PERSONAL DATA :
Date of Birth: 03-12-1991 E-mail: a.jassim1991@gmail.com
ahmed.j199050@yahoo.com
Cell Number: +9647711606878
Marital Status: single
Nationality : Iraqi
EDUCATION :
Bachelor of Electromechanical Engineering Dept/
Control and Systems (2010-2013)
University of Technology, Baghdad, Iraq.
PROFESSIONAL WORK EXPERIENCE
:
1- Organization:- AL-MASEERA COMPANY , IRAQ (for three month)
Position: - PLANT Engineer
 I work with Italian teams of (SACMI COMPANY) in mechanical and electrical
installation for machines and I connect all the electrical panels of the factory
also signal exchange between machines of NRP LINE .
 Commission of NRP filler, SMI shrink and conveyors.
2- Organization:- HUAWEI COMPANY(China company for communication) , IRAQ
(for three month)
Position: - SITE Engineer
 in HUAWEI I work in installations of antenna, make hardware configuration and
software configuration.
 also I was make the electrical installation of the cabinets same as the drawings .
 Install the power system for the towers.
Ahmed Jassim Mohammed
PROFESSIONAL PROFILE:-
one years’ experience of( Electrical wiring , designing and
connect all types of Electrical panels) , Operational and
Maintenance, Installation, Commissioning, Programming,
Sematic step-7 program, Troubleshooting, Breakdown
reduction and smooth operation with( KHS Germany
company for filling and packaging)
in this one years I work many projects with KHS Company:
1- Iraq(Erbil) coca cola, PET LINE .
2- Iraq(Kirkuk) Karwanchi group, CAN LINE.
3- Iraq(Karbala) Afico Company, PET LINE .
4- Afghanistan(Kabul) Pipes, CAN LINE .
5- Afghanistan(Kabul) Pipes, PET LINE .
6- Afghanistan(Kabul) Pipes, Aquafina LINE.
Page 2 of 4
3- Organization:- ( KHS COMPANY) PROJECT IRAQ (Erbil Kurdistan Coca Cola ,
I make electrical and mechanical installation for all machines and main power , and electrical
connection between machines and this job by reading the electrical and mechanical Diagrams for the
factory and machines .
 I work in Installation, Commission for all machines
 Repair electrical and software problems in FILLER and MIXER Machines.
 Installation, Commission and Vertical Start-Up of packer shrink and blow
Machines.
4- Organization:- (KHS COMPANY) PROJECT IRAQ, Kirkuk krwanchi group
 Mechanical and Electrical Installation, for all machines
 Installation, Commission and Vertical Start-Up of packer shrink Machine
 Commission of CAN LINE for (Mixer machine, packaging machine )
5- Organization:- (KHS COMPANY) PROJECT IRAQ, KARBALA, AFICO COMPANY
 Cable try drawing, cable pulling, electrical test.
 I make wiring for all machines and I connect all cabinet panel for machines.
 I make signal exchange between the PLC of machines .
 Commission of PET LINE for (Mixer machine, packaging machine and blow machine )
6- Organization:- (KHS COMPANY) PROJECT AFGHNISTAN, KABUL , ALOKOZAY NON
ALCOHOLIC
BEVERAGES COMPANY.
Position: Embedded Engineer plant care (for three lines can line, PET line, Aquafina
line)
Responsibility:.
 control production .
 maintenance engineer for all mechanical and electrical problems in machines.
 Increase the capability and problem solving skills of Operators and Technicians by doing Trainings .
 monitoring the correct execution of maintenance and service.
 reduce the downtime of system.
 planning required maintenance of equipment.
 suggestions for possible improvement.
 assessment of the operating and maintenance personnel.
 training of customer personnel.
Page 3 of 4
 Review daily, weekly and monthly Machine efficiencies, downtimes and make short term and long
term action plans to improve the efficiencies and performances.
 compliance with health & safety regulations.
 creating lists with recommended spare parts to order.
6 - Organization:- Vander Land company, Iraq, Baghdad national airport
Position: Electromechanical Engineer
 Electrical installation for the conveyors, counters and transporters of the bags.
 control all the motors with their sensor for all system.
 signal exchange between the units of this system.
 I help in PLC program of this project by Sematis step-7 program.
TECHNICAL TRAININGS :
 three days training for filler machine maintenance by Mr. Sasha KHS expert in Kabul
project.
 three days training for Sematic step-7 program by Mr. Kluse KHS expert in Kabul project.
 One week training for PLC basic by Mr. Kluse KHS expert in Kabul project .
 One week training for Shrink machine by MR. Steve KHS expert in Kabul project in Kabul
project .
 One day Maintenance Safety and Maintenance by COCA COLA Safety Manager.
 One day Package Line Monitoring System (PLMS) training .
 Two days training of Plan Maintenance training .
 Two days training of NCE & Total Performance Management (TPM).
 Three days training of Problem Solving Tools by Focus & Improvement Manager.
 Course English language in BBC Institute .
Qualification and Skills :
 Extensive knowledge of the PLC is equipped with the ability and Interface input and output
cards...The input and output cards digital and analog.
 I can treat wit Sematic step-7 program.
 All PLC Wiring Works.
 Strong knowledge in field devices, instruments and actuators (servo-valves, thermo
elements, transmitters.).
 Ability to handle special tools like pressure pump, multi-meter, frequency generator and
oscilloscope .
 Ability to understand and implement technical drawings (wiring diagram).
 Strong analytic and problem solving skills.
 The ability to repair faults and a logical follow-up and find a solution.
Page 4 of 4
 The ability to connect all type of sensors. Pressure and temperature sensors. Optical
Sensors .Metal sensors.
 Some Fields of communication and the Internet
 Hardworking and ready to accept challenges. Can work effectively under immense
pressures.
 A very good team player. Always eager to develop relationships among the team in a very
coherent manner.
 Confident & Optimistic with flexible & dynamic personality.
 computer skills :
Hardware and Software installation, Windows, Microsoft office(Word, Excel and power
point), Auto Cad, Mat lab, C++ and very good experience of using Internet.
Language :
 Arabic first language .
 English (Fluent in both written and spoken).
 German (beginner)

