SlideShare a Scribd company logo
1 of 10
Download to read offline
No.MC/LHB/Brake Date: 24.06.2019
Principal Chief Mechanical Engineers,
1. Central Railway, Chhatrapati Shivaji Terminus, Mumbai -
400 001
2. East Coast Railway, Chandrasekharpur, Bhubaneswar
- 751 016
3. Eastern Railway, Fairlie Place, Kolkata - 700 001 4. North Central Railway, Allahabad - 211 001
5. Northern Railway, Baroda House, New Delhi - 110 001 6. North Western Railway, Jaipur - 302 006
7. Southern Railway, Park Town, Chennai - 600 003 8. West Central Railway, Jabalpur - 482 008
9. South Central Railway, Rail Nilayam, Secunderabad - 500
071
10. South Western Railway, Hubli - 580 023
11. South Eastern Railway, Garden Reach, Kolkata - 700 043 12. South East Central Railway, Bilaspur - 495 004
13. North Eastern Railway, Gorakhpur - 273 001 14. Integral Coach Factory, Chennai - 600 038
15. Western Railway, Churchgate, Mumbai - 400 020 16. Rail Coach Factory, Hussainpur, Kapurthala,
Punjab - 144 602
17. Northeast Frontier Railway, Maligaon, Guwahati - 781 011 18. Modern Coach Factory, Raebareli, Lalganj - 229206
19. East Central Railway, Hajipur - 844 101 20. Konkan Railway Corp. Ltd. Corporate office, Belapur
Bhawan, Nawi, Mumbai-400 614
Sub: Modification in air brake pipeline & associated fittings in LHB Coaches.
Ref: 1) Consolidated instructions-Wheel Shelling vide RDSO L. No. MC/LHB/Brake dt. 15-4-19.
2) Item no.b(3) of CDE’s Minutes of Meeting dated 10.06.2019.
In continuation to the earlier studies & consolidated instructions on Wheel Shelling in LHB
Coaches, RDSO carried out studies at BCT/WR & SBC/SWR on wheel shelling which established that the
flexible air hose (600mm) connecting body to bogie of LHB Coaches provided with washer (Nylon/Teflon)
at hose ends adversely affects the post-dump release time by upto 300ms as washers get
perished/shrunk due to over tightening and routine maintenance during service. This leads to blockage of
air passage and thus causes brake binding/wheel shelling. The existing flexible pipeline joints are also not
metal-to-metal joints as recommended by M/s Alstom.
In the recent CDE’s meeting held on 31.05.2019 at MCF/RBL, the same issue was also discussed
at Item no.3 Part (b) of CDE’s MOM and it was decided that a standard piping layout should be issued by
RDSO.
RDSO has finalized standard piping layout in consultation with air-brake OEMs, and also validated
the same at RCF/KXH by fitment trials. Kindly find enclosed:
a. Brief overview & procedure for the modification (Annexure-A).
b. Piping scheme (existing arrangement as Annexure-B & modified arrangement as Annexure-C).
c. Standardized flexible hoses which are interchangeable across the existing LHB brake system
suppliers have been developed as Drg.No.CG-19036 (Flexible Hose-650mm for Bogie) at
Annexure-D & Drg.No.CG-19037 (Flexible Hose-500mm for Brake Actuators) at Annexure-E.
Page 1 of 3
Annexure-A
1. Flexible Air Hose (600mm) for Bogie
AIR BRAKE PIPING MODIFICATION
Existing design of flexible air hose (600mm) which is used to connect the air brake pipe running out from the
Dump Valve fitted on Underframe to Bogie is having Nylon/Teflon washers.
During the field studies by RDSO at BCT/WR & SBC/SWR; following problems are observed with the existing
hose results in restriction in smooth air flow in pipe line and ultimately affects the performance of brake system
which may leads to Wheel Shelling in case of wheel slip:
S.No. Observations Causes Photographs
i. Less inner diameter Insufficient air flow passage
ii. Washers The Nylon/Teflon washers provided
inside the hose gets perished/shrink
due to over tightening or during in
service of the coach, which results in
blockage of the air passage and thus to
inoperativeness of brake cylinders.
iii. More nos. of pipe
joints/fittings
Restriction in air flow & more chances
of occurring leakages.
To overcome above issues, RDSO has developed a standardized design of flexible hose (Drg.No.CG-
19036) which is interchangeable across all existing LHB brake suppliers. Further, based on the fitment trials
done at RCF/KXH no. of pipe joint fittings have also been reduced from 9 to 6 to ensure unrestricted &
leakage free air flow in brake system.
The upgraded flexible air hose for bogie has following advantages:
 Bigger Inner diameter: Sufficient air flow passage -The diameter of hose was increased from 9mm to
