458 762-915 762-915 500
Floor Loading(Kg/Square Meter) 416 489 734 734 800
Utility Voltage 208/480V 208/480V 12-15kV 12-15kV 10kV
Single Point-Of-Failure Many Many Some None None
Annual Site Caused IT Downtime 28.9 Hours 22.0 Hours 1.6 Hours 0.8 Hours 5.3 minutes
Reprehensive Site Availability 99.671% 99.749% 99.982% 99.995% 99.999%
Typical Months to implement 3 3-6 15-20 15-20 12
Year first deployed 1965 1970 1985 1995 2014
Available Data Centers
Beijing – Available CT Operated Data Centers
DC 1- almost sold out DC 2 DC 3
Data Center Name Beijing YIzhuang Yinghai IDC Zhongxing Majuqiao IDC Beijing Range IDC
Tier T3+ China Telecom 5 Star T3 China Telecom 4 Star T3 China Telecom 4 Star
Certification ISO27001, ISO20000 IS027001, ISO20000 ISO9000, ISO27001, ISO20000
Address 北京市大兴区瑞合西二路与融兴北二
街交叉口西南角
北京市通州区马驹桥镇景盛
中街38号
河北省廊坊市开发区楼庄路9号,润
泽国际信息港
Location 45km to int’ Airport, 8m to HWY 20km to Airport,
Subway/Bus access
80KM to Int’l Airport, go train
and bus access
Operation time Oct. 2016 Aug. 2016 May 2013
Building Area 85,341 sqm 15,147 sqm 41,000 sqm
Load-bearing capacity 1000kg/sqm 1100kg/sqm 1200-1600kg/sqm
Ceiling height 5-6.6m 4.8-5.3m 6.5m
Whitespace area 49,138 sqm 6700 sam 25,000 sqm
Racks 10,000 2856 5500
Electricity supply 4 utility power supply 2 utility power supply 2 utility power supply
Generator 8, each 2250KVA 14, each 2500KVA 23, each 1600KW
UPS systems 15 53 108
Battery: full load >30 minutes 15 minutes 15 minutes
Temperature 21-25 C 21-26 C 21-25 C
Humidity 40% -60% 30%-70% 40%-50%
Generator configuration N+1 N+1 N+1
Access network CT backbone CT Chinanet CT Chinanet
Network capacity 400G 400G 400G
Beijing Yizhuang yinghai IDC
Beijing Majuqiao IDC
Beijing Range IDC
Beijing – Available CT Partnered Data Centers
DC 1 DC 2
Data Center Name Beijing #2 BJ Free Trade Zone DC
Tier T3 + T3 +
Certification ISO9001, IS027001, ISO20000 IS027001, ISO20000
Address No16 kechuang san lu, Beijing 北京顺义区天竺综合保税区
Location 15KM to downtown, subway/bus
access
15KM to downtown, subway and
airport expressway access
Operation time June 2016 Jan. 2016
Building Area 18,400sqm 81,344 sqm
Load-bearing capacity 1200kg/sqm 1000kg/sqm
Ceiling height 5.5m 5.3m
Whitespace area 6200sqm 10 buildings, 1 administration center,
9 server room buildings
Racks 2786 15,000
Electricity supply 4 utility power supply 2 utility power supply
Generator Full load 25 hours Full Power Capacity: 105MW
UPS systems 2N configuration 2N configuration
Battery: full load 15 minutes 15 minutes
Temperature 23±2 ℃ 24±2 ℃
Humidity 40%-70% 35%-60%
Generator configuration N+1 N+1
Access network CT, CU, CM CT, CU, CM
Network capacity
Beijing #2 Data Center
Beijing Free Trade Zone Data Center
Shanghai – Available CT Operated Data Centers
DC 1 DC 2 DC 3
Data Center Name Wenchuan DC Jiyun DC Guiqiao DC
Tier T3 + T3+ T3
Certification ISO27001, ISO20000 ISO27001, ISO20000 ISO27001, ISO20000
Address 500 chuanji road, 777 Wenchuan
HWY, Baoshan District, Shanghai
上海市宝山区纪蕴路588号1
号楼
浦东新区桂桥路1201号
Location 32KM to downtown, 67km to airport 15KM to train station,
subway access
18km to downtown, 30km to
airport, bus access
Operation time Jan. 2015 2015 2013
Building Area 26,270sqm 12,000sqm 4000sqm
Load-bearing capacity 1000Kg/sqm 2000kg/sqm 1000kg/sqm
Ceiling height 5m 4.5m 4.5-5m
Whitespace area 12000sqm 8000sqm 1300sqm
Racks 2000 900 700
Electricity supply 2 utility supply 2 utility supply 2 utility supply
Generator 4 2250kw 4 2250KW
