Project Management
Local Setting:
TACLOBAN CITY
• Design & Build Services by
Administration
•Project Baseline in related
to:
Design/Planning Stage
 Project Definition Phase
Meeting with the Client
Define the Project and Needs
of the Client
Submit service Proposal
Defining Activities after Client Meeting and Site Inspection
 Removal of Artificial Climbing Wall
 Demolition of Existing Comport Room
 Excavation of Septic Tank
 Construction of New Comport Room Under the Stair
 Fabrication of Beam and Floor framing system
 Partition Walls and Glassworks
 Façade Modification (Install and Supply WPC)
 Balcony at Facade
Problem encountered/Risk: Parking Space
Solution/Mitigation: Acquire Space for Parking
Project Management
Local Setting:
TACLOBAN CITY
• Design & Build Services by
Administration
•Project Baseline in related
to:
Design/Planning Stage
Design Development Phase
Schematic/Preliminary/Initial
Sketches or drawing
Construction Documents
 Archt’l and Eng’ng Plans
 Estimates & Schedules
 Specifications
Preparing of Plans for Building Permit Application
Project Management
Local Setting:
TACLOBAN CITY
• Design & Build Services by Administration
• Project Baseline in related to:
Construction Phase
 Full Time Project Construction
Management
 Architect In-Charge of Construction
Quality Control
Evaluation of Construction Work
Preparation of Daily Inspection Reports
Filing of documents
Project Management
Local Setting:
TACLOBAN CITY
The three most
important components
of project management
Project Scope
Management
 Collect Requirements
 Define scope-detailed
description
 Create WBS-breaking into
smaller/detailed works
 Validate scope- to
finalized
 Control Scope-monitoring
Project Management
Local Setting:
TACLOBAN CITY
The three most
important components
of project
management
Project Time
Management
 Define the
activities
 Sequence of
activities
 Resources
Project Management
Local Setting:
TACLOBAN CITY
The three most important components of project
management
Project Cost Management
 Estimate
 Determine the budget
 Control Cost
Project Management
Local Setting:
TACLOBAN CITY
Summary:
Importance of Project Baseline
 Initial plan to create for efficiently oversee
and manage project deliverable.
Time Cost and Scope
 Known as Project Management Triangle
and the relationship of this three are
directly proportional.
Additional: Importance of Communication
 help make sure the right messages are
sent, received, and understood by the
right people
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 11
FIT-OUT (DESIGN-BID-BUILD)
Project Management in TRENDS AND CONCEPTS
Design Phase
• The Department Head assigns a Designer to do Test fit and Client
Coordination for Conceptualization based on the clients needs and
requirements
• The Design team conducts site inspection to check for the site
condition or existing site provisions
• The Design and Planning Stage includes preparations of materials
(Always prepares 2 options)
• The Design team provides material board and specification for the
QS/Cost Engineer Reference
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 12
FIT-OUT (DESIGN-BID-BUILD)
Project Management in TRENDS AND CONCEPTS
Bidding Phase
• The assigned Quantity Surveyor conducts take off estimate based on the test fit provided by
the designer
3 Consideration of Bid Phase
• Price Reference for the Materials/Finishes based on the design
• Work scopes
• Standard Unit Cost of our Company
Considering this 3 during the Bid phase. We can ensure to have accurate Cost Estimate
• After the Bidding Phase is the Procurement Stage. Project Team established connections with
other vendors for fast transaction.
• Preparation of Baseline WBS and Baseline Schedule using Gantt Chart
• Bid Presentation with clients thru F2F or Online meeting with the presence of Dept. Head
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 13
FIT-OUT (DESIGN-BID-BUILD)
Project Management in TRENDS AND CONCEPTS
Build Phase
• The build phase: Consist of A Project Site Manager, Site Team
• Project management practices includes, Preparation of Work schedule, Assessment of
Works, Risk Management
• All Documents needed to start is processed
• Designers and QS visits the site to conduct construction audit on site internally
Closeout Phase
• During this Phase we consolidate all the Documents, As-builts and any documents.
• Centralized documentation with physical and digital copy on site and the main office.
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 14
NATIONAL HOUSING AUTHORITY
Project Management in NATIONAL HOUSING AUTHORITY
The CBIA involves the following general processes:
 Community Planning and Organizing
 Invitation through Public Notice to landowners/developers/contractors to submit proposals
 General Orientation of landowners/developers/contractors to the CBIA
 NHA Evaluation of eligibility of landowner/developers/contractors and preliminary approval of
proposals
 Presentation of preliminary evaluated proposals to CAs, CA endorsement of preferred
resettlement sites and developers to LIAC and/or appropriate body
 NHA Final Evaluation and Approval of Proposals
 Execution of Agreements
 Award of Contract to landowners/developers/contractors
 Development of the resettlement site including land development and housing construction
 Documentation of the acquisition of housing units and movement of families to the
resettlement site
 Project Monitoring, Reporting and Evaluation
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 15
NATIONAL HOUSING AUTHORITY
Project Management in NATIONAL HOUSING AUTHORITY
The CBIA Process is a very promising scheme developed by the Authority to promote the
participation of the community and its beneficiaries in the design process of every project.
The CBIA scheme is made as a “Design and Build” Scheme, which allows developers to propose
their own design for every project, subject for evaluation by the Authority.
This concept emerged from the idea wherein for most of the years, the NHA have encountered
many dialogues, interactions, and even more so, complaints, from our beneficiaries as to their