12mm.
 No washers: Avoids blocking of air passage and increase smooth operation of brakes- The new hose
eliminates the use of washers and have M26 (F) type ferrule arrangement at both ends.
Page 2 of 3
 Less pipe joints/fittings: Avoids air flow restriction & leakages- By the use of upgraded hose
associated joints/fittings for air connections were reduced from 9 to 6nos.
 Increase in hose length: Avoids stretching & rupture- The length of upgraded hose was increased from
600 to 650mm, as in original Alstom design and also to avoid stretching & rupture of the hose.
 Details of existing vis-a-vis modified pipe line arrangement from the Dump Valves to the other end of
flexible hose connecting bogie is as under:
Existing Arrangement (Fig 1) Modified Arrangement (Fig 2)
 For new LHB coaches:
Modification Procedure for the aforesaid marked portion
• Provide arrangement as per Fig 2.
 For existing LHB coaches:
• Remove the M26 (F) ferrule of elbow (Item no.4 of Fig 1) at flexible hose end of coach side, thus it becomes Item
no.9 of Fig 2 and therefore there is no need to purchase a new item.
• Connect the new flexible hose(item no.8 of Fig 2) one end at elbow end (coach side), and connect other end
directly in Clamp Nut of the bogie end side, as illustarted in above figure 2.
Note:- Recommended thread sealent must be used. Ensure that SS pipe (Item no.3) is adequately clamped & supported close to
Item no.9 of Fig.2.
Note:- The above mentioned modification & quantities are for one side of pipe arrangement from Dump Valve to
bogie connection. There are a total of 4 such connections per coach, i.e. 2 per bogie.
M26 (F) ferrule
Page 3 of 3
2. Flexible Air Hose (500mm) for Brake Actuators
Existing design of flexible air hose (500mm) which is used to connect the air brake pipe (brake cylinder pipe) of
bogie to brake cylinders/actuators also varies with suppliers. During the aforesaid discussed study, it was noted
that the size of the hose (Inner diameter) varies from supplier to supplier which results in variation of
charging/venting of Dump valves affecting the optimum working of WSP. It is also found that consequent to
optimization of Dump Valves chokes sizes, clear opening of 12mm is required in the above flexible hose.
To overcome above issues, RDSO has developed a standardized the design of flexible hose (Drg.No.CG-
19037) which is interchangeable across all existing LHB brake suppliers. Modified hose has clear opening (Inner
diameter) of 12mm to match the optimized Dump Valve choke sizes.
Implementation of the above air brake piping modifications results in :
Conclusion
a. Reduction in Pipe joints/fittings.
b. Elimination of the use of Washers in Flexible Hoses.
c. Clear openings in Flexible Hoses.
d. Interchangeability across LHB brake suppliers.
The above modifications (along with choke size modifications circulated earlier) result in quicker response of
venting of air from brake actuators on generation of ‘dump’ command from the WSP by approx. 300ms, which
substantially improves the control action of the WSP and reduces wheel shelling.
**********
Existing piping arrangement
Modified piping arrangement with reduced joints and modified hose
Annexure-B
LEGEND
S.No. Description Quantity
1. Adopter 01
2. Ferrule Stud ½” (M) X M26 (M) 03
3. 18 OD Pipe with M26 ferrule fittings 01
4. Elbow M26 (M) X M26 (F) ferrule 01
5. Hose ½” with ½” BSP (F) both sides 01
6. 18 OD Pipe with M26 ferrule fittings 01
7. Stud M26 both sides 01
Total Quantity 09
Existing Arrangement
M26 (F) ferrule
Modification to be carried out
in this portion only
Clamp
Nut
Clamp on bogie
Annexure-C
LEGEND
S.No. Description Quantity Remarks
1. Adopter 01 --
2. Ferrule Stud ½” (M) X M26 (M) 01 Quantity reduced from 3 nos. to 1 nos.
3. 18 OD Pipe with M26 ferrule fittings 01 --
4. Elbow M26 (M) X M26 (F) ferrule 00 Replace with S.No.9
5. Hose ½” with ½” BSP (F) both sides 00 Replace with S.No.8
6. 18 OD Pipe with M26 ferrule fittings 00 Eliminated
7. Stud M26 both sides 01 --
8. Hose 5/8” with M26 (F) both sides 01 To replace with S.No.5
9. Elbow Male Connector M26 (M) 01 To replace with S.No.4
Total Quantity 06
Note: Items at S.No.4, 5 & 6 (in Red) to be deleted and at S.No.8 & 9 (in Green) to be added.
Modified Arrangement
Clamp on bogie
Clamp
Nut
Modification to be carried out
in this portion only
Annexure-D
Annexure-E