UPS systems 18 400KVA UPS system N+1 configuration 4 800KVA UPS system
Battery: full load 30 min. 15 min. 30 min.
Temperature 18° C ~ 28° C 18° C ~ 28° C 18° C ~ 28° C
Humidity 30%-70% 30%-70% 30%-70%
Generator configuration N +1 N +1 N +1
Access network CT IDC/backbone network CT IDC/backbone network CT IDC/backbone network
Network capacity 100G 100G 40G
Shanghai Wenchuan IDC
Shanghai Jiyun IDC
Shanghai – Available CT Operated Data Centers
DC 1 DC 2
Data Center Name Shanghai Free Trade Zone DC Baoshan Data Center
Tier T3 T3+
Certification ISO9001/ISO20000/ISO22301/ISO27001
LEED/Uptime M&O
ISO20000
Address 上海市浦东新区华京路6号
Location 20km to downtown, 35km to airport 20km to downtown,
subway/bus access
Operation time 2015 2015
Building Area 24,000 sqm 14,000 sqm
Load-bearing capacity 1200kg/sqm 1000kg/sqm
Ceiling height 6m 5.5m
Whitespace area 6500 sqm
Racks 3000 1600
Electricity supply 2 utility supply 2 utility supply
Generator 10 2000KW full-load operating 24hr
UPS systems 72, 400kva 4
Battery: full load 15min 15min
Temperature 23±2℃ 23±2℃
Humidity 40%-70% 40% -60%
Generator configuration N +1 N +1
Access network CT, CU, CM CT, CU, CM
Network capacity 400G
Shanghai Free Trade Zong IDC
Shanghai Baoshan Yun IDC
CT Chengdu IDC
20
CT Hangzhou IDC
Xingyi DC
CT Owned
T3+
Colo capacity: 3500 racks
1770G bandwidth to CT
Backbone
China Telecom ChinaNet
23
550G
Peering
Network Capacity
570G
International
Network Capacity
21000G
Backbone
Network Capacity
134.3 Million
Broadband &
113 Million 3G
Customer
2.3 Million Websites
(70% Chinese Content)
24
Architecture of CT ChinaNet Network
Value Proposition
IDC
• All available Data Centers are T3+
• All proposed Data Centers are POP(s) of CT metro network
• All proposed Data Centers are newly built/under expansion
• All Data Centers Under dual power systems, Power Availability
99.999%
• All Data Centers provide 7x24x365 technical support
IDC –Free Trade Zone Data Centers
• Benefits to companies registered in FTZ (Shanghai and Beijing)
(1)Fewer restriction to foreign investors (value-added telecommunication services);
(2) Tax Exemption: Customs duties and import taxes are exempt for goods
transferring between the free trade zones and overseas destinations;
(3)Domestic merchandise that enter the FTZ is regarded as having been exported
and exporters can enjoy a tax rebate;
(4)Taxation of business income and revenues in international shipping, transporting,
warehouse, and international shipping insurance are exempt for companies
registered in FTZ area.
Internet Access
• China Telecom has the largest user base in China
• China Telecom owns the largest Internet capacity in China
• Dedicated access connecting to ChinaNet
• One of tier 1 ISPs essentially own the China Internet Peering
Ecosystem
Data Center Operation Methodology
Standardization
Automation
Centralization
• DCOM
• Monitoring System (Facility Monitor and Alarm)
• Operation Data Analysis (Big Data)
• Asset Management Platform
• Resource Management Platform
• Customer Support Service (CSC)
• Tech Support (L0-L3)
• Job Scheduling (Scheduled Maintain Tasks Management)
• Supplier Management
• Tool Design & Develop
• Service Operation Process (SOP)
• Operation Management (MOP)
• QA System (Week, Month, Quarter, Year)
• Security System
• Customer Experience (Mark&Label, Customer Support)
• Staff Training
• On-site Mobile Device
• Mobile Operation APP
• WeChat PlatformMobility
30
Signature Customers
31
Signature Customers
Thank You!

