SlideShare a Scribd company logo
1 of 1
Download to read offline
12'-5"
37'-0"
23'-1"
DOWN
W/H
LIVING ROOM
KITCHEN
DINNING
BEDROOM #1
BEDROOM #2
BEDROOM #3
GARAGE
MASTER BEDROOM
MASTER
BATH
MASTER
CLOSET
OPEN
LAUNDRY
SOFFIT
ROOF ABOVE
DECK ABOVE
ROOF ABOVE
15'-4"
26'-2"
9'-4"4'-9"2'-1"11'-3"11'-3"
38'-8"
7'-2"
15'-4"
15'-10"
29'-7"
50'-1"
19'-0"
6'-10"
3'-6"
10'-9"
40'-0"
19'-3"4'-7"3'-1"
24'-10"
4'-5"
10'-9"
3'-6"6'-10" 8'-1" 19'-3"
16'-3" 3'-0"
6'-3"
2'-4"
2'-4"
2'-0"
40'-0"
24'-4"14'-3"
21'-3"
12'-11"
8'-6"15'-2"
30'-3"
16'-1"
UP
DOWN
OPEN
ROOF ABOVE
13'-1"
3'-10"
6'-3"
CEILING LIGHT FIXTURE
FLUORESCENT LIGHT
LIGHTING PENDANT
RECESSED LIGHT
SYMBOL DESCRIPTION
EXTERIOR FLUORESCENT
LIGHTING
SYMBOLS
UNLESS NOTED OTHERWISE
PLUG @ 12" A.F.F.
SWITCH @ 44" A.F.F.
UNLESS NOTED OTHERWISE
ARC FAULT INTERRUPTOR
INTERRUPTOR (GFI)
GROUND FAULT
(GFI)
CARBON MONOXIDE ALARM
SD
F EXHAUST FAN
SMOKE DETECTOR /
SD/CM
SMOKE DETECTOR
SYMBOL DESCRIPTION
NEW DECK UNCOVERED
CLOSET
CLOSET
CLOSET
SKYLIGHT
A/C
NEW DECK
(N) HANDRAIL
(N) HANDRAIL
23'-7"
15" MIN
F
NOTES:
1. FANS SHALL BE ENERGY STAR COMPLAINT AND BE DUCTED
TO THE OUTSIDE OF THE BUILDING
2. FANS NOT FUNCTIONINGFOR THE WHOLE HOUSE
VENTILATION SYSTEM MUST BE CONTROLLED BY A HUMIDITY
CONTROL
SD/CM
THRESHOLD <1.5"
(TYPICAL)
MIN. 10" RUN
MAX. 7.75" HEIGHT
(TYPICAL)
4'-0"
2'-0"
F
F
15"MIN
2'-10"2'-4"
15" MIN
3'-6"
3'-0"
4'-10"
9'-0"
4'-7"
(N) STAIRS
(N) STAIRS
15"MIN
(N) STAIRS
SD
SD
SD
SD/CM
SD/CM
SD
F
A-2
DRAWN BY: ALF
DATE: NOV.13.15
RENOVATIONANDADDITION

More Related Content

Viewers also liked

Debbie DeCinko Final PPP
Debbie DeCinko Final PPPDebbie DeCinko Final PPP
Debbie DeCinko Final PPPoDebbieo
 
2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industry2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industryResearch Hub
 
satul Țînțăreni,raionul Anenii Noi, Republica Moldova
satul Țînțăreni,raionul Anenii Noi, Republica Moldovasatul Țînțăreni,raionul Anenii Noi, Republica Moldova
satul Țînțăreni,raionul Anenii Noi, Republica MoldovaNatali Pașcan
 
2015 deep research report on global inositol industry
2015 deep research report on global inositol industry2015 deep research report on global inositol industry
2015 deep research report on global inositol industryResearch Hub
 
Vaikundarajan Wishes Every One A Happy Independence Day
Vaikundarajan Wishes Every One A Happy Independence DayVaikundarajan Wishes Every One A Happy Independence Day
Vaikundarajan Wishes Every One A Happy Independence DayVaikundarajan S
 