More Related Content

Similar to Modification in air brake pipes & its fittings in LHB Coaches dated 24.06.2019.pdf

conference paper
conference paperconference paper
conference paperRob Rosier
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01SrinivasaRao Guduru
 
Pump suction piping rules
Pump suction piping rulesPump suction piping rules
Pump suction piping rulesAmir Razmi
 
Design and analysis of ball mill inlet chute for roller press circuit in ceme...
Design and analysis of ball mill inlet chute for roller press circuit in ceme...Design and analysis of ball mill inlet chute for roller press circuit in ceme...
Design and analysis of ball mill inlet chute for roller press circuit in ceme...eSAT Publishing House
 
Catalogue Corrugated Steel Pipe.pdf
Catalogue Corrugated Steel Pipe.pdfCatalogue Corrugated Steel Pipe.pdf
Catalogue Corrugated Steel Pipe.pdfSteel
 
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET Journal
 
A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...
A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...
A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...Adeel Jameel
 
Axial Thrust Failure investigation
Axial Thrust Failure investigationAxial Thrust Failure investigation
Axial Thrust Failure investigationRory McKay
 
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍAJuan Novillo Ramos
 
A project on buffer
A project on bufferA project on buffer
A project on bufferRitesh Rohan
 
line sizing-mustang.pdf
line sizing-mustang.pdfline sizing-mustang.pdf
line sizing-mustang.pdfZeeshanAlam90
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishJim Novak (吉因龙)
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPChris Galeotti
 

Similar to Modification in air brake pipes & its fittings in LHB Coaches dated 24.06.2019.pdf (20)

conference paper
conference paperconference paper
conference paper
 
780045
780045780045
780045
 
780045
780045780045
780045
 
780045
780045780045
780045
 
780045
780045780045
780045
 
Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
 
Pump suction piping rules
Pump suction piping rulesPump suction piping rules
Pump suction piping rules
 
Design and analysis of ball mill inlet chute for roller press circuit in ceme...
Design and analysis of ball mill inlet chute for roller press circuit in ceme...Design and analysis of ball mill inlet chute for roller press circuit in ceme...
Design and analysis of ball mill inlet chute for roller press circuit in ceme...
 
Catalogue Corrugated Steel Pipe.pdf
Catalogue Corrugated Steel Pipe.pdfCatalogue Corrugated Steel Pipe.pdf
Catalogue Corrugated Steel Pipe.pdf
 
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
 
Gas pressure welding machine catalogue.pdf
Gas pressure welding machine catalogue.pdfGas pressure welding machine catalogue.pdf
Gas pressure welding machine catalogue.pdf
 
A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...
A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...
A recommended-approach-to-piping-flexibility-studies-to-avoid-compressor-syst...
 
Axial Thrust Failure investigation
Axial Thrust Failure investigationAxial Thrust Failure investigation
Axial Thrust Failure investigation
 
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
 
A project on buffer
A project on bufferA project on buffer
A project on buffer
 
line sizing-mustang.pdf
line sizing-mustang.pdfline sizing-mustang.pdf
line sizing-mustang.pdf
 
Est group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 englishEst group harbin urea conference 2014 pap paper v1 english
Est group harbin urea conference 2014 pap paper v1 english
 
GNFC problems.pdf
GNFC problems.pdfGNFC problems.pdf
GNFC problems.pdf
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEP
 

Recently uploaded

原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证jjrehjwj11gg
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一fhhkjh
 
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一fjjwgk
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsMihajloManjak
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Roomdivyansh0kumar0
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESDineshKumar4165
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一ga6c6bdl
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一hnfusn
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingEscondido German Auto
 
办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一mkfnjj
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCRsoniya singh
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607dollysharma2066
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一mjyguplun
 

Recently uploaded (20)

原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
 
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
 
Digamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and QualificationsDigamma - CertiCon Team Skills and Qualifications
Digamma - CertiCon Team Skills and Qualifications
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
 
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLESUNIT-III-TRANSMISSION SYSTEMS REAR AXLES
UNIT-III-TRANSMISSION SYSTEMS REAR AXLES
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Rice毕业证)莱斯大学毕业证成绩单修改留信学历认证原版一模一样
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
 
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Kirti Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Kirti Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
 
办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一办理埃默里大学毕业证Emory毕业证原版一比一
办理埃默里大学毕业证Emory毕业证原版一比一
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
 
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
如何办理爱尔兰都柏林大学毕业证(UCD毕业证) 成绩单原版一比一
 