More Related Content

What's hot

Passive Optical LAN Solution - White Paper
Passive Optical LAN Solution - White PaperPassive Optical LAN Solution - White Paper
Passive Optical LAN Solution - White Paper
Syed Firas
 

What's hot (20)

ZigBee Based Wireless Sensor Network
ZigBee Based Wireless Sensor NetworkZigBee Based Wireless Sensor Network
ZigBee Based Wireless Sensor Network
 
Presentation 5G high school
Presentation 5G high schoolPresentation 5G high school
Presentation 5G high school
 
Mavenir network function virtualisation
Mavenir network function virtualisationMavenir network function virtualisation
Mavenir network function virtualisation
 
Setting off the 5G Advanced evolution with 3GPP Release 18
Setting off the 5G Advanced evolution with 3GPP Release 18Setting off the 5G Advanced evolution with 3GPP Release 18
Setting off the 5G Advanced evolution with 3GPP Release 18
 
5G and Open Reference Platforms
5G and Open Reference Platforms5G and Open Reference Platforms
5G and Open Reference Platforms
 
3GPP Release 17: Completing the first phase of 5G evolution
3GPP Release 17: Completing the first phase of 5G evolution3GPP Release 17: Completing the first phase of 5G evolution
3GPP Release 17: Completing the first phase of 5G evolution
 
Beginners: Introduction to 5G Reduced Capability (RedCap) Devices
Beginners: Introduction to 5G Reduced Capability (RedCap) DevicesBeginners: Introduction to 5G Reduced Capability (RedCap) Devices
Beginners: Introduction to 5G Reduced Capability (RedCap) Devices
 
Sigfox presentation [Sep 2016]
Sigfox presentation [Sep 2016]Sigfox presentation [Sep 2016]
Sigfox presentation [Sep 2016]
 
Should we stop the shutdown of 2G/3G to save lives??
Should we stop the shutdown of 2G/3G to save lives??Should we stop the shutdown of 2G/3G to save lives??
Should we stop the shutdown of 2G/3G to save lives??
 
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable SolutionsGetting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
 
Design and Testing Challenges for Chiplet Based Design: Assembly and Test View
Design and Testing Challenges for Chiplet Based Design: Assembly and Test ViewDesign and Testing Challenges for Chiplet Based Design: Assembly and Test View
Design and Testing Challenges for Chiplet Based Design: Assembly and Test View
 
Microwave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware StructureMicrowave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware Structure
 
5G: The Evolution and Tech Trends Today
5G: The Evolution and Tech Trends Today5G: The Evolution and Tech Trends Today
5G: The Evolution and Tech Trends Today
 
Small cell Evolution final
Small cell Evolution finalSmall cell Evolution final
Small cell Evolution final
 
Device to device communication
Device to device communicationDevice to device communication
Device to device communication
 
Elitery The First Tier III Certified data center in South East Asia by Uptime...
Elitery The First Tier III Certified data center in South East Asia by Uptime...Elitery The First Tier III Certified data center in South East Asia by Uptime...
Elitery The First Tier III Certified data center in South East Asia by Uptime...
 
