Ada’a Health – Most Improved Services
Hospitals
Name and type of organization
Contact Details
Baish General Hospital
Jazan
Name(s) of author(s)
Hind Hamoud Kherat
0553345875
Contact Number
Email
hkherat@moh.gov.sa
Jubran Hamoud Albeshi
0534068413
Contact Number
Email
jalbeshi@moh.gov.sa
Description Of Innovative Approach
Description of innovative approaches (Hospitals)
 ED patients have a long wait to be admit to the ward and ICU when a bed is available due to poor communication
between ED and IP staff which leading to solve this issue through:
 Assign ED bed coordinator to manage and follow patients disposition to other department
 ED team create a dashboard that include patient journey with time in each destination and recorded which resulted in
KPI improvement.
 Centralized Bed Management Department Activated in hospital
 IP team and bed management team create electronic form & use a tool called (RED 2 Green). This tool design to collect
data about each patient journey and that its' indicate whether the patient is ready for discharge and what reasons are
delaying their discharge. If they are not discharged must recorded as having a red day with a clear reasons. A Green day
when patient receives value adding acute care that progress towards discharge and when everything planned is done.
 Bed management and quality team created flow chart of patients' admission from ED, OR and OPD.
 Create "organization chart" of bed management unit that include different area in hospital (ED, OR, IP and OPD) with a
good impact to launch many projects correlation each other with effective outcome. For example in ED Bed coordinator
project that help to manage patients flow and disposition within 4 hours, whereas create OR coordinator to manage
patient flow between IP and OPD to schedule elective.
 Increased percentage of now-show rate in OPD which leading to solve this issue through launch call center team
project in OPD
 OPD team create an Excel sheet to collect data and analyzed reason of no-show rate. This demographic information
obtained to determined top 15 % of patients most likely to no-show. Begin calling patient 7 days before schedule
appointment as remainder which impact in monitoring and maintaining the KPI.
 Improve staff skills through conduct training and workshops in different area (ED staff, OR, OPD and IP staff).
Engagement with clinicians in improvement activities
RED 2 GREEN Training program with the participation of all relevant clinicians
 Clinicians had participate in approval of policy and procedure of projects.
 Increase awareness of clinicians the importance of provide care within 4 hours and follow that by
dashboard in ED.
 Weekly meeting between medical director, nursing director and domain leader, quality assurance
director and bed management unit to facilitate improve the procedure of patients' admission.
 In IP, clinicians have a clear role and engagement in bed management unit, that help to improve LoS
and weekend discharge indicators.
 Weekly meeting with patients experience department, PIO, CA and domain leaders of OPD, ED and
IP that to measure patients satisfaction.
 Monthly meeting with hospital director and stakeholders to discuss and mentor recommendation for
each projects.
Description: In 2020- the Percentage of patient disposition within 4 hours were slightly affected due to the pandemic of COVID 19,
after launch the project of Assign a bed coordinator supervisor to reduce waiting time between ED and admission to ward/ICU; the
KPI of door to disposition has sustained steady performance. Moreover, establish dashboard in the ED was the main key to mentors
and improve KPIs during the project.
Door to…
96.00%
98.00%
100.00%
Jan
Feb
Mar
Apr
May
Jun
Jul
98.30%
100.00% 100.00% 100.00% 100.00% 99.80% 100.00%
Door to disposition 4 h
2021
Door to disposition (% Patients
seen within 4 hours)
Patient Satisfaction -2021
Dashboard that Created at ED
to follow patients'disposition
CASE STUDY 1
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
Apr May
100%
Baseline Data
For April and May of 2020
100%
 Emergency Department (MANDATORY)
Description: IN Outpatient department, the percentage of no-show was high which let OPD team to create the project of Calling
team Center to call patients before their appointments as a reminder, to decrease no-shows. In 2021 the KPI of No-show has reach to
target percentage 8% and sustained steady performance. However, this project has a good resulted by increasing patients’
satisfaction and changed customer culture which that courage them do not miss their appointment.
Patient Satisfaction -2021
CASE STUDY 2
0.00%
5.00%
10.00%
J A N
F E B
M A R
A P R
M A Y
J U N
J U L
9.20%
8.10%
6.90%
1.90%
1.80%
1.70%
0.80%
0.00%
20.00%
40.00%
60.00%
A P R
M A Y
20.00%
44.40%
Baseline Data
For April and May of 2020
2021
No-show Rate
 Outpatient Department
Description: Length of stay in the inpatient department rose above recommended level and percentage of weekend discharge was
much lower than world-class level due to covid-19, however after the project of centralized bed management activated; the LOS
decreased and percentage of weekend discharge increased and improve staff skills and knowledge of KPIs that sustained steady
performance and met the goal.
Length Of Stay Rate
Patient Satisfaction -2021
CASE STUDY 3
0
5
jan
feb
mar
apr
may
jun
jul
3.8 3.3 3.6 3.2
1.7
3.9 3
Length
Of
Stay
Rate
0.00%
50.00%
Jan
Feb
Mar
Apr
May
Jun
Jul
23.30% 27.20%
17.30%
24.50% 23.00% 21.60% 23.70%
Selected By PWC as a success story in southern region -2021
0.00%
20.00%
Apr May
8.50%
11.60%
Baseline Data For April and May of 2020
2021
6
8
10
apr may
8.2
7
2021
2021
Baseline Data For April and May of 2020
Weekend
Discharge
Rate
2021
 Inpatient Department
Sharing of lessons learned with other facilities
 Create a poster of bed management unit and share with south region as success story.
 Exchange experience of call center team project with Asir central hospital through PWC.
 Sharing the experience of kainexues website and monitor projects with other colleagues
from different hospitals in the region and RHD.
 PIO and CA visited the command center in RHD to discuss focus improvement projects
and learning new skills with dashboard.
Endorsement of facility director
Mr. Essa Abdullah Jafari
Hospital Director
The hospital director has assigned and approved an improvement projects with
stakeholders. He encouraged the developments in the areas that need to improve as well
as provided full support. Certificate of thanks and praise were presented to all staff
involved in the projects improvement process. the participation in Ada’a health awards
2021 approved by hospital director.
We Thank You for Your Participation in
Ada’a Health Awards 2021
End of Application