Система удаленного сбора показаний водяных счетчиков
Система удаленного сбора показаний водяных счетчиковСистема удаленного сбора показаний водяных счетчиков
Система удаленного сбора показаний водяных счетчиковСТРИЖ Телематика
 
Certificazione delle competenze. Michele Colaianni
Certificazione delle competenze. Michele ColaianniCertificazione delle competenze. Michele Colaianni
Certificazione delle competenze. Michele ColaianniDigital-Coach.it
 
Reviewing the unit balanced scorecard 15 june2010
Reviewing the unit balanced scorecard 15 june2010Reviewing the unit balanced scorecard 15 june2010
Reviewing the unit balanced scorecard 15 june2010Ajoy Jauhar
 
Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"
Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"
Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"Φωτεινή Kαφίδα
 
RSA_CitizenPower_Final-report_20130709 (1)
RSA_CitizenPower_Final-report_20130709 (1)RSA_CitizenPower_Final-report_20130709 (1)
RSA_CitizenPower_Final-report_20130709 (1)Di Goldsmith
 
JCI Alabang July Activities and Upcoming Activities
JCI Alabang July Activities and Upcoming ActivitiesJCI Alabang July Activities and Upcoming Activities
JCI Alabang July Activities and Upcoming ActivitiesAimee Flordeliza
 
Foundation Degree in Motorsport Engineering
Foundation Degree in Motorsport EngineeringFoundation Degree in Motorsport Engineering
Foundation Degree in Motorsport Engineeringbwcelearning
 
Undp youth project MyCareer
Undp youth project MyCareerUndp youth project MyCareer
Undp youth project MyCareerUNDP Ukraine
 
Mechanical Engineer C.V
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.VAslam Mohammed
 

Viewers also liked (20)

Debbie DeCinko Final PPP
Debbie DeCinko Final PPPDebbie DeCinko Final PPP
Debbie DeCinko Final PPP
 
2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industry2015 deep research report on global paste pvc resin industry
2015 deep research report on global paste pvc resin industry
 
satul Țînțăreni,raionul Anenii Noi, Republica Moldova
satul Țînțăreni,raionul Anenii Noi, Republica Moldovasatul Țînțăreni,raionul Anenii Noi, Republica Moldova
satul Țînțăreni,raionul Anenii Noi, Republica Moldova
 
2015 deep research report on global inositol industry
2015 deep research report on global inositol industry2015 deep research report on global inositol industry
2015 deep research report on global inositol industry
 
Vaikundarajan Wishes Every One A Happy Independence Day
Vaikundarajan Wishes Every One A Happy Independence DayVaikundarajan Wishes Every One A Happy Independence Day
Vaikundarajan Wishes Every One A Happy Independence Day
 
Bryan_Nelson_Water_Panel-AquaFiber
Bryan_Nelson_Water_Panel-AquaFiberBryan_Nelson_Water_Panel-AquaFiber
Bryan_Nelson_Water_Panel-AquaFiber
 
Система удаленного сбора показаний водяных счетчиков
Система удаленного сбора показаний водяных счетчиковСистема удаленного сбора показаний водяных счетчиков
Система удаленного сбора показаний водяных счетчиков
 
Certificazione delle competenze. Michele Colaianni
Certificazione delle competenze. Michele ColaianniCertificazione delle competenze. Michele Colaianni
Certificazione delle competenze. Michele Colaianni
 
Manage book project
Manage book projectManage book project
Manage book project
 
iklim sekolah
 iklim sekolah iklim sekolah
iklim sekolah
 
Reviewing the unit balanced scorecard 15 june2010
Reviewing the unit balanced scorecard 15 june2010Reviewing the unit balanced scorecard 15 june2010
Reviewing the unit balanced scorecard 15 june2010
 
Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"
Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"
Ε' δημοτικού: "Γνωριμία με τη Τέχνη και τους καλλιτέχνες"
 
RSA_CitizenPower_Final-report_20130709 (1)
RSA_CitizenPower_Final-report_20130709 (1)RSA_CitizenPower_Final-report_20130709 (1)
RSA_CitizenPower_Final-report_20130709 (1)
 