Advanced RF SiP for Cellphones 2017 report from Yole Développement
Advanced RF SiP for Cellphones 2017 report from Yole Développement Advanced RF SiP for Cellphones 2017 report from Yole Développement
Advanced RF SiP for Cellphones 2017 report from Yole Développement
 
Passive Optical LAN Solution - White Paper
Passive Optical LAN Solution - White PaperPassive Optical LAN Solution - White Paper
Passive Optical LAN Solution - White Paper
 
5G Wireless.ppt
5G Wireless.ppt5G Wireless.ppt
5G Wireless.ppt
 
Ultra Dense Netwok
Ultra Dense NetwokUltra Dense Netwok
Ultra Dense Netwok
 

Similar to China Telecom - China Data Centers

Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
paul_mathews
 
Cost Efficient Network Experience in China Telecom
Cost Efficient Network Experience in China TelecomCost Efficient Network Experience in China Telecom
Cost Efficient Network Experience in China Telecom
BSP Media Group
 
IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data Centre
Derek Webster
 
19972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v219972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v2
Niamh Horan
 
Zcom Wireless products application overview
Zcom Wireless products application overviewZcom Wireless products application overview
Zcom Wireless products application overview
Rajesh Kapoor
 
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
victoriovega
 

Similar to China Telecom - China Data Centers (20)

Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
 
Apresentação Webinar sobre soluções IoT para o Mercado de Energia!
Apresentação Webinar sobre soluções IoT para o Mercado de Energia!Apresentação Webinar sobre soluções IoT para o Mercado de Energia!
Apresentação Webinar sobre soluções IoT para o Mercado de Energia!
 
Cost Efficient Network Experience in China Telecom
Cost Efficient Network Experience in China TelecomCost Efficient Network Experience in China Telecom
Cost Efficient Network Experience in China Telecom
 
CE1009_Implementation of Civil IoT Architecture.pdf
CE1009_Implementation  of Civil IoT Architecture.pdfCE1009_Implementation  of Civil IoT Architecture.pdf
CE1009_Implementation of Civil IoT Architecture.pdf
 
Global Switch Sydney East data centre Technical Specification
Global Switch Sydney East data centre Technical Specification Global Switch Sydney East data centre Technical Specification
Global Switch Sydney East data centre Technical Specification
 
China Telecom Global
China Telecom GlobalChina Telecom Global
China Telecom Global
 
KVH Tokyo Otemachi Data Center (TODC)
KVH Tokyo Otemachi Data Center (TODC)KVH Tokyo Otemachi Data Center (TODC)
KVH Tokyo Otemachi Data Center (TODC)
 
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh Environments
 
Water and Electrical Utility Meter Reading with BPL
Water and Electrical Utility  Meter Reading with BPLWater and Electrical Utility  Meter Reading with BPL
Water and Electrical Utility Meter Reading with BPL
 
IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data Centre
 
ICG-2510WG-LTE Industrial 4G LTE Cellular Wireless Gateway with 5-Port 10/10...
ICG-2510WG-LTE  Industrial 4G LTE Cellular Wireless Gateway with 5-Port 10/10...ICG-2510WG-LTE  Industrial 4G LTE Cellular Wireless Gateway with 5-Port 10/10...
ICG-2510WG-LTE Industrial 4G LTE Cellular Wireless Gateway with 5-Port 10/10...
 
