Project Subway London – UK, CTRL Joint Venture Group Customer/Country - 2002
2 TBMs running in parallel lines, EPB Mode / Size 314” Diameter; Duration of the project – 3 months
Project Subway Singapore, - 2003
TBM - Singapore, EPB Mode / Size 256” Diameter; Duration of the project – 6 months
Project Metro Torino/ Italy GSG Tunnelling S.R.L. 2002
2 TBMs EPB Mode / Size 320” Diameter; Duration of the project - 2 months
Project Waste Water Sewer – Indianapolis- USA Super Excavator Inc 2005
TBM EPB Mode / Size 167”; Duration of the project – 1 month
Project Waste Water Sewer Los Angeles – USA 2003
2 TBMs EPB Mode / Size 152” Diameter; First TBMs using Variable Frequency Drive
1 TBM 157” open mode. Duration of the project – 3 months
Project Waste Water Sewer – Columbus / Ohio- USA Jay Dee / Traylor Joint venture 2006
TBM EPB Mode / Size 167” Diameter; Variable Frequency Drive Duration of the project - 1 month
Project Subway London – UK AMEC Group 2006
1 TBM, EPB Mode / Size 310” Diameter, Variable Frequency Drive Duration of the project - 3 months
Cable tunnel – London Morgan Est. 2007
1 TBM; EPB Mode / Size 140” Diameter, Variable Frequency Drive Duration of the project - 2 months
Project Waste Water Sewer New Jersey – USA, Bradshaw Inc. 2004
Open Mode TBM 101” Diameter. Duration of the project 1 month
Projects with Valiant, Windsor, ON - Canada
4 TBMs; EPB Mode / Size 142” Diameter, Variable Frequency Drive Toronto - York Waste sewer projects
4 TBMs Metro size, EPB Mode / Size 256” Diameter, Variable Frequency Drive - Toronto Subway projects
Duration of the projects - 1 year