Contents: - Page
1- Summary 4
2- Technical reports:
 Fans 6
 Split Units 16
 Sound Measurements 19
3- Instrument Used 21
4- Calibration Certificates 23
Page (3)
Page (4)
TAB
The Engineering Company Draft Report Cairo West Air Base
	For Testing and Balancing Services
	
Summary	
	
Introduction	
	
								As	per	the	Client	requirement,	TAB	Company	was	honoured	to	be	hired	by	
AICI	to	carry	out	the	entire	(Cairo	West	Air	Base)	project	TAB	Works	for	the	HVAC	
system.	
	
Herewith	are	the	TAB	Works	draft	reports	after	completion	of	works.	
	
 Security	Admin	(AA):‐	
												TAB	Scope	of	Work:	
1‐ Air	systems:	
1‐1‐ (3)	Fans	
1‐2‐ (7)	Split	Units		
1‐3‐ (Ls)	Air	terminals	
1‐4‐ Sound	Measurements	(Not	under	NEBB)	
	
	
 Remarks:	
1‐ EX‐01	 is	 achieving	 492%	 (Fan	 is	 direct	 driven	 and	 served	 with	 one	
terminal).	
2‐ EX‐02	is	achieving	180%	(Fan	is	direct	driven).	
	
	
	
	
	
	
Page (5)
Page (6)
Page (7)
Page (8)
Page (9)
Volume (CFM): 250 Air Density (kg/m3): 1.191 Drive Loss (%): 3
External SP (in. wg): 0.4 Elevation (m): 74 Inlet Vane Damper
Operating Power (hp): 0.04 Airstream Temp. (C): 21 Static Efficiency (%) 39
Fan RPM: 1200 Filter Box:
TCBRS-2-09-4
Chart Type: RPM Family
Sound Power by Octave Band
Sound
Data
62.5 125 250 500 1000 2000 4000 8000 LwA dBA Sones
Inlet 77 67 61 64 60 56 54 42 65 54 7.0
LwA - A weighted sound power level, based on ANSI S1.4
dBA - A weighed sound pressure level, based on 11.5 dB attenuation per Octave band at 1.52 m. dBA levels are not licensed by AMCA
International
Sones - calculated using AMCA 301 at 1.52 m
System Effect couldn't be determined
(No access to measure total static
pressure
Page (10)
Page (11)
Page (12)
Page (13)
Page (14)
Page (15)
Page (16)
Page (17)
Page (18)
Sound Measurements
Page (19)
TAB
The Engineering Company for Testing and Balancing Services
Project : Cairo West Air Base
Building : Security Admin Facility (AA)
SPU-01-01 Ground Floor Office (109) 1 40 35 41 40
SPU-01-02 Ground Floor Office (108) 1 40 35 38 35
SPU-01-03 Ground Floor Office (107) 1 40 35 50 50
SPU-01-04 Ground Floor Office (106) 1 40 35 42 41
SPU-01-05 Ground Floor Office (105) 1 40 35 42 41
SPU-01-06 Ground Floor Office (104) 1 40 35 39 37
SPU-01-07 Ground Floor Office (104) 1 40 35 40 39
EXF-02 Ground Floor Toilet (111) 1 40 35 45 45
Remarks:
Test Date:
Reading By: Maged Madouh
19-4-2015
Noise Level Measurments
Location
Area Served ZONE
Floor
Back Ground
noise(NC)
Measured
Combined
Noise (NC)
Equipment
Effect (NC)
Notes
Equipment
Design Noise
Criteria (NC)
Page (20)
Page (21)
Page (22)
Page (23)
Page (24)
Page (25)
Page (26)
Page (27)
Page (28)
Page (29)
Page (30)
Page (31)
Page (32)

More Related Content

What's hot

1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and TrackingATUL RAJ
 
Continuous machinery survey
Continuous machinery surveyContinuous machinery survey
Continuous machinery surveyViktor Bily
 
airsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight GmbH
 
Chanonry Point Project
Chanonry Point ProjectChanonry Point Project
Chanonry Point ProjectEdward Brown
 
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - AerospaceGF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - AerospaceMachine Tool Systems Inc.
 
Robotics: Virtual Commissioning in Process Simulate
Robotics: Virtual Commissioning in Process SimulateRobotics: Virtual Commissioning in Process Simulate
Robotics: Virtual Commissioning in Process SimulateMichał Gurgul
 
Severance package min 200k package and sweeteners.pdf
Severance package   min 200k package and sweeteners.pdfSeverance package   min 200k package and sweeteners.pdf
Severance package min 200k package and sweeteners.pdfSABC News
 
Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.Sung (Stephen) Kim
 
Logistics organization presentation 14-01-22
Logistics organization presentation   14-01-22Logistics organization presentation   14-01-22
Logistics organization presentation 14-01-22Ahmed Hussain
 
Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Sung (Stephen) Kim
 
Cnc 4-g cod language -hiast
Cnc 4-g cod language -hiastCnc 4-g cod language -hiast
Cnc 4-g cod language -hiastahmad almaleh
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localizationhabbang
 
Trapezoidal Log-Periodic Antenna Analysis
Trapezoidal Log-Periodic Antenna Analysis Trapezoidal Log-Periodic Antenna Analysis
Trapezoidal Log-Periodic Antenna Analysis Amar Rastogi
 
Technical minimum schedule for ppt f
Technical minimum schedule for  ppt fTechnical minimum schedule for  ppt f
Technical minimum schedule for ppt fvickylko11
 

What's hot (17)

1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking
 
Continuous machinery survey
Continuous machinery surveyContinuous machinery survey
Continuous machinery survey
 
airsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight - UAV airport pavement inspections
airsight - UAV airport pavement inspections
 
Chanonry Point Project
Chanonry Point ProjectChanonry Point Project
Chanonry Point Project
 
RVI flyer_opt
RVI flyer_optRVI flyer_opt
RVI flyer_opt
 
2
22
2
 
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - AerospaceGF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
 
Robotics: Virtual Commissioning in Process Simulate
Robotics: Virtual Commissioning in Process SimulateRobotics: Virtual Commissioning in Process Simulate
Robotics: Virtual Commissioning in Process Simulate
 
Severance package min 200k package and sweeteners.pdf
Severance package   min 200k package and sweeteners.pdfSeverance package   min 200k package and sweeteners.pdf
Severance package min 200k package and sweeteners.pdf
 
Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.
 
Logistics organization presentation 14-01-22
Logistics organization presentation   14-01-22Logistics organization presentation   14-01-22
Logistics organization presentation 14-01-22
 
Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.
 
Cnc 4-g cod language -hiast
Cnc 4-g cod language -hiastCnc 4-g cod language -hiast
Cnc 4-g cod language -hiast
 
SDDS May 15
SDDS May 15SDDS May 15
SDDS May 15
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localization
 
Trapezoidal Log-Periodic Antenna Analysis
Trapezoidal Log-Periodic Antenna Analysis Trapezoidal Log-Periodic Antenna Analysis
Trapezoidal Log-Periodic Antenna Analysis
 
Technical minimum schedule for ppt f
Technical minimum schedule for  ppt fTechnical minimum schedule for  ppt f
Technical minimum schedule for ppt f
 

Similar to TAB Report Cairo West Air Base Security Admin Facility

Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.S P Singh
 
1F-Luigi-Pisu
1F-Luigi-Pisu1F-Luigi-Pisu
1F-Luigi-Pisulpisu
 
The Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal AnalysisThe Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal AnalysisIRJET Journal
 
The Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal AnalysisThe Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal AnalysisIRJET Journal
 
Fieldbus tutorial part 3 example applications
Fieldbus tutorial part 3   example applicationsFieldbus tutorial part 3   example applications
Fieldbus tutorial part 3 example applicationsEmerson Exchange
 
Fieldbus Tutorial Part 3 - Example Applications
Fieldbus Tutorial Part 3  - Example ApplicationsFieldbus Tutorial Part 3  - Example Applications
Fieldbus Tutorial Part 3 - Example ApplicationsEmerson Exchange
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...Joseph Uken
 
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohamed Tawfik
 
TIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENT
TIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENTTIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENT
TIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENTIRJET Journal
 
Check interval escalation
Check interval escalation Check interval escalation
Check interval escalation Mohammed Awad
 
Validation Trials for Regional Aircraft
Validation Trials for Regional AircraftValidation Trials for Regional Aircraft
Validation Trials for Regional AircraftLeonardo
 
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...Excavator
 
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...ReparacionPcLaptopsDesktop
 
Single Engine Presentation Faa Ia Burbank Ca 2008 A
Single Engine Presentation Faa  Ia Burbank Ca  2008 ASingle Engine Presentation Faa  Ia Burbank Ca  2008 A
Single Engine Presentation Faa Ia Burbank Ca 2008 Aguestf7d78
 
AIRCOM LTE Webinar 2 - Air Interface
AIRCOM LTE Webinar 2 - Air InterfaceAIRCOM LTE Webinar 2 - Air Interface
AIRCOM LTE Webinar 2 - Air InterfaceAIRCOM International
 
Clelio alves petrobras english
Clelio alves petrobras englishClelio alves petrobras english
Clelio alves petrobras englishFieldComm Group
 
F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]ExerciseLeanLLC
 
SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...
SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...
SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...azmisalim
 

Similar to TAB Report Cairo West Air Base Security Admin Facility (20)

Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.
 