housing project location, their housing design, and even the financing scheme.
One of the best practices done with this scheme is that this involves the community the design
process, and if followed properly, the financing scheme of this process is beneficial to the
community and to the government, allowing them to fully utilize their budget at lower risk. The
monitoring requirements of projects are also a good aspect of this scheme. Daily, weekly and
monthly monitoring report with logbooks are required from the technical team assigned to the
projects by this scheme. This will entail a more intensive monitoring and allow the management
to foresee problems that might arise during the contract period and possibly mitigate more
negative effects of them.
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 16
NATIONAL HOUSING AUTHORITY
Project Management in NATIONAL HOUSING AUTHORITY
 The law being used by different government agencies to procure and handle infrastructure
projects is the Republic Act No. 9184 or what we call the “Government Procurement Reform
Act”, which the details how to program, procure and finance infrastructure project handled by
the government.
 “Community Based Initiative Approach” or CBIA.
 The CBIA has four (4) key components:
 Selection and endorsement by project beneficiaries of their preferred project sites
 Development of project sites including the construction of housing units by the participating
landowner/developer/contractor.
 Acquisition of house and lot units through the existing financing scheme for beneficiaries,
 Participation of the project beneficiaries in the identified aspects of the relocation and
resettlement program as well as in project implementation.
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 17
NATIONAL HOUSING AUTHORITY
Project Management in NATIONAL HOUSING AUTHORITY
The CBIA involves the following general processes:
 Community Planning and Organizing
 Invitation through Public Notice to landowners/developers/contractors to submit proposals
 General Orientation of landowners/developers/contractors to the CBIA
 NHA Evaluation of eligibility of landowner/developers/contractors and preliminary approval of
proposals
 Presentation of preliminary evaluated proposals to CAs, CA endorsement of preferred
resettlement sites and developers to LIAC and/or appropriate body
 NHA Final Evaluation and Approval of Proposals
 Execution of Agreements
 Award of Contract to landowners/developers/contractors
 Development of the resettlement site including land development and housing construction
 Documentation of the acquisition of housing units and movement of families to the
resettlement site
 Project Monitoring, Reporting and Evaluation
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 18
NATIONAL HOUSING AUTHORITY
Project Management in NATIONAL HOUSING AUTHORITY
The CBIA Process is a very promising scheme developed by the Authority to promote the
participation of the community and its beneficiaries in the design process of every project.
The CBIA scheme is made as a “Design and Build” Scheme, which allows developers to propose
their own design for every project, subject for evaluation by the Authority.
This concept emerged from the idea wherein for most of the years, the NHA have encountered
many dialogues, interactions, and even more so, complaints, from our beneficiaries as to their
housing project location, their housing design, and even the financing scheme.
One of the best practices done with this scheme is that this involves the community the design
process, and if followed properly, the financing scheme of this process is beneficial to the
community and to the government, allowing them to fully utilize their budget at lower risk. The
monitoring requirements of projects are also a good aspect of this scheme. Daily, weekly and
monthly monitoring report with logbooks are required from the technical team assigned to the
projects by this scheme. This will entail a more intensive monitoring and allow the management
to foresee problems that might arise during the contract period and possibly mitigate more
negative effects of them.
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 19
LGU- GUMACA, QUEZON
Project Management in LGU – Gumaca, Quezon
 Project Integration Management - All infrastructure projects should be
included in Annual Investment Plan (AIP).
 Project Scope Management – Conduct pre-construction meetings
with recipients and other departments.
 Project Time Management – Provides PERT-CPM of respective
projects to monitor construction progress. Request for Catch-up Plan
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 20
LGU- GUMACA, QUEZON
Project Management in LGU – Gumaca, Quezon
 Project Cost Management - Preparation of plans, detailed
engineering design, specifications, estimates and surveys of the
projects with the consideration of locally available products/ materials
to maintain budget control and to avoid extra expenses.
 Project Quality Management – Regular ocular site inspection to
ensure plans and technical specifications are followed. Infrastructure
projects are audited by COA.
 Project Human Resource Management – Assigned technical staff that
have knowledge of respective project types and allowed them to
attend training and seminars for their professional growth.
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 21
LGU- GUMACA, QUEZON
Project Management in LGU – Gumaca, Quezon
 Project Communication Management – Regular report about the
updates on projects with the contractor, implementing office, and end
users. Implement proper safe keeping of records.
 Project Risk Management – All possible risk are being discussed
during pre-procurement meeting.
 Project Procurement Management - The procurement strictly adhere
to the provisions of R.A. 9184, its IRR, and GPPB guidelines.
METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 22
LGU- GUMACA, QUEZON
Project Management in LGU – Gumaca, Quezon
 Project Stakeholder Management – Regular reporting of the project
status with the contractor, implementing office, non government
organization and end users.

