TEEKAY OFFSHORE
First Quarter 2014 Earnings
Presentation
May 16, 2014
TEEKAY OFFSHORE
This presentation contains forward-looking statements (as defined in Section 21E of the Securities Exchange Act of 1934, as
amended) which reflect management’s current views with respect to certain future events and performance, including statements
regarding: the fundamentals in the offshore industry; future growth opportunities, including the Partnership’s ability to successfully
bid for new offshore projects or to grow organically; future increases in the Partnership’s distributable cash flows; the results of
proposed projects; the timing of new and converted vessel deliveries and commencement of their time charter contracts; the
potential for the Partnership to acquire future HiLoad projects and improved features of new HiLoad DP vessel designs; the timing
and certainty of completion of the Partnership’s acquisition of Logitel; the effect of the Logitel acquisition on the Partnership’s future
cash flows and growth opportunities; the timing and certainty of entering into long-term financing for the FAU newbuildings prior to
their deliveries; the timing and certainty of securing a charter contract for the second FAU newbuilding prior to its delivery; the
estimated cost of building or converting vessels or offshore units; the effect of the Dampier Spirit FSO contract extension on the
Partnership’s cash flow from vessel operations; and the potential for Teekay Corporation or third parties to offer additional vessels or
projects to the Partnership and the Partnership agreeing to acquire such vessels or projects, including the timing and certainty of the
acquisition of the Knarr FPSO. The following factors are among those that could cause actual results to differ materially from the
forward-looking statements, which involve risks and uncertainties, and that should be considered in evaluating any such statement:
vessel operations and oil production volumes; significant changes in oil prices; variations in expected levels of field maintenance;
increased operating expenses; different-than-expected levels of oil production in the North Sea and Brazil offshore fields; potential
early termination of contracts; shipyard delivery or vessel conversion delays and cost overruns; failure to complete the Partnership’s
acquisition of Logitel; failure by the Partnership to secure financing on the two FAU newbuildings and secure a charter contract for
the second FAU newbuilding; change in exploration, production and storage of offshore oil and gas, either generally or in particular
regions that would impact the expected future growth in the floating accommodation and services rig market; delays in the
commencement of time-charters; the inability to successfully complete the operational testing of the HiLoad DP unit; actual results of
the new HiLoad DP unit designs; failure of Teekay Corporation to offer to the Partnership additional vessels or of Sevan, Remora or
Odebrecht to develop new vessels or projects; potential delays in the construction of the Knarr FPSO and/or commencement of
operations under its charter contract; failure to obtain required approvals by the Conflicts Committee of Teekay Offshore’s general
partner to approve the acquisition of vessels offered from Teekay Corporation, or third parties; the Partnership’s ability to raise
adequate financing to purchase additional assets; and other factors discussed in Teekay Offshore’s filings from time to time with the
SEC, including its Report on Form 20-F for the fiscal year ended December 31, 2013. The Partnership expressly disclaims any
obligation or undertaking to release publicly any updates or revisions to any forward-looking statements contained herein to reflect
any change in the Partnership’s expectations with respect thereto or any change in events, conditions or circumstances on which
any such statement is based.
Forward Looking Statements
2
TEEKAY OFFSHORE
• Generated distributable cash flow of $51.1 million in Q1-14, a
22% increase from Q1-13
• Declared Q1-14 cash distribution of $0.5384 per unit
• Signed a letter of intent (LOI) to acquire Logitel Offshore, a
company focused on the floating accommodation market
• Potential to grow to a $1.0+ billion investment for Teekay Offshore
• Completed $261 million acquisition of ALP Maritime Services
and ordered four towing and anchor handling vessel newbuilds
• Signed a contract extension for the Dampier Spirit FSO
contract with Apache Energy for an additional 10-years
Recent Highlights
3
TEEKAY OFFSHORE
• In May 2014, TOO signed an LOI to acquire Logitel
Offshore Holdings Ltd. (Logitel), an offshore floating
accommodation company carved out of Sevan Marine
ASA (Sevan)
– Logitel owns two floating accommodation units (FAUs),
which are based on the Sevan cylindrical hull design, plus
options to order up to an additional six FAUs
– Both units are currently under construction at the COSCO
shipyard in China
• First unit has secured a 3-yr charter contract, plus
extension options, with Petrobras in Brazil and is
scheduled to deliver in Q1-2015
• Expect to secure charter contract for the second unit prior
to its scheduled delivery in Q4-2015
• Natural complement to TOO’s existing offshore business
and provides a new channel for accretive growth
Signed LOI toAcquire Logitel Offshore
4
TEEKAY OFFSHORE
FloatingAccommodation Market
5
• Employed where there is a need for additional offshore accommodation, storage and support
• Mainly used for maintenance and modification projects on existing offshore installations
• Can also be used during the hook-up of new installations and decommissioning of old facilities
• Current fleet of 23 floating accommodation units worldwide with 14 more on order
• Main regions are Mexico and the North Sea with future demand from Brazil, Asia and West Africa
Strong Demand FundamentalsAging Floating Accommodation Fleet
Source: DNB / Pareto
-5
0
5
10
15
20
25
30
35
40
45
SafeNotus
SafeEurus
POSHXanadu
POSHArcadia
LogitelHull1
LogitelHull2
AxisVega
FloatelTriumph
SafeZephyrus
FloatelEndurance
AxisNova
CotemarNB
CotemarNB
SafeBoreas
FloatelVictory
OSSGretha
OSSPrometheus
FloatelSuperior
FloatelReliance
SafeConcordia
GrupoRSemi1
GrupoRSemi2
MSVRegalia
SafeScandinavia
SafeLancia
SafeBristolia
Chemul
SafeAstoria
SafeCaledonia
SafeRegency
Iolair
Jasminia
SafeBrittania