Bab 4
Bab 4Bab 4
Bab 4
 
Postcard from napoli
Postcard from napoliPostcard from napoli
Postcard from napoli
 
JCI Alabang July Activities and Upcoming Activities
JCI Alabang July Activities and Upcoming ActivitiesJCI Alabang July Activities and Upcoming Activities
JCI Alabang July Activities and Upcoming Activities
 
Foundation Degree in Motorsport Engineering
Foundation Degree in Motorsport EngineeringFoundation Degree in Motorsport Engineering
Foundation Degree in Motorsport Engineering
 
Undp youth project MyCareer
Undp youth project MyCareerUndp youth project MyCareer
Undp youth project MyCareer
 
Przestrzeń i człowiek / Anna Komorowska
Przestrzeń i człowiek / Anna Komorowska Przestrzeń i człowiek / Anna Komorowska
Przestrzeń i człowiek / Anna Komorowska
 
Mechanical Engineer C.V
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.V
 

Similar to TIVOILI A2 FLOOR PLANS NOV.13.15

106 Wilkes Avenue-First Floor Plan - Proposed
106 Wilkes Avenue-First Floor Plan - Proposed106 Wilkes Avenue-First Floor Plan - Proposed
106 Wilkes Avenue-First Floor Plan - ProposedMark Williams
 
332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN
332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN
332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLANKensonSunBernade
 
2161 Niagara Street-Renovated 2nd Floor Plan
2161 Niagara Street-Renovated 2nd Floor Plan2161 Niagara Street-Renovated 2nd Floor Plan
2161 Niagara Street-Renovated 2nd Floor PlanMark Williams
 
332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN
332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN
332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLANKensonSunBernade
 
MM Design Project 4 - Sheet - 4 - First Floor Dimensions
MM Design Project 4 - Sheet - 4 - First Floor DimensionsMM Design Project 4 - Sheet - 4 - First Floor Dimensions
MM Design Project 4 - Sheet - 4 - First Floor DimensionsMichael McConnell
 
The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...
The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...
The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...Regrob.com
 
JL-Harris Lake House-2-FL-Main Floor
JL-Harris Lake House-2-FL-Main FloorJL-Harris Lake House-2-FL-Main Floor
JL-Harris Lake House-2-FL-Main FloorJennifer Lindquist
 
FS The Coronation Brochure - Zricks.com
FS The Coronation Brochure - Zricks.comFS The Coronation Brochure - Zricks.com
FS The Coronation Brochure - Zricks.comZricks.com
 
PLAN DESIGN BY BIKI MALLIK
PLAN DESIGN BY BIKI MALLIKPLAN DESIGN BY BIKI MALLIK
PLAN DESIGN BY BIKI MALLIKBIKIMALLIK1
 
ADT316-ITALIANTE-1stFloor
ADT316-ITALIANTE-1stFloorADT316-ITALIANTE-1stFloor
ADT316-ITALIANTE-1stFloorAriel San Jose
 
Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...
Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...
Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...ompalsi
 
ARCH1011 Townhouse 2016 JAS
ARCH1011 Townhouse 2016 JASARCH1011 Townhouse 2016 JAS
ARCH1011 Townhouse 2016 JASJennifer Schultz
 
EQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUT
EQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUTEQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUT
EQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUTPaul Dorroh
 

Similar to TIVOILI A2 FLOOR PLANS NOV.13.15 (20)

106 Wilkes Avenue-First Floor Plan - Proposed
106 Wilkes Avenue-First Floor Plan - Proposed106 Wilkes Avenue-First Floor Plan - Proposed
106 Wilkes Avenue-First Floor Plan - Proposed
 
332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN
332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN
332 ANDALUSIAN UPDATED PROPOSED BASEMENT PLAN
 
3
33
3
 
2161 Niagara Street-Renovated 2nd Floor Plan
2161 Niagara Street-Renovated 2nd Floor Plan2161 Niagara Street-Renovated 2nd Floor Plan
2161 Niagara Street-Renovated 2nd Floor Plan
 
332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN
332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN
332 ANDALUSIAN OP # 1 PROPOSED BASEMENT FLOOR PLAN
 