More Related Content

Similar to FMA - 2_CM651_Group.pptx

Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aForbes Chanakira
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
VGBC Online Series, Phần 10: Quản lý dự án Công trình xanh
VGBC Online Series, Phần 10: Quản lý dự án Công trình xanhVGBC Online Series, Phần 10: Quản lý dự án Công trình xanh
VGBC Online Series, Phần 10: Quản lý dự án Công trình xanhVietnam Green Building Council
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 AClive Price
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTRiyaVerma238431
 
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTMANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTTaiwo Okuselu
 
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for TrainersPMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for TrainersReady to Train
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxssuser5fc1e7
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016sherif kadry
 

Similar to FMA - 2_CM651_Group.pptx (20)

Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_a
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
VGBC Online Series, Phần 10: Quản lý dự án Công trình xanh
VGBC Online Series, Phần 10: Quản lý dự án Công trình xanhVGBC Online Series, Phần 10: Quản lý dự án Công trình xanh
VGBC Online Series, Phần 10: Quản lý dự án Công trình xanh
 
Bussiness planning process
Bussiness planning processBussiness planning process
Bussiness planning process
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENT
 
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENTMANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
MANAGEMENT OF PROJECTS IN LOCAL GOVERNMENT
 
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for TrainersPMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
Project scope management
Project scope managementProject scope management
Project scope management
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016
 