SafeHibernia
JasperFinder
COSLRival
EtescoMillennium
BorgholmDolphin
Age(Years)
Non-DP
DP2
DP3
Source: Fearnleys
Average age of fleet = 24 years
Orderbook
• Growth in installed base of FPUs
• Aging infrastructure
Accommodation Demand (‘000 vessel days)
Decommissioning Inspection, maintenance and repair Construction and commissioning
TEEKAY OFFSHORE
• In May 2014, the 1987-built Dampier Spirit FSO contract was
extended for an additional 10 years by Apache Energy
• The FSO will continue to operate on the Stag oil field offshore
Western Australia
Dampier Spirit FSOAccretive Life Extension
6
• The FSO is expected to be
drydocked for 45 days for
upgrades during Q2-2014 for
a total cost of approximately
$11 million
• The FSO contract is expected
to earn approximately $5.7
million in annual CFVO1
1) Cash flow from vessel operations (CFVO) from consolidated vessels represents income from vessel operations before depreciation and amortization expense, write-down of vessels and amortization of
deferred gains, includes the realized gains (losses) on the settlement of foreign exchange forward contracts, and cash flow from vessel operations relating to its discontinued operations and adjusting
for direct financing leases to a cash basis. CFVO is a non-GAAP financial measure used by certain investors to measure the financial performance of shipping companies.
TEEKAY OFFSHORE
Adjusted Operating Results for Q1 2014 vs. Q4 2013
(1) See Appendix A to the Partnership's Q1-14 earnings release for a description of Appendix A items.
(2) Reallocating the realized gains/losses to their respective line as if hedge accounting had applied. Please refer to footnotes (2) and (3) to the Summary Consolidated
Statements of Income in the Q1-14 earnings release.
UNAUDITED
(in thousands of US dollars)
As Reported
Appendix A items
(1)
Reclass for
Realized
Gains/Losses on
Derivatives
(2)
TOO Adjusted
Income Statement
TOO Adjusted
Income Statement
NET REVENUES
Revenues 259,234 - - 259,234 260,654
Voyage expenses 33,454 - - 33,454 29,173
Net revenues 225,780 - - 225,780 231,481
OPERATING EXPENSES
Vessel operating expenses 88,130 637 378 89,145 90,343
Time-charter hire expense 11,412 - 11,412 13,670
Depreciation and amortization 48,488 - - 48,488 52,311
General and administrative 14,849 (1,000) 119 13,968 11,209
Restructuring charge 559 (559) - - -
Total operating expenses 163,438 (922) 497 163,013 167,533
Income from vessel operations 62,342 922 (497) 62,767 63,948
OTHER ITEMS
Interest expense (18,920) - (14,047) (32,967) (33,211)
Interest income 177 - - 177 434
Realized and unrealized (losses) gains
on derivative instruments (36,632) 22,072 14,560 - -
Equity income from joint venture 3,703 (151) - 3,552 2,756
Foreign exchange loss (775) 791 (16) - -
Other income – net 390 - - 390 260
Income tax expense (1,263) - - (1,263) (87)
Total other items (53,320) 22,712 497 (30,111) (29,848)
Net income from continuing operations 9,022 23,634 - 32,656 34,100
Less: Net income attributable to
non-controlling interests (1,679) 199 - (1,480) (417)
ADJUSTED NET INCOME ATTRIBUTABLE TO
THE PARTNERSHIP 7,343 23,833 - 31,176 33,683
March 31, 2014 December 31, 2013
Three Months Ended Three Months Ended
7
TEEKAY OFFSHORE
Distributable Cash Flow and Cash Distribution
Three Months Ended Three Months Ended
March 31, 2014 December 31, 2013
(unaudited) (unaudited)
Net income 9,022 35,612
Add (subtract):
48,488 52,311
22,072 (25,219)
- 19,280
distributable cash flow before estimated maintenance
capital expenditures 5,907 4,787
1,707 2,914
(2,719) (2,719)
(3,703) (3,934)
(29,924) (28,859)
Voyageur Spirit FPSO (1)
3,474 4,911
1,106 2,969
Distributable Cash Flow before Non-Controlling Interests 55,430 62,053
Non-controlling interests’ share of DCF (4,370) (4,650)
Distributable Cash Flow 51,060 57,403 A
Total Distributions 50,884 50,875 B
Coverage Ratio 1.00x 1.13x =A/B
Foreign exchange and other, net
Distributions relating to preferred units
Equity income from joint venture
Depreciation and amortization
Write-dow n of vessels
Partnership's share of equity accounted joint venture's
Distributions relating to equity financing of new buildings
Unrealized losses (gains) on derivative instruments
Estimated maintenance capital expenditures (1)
Indemnification from Teekay Corporation relating to the
(1) Indemnification of Voyageur Spirit FPSO’s revenues and certain unrecovered vessel operating expenses are effectively treated as a reduction to estimated
maintenance capital expenditures.
8
TEEKAY OFFSHORE
Visible Existing and Potential Growth Opportunities for TOO
9
Agreements with Sevan and Remora expected to provide additional growth
opportunities
Visible Growth
Potential Future Growth
SHUTTLE
& FSO
Remora HiLoad DP Unit
Salamander FSO Project
2014
FPSO
Petrojarl Knarr Newbuild
20162015 2017
Gina Krog FSO Project
Teekay Offshore Projects
Teekay Corp. Project
Directly bidding on several offshore projects
ALP - Four Towing and Anchor NewbuildsTowing
Vessels
Accommodation
units
Logitel - Two Accommodation unit Newbuilds, not including options
TEEKAY OFFSHORE
Logitel Acquisition
Partnering forAdjacent Offshore Growth
10
Engineering
prowess and
intellectual
property
(cylindrical hull
technology)
Access to capital,
operational
platform and
market leading
positions in the
offshore industry
ALP Acquisition
Ulstein X‐BOW®
design used on the
new vessels
Operational
platform, customer
relationships and
experience in the
long-haul towing
industry
Access to capital
and market leading
positions in the
offshore oil
industry
New Growth
Channel for TOO in
Long-Haul Towing
and Anchor
Handling Market
($261 million
acquisition/order)
New Growth
Channel for TOO in
the Floating
Accommodation
Market
(Potential to grow
to $1.5 billion
segment)
TEEKAY OFFSHORE
2014 Investor Day
11
TEEKAY OFFSHORE
Appendix
12
TEEKAY OFFSHORE
2014 Drydock Schedule
13
Note: In the case that a vessel drydock straddles between quarters, the drydock has been allocated to the quarter in which the majority of drydock days occur.
Entity Segment
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Vessels
Drydocked
Total
Offhire
Days
Teekay Offshore Fixed-Rate Tanker - - 1 23 - - - - 1 23
FSO - - 1 70 1 40 - - 2 110
Shuttle Tanker 2 54 1 32 2 64 1 55 6 205
2 54 3 125 3 104 1 55 9 338
December 31, 2014 (E) Total 2014March 31, 2014 (A) June 30, 2014 (E) September 30, 2014 (E)
TEEKAY OFFSHORE