Huawei 6 month industrail training program
Huawei 6 month industrail training programHuawei 6 month industrail training program
Huawei 6 month industrail training program
 
ICP DAS USA Products Presentation
ICP DAS USA Products PresentationICP DAS USA Products Presentation
ICP DAS USA Products Presentation
 
19972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v219972 Informa Telecoms P15M16_v2
19972 Informa Telecoms P15M16_v2
 
2015 02 antaira quarterly webinar optimizing a robust automation network
2015 02 antaira quarterly webinar optimizing a robust automation network2015 02 antaira quarterly webinar optimizing a robust automation network
2015 02 antaira quarterly webinar optimizing a robust automation network
 
Industrieel Ehternet (NL)
Industrieel Ehternet (NL)Industrieel Ehternet (NL)
Industrieel Ehternet (NL)
 
Zcom Wireless products application overview
Zcom Wireless products application overviewZcom Wireless products application overview
Zcom Wireless products application overview
 
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
001 osn 9800 m wdm series main slides 202008-v1-r19c10-mo (1) (002)
 
Spectrum Requirements for Utilities
Spectrum Requirements for UtilitiesSpectrum Requirements for Utilities
Spectrum Requirements for Utilities
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 

China Telecom - China Data Centers

  • 1. China Telecom China Data Center Overview
  • 2. 2 Industry Leader NO.1 The largest data center service provider in China 300+ Over 20 years of experience in data center operation 20+ 1000+ Serve over 1000+ Government, Finance, IT, Internet, Logistics, Manufacture customers in China China largest IP network All DC(s) CT network node TOP Full Service Connectivity, ICT, Cloud Operating DC in all provinces of China Tier 3 and above: 94
  • 3. High-availability Data Center Services Colocation Service • Customized services • Guarantee for operation & maintenance of data center infrastructure Network Service • access and end-to-end circuit • Inter-campus connectivity • Network value-added services Smart Hands Service • Hosting client support service • Optional hosting O&M service • Tape media management service Managed Hosting Service • Turn-key solution • Managing the colocation service together with in- rack equipment and network services • Customized integration Site Resource Service • Disaster recovery and business continuity work area • On-site seats and storage
  • 5. *BJ *SH *GZ *ChengDu *HangZhou NJ TJ WH XA China Telecom Chinanet – Core Nodes/latency ms BJ SH GZ HZ SH 30 GZ 45 33 HZ 40 9 30 CD 37 42 40 45
  • 6. Data Center Cluster –Beijing
  • 7. IDC: 2 racks 1x 10G Internet, BGP and static, 2 options IDC: 1 rack 1x 100M Internet, static IDC: 1 rack 1x 100M Internet, static CT Chinanet Core node ITMC Peering point Blue sign CT Shanghai operated DC Data Center Cluster -Shanghai
  • 8. Data Center Cluster -Guangzhou Chinanet Core Node ITMC, Peering
  • 9. Data Center Cluster -Chengdu Proposed DC: Yunjin Sichuan (1)T3+ (2)CT Owned/Managed (3)Carrier Neutral (4)Colo Capacity: 2800 racks (5)POP of CT IDC Network (6)Latency to Chinanet Core Node: 1-2ms CT Chengdu IDC Network ChinaNet Core Node
