Understanding the reasons for the NPT is the starting point to reducing drilling time and saving money. The NPT is defined as time which drilling operation is ceased or penetration rate is very low. Time spent on fishing, pipe stuck, weather, tool transportation, lost circulation and tripping in/out can be counted as NPT.