More Related Content

What's hot

Teekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings PresentationTeekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings PresentationAltera Infrastructure
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor PresentationAltera Infrastructure
 
Teekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings PresentationTeekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Tankers Q1-2017 Earnings Presentation
Teekay Tankers Q1-2017 Earnings PresentationTeekay Tankers Q1-2017 Earnings Presentation
Teekay Tankers Q1-2017 Earnings PresentationTeekay Tankers Ltd
 
Teekay Tankers Third Quarter 2013 Earnings Presentation
Teekay Tankers Third Quarter 2013 Earnings PresentationTeekay Tankers Third Quarter 2013 Earnings Presentation
Teekay Tankers Third Quarter 2013 Earnings PresentationTeekay Tankers Ltd
 
Teekay Tankers Q4-2016 Earnings Presentation
Teekay Tankers Q4-2016 Earnings PresentationTeekay Tankers Q4-2016 Earnings Presentation
Teekay Tankers Q4-2016 Earnings PresentationTeekay Tankers Ltd
 
Teekay's Q4-2016 Earnings Presentation
Teekay's Q4-2016 Earnings PresentationTeekay's Q4-2016 Earnings Presentation
Teekay's Q4-2016 Earnings PresentationTeekay Corporation
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceAltera Infrastructure
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay LNG Partners L.P.
 
Teekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings PresentationTeekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings PresentationTeekay Corporation
 
Proposed Merger of TNK and TIL
Proposed Merger of TNK and TILProposed Merger of TNK and TIL
Proposed Merger of TNK and TILTeekay Tankers Ltd
 
Teekay Offshore Partners Investor Day Presentation 2012
Teekay Offshore Partners Investor Day Presentation 2012Teekay Offshore Partners Investor Day Presentation 2012
Teekay Offshore Partners Investor Day Presentation 2012Altera Infrastructure
 
Strategic Partnership with Brookfield
Strategic Partnership with BrookfieldStrategic Partnership with Brookfield
Strategic Partnership with BrookfieldTeekay Corporation
 
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014Teekay LNG Partners L.P.
 
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014Altera Infrastructure
 
Teekay LNG Partners Q4-2016 Earnings Presentation
Teekay LNG Partners Q4-2016 Earnings PresentationTeekay LNG Partners Q4-2016 Earnings Presentation
Teekay LNG Partners Q4-2016 Earnings PresentationTeekay LNG Partners L.P.
 

What's hot (16)

Teekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings PresentationTeekay Offshore Partners Q4-2016 Earnings Presentation
Teekay Offshore Partners Q4-2016 Earnings Presentation
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor Presentation
 
Teekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings PresentationTeekay LNG Partners Q1-2017 Earnings Presentation
Teekay LNG Partners Q1-2017 Earnings Presentation
 
Teekay Tankers Q1-2017 Earnings Presentation
Teekay Tankers Q1-2017 Earnings PresentationTeekay Tankers Q1-2017 Earnings Presentation
Teekay Tankers Q1-2017 Earnings Presentation
 
Teekay Tankers Third Quarter 2013 Earnings Presentation
Teekay Tankers Third Quarter 2013 Earnings PresentationTeekay Tankers Third Quarter 2013 Earnings Presentation
Teekay Tankers Third Quarter 2013 Earnings Presentation
 
Teekay Tankers Q4-2016 Earnings Presentation
Teekay Tankers Q4-2016 Earnings PresentationTeekay Tankers Q4-2016 Earnings Presentation
Teekay Tankers Q4-2016 Earnings Presentation
 
Teekay's Q4-2016 Earnings Presentation
Teekay's Q4-2016 Earnings PresentationTeekay's Q4-2016 Earnings Presentation
Teekay's Q4-2016 Earnings Presentation
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings PresentationTeekay Corporation Q1 2017 Earnings Presentation
Teekay Corporation Q1 2017 Earnings Presentation
 
Proposed Merger of TNK and TIL
Proposed Merger of TNK and TILProposed Merger of TNK and TIL
Proposed Merger of TNK and TIL
 
Teekay Offshore Partners Investor Day Presentation 2012
Teekay Offshore Partners Investor Day Presentation 2012Teekay Offshore Partners Investor Day Presentation 2012
Teekay Offshore Partners Investor Day Presentation 2012
 
Strategic Partnership with Brookfield
Strategic Partnership with BrookfieldStrategic Partnership with Brookfield
Strategic Partnership with Brookfield
 
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
Teekay LNG Partners (NYSE: TGP) Investor Day Presentation, Sep 30, 2014
 
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
 
Teekay LNG Partners Q4-2016 Earnings Presentation
Teekay LNG Partners Q4-2016 Earnings PresentationTeekay LNG Partners Q4-2016 Earnings Presentation
Teekay LNG Partners Q4-2016 Earnings Presentation
 

Viewers also liked

Teekay Offshore Partners Third Quarter 2013 Earnings Presentation
Teekay Offshore Partners Third Quarter 2013 Earnings PresentationTeekay Offshore Partners Third Quarter 2013 Earnings Presentation
Teekay Offshore Partners Third Quarter 2013 Earnings PresentationAltera Infrastructure
 
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation Altera Infrastructure
 
Teekay LNG Partners Third Quarter 2014 Earnings Presentation
Teekay LNG Partners Third Quarter 2014 Earnings PresentationTeekay LNG Partners Third Quarter 2014 Earnings Presentation
Teekay LNG Partners Third Quarter 2014 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationAltera Infrastructure
 
Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation Teekay LNG Partners L.P.
 