Information Management and Model Checking
Information Management and Model CheckingInformation Management and Model Checking
Information Management and Model Checking
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 

Recently uploaded

VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,MsVIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Msankitnayak356677
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
(办)McGill毕业证怎么查学位证书
(办)McGill毕业证怎么查学位证书(办)McGill毕业证怎么查学位证书
(办)McGill毕业证怎么查学位证书mbetknu
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.Christina Parmionova
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Christina Parmionova
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbaisonalikaur4
 
(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书mbetknu
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证mbetknu
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本mbetknu
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 

Recently uploaded (20)

VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,MsVIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
VIP Greater Noida Call Girls 9711199012 Escorts Service Noida Extension,Ms
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
(办)McGill毕业证怎么查学位证书
(办)McGill毕业证怎么查学位证书(办)McGill毕业证怎么查学位证书
(办)McGill毕业证怎么查学位证书
 
WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.WORLD CREATIVITY AND INNOVATION DAY 2024.
WORLD CREATIVITY AND INNOVATION DAY 2024.
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
 
(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书(怎样办)Sherbrooke毕业证本科/硕士学位证书
(怎样办)Sherbrooke毕业证本科/硕士学位证书
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本(官方原版办理)BU毕业证国外大学毕业证样本
(官方原版办理)BU毕业证国外大学毕业证样本
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 