  • 10. IDC –Key parameters Uptime Tier Ⅰ I Uptime Tier Ⅱ Uptime Tier Ⅲ Uptime Tier Ⅳ CT Star 5 IDC Building Type Tenant Tenant Stand-alone Stand-alone Stand-alone Staffing Non 1 Shift 1 +Shift “24×by forever” “24×by forever” Useable for Critical Load 100%N 100%N 90%N 90%N <90%N Initial Build-Out (Gross Watt/Square meter) 216-323 431-539 431-646 539-862 800 Ultimate Gross Watt/Square Meter 216-323 431-539 1077-1615 ≥1615 Support dynamically upgrading Class A uninterruptable Cooling No No Maybe Yes Yes Raised Floor Height(mm) 305 458 762-915 762-915 500 Floor Loading(Kg/Square Meter) 416 489 734 734 800 Utility Voltage 208/480V 208/480V 12-15kV 12-15kV 10kV Single Point-Of-Failure Many Many Some None None Annual Site Caused IT Downtime 28.9 Hours 22.0 Hours 1.6 Hours 0.8 Hours 5.3 minutes Reprehensive Site Availability 99.671% 99.749% 99.982% 99.995% 99.999% Typical Months to implement 3 3-6 15-20 15-20 12 Year first deployed 1965 1970 1985 1995 2014
  • 12. Beijing – Available CT Operated Data Centers DC 1- almost sold out DC 2 DC 3 Data Center Name Beijing YIzhuang Yinghai IDC Zhongxing Majuqiao IDC Beijing Range IDC Tier T3+ China Telecom 5 Star T3 China Telecom 4 Star T3 China Telecom 4 Star Certification ISO27001, ISO20000 IS027001, ISO20000 ISO9000, ISO27001, ISO20000 Address 北京市大兴区瑞合西二路与融兴北二 街交叉口西南角 北京市通州区马驹桥镇景盛 中街38号 河北省廊坊市开发区楼庄路9号,润 泽国际信息港 Location 45km to int’ Airport, 8m to HWY 20km to Airport, Subway/Bus access 80KM to Int’l Airport, go train and bus access Operation time Oct. 2016 Aug. 2016 May 2013 Building Area 85,341 sqm 15,147 sqm 41,000 sqm Load-bearing capacity 1000kg/sqm 1100kg/sqm 1200-1600kg/sqm Ceiling height 5-6.6m 4.8-5.3m 6.5m Whitespace area 49,138 sqm 6700 sam 25,000 sqm Racks 10,000 2856 5500 Electricity supply 4 utility power supply 2 utility power supply 2 utility power supply Generator 8, each 2250KVA 14, each 2500KVA 23, each 1600KW UPS systems 15 53 108 Battery: full load >30 minutes 15 minutes 15 minutes Temperature 21-25 C 21-26 C 21-25 C Humidity 40% -60% 30%-70% 40%-50% Generator configuration N+1 N+1 N+1 Access network CT backbone CT Chinanet CT Chinanet Network capacity 400G 400G 400G
  • 13. Beijing Yizhuang yinghai IDC Beijing Majuqiao IDC Beijing Range IDC
  • 14. Beijing – Available CT Partnered Data Centers DC 1 DC 2 Data Center Name Beijing #2 BJ Free Trade Zone DC Tier T3 + T3 + Certification ISO9001, IS027001, ISO20000 IS027001, ISO20000 Address No16 kechuang san lu, Beijing 北京顺义区天竺综合保税区 Location 15KM to downtown, subway/bus access 15KM to downtown, subway and airport expressway access Operation time June 2016 Jan. 2016 Building Area 18,400sqm 81,344 sqm Load-bearing capacity 1200kg/sqm 1000kg/sqm Ceiling height 5.5m 5.3m Whitespace area 6200sqm 10 buildings, 1 administration center, 9 server room buildings Racks 2786 15,000 Electricity supply 4 utility power supply 2 utility power supply Generator Full load 25 hours Full Power Capacity: 105MW UPS systems 2N configuration 2N configuration Battery: full load 15 minutes 15 minutes Temperature 23±2 ℃ 24±2 ℃ Humidity 40%-70% 35%-60% Generator configuration N+1 N+1 Access network CT, CU, CM CT, CU, CM Network capacity
  • 15. Beijing #2 Data Center Beijing Free Trade Zone Data Center
  • 16. Shanghai – Available CT Operated Data Centers DC 1 DC 2 DC 3 Data Center Name Wenchuan DC Jiyun DC Guiqiao DC Tier T3 + T3+ T3 Certification ISO27001, ISO20000 ISO27001, ISO20000 ISO27001, ISO20000 Address 500 chuanji road, 777 Wenchuan HWY, Baoshan District, Shanghai 上海市宝山区纪蕴路588号1 号楼 浦东新区桂桥路1201号 Location 32KM to downtown, 67km to airport 15KM to train station, subway access 18km to downtown, 30km to airport, bus access Operation time Jan. 2015 2015 2013 Building Area 26,270sqm 12,000sqm 4000sqm Load-bearing capacity 1000Kg/sqm 2000kg/sqm 1000kg/sqm Ceiling height 5m 4.5m 4.5-5m Whitespace area 12000sqm 8000sqm 1300sqm Racks 2000 900 700 Electricity supply 2 utility supply 2 utility supply 2 utility supply Generator 4 2250kw 4 2250KW UPS systems 18 400KVA UPS system N+1 configuration 4 800KVA UPS system Battery: full load 30 min. 15 min. 30 min. Temperature 18° C ~ 28° C 18° C ~ 28° C 18° C ~ 28° C Humidity 30%-70% 30%-70% 30%-70% Generator configuration N +1 N +1 N +1 Access network CT IDC/backbone network CT IDC/backbone network CT IDC/backbone network Network capacity 100G 100G 40G