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners L.P.
 
TEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATION
TEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATIONTEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATION
TEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATIONTeekay LNG Partners L.P.
 
Teekay Offshore Partners Third Quarter 2012 Earnings Presentation
Teekay Offshore Partners Third Quarter 2012 Earnings PresentationTeekay Offshore Partners Third Quarter 2012 Earnings Presentation
Teekay Offshore Partners Third Quarter 2012 Earnings PresentationAltera Infrastructure
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference PresentationAltera Infrastructure
 
TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation
TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation
TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation Teekay LNG Partners L.P.
 
Teekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings PresentationTeekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay LNG Partners Third Quarter 2012 Earnings Presentation
Teekay LNG Partners Third Quarter 2012 Earnings PresentationTeekay LNG Partners Third Quarter 2012 Earnings Presentation
Teekay LNG Partners Third Quarter 2012 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation Teekay LNG Partners L.P.
 
Teekay LNG Partners First Quarter 2013 Earnings Presentation
Teekay LNG Partners First Quarter 2013 Earnings PresentationTeekay LNG Partners First Quarter 2013 Earnings Presentation
Teekay LNG Partners First Quarter 2013 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Offshore Partners Fourth Quarter 2012 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2012 Earnings PresentationTeekay Offshore Partners Fourth Quarter 2012 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2012 Earnings PresentationAltera Infrastructure
 
Teekay LNG Partners Q2-2015 Earnings Presentation
Teekay LNG Partners Q2-2015 Earnings PresentationTeekay LNG Partners Q2-2015 Earnings Presentation
Teekay LNG Partners Q2-2015 Earnings PresentationTeekay LNG Partners L.P.
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings PresentationTeekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings PresentationAltera Infrastructure
 

Viewers also liked (20)

Teekay Offshore Partners Third Quarter 2013 Earnings Presentation
Teekay Offshore Partners Third Quarter 2013 Earnings PresentationTeekay Offshore Partners Third Quarter 2013 Earnings Presentation
Teekay Offshore Partners Third Quarter 2013 Earnings Presentation
 
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
 
Teekay LNG Partners Third Quarter 2014 Earnings Presentation
Teekay LNG Partners Third Quarter 2014 Earnings PresentationTeekay LNG Partners Third Quarter 2014 Earnings Presentation
Teekay LNG Partners Third Quarter 2014 Earnings Presentation
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
 
Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation Teekay LNG Partners Q1-2015 Earnings Presentation
Teekay LNG Partners Q1-2015 Earnings Presentation
 
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings PresentationTeekay LNG Partners Third Quarter 2013 Earnings Presentation
Teekay LNG Partners Third Quarter 2013 Earnings Presentation
 
TEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATION
TEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATIONTEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATION
TEEKAY LNG PARTNERS Q2-2015 EARNINGS PRESENTATION
 
Teekay Offshore Partners Third Quarter 2012 Earnings Presentation
Teekay Offshore Partners Third Quarter 2012 Earnings PresentationTeekay Offshore Partners Third Quarter 2012 Earnings Presentation
Teekay Offshore Partners Third Quarter 2012 Earnings Presentation
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation
 
TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation
TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation
TGP Q1 2012: Teekay LNG Partners First Quarter 2012 Earnings Presentation
 
Teekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings PresentationTeekay LNG Partners Second Quarter 2013 Earnings Presentation
Teekay LNG Partners Second Quarter 2013 Earnings Presentation
 
Teekay LNG Partners Third Quarter 2012 Earnings Presentation
Teekay LNG Partners Third Quarter 2012 Earnings PresentationTeekay LNG Partners Third Quarter 2012 Earnings Presentation
Teekay LNG Partners Third Quarter 2012 Earnings Presentation
 
Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation Teekay LNG Partners Q1-2016 Earnings Presentation
Teekay LNG Partners Q1-2016 Earnings Presentation
 
2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation2013 NAPTP MLP Conference Presentation
2013 NAPTP MLP Conference Presentation
 
Teekay LNG Partners First Quarter 2013 Earnings Presentation
Teekay LNG Partners First Quarter 2013 Earnings PresentationTeekay LNG Partners First Quarter 2013 Earnings Presentation
Teekay LNG Partners First Quarter 2013 Earnings Presentation
 
Teekay Offshore Partners Fourth Quarter 2012 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2012 Earnings PresentationTeekay Offshore Partners Fourth Quarter 2012 Earnings Presentation
Teekay Offshore Partners Fourth Quarter 2012 Earnings Presentation
 
Teekay LNG Partners Q2-2015 Earnings Presentation
Teekay LNG Partners Q2-2015 Earnings PresentationTeekay LNG Partners Q2-2015 Earnings Presentation
Teekay LNG Partners Q2-2015 Earnings Presentation
 
TGP NAPTP Conference 2012
TGP NAPTP Conference 2012TGP NAPTP Conference 2012
TGP NAPTP Conference 2012
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
 
Teekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings PresentationTeekay Offshore Partners Q3-2015 Earnings Presentation
Teekay Offshore Partners Q3-2015 Earnings Presentation
 

Similar to Teekay Offshore Partners First Quarter 2014 Earnings Presentation

Teekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationAltera Infrastructure
 
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings PresentationTeekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings PresentationTeekay Corporation
 
Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013TradeWindsnews
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor PresentationTeekay Corporation
 
Teekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings PresentationTeekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Second Quarter 2013 Earnings Presentation
Teekay Offshore Partners Second Quarter 2013 Earnings PresentationTeekay Offshore Partners Second Quarter 2013 Earnings Presentation
Teekay Offshore Partners Second Quarter 2013 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q2 2013 results presentation
Teekay Offshore Partners Q2 2013 results presentationTeekay Offshore Partners Q2 2013 results presentation
Teekay Offshore Partners Q2 2013 results presentationTradeWindsnews
 