More Related Content

What's hot

Hussain Abd Alkarem Aweid At Last
Hussain Abd Alkarem Aweid At LastHussain Abd Alkarem Aweid At Last
Hussain Abd Alkarem Aweid At LastHussein Aweid
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Rajesh S
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMEOmer Liaquat
 
Abrar Haidar Tasneem
Abrar Haidar TasneemAbrar Haidar Tasneem
Abrar Haidar TasneemABRAR TASNEEM
 
EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016Ejaz Wagi
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_templatetathanhluan
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineerfadel shihab
 
engineer cv .doc
engineer cv .docengineer cv .doc
engineer cv .docbilal ahmad
 
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEERS.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEERNagarajan Srinivasan
 

What's hot (20)

Hussain Abd Alkarem Aweid At Last
Hussain Abd Alkarem Aweid At LastHussain Abd Alkarem Aweid At Last
Hussain Abd Alkarem Aweid At Last
 
Electrical engineer CV
Electrical engineer CVElectrical engineer CV
Electrical engineer CV
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUME
 
Electrical Engineer Mena Gamil
Electrical Engineer Mena GamilElectrical Engineer Mena Gamil
Electrical Engineer Mena Gamil
 
~$MyCV
~$MyCV~$MyCV
~$MyCV
 
Eng Hisham CV
Eng Hisham CVEng Hisham CV
Eng Hisham CV
 
Resume_Syafiq_2015
Resume_Syafiq_2015Resume_Syafiq_2015
Resume_Syafiq_2015
 
++C.V 2015
++C.V 2015++C.V 2015
++C.V 2015
 
Saladin c.v
Saladin c.v Saladin c.v
Saladin c.v
 
Abrar Haidar Tasneem
Abrar Haidar TasneemAbrar Haidar Tasneem
Abrar Haidar Tasneem
 
EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016EE - ejaz cv (dubai) june 2016
EE - ejaz cv (dubai) june 2016
 
Electrical engineer cv_template
Electrical engineer cv_templateElectrical engineer cv_template
Electrical engineer cv_template
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineer
 
Update CV
Update CVUpdate CV
Update CV
 
engineer cv .doc
engineer cv .docengineer cv .doc
engineer cv .doc
 
Saladin c.v
Saladin c.vSaladin c.v
Saladin c.v
 
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEERS.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
 