1F-Luigi-Pisu
1F-Luigi-Pisu1F-Luigi-Pisu
1F-Luigi-Pisu
 
The Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal AnalysisThe Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
 
The Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal AnalysisThe Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
The Condition Monitoring of I.C. Engine using Acoustic Signal Analysis
 
Fieldbus tutorial part 3 example applications
Fieldbus tutorial part 3   example applicationsFieldbus tutorial part 3   example applications
Fieldbus tutorial part 3 example applications
 
Fieldbus Tutorial Part 3 - Example Applications
Fieldbus Tutorial Part 3  - Example ApplicationsFieldbus Tutorial Part 3  - Example Applications
Fieldbus Tutorial Part 3 - Example Applications
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
 
Scope of work
Scope of workScope of work
Scope of work
 
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016
 
TIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENT
TIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENTTIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENT
TIME STUDY – A KEY TECHNIQUE FOR PRODUCTIVITY IMPROVEMENT
 
Check interval escalation
Check interval escalation Check interval escalation
Check interval escalation
 
Validation Trials for Regional Aircraft
Validation Trials for Regional AircraftValidation Trials for Regional Aircraft
Validation Trials for Regional Aircraft
 
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
 
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
John Deere 6130, 6230, 6330, 6430, 6530, 6534, 6630, 6830, 6930 Tractor (TM40...
 
testing formats
testing formatstesting formats
testing formats
 
Single Engine Presentation Faa Ia Burbank Ca 2008 A
Single Engine Presentation Faa  Ia Burbank Ca  2008 ASingle Engine Presentation Faa  Ia Burbank Ca  2008 A
Single Engine Presentation Faa Ia Burbank Ca 2008 A
 
AIRCOM LTE Webinar 2 - Air Interface
AIRCOM LTE Webinar 2 - Air InterfaceAIRCOM LTE Webinar 2 - Air Interface
AIRCOM LTE Webinar 2 - Air Interface
 
Clelio alves petrobras english
Clelio alves petrobras englishClelio alves petrobras english
Clelio alves petrobras english
 
F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]
 
SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...
SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...
SEMINAR PENGENALAN KEPADA SPESIFIKASI STANDARD DAN REKABENTUK SISTEM PENYAMAN...
 

TAB Report Cairo West Air Base Security Admin Facility

  • 3. Contents: - Page 1- Summary 4 2- Technical reports:  Fans 6  Split Units 16  Sound Measurements 19 3- Instrument Used 21 4- Calibration Certificates 23 Page (3)
  • 5. TAB The Engineering Company Draft Report Cairo West Air Base For Testing and Balancing Services Summary Introduction As per the Client requirement, TAB Company was honoured to be hired by AICI to carry out the entire (Cairo West Air Base) project TAB Works for the HVAC system. Herewith are the TAB Works draft reports after completion of works.  Security Admin (AA):‐ TAB Scope of Work: 1‐ Air systems: 1‐1‐ (3) Fans 1‐2‐ (7) Split Units 1‐3‐ (Ls) Air terminals 1‐4‐ Sound Measurements (Not under NEBB)  Remarks: 1‐ EX‐01 is achieving 492% (Fan is direct driven and served with one terminal). 2‐ EX‐02 is achieving 180% (Fan is direct driven). Page (5)
  • 10. Volume (CFM): 250 Air Density (kg/m3): 1.191 Drive Loss (%): 3 External SP (in. wg): 0.4 Elevation (m): 74 Inlet Vane Damper Operating Power (hp): 0.04 Airstream Temp. (C): 21 Static Efficiency (%) 39 Fan RPM: 1200 Filter Box: TCBRS-2-09-4 Chart Type: RPM Family Sound Power by Octave Band Sound Data 62.5 125 250 500 1000 2000 4000 8000 LwA dBA Sones Inlet 77 67 61 64 60 56 54 42 65 54 7.0 LwA - A weighted sound power level, based on ANSI S1.4 dBA - A weighed sound pressure level, based on 11.5 dB attenuation per Octave band at 1.52 m. dBA levels are not licensed by AMCA International Sones - calculated using AMCA 301 at 1.52 m System Effect couldn't be determined (No access to measure total static pressure
  • 21. TAB The Engineering Company for Testing and Balancing Services Project : Cairo West Air Base Building : Security Admin Facility (AA) SPU-01-01 Ground Floor Office (109) 1 40 35 41 40 SPU-01-02 Ground Floor Office (108) 1 40 35 38 35 SPU-01-03 Ground Floor Office (107) 1 40 35 50 50 SPU-01-04 Ground Floor Office (106) 1 40 35 42 41 SPU-01-05 Ground Floor Office (105) 1 40 35 42 41 SPU-01-06 Ground Floor Office (104) 1 40 35 39 37 SPU-01-07 Ground Floor Office (104) 1 40 35 40 39 EXF-02 Ground Floor Toilet (111) 1 40 35 45 45 Remarks: Test Date: Reading By: Maged Madouh 19-4-2015 Noise Level Measurments Location Area Served ZONE Floor Back Ground noise(NC) Measured Combined Noise (NC) Equipment Effect (NC) Notes Equipment Design Noise Criteria (NC) Page (20)