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioTeekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioAltera Infrastructure
 
Teekay Corporation Q3-2016 Earnings Presentation
Teekay Corporation Q3-2016 Earnings Presentation Teekay Corporation Q3-2016 Earnings Presentation
Teekay Corporation Q3-2016 Earnings Presentation Teekay Corporation
 
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Corporation
 
Teekay Tankers Q2 2013 results presentation
Teekay Tankers Q2 2013 results presentationTeekay Tankers Q2 2013 results presentation
Teekay Tankers Q2 2013 results presentationTradeWindsnews
 
Teekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation
 
Teekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings PresentationTeekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings PresentationTeekay Corporation
 
Teekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings PresentationTeekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings PresentationTeekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings PresentationAltera Infrastructure
 
Teekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings PresentationTeekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings PresentationTeekay Tankers Ltd
 
Teekay Corporation Second Quarter 2013 Earnings Presentation
Teekay Corporation Second Quarter 2013 Earnings PresentationTeekay Corporation Second Quarter 2013 Earnings Presentation
Teekay Corporation Second Quarter 2013 Earnings PresentationTeekay Corporation
 
Teekay Tankers Fourth Quarter 2014 Earnings Presentation
Teekay Tankers Fourth Quarter 2014 Earnings PresentationTeekay Tankers Fourth Quarter 2014 Earnings Presentation
Teekay Tankers Fourth Quarter 2014 Earnings PresentationTeekay Tankers Ltd
 
Teekay Corporation First Quarter Earnings Presentation
Teekay Corporation First Quarter Earnings PresentationTeekay Corporation First Quarter Earnings Presentation
Teekay Corporation First Quarter Earnings PresentationTeekay Corporation
 

Similar to Teekay Offshore Partners First Quarter 2014 Earnings Presentation (20)

Teekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings PresentationTeekay Offshore Partners Q1-2015 Earnings Presentation
Teekay Offshore Partners Q1-2015 Earnings Presentation
 
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings PresentationTeekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
Teekay Corporation Fourth Quarter and Fiscal 2013 Earnings Presentation
 
Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013Teekay Corp group presentation September 2013
Teekay Corp group presentation September 2013
 
September 2013 Investor Presentation
September 2013 Investor PresentationSeptember 2013 Investor Presentation
September 2013 Investor Presentation
 
Teekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings PresentationTeekay Corporation First Quarter 2014 Earnings Presentation
Teekay Corporation First Quarter 2014 Earnings Presentation
 
Teekay Offshore Partners Second Quarter 2013 Earnings Presentation
Teekay Offshore Partners Second Quarter 2013 Earnings PresentationTeekay Offshore Partners Second Quarter 2013 Earnings Presentation
Teekay Offshore Partners Second Quarter 2013 Earnings Presentation
 
Teekay Offshore Partners Q2 2013 results presentation
Teekay Offshore Partners Q2 2013 results presentationTeekay Offshore Partners Q2 2013 results presentation
Teekay Offshore Partners Q2 2013 results presentation
 
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings PresentatioTeekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
Teekay Offshore Partners Fourth Quarter 2014 Earnings Presentatio
 
Teekay Corporation Q3-2016 Earnings Presentation
Teekay Corporation Q3-2016 Earnings Presentation Teekay Corporation Q3-2016 Earnings Presentation
Teekay Corporation Q3-2016 Earnings Presentation
 
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream ConferenceTeekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
Teekay Group Presents at the 2013 Citi One-on-One MLP / Midstream Conference
 
Teekay Tankers Q2 2013 results presentation
Teekay Tankers Q2 2013 results presentationTeekay Tankers Q2 2013 results presentation
Teekay Tankers Q2 2013 results presentation
 
Teekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings PresentationTeekay Corporation Third Quarter 2013 Earnings Presentation
Teekay Corporation Third Quarter 2013 Earnings Presentation
 
Teekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings PresentationTeekay Corporation Third Quarter 2014 Earnings Presentation
Teekay Corporation Third Quarter 2014 Earnings Presentation
 
Teekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings PresentationTeekay Offshore Partners Q2-2015 Earnings Presentation
Teekay Offshore Partners Q2-2015 Earnings Presentation
 
Teekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings PresentationTeekay Offshore Partners Q2-2018 Earnings Presentation
Teekay Offshore Partners Q2-2018 Earnings Presentation
 
Teekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings PresentationTeekay Tankers Second Quarter 2014 Earnings Presentation
Teekay Tankers Second Quarter 2014 Earnings Presentation
 
Teekay Corporation Second Quarter 2013 Earnings Presentation
Teekay Corporation Second Quarter 2013 Earnings PresentationTeekay Corporation Second Quarter 2013 Earnings Presentation
Teekay Corporation Second Quarter 2013 Earnings Presentation
 
Teekay Tankers Fourth Quarter 2014 Earnings Presentation
Teekay Tankers Fourth Quarter 2014 Earnings PresentationTeekay Tankers Fourth Quarter 2014 Earnings Presentation
Teekay Tankers Fourth Quarter 2014 Earnings Presentation
 
xxxxx
xxxxxxxxxx
xxxxx
 
Teekay Corporation First Quarter Earnings Presentation
Teekay Corporation First Quarter Earnings PresentationTeekay Corporation First Quarter Earnings Presentation
Teekay Corporation First Quarter Earnings Presentation
 

More from Altera Infrastructure

Teekay Offshore Partners Q4-2019 Earnings Presentation
Teekay Offshore Partners Q4-2019 Earnings PresentationTeekay Offshore Partners Q4-2019 Earnings Presentation
Teekay Offshore Partners Q4-2019 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q3-2019 Earnings Presentation
Teekay Offshore Partners Q3-2019 Earnings PresentationTeekay Offshore Partners Q3-2019 Earnings Presentation
Teekay Offshore Partners Q3-2019 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationTeekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationTeekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q4-2018 Earnings Presentation
Teekay Offshore Partners Q4-2018 Earnings Presentation Teekay Offshore Partners Q4-2018 Earnings Presentation
Teekay Offshore Partners Q4-2018 Earnings Presentation Altera Infrastructure
 
Teekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings PresentationTeekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q1-2018 Earnings Presentation
Teekay Offshore Partners Q1-2018 Earnings PresentationTeekay Offshore Partners Q1-2018 Earnings Presentation
Teekay Offshore Partners Q1-2018 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings PresentationTeekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings PresentationTeekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Altera Infrastructure
 
Strategic Partnership with Brookfield
Strategic Partnership with BrookfieldStrategic Partnership with Brookfield
Strategic Partnership with BrookfieldAltera Infrastructure
 
Teekay Offshore Partners Q3-2016 Earnings Presentation
Teekay Offshore Partners Q3-2016 Earnings Presentation Teekay Offshore Partners Q3-2016 Earnings Presentation
Teekay Offshore Partners Q3-2016 Earnings Presentation Altera Infrastructure
 
Teekay Offshore Production Sustainability Report 2015
Teekay Offshore Production Sustainability Report 2015Teekay Offshore Production Sustainability Report 2015
Teekay Offshore Production Sustainability Report 2015Altera Infrastructure
 
Teekay Offshore Partners Q2-2016 Earnings Presentation
Teekay Offshore Partners Q2-2016 Earnings PresentationTeekay Offshore Partners Q2-2016 Earnings Presentation
Teekay Offshore Partners Q2-2016 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings PresentationTeekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook Presentation
Teekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook PresentationTeekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook Presentation
Teekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook PresentationAltera Infrastructure
 

More from Altera Infrastructure (20)

Q4 20 Earnings Presentation
Q4 20 Earnings PresentationQ4 20 Earnings Presentation
Q4 20 Earnings Presentation
 
Q3 20 ER Presentation
Q3 20 ER PresentationQ3 20 ER Presentation
Q3 20 ER Presentation
 
Q2 20 ER Presentation
Q2 20 ER PresentationQ2 20 ER Presentation
Q2 20 ER Presentation
 
Q1 20 Earnings Release
Q1 20 Earnings ReleaseQ1 20 Earnings Release
Q1 20 Earnings Release
 
Teekay Offshore Partners Q4-2019 Earnings Presentation
Teekay Offshore Partners Q4-2019 Earnings PresentationTeekay Offshore Partners Q4-2019 Earnings Presentation
Teekay Offshore Partners Q4-2019 Earnings Presentation
 
Teekay Offshore Partners Q3-2019 Earnings Presentation
Teekay Offshore Partners Q3-2019 Earnings PresentationTeekay Offshore Partners Q3-2019 Earnings Presentation
Teekay Offshore Partners Q3-2019 Earnings Presentation
 
Teekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationTeekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings Presentation
 
Teekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings PresentationTeekay Offshore Partners Q1-2019 Earnings Presentation
Teekay Offshore Partners Q1-2019 Earnings Presentation
 
Teekay Offshore Partners Q4-2018 Earnings Presentation
Teekay Offshore Partners Q4-2018 Earnings Presentation Teekay Offshore Partners Q4-2018 Earnings Presentation
Teekay Offshore Partners Q4-2018 Earnings Presentation
 
Teekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings PresentationTeekay Offshore Partners Q3-2018 Earnings Presentation
Teekay Offshore Partners Q3-2018 Earnings Presentation
 
Teekay Offshore Partners Q1-2018 Earnings Presentation
Teekay Offshore Partners Q1-2018 Earnings PresentationTeekay Offshore Partners Q1-2018 Earnings Presentation
Teekay Offshore Partners Q1-2018 Earnings Presentation
 
Teekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings PresentationTeekay Offshore Partners Q4-2017 Earnings Presentation
Teekay Offshore Partners Q4-2017 Earnings Presentation
 
Teekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings PresentationTeekay Offshore Partners Q3-2017 Earnings Presentation
Teekay Offshore Partners Q3-2017 Earnings Presentation
 
Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation Teekay Offshore Partners Q2-2017 Earnings Presentation
Teekay Offshore Partners Q2-2017 Earnings Presentation
 
Strategic Partnership with Brookfield
Strategic Partnership with BrookfieldStrategic Partnership with Brookfield
Strategic Partnership with Brookfield
 
Teekay Offshore Partners Q3-2016 Earnings Presentation
Teekay Offshore Partners Q3-2016 Earnings Presentation Teekay Offshore Partners Q3-2016 Earnings Presentation
Teekay Offshore Partners Q3-2016 Earnings Presentation
 
Teekay Offshore Production Sustainability Report 2015
Teekay Offshore Production Sustainability Report 2015Teekay Offshore Production Sustainability Report 2015
Teekay Offshore Production Sustainability Report 2015
 
Teekay Offshore Partners Q2-2016 Earnings Presentation
Teekay Offshore Partners Q2-2016 Earnings PresentationTeekay Offshore Partners Q2-2016 Earnings Presentation
Teekay Offshore Partners Q2-2016 Earnings Presentation
 
Teekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings PresentationTeekay Offshore Partners Q1-2016 Earnings Presentation
Teekay Offshore Partners Q1-2016 Earnings Presentation
 
Teekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook Presentation
Teekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook PresentationTeekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook Presentation
Teekay Offshore Partners L.P. Q4-2015 Earnings and Business Outlook Presentation
 

Recently uploaded

B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...tanu pandey
 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...SUHANI PANDEY
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...mriyagarg453
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024gstubel
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsgwenoracqe6
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationPaul West-Sells
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...tanu pandey
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 

Recently uploaded (20)

Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...High Profile Call Girls in Pune  (Adult Only) 8005736733 Escort Service 24x7 ...
High Profile Call Girls in Pune (Adult Only) 8005736733 Escort Service 24x7 ...
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 

