More Related Content More from Anurag Srivastava (20) Lp formulation2. Two products, namely P1 and P2 are being manufactured.
Each product has to be processed through two machines
M1 and M2. One unit of product P1 consumes 4 hours of
time on M1 and 2 hours of time on M2. Similarly, one unit
of P2 consumes 2 hours of time on M1 and 4 hours of
time on M2. 60 hours of time is available on M1 and 48
hours on M2. The per unit contribution margin of P1 is 8
and of P2 is 6. Determine the number of units of P1 and
P2 to be manufactured so as to maximise total
contribution.
3. Products M1 M2 Contribution
Margin
P1 4hrs 2hrs Rs.8
P2 2hrs 4hrs Rs.6
Total Machine
hours
60hrs 48hrs
4. ๐ถ๐๐๐๐๐๐๐๐: ๐ป๐ ๐๐๐๐๐๐๐๐ ๐๐๐ ๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐
๐ช๐๐๐๐๐๐๐๐๐๐: ๐จ๐๐๐๐๐๐๐๐๐๐๐ ๐๐ ๐๐๐๐๐๐๐ ๐๐๐๐๐
๐ณ๐๐ ๐๐ ๐๐๐๐๐๐ ๐๐๐๐ ๐ ๐ ๐๐๐๐๐ ๐๐ ๐ท๐ ๐๐๐
๐ ๐ ๐๐๐๐๐ ๐๐ ๐ท๐ ๐๐๐
๐๐๐๐
๐๐๐๐
๐ถ๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐:
๐ด๐๐๐๐๐๐๐ ๐ = ๐๐ ๐ + ๐๐ ๐
๐ด๐๐๐๐๐๐ ๐ด๐ ๐๐๐๐๐๐๐๐๐๐:
๐๐ ๐ + ๐๐ ๐ โค ๐๐
๐ด๐๐๐๐๐๐ ๐ด๐ ๐๐๐๐๐๐๐๐๐๐:
๐๐ ๐ + ๐๐ ๐ โค ๐๐
๐ต๐๐ โ ๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐:
๐ ๐ โฅ ๐
๐ ๐ โฅ ๐
5. โด ๐ป๐๐ ๐๐๐๐๐๐๐๐๐๐
๐๐๐๐๐๐๐ ๐๐๐ ๐๐ ๐๐๐๐๐๐
๐๐:
๐ด๐๐๐๐๐๐๐ ๐ = ๐๐ ๐ + ๐๐ ๐
๐๐๐๐๐๐๐ ๐๐ ๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐:
๐๐ ๐ + ๐๐ ๐ โค ๐๐
๐๐ ๐ + ๐๐ ๐ โค ๐๐
๐ ๐ โฅ ๐
๐ ๐ โฅ ๐