2. EXCAVATION OF NEW DECK AND FOUNDATION
No more digging, level and plumb. The hard part is done.
3. THE LANDING HAD TO BE MADE FIRST
5' deck with 4 stringers for the connection of the
original deck
The deck was built according to the existing topography
with the consideration of the 2 air conditioner units.
4. AFTER 8 A.M. , FULL ALABAMA SUNSHINE
Treads installed A few more post and handrails
5. LIMESTONE STEPS WERE INSTALLED A WEEK PRIOR
Topography is well??,... very steep.
You can not have a level playing field all the time!
We built the rails in the shade under the back porch.
Still have to bring them up and place them.
6. EARLY START @ 6 A.M.3 HOURS OF SHADE
Checking out before leaving the heat Almost Done
7. THIS CONNECTS TO THE LIMESTONE STEPS WITH
BOX WOOD TREES AT THE BASE OF THE PICTURE.
Deck finished and now the landscapers
from PROSCAPE, Inc. will do the rest. It will be stained later to match the back.