Teekay Offshore Partners First Quarter 2014 Earnings Presentation

  • 1. TEEKAY OFFSHORE First Quarter 2014 Earnings Presentation May 16, 2014
  • 2. TEEKAY OFFSHORE This presentation contains forward-looking statements (as defined in Section 21E of the Securities Exchange Act of 1934, as amended) which reflect management’s current views with respect to certain future events and performance, including statements regarding: the fundamentals in the offshore industry; future growth opportunities, including the Partnership’s ability to successfully bid for new offshore projects or to grow organically; future increases in the Partnership’s distributable cash flows; the results of proposed projects; the timing of new and converted vessel deliveries and commencement of their time charter contracts; the potential for the Partnership to acquire future HiLoad projects and improved features of new HiLoad DP vessel designs; the timing and certainty of completion of the Partnership’s acquisition of Logitel; the effect of the Logitel acquisition on the Partnership’s future cash flows and growth opportunities; the timing and certainty of entering into long-term financing for the FAU newbuildings prior to their deliveries; the timing and certainty of securing a charter contract for the second FAU newbuilding prior to its delivery; the estimated cost of building or converting vessels or offshore units; the effect of the Dampier Spirit FSO contract extension on the Partnership’s cash flow from vessel operations; and the potential for Teekay Corporation or third parties to offer additional vessels or projects to the Partnership and the Partnership agreeing to acquire such vessels or projects, including the timing and certainty of the acquisition of the Knarr FPSO. The following factors are among those that could cause actual results to differ materially from the forward-looking statements, which involve risks and uncertainties, and that should be considered in evaluating any such statement: vessel operations and oil production volumes; significant changes in oil prices; variations in expected levels of field maintenance; increased operating expenses; different-than-expected levels of oil production in the North Sea and Brazil offshore fields; potential early termination of contracts; shipyard delivery or vessel conversion delays and cost overruns; failure to complete the Partnership’s acquisition of Logitel; failure by the Partnership to secure financing on the two FAU newbuildings and secure a charter contract for the second FAU newbuilding; change in exploration, production and storage of offshore oil and gas, either generally or in particular regions that would impact the expected future growth in the floating accommodation and services rig market; delays in the commencement of time-charters; the inability to successfully complete the operational testing of the HiLoad DP unit; actual results of the new HiLoad DP unit designs; failure of Teekay Corporation to offer to the Partnership additional vessels or of Sevan, Remora or Odebrecht to develop new vessels or projects; potential delays in the construction of the Knarr FPSO and/or commencement of operations under its charter contract; failure to obtain required approvals by the Conflicts Committee of Teekay Offshore’s general partner to approve the acquisition of vessels offered from Teekay Corporation, or third parties; the Partnership’s ability to raise adequate financing to purchase additional assets; and other factors discussed in Teekay Offshore’s filings from time to time with the SEC, including its Report on Form 20-F for the fiscal year ended December 31, 2013. The Partnership expressly disclaims any obligation or undertaking to release publicly any updates or revisions to any forward-looking statements contained herein to reflect any change in the Partnership’s expectations with respect thereto or any change in events, conditions or circumstances on which any such statement is based. Forward Looking Statements 2
  • 3. TEEKAY OFFSHORE • Generated distributable cash flow of $51.1 million in Q1-14, a 22% increase from Q1-13 • Declared Q1-14 cash distribution of $0.5384 per unit • Signed a letter of intent (LOI) to acquire Logitel Offshore, a company focused on the floating accommodation market • Potential to grow to a $1.0+ billion investment for Teekay Offshore • Completed $261 million acquisition of ALP Maritime Services and ordered four towing and anchor handling vessel newbuilds • Signed a contract extension for the Dampier Spirit FSO contract with Apache Energy for an additional 10-years Recent Highlights 3
  • 4. TEEKAY OFFSHORE • In May 2014, TOO signed an LOI to acquire Logitel Offshore Holdings Ltd. (Logitel), an offshore floating accommodation company carved out of Sevan Marine ASA (Sevan) – Logitel owns two floating accommodation units (FAUs), which are based on the Sevan cylindrical hull design, plus options to order up to an additional six FAUs – Both units are currently under construction at the COSCO shipyard in China • First unit has secured a 3-yr charter contract, plus extension options, with Petrobras in Brazil and is scheduled to deliver in Q1-2015 • Expect to secure charter contract for the second unit prior to its scheduled delivery in Q4-2015 • Natural complement to TOO’s existing offshore business and provides a new channel for accretive growth Signed LOI toAcquire Logitel Offshore 4
  • 5. TEEKAY OFFSHORE FloatingAccommodation Market 5 • Employed where there is a need for additional offshore accommodation, storage and support • Mainly used for maintenance and modification projects on existing offshore installations • Can also be used during the hook-up of new installations and decommissioning of old facilities • Current fleet of 23 floating accommodation units worldwide with 14 more on order • Main regions are Mexico and the North Sea with future demand from Brazil, Asia and West Africa Strong Demand FundamentalsAging Floating Accommodation Fleet Source: DNB / Pareto -5 0 5 10 15 20 25 30 35 40 45 SafeNotus SafeEurus POSHXanadu POSHArcadia LogitelHull1 LogitelHull2 AxisVega FloatelTriumph SafeZephyrus FloatelEndurance AxisNova CotemarNB CotemarNB SafeBoreas FloatelVictory OSSGretha OSSPrometheus FloatelSuperior FloatelReliance SafeConcordia GrupoRSemi1 GrupoRSemi2 MSVRegalia SafeScandinavia SafeLancia SafeBristolia Chemul SafeAstoria SafeCaledonia SafeRegency Iolair Jasminia SafeBrittania SafeHibernia JasperFinder COSLRival EtescoMillennium BorgholmDolphin Age(Years) Non-DP DP2 DP3 Source: Fearnleys Average age of fleet = 24 years Orderbook • Growth in installed base of FPUs • Aging infrastructure Accommodation Demand (‘000 vessel days) Decommissioning Inspection, maintenance and repair Construction and commissioning