Modification in air brake pipes & its fittings in LHB Coaches dated 24.06.2019.pdf

  • 1. No.MC/LHB/Brake Date: 24.06.2019 Principal Chief Mechanical Engineers, 1. Central Railway, Chhatrapati Shivaji Terminus, Mumbai - 400 001 2. East Coast Railway, Chandrasekharpur, Bhubaneswar - 751 016 3. Eastern Railway, Fairlie Place, Kolkata - 700 001 4. North Central Railway, Allahabad - 211 001 5. Northern Railway, Baroda House, New Delhi - 110 001 6. North Western Railway, Jaipur - 302 006 7. Southern Railway, Park Town, Chennai - 600 003 8. West Central Railway, Jabalpur - 482 008 9. South Central Railway, Rail Nilayam, Secunderabad - 500 071 10. South Western Railway, Hubli - 580 023 11. South Eastern Railway, Garden Reach, Kolkata - 700 043 12. South East Central Railway, Bilaspur - 495 004 13. North Eastern Railway, Gorakhpur - 273 001 14. Integral Coach Factory, Chennai - 600 038 15. Western Railway, Churchgate, Mumbai - 400 020 16. Rail Coach Factory, Hussainpur, Kapurthala, Punjab - 144 602 17. Northeast Frontier Railway, Maligaon, Guwahati - 781 011 18. Modern Coach Factory, Raebareli, Lalganj - 229206 19. East Central Railway, Hajipur - 844 101 20. Konkan Railway Corp. Ltd. Corporate office, Belapur Bhawan, Nawi, Mumbai-400 614 Sub: Modification in air brake pipeline & associated fittings in LHB Coaches. Ref: 1) Consolidated instructions-Wheel Shelling vide RDSO L. No. MC/LHB/Brake dt. 15-4-19. 2) Item no.b(3) of CDE’s Minutes of Meeting dated 10.06.2019. In continuation to the earlier studies & consolidated instructions on Wheel Shelling in LHB Coaches, RDSO carried out studies at BCT/WR & SBC/SWR on wheel shelling which established that the flexible air hose (600mm) connecting body to bogie of LHB Coaches provided with washer (Nylon/Teflon) at hose ends adversely affects the post-dump release time by upto 300ms as washers get perished/shrunk due to over tightening and routine maintenance during service. This leads to blockage of air passage and thus causes brake binding/wheel shelling. The existing flexible pipeline joints are also not metal-to-metal joints as recommended by M/s Alstom. In the recent CDE’s meeting held on 31.05.2019 at MCF/RBL, the same issue was also discussed at Item no.3 Part (b) of CDE’s MOM and it was decided that a standard piping layout should be issued by RDSO. RDSO has finalized standard piping layout in consultation with air-brake OEMs, and also validated the same at RCF/KXH by fitment trials. Kindly find enclosed: a. Brief overview & procedure for the modification (Annexure-A). b. Piping scheme (existing arrangement as Annexure-B & modified arrangement as Annexure-C). c. Standardized flexible hoses which are interchangeable across the existing LHB brake system suppliers have been developed as Drg.No.CG-19036 (Flexible Hose-650mm for Bogie) at Annexure-D & Drg.No.CG-19037 (Flexible Hose-500mm for Brake Actuators) at Annexure-E.
  • 2.
  • 3. Page 1 of 3 Annexure-A 1. Flexible Air Hose (600mm) for Bogie AIR BRAKE PIPING MODIFICATION Existing design of flexible air hose (600mm) which is used to connect the air brake pipe running out from the Dump Valve fitted on Underframe to Bogie is having Nylon/Teflon washers. During the field studies by RDSO at BCT/WR & SBC/SWR; following problems are observed with the existing hose results in restriction in smooth air flow in pipe line and ultimately affects the performance of brake system which may leads to Wheel Shelling in case of wheel slip: S.No. Observations Causes Photographs i. Less inner diameter Insufficient air flow passage ii. Washers The Nylon/Teflon washers provided inside the hose gets perished/shrink due to over tightening or during in service of the coach, which results in blockage of the air passage and thus to inoperativeness of brake cylinders. iii. More nos. of pipe joints/fittings Restriction in air flow & more chances of occurring leakages. To overcome above issues, RDSO has developed a standardized design of flexible hose (Drg.No.CG- 19036) which is interchangeable across all existing LHB brake suppliers. Further, based on the fitment trials done at RCF/KXH no. of pipe joint fittings have also been reduced from 9 to 6 to ensure unrestricted & leakage free air flow in brake system. The upgraded flexible air hose for bogie has following advantages:  Bigger Inner diameter: Sufficient air flow passage -The diameter of hose was increased from 9mm to 12mm.  No washers: Avoids blocking of air passage and increase smooth operation of brakes- The new hose eliminates the use of washers and have M26 (F) type ferrule arrangement at both ends.