LEED Silver House
LEED Silver HouseLEED Silver House
LEED Silver House
 
SAN ANTONIO
SAN ANTONIOSAN ANTONIO
SAN ANTONIO
 
PURDUE A2 FLOOR PLANS SEP.27.16
PURDUE A2 FLOOR PLANS SEP.27.16PURDUE A2 FLOOR PLANS SEP.27.16
PURDUE A2 FLOOR PLANS SEP.27.16
 
MM Design Project 4 - Sheet - 4 - First Floor Dimensions
MM Design Project 4 - Sheet - 4 - First Floor DimensionsMM Design Project 4 - Sheet - 4 - First Floor Dimensions
MM Design Project 4 - Sheet - 4 - First Floor Dimensions
 
CEDRICKWELCH
CEDRICKWELCHCEDRICKWELCH
CEDRICKWELCH
 
The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...
The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...
The Valencia Banjara Hills Hyderabad | Price | Location | Floor Plan | Posses...
 
JL-Harris Lake House-2-FL-Main Floor
JL-Harris Lake House-2-FL-Main FloorJL-Harris Lake House-2-FL-Main Floor
JL-Harris Lake House-2-FL-Main Floor
 
FS The Coronation Brochure - Zricks.com
FS The Coronation Brochure - Zricks.comFS The Coronation Brochure - Zricks.com
FS The Coronation Brochure - Zricks.com
 
PLAN DESIGN BY BIKI MALLIK
PLAN DESIGN BY BIKI MALLIKPLAN DESIGN BY BIKI MALLIK
PLAN DESIGN BY BIKI MALLIK
 
ADT316-ITALIANTE-1stFloor
ADT316-ITALIANTE-1stFloorADT316-ITALIANTE-1stFloor
ADT316-ITALIANTE-1stFloor
 
PORTFOLIO.pdf
PORTFOLIO.pdfPORTFOLIO.pdf
PORTFOLIO.pdf
 
Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...
Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...
Book Now SARE Crescent ParC Green ParC II Call @ 09999536147 in Sector 92, Gu...
 
ARCH1011 Townhouse 2016 JAS
ARCH1011 Townhouse 2016 JASARCH1011 Townhouse 2016 JAS
ARCH1011 Townhouse 2016 JAS
 
EQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUT
EQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUTEQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUT
EQUIPMENT SHED DESIGN - Sheet - A101 - CONCEPT LAYOUT
 
Pathot revit model
Pathot revit model Pathot revit model
Pathot revit model
 

More from Alfonso Duran, Assoc. AIA (15)

TIVOILI A3 ELEVATIONS NOV.13.15
TIVOILI A3 ELEVATIONS NOV.13.15TIVOILI A3 ELEVATIONS NOV.13.15
TIVOILI A3 ELEVATIONS NOV.13.15
 
PURDUE A3 ELEVATIONS SEP.27.16
PURDUE A3 ELEVATIONS SEP.27.16PURDUE A3 ELEVATIONS SEP.27.16
PURDUE A3 ELEVATIONS SEP.27.16
 
7TH ST A000 APR.29.16 Z
7TH ST A000 APR.29.16 Z7TH ST A000 APR.29.16 Z
7TH ST A000 APR.29.16 Z
 
7TH ST A102 APR.29.16 Z
7TH ST A102 APR.29.16 Z7TH ST A102 APR.29.16 Z
7TH ST A102 APR.29.16 Z
 
7TH ST A100 APR.29.16 Z
7TH ST A100 APR.29.16 Z7TH ST A100 APR.29.16 Z
7TH ST A100 APR.29.16 Z
 
ONTARIO A201 ELEVATIONS MAY.16.16
ONTARIO A201 ELEVATIONS MAY.16.16ONTARIO A201 ELEVATIONS MAY.16.16
ONTARIO A201 ELEVATIONS MAY.16.16
 
BEVER A801x
BEVER A801xBEVER A801x
BEVER A801x
 
BEVER A101x
BEVER A101xBEVER A101x
BEVER A101x
 
BEVER A100x
BEVER A100xBEVER A100x
BEVER A100x
 
ONTARIO A320 SITE DETAILS MAY.16.16
ONTARIO A320 SITE DETAILS MAY.16.16ONTARIO A320 SITE DETAILS MAY.16.16
ONTARIO A320 SITE DETAILS MAY.16.16
 