FMA - 2_CM651_Group.pptx

  • 1. Project Management Local Setting: TACLOBAN CITY • Design & Build Services by Administration •Project Baseline in related to: Design/Planning Stage  Project Definition Phase Meeting with the Client Define the Project and Needs of the Client Submit service Proposal
  • 2. Defining Activities after Client Meeting and Site Inspection  Removal of Artificial Climbing Wall  Demolition of Existing Comport Room  Excavation of Septic Tank  Construction of New Comport Room Under the Stair  Fabrication of Beam and Floor framing system  Partition Walls and Glassworks  Façade Modification (Install and Supply WPC)  Balcony at Facade Problem encountered/Risk: Parking Space Solution/Mitigation: Acquire Space for Parking
  • 3.
  • 4. Project Management Local Setting: TACLOBAN CITY • Design & Build Services by Administration •Project Baseline in related to: Design/Planning Stage Design Development Phase Schematic/Preliminary/Initial Sketches or drawing Construction Documents  Archt’l and Eng’ng Plans  Estimates & Schedules  Specifications
  • 5. Preparing of Plans for Building Permit Application
  • 6. Project Management Local Setting: TACLOBAN CITY • Design & Build Services by Administration • Project Baseline in related to: Construction Phase  Full Time Project Construction Management  Architect In-Charge of Construction Quality Control Evaluation of Construction Work Preparation of Daily Inspection Reports Filing of documents
  • 7. Project Management Local Setting: TACLOBAN CITY The three most important components of project management Project Scope Management  Collect Requirements  Define scope-detailed description  Create WBS-breaking into smaller/detailed works  Validate scope- to finalized  Control Scope-monitoring
  • 8. Project Management Local Setting: TACLOBAN CITY The three most important components of project management Project Time Management  Define the activities  Sequence of activities  Resources
  • 9. Project Management Local Setting: TACLOBAN CITY The three most important components of project management Project Cost Management  Estimate  Determine the budget  Control Cost
  • 10. Project Management Local Setting: TACLOBAN CITY Summary: Importance of Project Baseline  Initial plan to create for efficiently oversee and manage project deliverable. Time Cost and Scope  Known as Project Management Triangle and the relationship of this three are directly proportional. Additional: Importance of Communication  help make sure the right messages are sent, received, and understood by the right people
  • 11. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 11 FIT-OUT (DESIGN-BID-BUILD) Project Management in TRENDS AND CONCEPTS Design Phase • The Department Head assigns a Designer to do Test fit and Client Coordination for Conceptualization based on the clients needs and requirements • The Design team conducts site inspection to check for the site condition or existing site provisions • The Design and Planning Stage includes preparations of materials (Always prepares 2 options) • The Design team provides material board and specification for the QS/Cost Engineer Reference
  • 12. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 12 FIT-OUT (DESIGN-BID-BUILD) Project Management in TRENDS AND CONCEPTS Bidding Phase • The assigned Quantity Surveyor conducts take off estimate based on the test fit provided by the designer 3 Consideration of Bid Phase • Price Reference for the Materials/Finishes based on the design • Work scopes • Standard Unit Cost of our Company Considering this 3 during the Bid phase. We can ensure to have accurate Cost Estimate • After the Bidding Phase is the Procurement Stage. Project Team established connections with other vendors for fast transaction. • Preparation of Baseline WBS and Baseline Schedule using Gantt Chart • Bid Presentation with clients thru F2F or Online meeting with the presence of Dept. Head
  • 13. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 13 FIT-OUT (DESIGN-BID-BUILD) Project Management in TRENDS AND CONCEPTS Build Phase • The build phase: Consist of A Project Site Manager, Site Team • Project management practices includes, Preparation of Work schedule, Assessment of Works, Risk Management • All Documents needed to start is processed • Designers and QS visits the site to conduct construction audit on site internally Closeout Phase • During this Phase we consolidate all the Documents, As-builts and any documents. • Centralized documentation with physical and digital copy on site and the main office.
  • 14. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 14 NATIONAL HOUSING AUTHORITY Project Management in NATIONAL HOUSING AUTHORITY The CBIA involves the following general processes:  Community Planning and Organizing  Invitation through Public Notice to landowners/developers/contractors to submit proposals  General Orientation of landowners/developers/contractors to the CBIA  NHA Evaluation of eligibility of landowner/developers/contractors and preliminary approval of proposals  Presentation of preliminary evaluated proposals to CAs, CA endorsement of preferred resettlement sites and developers to LIAC and/or appropriate body  NHA Final Evaluation and Approval of Proposals  Execution of Agreements  Award of Contract to landowners/developers/contractors  Development of the resettlement site including land development and housing construction  Documentation of the acquisition of housing units and movement of families to the resettlement site  Project Monitoring, Reporting and Evaluation
  • 15. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 15 NATIONAL HOUSING AUTHORITY Project Management in NATIONAL HOUSING AUTHORITY The CBIA Process is a very promising scheme developed by the Authority to promote the participation of the community and its beneficiaries in the design process of every project. The CBIA scheme is made as a “Design and Build” Scheme, which allows developers to propose their own design for every project, subject for evaluation by the Authority. This concept emerged from the idea wherein for most of the years, the NHA have encountered many dialogues, interactions, and even more so, complaints, from our beneficiaries as to their housing project location, their housing design, and even the financing scheme. One of the best practices done with this scheme is that this involves the community the design process, and if followed properly, the financing scheme of this process is beneficial to the community and to the government, allowing them to fully utilize their budget at lower risk. The monitoring requirements of projects are also a good aspect of this scheme. Daily, weekly and monthly monitoring report with logbooks are required from the technical team assigned to the projects by this scheme. This will entail a more intensive monitoring and allow the management to foresee problems that might arise during the contract period and possibly mitigate more negative effects of them.