  • 6. TEEKAY OFFSHORE • In May 2014, the 1987-built Dampier Spirit FSO contract was extended for an additional 10 years by Apache Energy • The FSO will continue to operate on the Stag oil field offshore Western Australia Dampier Spirit FSOAccretive Life Extension 6 • The FSO is expected to be drydocked for 45 days for upgrades during Q2-2014 for a total cost of approximately $11 million • The FSO contract is expected to earn approximately $5.7 million in annual CFVO1 1) Cash flow from vessel operations (CFVO) from consolidated vessels represents income from vessel operations before depreciation and amortization expense, write-down of vessels and amortization of deferred gains, includes the realized gains (losses) on the settlement of foreign exchange forward contracts, and cash flow from vessel operations relating to its discontinued operations and adjusting for direct financing leases to a cash basis. CFVO is a non-GAAP financial measure used by certain investors to measure the financial performance of shipping companies.
  • 7. TEEKAY OFFSHORE Adjusted Operating Results for Q1 2014 vs. Q4 2013 (1) See Appendix A to the Partnership's Q1-14 earnings release for a description of Appendix A items. (2) Reallocating the realized gains/losses to their respective line as if hedge accounting had applied. Please refer to footnotes (2) and (3) to the Summary Consolidated Statements of Income in the Q1-14 earnings release. UNAUDITED (in thousands of US dollars) As Reported Appendix A items (1) Reclass for Realized Gains/Losses on Derivatives (2) TOO Adjusted Income Statement TOO Adjusted Income Statement NET REVENUES Revenues 259,234 - - 259,234 260,654 Voyage expenses 33,454 - - 33,454 29,173 Net revenues 225,780 - - 225,780 231,481 OPERATING EXPENSES Vessel operating expenses 88,130 637 378 89,145 90,343 Time-charter hire expense 11,412 - 11,412 13,670 Depreciation and amortization 48,488 - - 48,488 52,311 General and administrative 14,849 (1,000) 119 13,968 11,209 Restructuring charge 559 (559) - - - Total operating expenses 163,438 (922) 497 163,013 167,533 Income from vessel operations 62,342 922 (497) 62,767 63,948 OTHER ITEMS Interest expense (18,920) - (14,047) (32,967) (33,211) Interest income 177 - - 177 434 Realized and unrealized (losses) gains on derivative instruments (36,632) 22,072 14,560 - - Equity income from joint venture 3,703 (151) - 3,552 2,756 Foreign exchange loss (775) 791 (16) - - Other income – net 390 - - 390 260 Income tax expense (1,263) - - (1,263) (87) Total other items (53,320) 22,712 497 (30,111) (29,848) Net income from continuing operations 9,022 23,634 - 32,656 34,100 Less: Net income attributable to non-controlling interests (1,679) 199 - (1,480) (417) ADJUSTED NET INCOME ATTRIBUTABLE TO THE PARTNERSHIP 7,343 23,833 - 31,176 33,683 March 31, 2014 December 31, 2013 Three Months Ended Three Months Ended 7
  • 8. TEEKAY OFFSHORE Distributable Cash Flow and Cash Distribution Three Months Ended Three Months Ended March 31, 2014 December 31, 2013 (unaudited) (unaudited) Net income 9,022 35,612 Add (subtract): 48,488 52,311 22,072 (25,219) - 19,280 distributable cash flow before estimated maintenance capital expenditures 5,907 4,787 1,707 2,914 (2,719) (2,719) (3,703) (3,934) (29,924) (28,859) Voyageur Spirit FPSO (1) 3,474 4,911 1,106 2,969 Distributable Cash Flow before Non-Controlling Interests 55,430 62,053 Non-controlling interests’ share of DCF (4,370) (4,650) Distributable Cash Flow 51,060 57,403 A Total Distributions 50,884 50,875 B Coverage Ratio 1.00x 1.13x =A/B Foreign exchange and other, net Distributions relating to preferred units Equity income from joint venture Depreciation and amortization Write-dow n of vessels Partnership's share of equity accounted joint venture's Distributions relating to equity financing of new buildings Unrealized losses (gains) on derivative instruments Estimated maintenance capital expenditures (1) Indemnification from Teekay Corporation relating to the (1) Indemnification of Voyageur Spirit FPSO’s revenues and certain unrecovered vessel operating expenses are effectively treated as a reduction to estimated maintenance capital expenditures. 8
  • 9. TEEKAY OFFSHORE Visible Existing and Potential Growth Opportunities for TOO 9 Agreements with Sevan and Remora expected to provide additional growth opportunities Visible Growth Potential Future Growth SHUTTLE & FSO Remora HiLoad DP Unit Salamander FSO Project 2014 FPSO Petrojarl Knarr Newbuild 20162015 2017 Gina Krog FSO Project Teekay Offshore Projects Teekay Corp. Project Directly bidding on several offshore projects ALP - Four Towing and Anchor NewbuildsTowing Vessels Accommodation units Logitel - Two Accommodation unit Newbuilds, not including options
  • 10. TEEKAY OFFSHORE Logitel Acquisition Partnering forAdjacent Offshore Growth 10 Engineering prowess and intellectual property (cylindrical hull technology) Access to capital, operational platform and market leading positions in the offshore industry ALP Acquisition Ulstein X‐BOW® design used on the new vessels Operational platform, customer relationships and experience in the long-haul towing industry Access to capital and market leading positions in the offshore oil industry New Growth Channel for TOO in Long-Haul Towing and Anchor Handling Market ($261 million acquisition/order) New Growth Channel for TOO in the Floating Accommodation Market (Potential to grow to $1.5 billion segment)
  • 13. TEEKAY OFFSHORE 2014 Drydock Schedule 13 Note: In the case that a vessel drydock straddles between quarters, the drydock has been allocated to the quarter in which the majority of drydock days occur. Entity Segment Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Vessels Drydocked Total Offhire Days Teekay Offshore Fixed-Rate Tanker - - 1 23 - - - - 1 23 FSO - - 1 70 1 40 - - 2 110 Shuttle Tanker 2 54 1 32 2 64 1 55 6 205 2 54 3 125 3 104 1 55 9 338 December 31, 2014 (E) Total 2014March 31, 2014 (A) June 30, 2014 (E) September 30, 2014 (E)