Overall, coordination drawings help ensure that all building systems and components are properly integrated and functioning together in the final design, which helps prevent errors and delays during construction.
2. Types of Coordination Drawings
Coordination drawings are used in
construction projects to ensure that all the
different building systems and components,
such as mechanical, electrical, plumbing, and
structural, are properly coordinated and
integrated into the final design.
3. The following are some of the
different types of coordination
drawings
General Arrangement (GA) drawings
Mechanical, Electrical, and Plumbing (MEP)
drawings
Structural drawings
Fire protection and life safety drawings
Site plan and landscape drawings
Interior design and finishes drawings
Detail drawings
4. General Arrangement (GA)
drawings
These drawings
show the overall
layout of the building
and the location of
major building
systems and
components.
5. Mechanical, Electrical, and Plumbing
(MEP) drawings
These drawings
show the detailed
layout of the
mechanical,
electrical, and
plumbing systems,
including
ductwork, piping,
wiring, and
equipment.
6. Structural drawings
These drawings
show the detailed
layout of the
building's
structural
components,
including
columns, beams,
and walls.
7. Fire protection and life safety
drawings
These drawings
show the location
and layout of fire
protection and life
safety systems,
including fire
alarms, sprinklers,
and emergency
lighting.
8. Site plan and landscape
drawings
These drawings
show the location
and layout of the
building on the
site, including
parking lots,
sidewalks, and
landscaping.
9. Interior design and finishes
drawings
These drawings
show the details
of the interior
finishes,
including
flooring, wall
finishes, and
cabinetry.
10. Detail drawings
These drawings
show the details of
specific building
components, such
as doors, windows,
and stairways.
11. Overall, coordination drawings help ensure
that all building systems and components are
properly integrated and functioning together in
the final design, which helps prevent errors
and delays during construction.
12. Thank you
For more details of Coordination Drawings,
you can contact us:
Call Us: 240-899-7711
Email Us: info@topbimcompany.com
Website: https://www.topbimcompany.com/bim-
services/3d-bim-coordination-services/