  • 18. Shanghai – Available CT Operated Data Centers DC 1 DC 2 Data Center Name Shanghai Free Trade Zone DC Baoshan Data Center Tier T3 T3+ Certification ISO9001/ISO20000/ISO22301/ISO27001 LEED/Uptime M&O ISO20000 Address 上海市浦东新区华京路6号 Location 20km to downtown, 35km to airport 20km to downtown, subway/bus access Operation time 2015 2015 Building Area 24,000 sqm 14,000 sqm Load-bearing capacity 1200kg/sqm 1000kg/sqm Ceiling height 6m 5.5m Whitespace area 6500 sqm Racks 3000 1600 Electricity supply 2 utility supply 2 utility supply Generator 10 2000KW full-load operating 24hr UPS systems 72, 400kva 4 Battery: full load 15min 15min Temperature 23±2℃ 23±2℃ Humidity 40%-70% 40% -60% Generator configuration N +1 N +1 Access network CT, CU, CM CT, CU, CM Network capacity 400G
  • 19. Shanghai Free Trade Zong IDC Shanghai Baoshan Yun IDC
  • 21. CT Hangzhou IDC Xingyi DC CT Owned T3+ Colo capacity: 3500 racks 1770G bandwidth to CT Backbone
  • 23. 23 550G Peering Network Capacity 570G International Network Capacity 21000G Backbone Network Capacity 134.3 Million Broadband & 113 Million 3G Customer 2.3 Million Websites (70% Chinese Content)
  • 24. 24 Architecture of CT ChinaNet Network
  • 26. IDC • All available Data Centers are T3+ • All proposed Data Centers are POP(s) of CT metro network • All proposed Data Centers are newly built/under expansion • All Data Centers Under dual power systems, Power Availability 99.999% • All Data Centers provide 7x24x365 technical support
  • 27. IDC –Free Trade Zone Data Centers • Benefits to companies registered in FTZ (Shanghai and Beijing) (1)Fewer restriction to foreign investors (value-added telecommunication services); (2) Tax Exemption: Customs duties and import taxes are exempt for goods transferring between the free trade zones and overseas destinations; (3)Domestic merchandise that enter the FTZ is regarded as having been exported and exporters can enjoy a tax rebate; (4)Taxation of business income and revenues in international shipping, transporting, warehouse, and international shipping insurance are exempt for companies registered in FTZ area.
  • 28. Internet Access • China Telecom has the largest user base in China • China Telecom owns the largest Internet capacity in China • Dedicated access connecting to ChinaNet • One of tier 1 ISPs essentially own the China Internet Peering Ecosystem
  • 29. Data Center Operation Methodology Standardization Automation Centralization • DCOM • Monitoring System (Facility Monitor and Alarm) • Operation Data Analysis (Big Data) • Asset Management Platform • Resource Management Platform • Customer Support Service (CSC) • Tech Support (L0-L3) • Job Scheduling (Scheduled Maintain Tasks Management) • Supplier Management • Tool Design & Develop • Service Operation Process (SOP) • Operation Management (MOP) • QA System (Week, Month, Quarter, Year) • Security System • Customer Experience (Mark&Label, Customer Support) • Staff Training • On-site Mobile Device • Mobile Operation APP • WeChat PlatformMobility