  • 4. Page 2 of 3  Less pipe joints/fittings: Avoids air flow restriction & leakages- By the use of upgraded hose associated joints/fittings for air connections were reduced from 9 to 6nos.  Increase in hose length: Avoids stretching & rupture- The length of upgraded hose was increased from 600 to 650mm, as in original Alstom design and also to avoid stretching & rupture of the hose.  Details of existing vis-a-vis modified pipe line arrangement from the Dump Valves to the other end of flexible hose connecting bogie is as under: Existing Arrangement (Fig 1) Modified Arrangement (Fig 2)  For new LHB coaches: Modification Procedure for the aforesaid marked portion • Provide arrangement as per Fig 2.  For existing LHB coaches: • Remove the M26 (F) ferrule of elbow (Item no.4 of Fig 1) at flexible hose end of coach side, thus it becomes Item no.9 of Fig 2 and therefore there is no need to purchase a new item. • Connect the new flexible hose(item no.8 of Fig 2) one end at elbow end (coach side), and connect other end directly in Clamp Nut of the bogie end side, as illustarted in above figure 2. Note:- Recommended thread sealent must be used. Ensure that SS pipe (Item no.3) is adequately clamped & supported close to Item no.9 of Fig.2. Note:- The above mentioned modification & quantities are for one side of pipe arrangement from Dump Valve to bogie connection. There are a total of 4 such connections per coach, i.e. 2 per bogie. M26 (F) ferrule
  • 5. Page 3 of 3 2. Flexible Air Hose (500mm) for Brake Actuators Existing design of flexible air hose (500mm) which is used to connect the air brake pipe (brake cylinder pipe) of bogie to brake cylinders/actuators also varies with suppliers. During the aforesaid discussed study, it was noted that the size of the hose (Inner diameter) varies from supplier to supplier which results in variation of charging/venting of Dump valves affecting the optimum working of WSP. It is also found that consequent to optimization of Dump Valves chokes sizes, clear opening of 12mm is required in the above flexible hose. To overcome above issues, RDSO has developed a standardized the design of flexible hose (Drg.No.CG- 19037) which is interchangeable across all existing LHB brake suppliers. Modified hose has clear opening (Inner diameter) of 12mm to match the optimized Dump Valve choke sizes. Implementation of the above air brake piping modifications results in : Conclusion a. Reduction in Pipe joints/fittings. b. Elimination of the use of Washers in Flexible Hoses. c. Clear openings in Flexible Hoses. d. Interchangeability across LHB brake suppliers. The above modifications (along with choke size modifications circulated earlier) result in quicker response of venting of air from brake actuators on generation of ‘dump’ command from the WSP by approx. 300ms, which substantially improves the control action of the WSP and reduces wheel shelling. **********
  • 6. Existing piping arrangement Modified piping arrangement with reduced joints and modified hose
  • 7. Annexure-B LEGEND S.No. Description Quantity 1. Adopter 01 2. Ferrule Stud ½” (M) X M26 (M) 03 3. 18 OD Pipe with M26 ferrule fittings 01 4. Elbow M26 (M) X M26 (F) ferrule 01 5. Hose ½” with ½” BSP (F) both sides 01 6. 18 OD Pipe with M26 ferrule fittings 01 7. Stud M26 both sides 01 Total Quantity 09 Existing Arrangement M26 (F) ferrule Modification to be carried out in this portion only Clamp Nut Clamp on bogie
  • 8. Annexure-C LEGEND S.No. Description Quantity Remarks 1. Adopter 01 -- 2. Ferrule Stud ½” (M) X M26 (M) 01 Quantity reduced from 3 nos. to 1 nos. 3. 18 OD Pipe with M26 ferrule fittings 01 -- 4. Elbow M26 (M) X M26 (F) ferrule 00 Replace with S.No.9 5. Hose ½” with ½” BSP (F) both sides 00 Replace with S.No.8 6. 18 OD Pipe with M26 ferrule fittings 00 Eliminated 7. Stud M26 both sides 01 -- 8. Hose 5/8” with M26 (F) both sides 01 To replace with S.No.5 9. Elbow Male Connector M26 (M) 01 To replace with S.No.4 Total Quantity 06 Note: Items at S.No.4, 5 & 6 (in Red) to be deleted and at S.No.8 & 9 (in Green) to be added. Modified Arrangement Clamp on bogie Clamp Nut Modification to be carried out in this portion only