Mohamed rabee cv
Mohamed rabee cvMohamed rabee cv
Mohamed rabee cv
 

Similar to Ahmed_C.V

Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)khaja Ahammad
 
Mahmoud_Amer_final_resume
Mahmoud_Amer_final_resumeMahmoud_Amer_final_resume
Mahmoud_Amer_final_resumeMahmoud Amer
 
Waqas Khan
Waqas KhanWaqas Khan
Waqas Khanqandrani
 
Tarek Mohamed Habib CV
Tarek Mohamed Habib CVTarek Mohamed Habib CV
Tarek Mohamed Habib CVTarek Habib
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1PSherif Gharib, MBA
 
Eng.mostafa khalid (c) english
Eng.mostafa khalid (c) englishEng.mostafa khalid (c) english
Eng.mostafa khalid (c) englishmostafa khalid
 
my C.V Mohanad Zaki
my C.V Mohanad Zakimy C.V Mohanad Zaki
my C.V Mohanad ZakiMohanad Zaki
 
Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects Engineer
Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects EngineerMohamed Ahmed Fouad Hassan - Major Overhauls and Projects Engineer
Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects EngineerMohamed Fouad
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman aliayman ali
 

Similar to Ahmed_C.V (20)

Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)
 
Taher_Ahmed C.V
Taher_Ahmed C.VTaher_Ahmed C.V
Taher_Ahmed C.V
 
Mohanad 123-4
Mohanad 123-4Mohanad 123-4
Mohanad 123-4
 
Mahmoud_Amer_final_resume
Mahmoud_Amer_final_resumeMahmoud_Amer_final_resume
Mahmoud_Amer_final_resume
 
Waqas Khan
Waqas KhanWaqas Khan
Waqas Khan
 
Waqas CV
Waqas CVWaqas CV
Waqas CV
 
Tarek Mohamed Habib CV
Tarek Mohamed Habib CVTarek Mohamed Habib CV
Tarek Mohamed Habib CV
 
Ritesh Resume
Ritesh ResumeRitesh Resume
Ritesh Resume
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
Omar Salih
Omar SalihOmar Salih
Omar Salih
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Eng.mostafa khalid (c) english
Eng.mostafa khalid (c) englishEng.mostafa khalid (c) english
Eng.mostafa khalid (c) english
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
sameh c.v
sameh c.vsameh c.v
sameh c.v
 
my C.V Mohanad Zaki
my C.V Mohanad Zakimy C.V Mohanad Zaki
my C.V Mohanad Zaki
 
Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects Engineer
Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects EngineerMohamed Ahmed Fouad Hassan - Major Overhauls and Projects Engineer
Mohamed Ahmed Fouad Hassan - Major Overhauls and Projects Engineer
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
 