  • 16. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 16 NATIONAL HOUSING AUTHORITY Project Management in NATIONAL HOUSING AUTHORITY  The law being used by different government agencies to procure and handle infrastructure projects is the Republic Act No. 9184 or what we call the “Government Procurement Reform Act”, which the details how to program, procure and finance infrastructure project handled by the government.  “Community Based Initiative Approach” or CBIA.  The CBIA has four (4) key components:  Selection and endorsement by project beneficiaries of their preferred project sites  Development of project sites including the construction of housing units by the participating landowner/developer/contractor.  Acquisition of house and lot units through the existing financing scheme for beneficiaries,  Participation of the project beneficiaries in the identified aspects of the relocation and resettlement program as well as in project implementation.
  • 17. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 17 NATIONAL HOUSING AUTHORITY Project Management in NATIONAL HOUSING AUTHORITY The CBIA involves the following general processes:  Community Planning and Organizing  Invitation through Public Notice to landowners/developers/contractors to submit proposals  General Orientation of landowners/developers/contractors to the CBIA  NHA Evaluation of eligibility of landowner/developers/contractors and preliminary approval of proposals  Presentation of preliminary evaluated proposals to CAs, CA endorsement of preferred resettlement sites and developers to LIAC and/or appropriate body  NHA Final Evaluation and Approval of Proposals  Execution of Agreements  Award of Contract to landowners/developers/contractors  Development of the resettlement site including land development and housing construction  Documentation of the acquisition of housing units and movement of families to the resettlement site  Project Monitoring, Reporting and Evaluation
  • 18. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 18 NATIONAL HOUSING AUTHORITY Project Management in NATIONAL HOUSING AUTHORITY The CBIA Process is a very promising scheme developed by the Authority to promote the participation of the community and its beneficiaries in the design process of every project. The CBIA scheme is made as a “Design and Build” Scheme, which allows developers to propose their own design for every project, subject for evaluation by the Authority. This concept emerged from the idea wherein for most of the years, the NHA have encountered many dialogues, interactions, and even more so, complaints, from our beneficiaries as to their housing project location, their housing design, and even the financing scheme. One of the best practices done with this scheme is that this involves the community the design process, and if followed properly, the financing scheme of this process is beneficial to the community and to the government, allowing them to fully utilize their budget at lower risk. The monitoring requirements of projects are also a good aspect of this scheme. Daily, weekly and monthly monitoring report with logbooks are required from the technical team assigned to the projects by this scheme. This will entail a more intensive monitoring and allow the management to foresee problems that might arise during the contract period and possibly mitigate more negative effects of them.
  • 19. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 19 LGU- GUMACA, QUEZON Project Management in LGU – Gumaca, Quezon  Project Integration Management - All infrastructure projects should be included in Annual Investment Plan (AIP).  Project Scope Management – Conduct pre-construction meetings with recipients and other departments.  Project Time Management – Provides PERT-CPM of respective projects to monitor construction progress. Request for Catch-up Plan
  • 20. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 20 LGU- GUMACA, QUEZON Project Management in LGU – Gumaca, Quezon  Project Cost Management - Preparation of plans, detailed engineering design, specifications, estimates and surveys of the projects with the consideration of locally available products/ materials to maintain budget control and to avoid extra expenses.  Project Quality Management – Regular ocular site inspection to ensure plans and technical specifications are followed. Infrastructure projects are audited by COA.  Project Human Resource Management – Assigned technical staff that have knowledge of respective project types and allowed them to attend training and seminars for their professional growth.
  • 21. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 21 LGU- GUMACA, QUEZON Project Management in LGU – Gumaca, Quezon  Project Communication Management – Regular report about the updates on projects with the contractor, implementing office, and end users. Implement proper safe keeping of records.  Project Risk Management – All possible risk are being discussed during pre-procurement meeting.  Project Procurement Management - The procurement strictly adhere to the provisions of R.A. 9184, its IRR, and GPPB guidelines.
  • 22. METHODOLOGIES ON PROJECT MANAGEMENT IN RELATION TO CONSTRUCTION PROJECTS 22 LGU- GUMACA, QUEZON Project Management in LGU – Gumaca, Quezon  Project Stakeholder Management – Regular reporting of the project status with the contractor, implementing office, non government organization and end users.

Editor's Notes

  1. The accounting office will submit all disbursement vouchers together with the supporting documents to COA after the payment for projects. C
  2. The accounting office will submit all disbursement vouchers together with the supporting documents to COA after the payment for projects. C