Grade Separation Systems is an innovative method developed by art engineering inc. for constructing rail-highway underpasses without using expensive temporary tracks, structures, or long-term closures. It provides a more cost-effective alternative to traditional grade separation projects, with potential savings of up to 45% by avoiding the need for temporary works, foreign technology, or shoofly tracks. The system utilizes common heavy civil construction techniques to separate highway and rail lines in a way that meets North American safety standards and allows for year-round construction.
2. Grade Separation Systems is an innovative method for the
construction of underpasses at rail-highway grade crossings.
What Is ?
Grade Crossing Underpass
3. Rail-highway grade crossings are one of the biggest problems
with modern infrastructure, causing hundreds of deaths each
year.
Rail Crossing Issues
4. There are over 100,000 public rail-highway grade crossings in
North America that are still in use, leaving lots of potential for
accidents.
Rail Crossing Issues
0
2000
4000
6000
8000
10000
12000
14000
2004 2006 2008 2010 2012 2014 2016
Highway-rail accidents
Trespassing accidents
8,444
3,454
courtesy of FRA
Accidents by type of occurrence in the U.S.
5. Although preventing accidents is the top priority, other rail-
highway crossing issues can be resolved with grade separation.
Rail Crossing Issues
Trains cannot operate at full speed
Warning horns disrupt residents Traffic congests due to delays
6. Why Do We Need ?
Current grade separating methods are expensive, often
making separation projects infeasible.
Total Unnecessary Cost:
≈$900,000 CAD
Total Unnecessary Cost:
$1,000,000+ CAD
Total Unnecessary Cost:
$1,000,000+ CAD
Temporary Works
Foreign Technology
Shoo-fly Track
7. How Is Different?
GSS is a more efficient method that avoids long term closures,
rail detours, and temporary structures altogether.
These improvements allow for significant savings – up to a 45%
reduction in project costs.
Innovative method
No temporary structures
No rail detours
Common heavy civil techniques
Meets all North American standards
Year round constructability
8. How Does Work?
For more information visit:
www.artengineering.ca/GSS
Or call:
1 (844) 8 ART ENG
• art engineering inc.
Structural Consulting Engineers