ONTARIO A102 FLOOR PLANS MAY.16.16
ONTARIO A102 FLOOR PLANS MAY.16.16ONTARIO A102 FLOOR PLANS MAY.16.16
ONTARIO A102 FLOOR PLANS MAY.16.16
 
ONTARIO A100 EGRESS PLAN MAY.16.16
ONTARIO A100 EGRESS PLAN MAY.16.16ONTARIO A100 EGRESS PLAN MAY.16.16
ONTARIO A100 EGRESS PLAN MAY.16.16
 
Duran Salazar projects 2014 B reduced
Duran Salazar projects 2014 B reducedDuran Salazar projects 2014 B reduced
Duran Salazar projects 2014 B reduced
 
ALFONSO DURAN resume 2015Z docs
ALFONSO DURAN resume 2015Z docsALFONSO DURAN resume 2015Z docs
ALFONSO DURAN resume 2015Z docs
 
Rosemead brochure
Rosemead brochureRosemead brochure
Rosemead brochure
 

TIVOILI A2 FLOOR PLANS NOV.13.15

  • 1. 12'-5" 37'-0" 23'-1" DOWN W/H LIVING ROOM KITCHEN DINNING BEDROOM #1 BEDROOM #2 BEDROOM #3 GARAGE MASTER BEDROOM MASTER BATH MASTER CLOSET OPEN LAUNDRY SOFFIT ROOF ABOVE DECK ABOVE ROOF ABOVE 15'-4" 26'-2" 9'-4"4'-9"2'-1"11'-3"11'-3" 38'-8" 7'-2" 15'-4" 15'-10" 29'-7" 50'-1" 19'-0" 6'-10" 3'-6" 10'-9" 40'-0" 19'-3"4'-7"3'-1" 24'-10" 4'-5" 10'-9" 3'-6"6'-10" 8'-1" 19'-3" 16'-3" 3'-0" 6'-3" 2'-4" 2'-4" 2'-0" 40'-0" 24'-4"14'-3" 21'-3" 12'-11" 8'-6"15'-2" 30'-3" 16'-1" UP DOWN OPEN ROOF ABOVE 13'-1" 3'-10" 6'-3" CEILING LIGHT FIXTURE FLUORESCENT LIGHT LIGHTING PENDANT RECESSED LIGHT SYMBOL DESCRIPTION EXTERIOR FLUORESCENT LIGHTING SYMBOLS UNLESS NOTED OTHERWISE PLUG @ 12" A.F.F. SWITCH @ 44" A.F.F. UNLESS NOTED OTHERWISE ARC FAULT INTERRUPTOR INTERRUPTOR (GFI) GROUND FAULT (GFI) CARBON MONOXIDE ALARM SD F EXHAUST FAN SMOKE DETECTOR / SD/CM SMOKE DETECTOR SYMBOL DESCRIPTION NEW DECK UNCOVERED CLOSET CLOSET CLOSET SKYLIGHT A/C NEW DECK (N) HANDRAIL (N) HANDRAIL 23'-7" 15" MIN F NOTES: 1. FANS SHALL BE ENERGY STAR COMPLAINT AND BE DUCTED TO THE OUTSIDE OF THE BUILDING 2. FANS NOT FUNCTIONINGFOR THE WHOLE HOUSE VENTILATION SYSTEM MUST BE CONTROLLED BY A HUMIDITY CONTROL SD/CM THRESHOLD <1.5" (TYPICAL) MIN. 10" RUN MAX. 7.75" HEIGHT (TYPICAL) 4'-0" 2'-0" F F 15"MIN 2'-10"2'-4" 15" MIN 3'-6" 3'-0" 4'-10" 9'-0" 4'-7" (N) STAIRS (N) STAIRS 15"MIN (N) STAIRS SD SD SD SD/CM SD/CM SD F A-2 DRAWN BY: ALF DATE: NOV.13.15 RENOVATIONANDADDITION