Athar CV updated
Athar CV updatedAthar CV updated
Athar CV updated
 

Ahmed_C.V

  • 1. Page 1 of 4 PERSONAL DATA : Date of Birth: 03-12-1991 E-mail: a.jassim1991@gmail.com ahmed.j199050@yahoo.com Cell Number: +9647711606878 Marital Status: single Nationality : Iraqi EDUCATION : Bachelor of Electromechanical Engineering Dept/ Control and Systems (2010-2013) University of Technology, Baghdad, Iraq. PROFESSIONAL WORK EXPERIENCE : 1- Organization:- AL-MASEERA COMPANY , IRAQ (for three month) Position: - PLANT Engineer  I work with Italian teams of (SACMI COMPANY) in mechanical and electrical installation for machines and I connect all the electrical panels of the factory also signal exchange between machines of NRP LINE .  Commission of NRP filler, SMI shrink and conveyors. 2- Organization:- HUAWEI COMPANY(China company for communication) , IRAQ (for three month) Position: - SITE Engineer  in HUAWEI I work in installations of antenna, make hardware configuration and software configuration.  also I was make the electrical installation of the cabinets same as the drawings .  Install the power system for the towers. Ahmed Jassim Mohammed PROFESSIONAL PROFILE:- one years’ experience of( Electrical wiring , designing and connect all types of Electrical panels) , Operational and Maintenance, Installation, Commissioning, Programming, Sematic step-7 program, Troubleshooting, Breakdown reduction and smooth operation with( KHS Germany company for filling and packaging) in this one years I work many projects with KHS Company: 1- Iraq(Erbil) coca cola, PET LINE . 2- Iraq(Kirkuk) Karwanchi group, CAN LINE. 3- Iraq(Karbala) Afico Company, PET LINE . 4- Afghanistan(Kabul) Pipes, CAN LINE . 5- Afghanistan(Kabul) Pipes, PET LINE . 6- Afghanistan(Kabul) Pipes, Aquafina LINE.
  • 2. Page 2 of 4 3- Organization:- ( KHS COMPANY) PROJECT IRAQ (Erbil Kurdistan Coca Cola , I make electrical and mechanical installation for all machines and main power , and electrical connection between machines and this job by reading the electrical and mechanical Diagrams for the factory and machines .  I work in Installation, Commission for all machines  Repair electrical and software problems in FILLER and MIXER Machines.  Installation, Commission and Vertical Start-Up of packer shrink and blow Machines. 4- Organization:- (KHS COMPANY) PROJECT IRAQ, Kirkuk krwanchi group  Mechanical and Electrical Installation, for all machines  Installation, Commission and Vertical Start-Up of packer shrink Machine  Commission of CAN LINE for (Mixer machine, packaging machine ) 5- Organization:- (KHS COMPANY) PROJECT IRAQ, KARBALA, AFICO COMPANY  Cable try drawing, cable pulling, electrical test.  I make wiring for all machines and I connect all cabinet panel for machines.  I make signal exchange between the PLC of machines .  Commission of PET LINE for (Mixer machine, packaging machine and blow machine ) 6- Organization:- (KHS COMPANY) PROJECT AFGHNISTAN, KABUL , ALOKOZAY NON ALCOHOLIC BEVERAGES COMPANY. Position: Embedded Engineer plant care (for three lines can line, PET line, Aquafina line) Responsibility:.  control production .  maintenance engineer for all mechanical and electrical problems in machines.  Increase the capability and problem solving skills of Operators and Technicians by doing Trainings .  monitoring the correct execution of maintenance and service.  reduce the downtime of system.  planning required maintenance of equipment.  suggestions for possible improvement.  assessment of the operating and maintenance personnel.  training of customer personnel.
  • 3. Page 3 of 4  Review daily, weekly and monthly Machine efficiencies, downtimes and make short term and long term action plans to improve the efficiencies and performances.  compliance with health & safety regulations.  creating lists with recommended spare parts to order. 6 - Organization:- Vander Land company, Iraq, Baghdad national airport Position: Electromechanical Engineer  Electrical installation for the conveyors, counters and transporters of the bags.  control all the motors with their sensor for all system.  signal exchange between the units of this system.  I help in PLC program of this project by Sematis step-7 program. TECHNICAL TRAININGS :  three days training for filler machine maintenance by Mr. Sasha KHS expert in Kabul project.  three days training for Sematic step-7 program by Mr. Kluse KHS expert in Kabul project.  One week training for PLC basic by Mr. Kluse KHS expert in Kabul project .  One week training for Shrink machine by MR. Steve KHS expert in Kabul project in Kabul project .  One day Maintenance Safety and Maintenance by COCA COLA Safety Manager.  One day Package Line Monitoring System (PLMS) training .  Two days training of Plan Maintenance training .  Two days training of NCE & Total Performance Management (TPM).  Three days training of Problem Solving Tools by Focus & Improvement Manager.  Course English language in BBC Institute . Qualification and Skills :  Extensive knowledge of the PLC is equipped with the ability and Interface input and output cards...The input and output cards digital and analog.  I can treat wit Sematic step-7 program.  All PLC Wiring Works.  Strong knowledge in field devices, instruments and actuators (servo-valves, thermo elements, transmitters.).  Ability to handle special tools like pressure pump, multi-meter, frequency generator and oscilloscope .  Ability to understand and implement technical drawings (wiring diagram).  Strong analytic and problem solving skills.  The ability to repair faults and a logical follow-up and find a solution.
  • 4. Page 4 of 4  The ability to connect all type of sensors. Pressure and temperature sensors. Optical Sensors .Metal sensors.  Some Fields of communication and the Internet  Hardworking and ready to accept challenges. Can work effectively under immense pressures.  A very good team player. Always eager to develop relationships among the team in a very coherent manner.  Confident & Optimistic with flexible & dynamic personality.  computer skills : Hardware and Software installation, Windows, Microsoft office(Word, Excel and power point), Auto Cad, Mat lab, C++ and very good experience of using Internet. Language :  Arabic first language .  English (Fluent in both written and spoken).  German (beginner)