More Related Content

What's hot

Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...
Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...
Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...Reynaldo Joson
 
Standards & survey process orientation sspo cbahi
Standards  & survey  process orientation sspo cbahiStandards  & survey  process orientation sspo cbahi
Standards & survey process orientation sspo cbahiMEEQAT HOSPITAL
 
6333147 how-to-get-started-with-jci-accreditation
6333147 how-to-get-started-with-jci-accreditation6333147 how-to-get-started-with-jci-accreditation
6333147 how-to-get-started-with-jci-accreditationyoussefpec
 
Hac ppt-execom (05.05.2014) (1)
Hac ppt-execom (05.05.2014) (1)Hac ppt-execom (05.05.2014) (1)
Hac ppt-execom (05.05.2014) (1)Ted Herbosa
 
International Healthcare Accreditation by Dr.Mahboob ali khan Phd
International Healthcare Accreditation by Dr.Mahboob ali khan Phd International Healthcare Accreditation by Dr.Mahboob ali khan Phd
International Healthcare Accreditation by Dr.Mahboob ali khan Phd Healthcare consultant
 
Standard infrastructure for quality eye care services
Standard infrastructure for quality eye care servicesStandard infrastructure for quality eye care services
Standard infrastructure for quality eye care serviceslionsleaders
 
Finalization of Hospital Accreditation Standards
Finalization of Hospital Accreditation StandardsFinalization of Hospital Accreditation Standards
Finalization of Hospital Accreditation Standardsmzkarim
 
Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...
Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...
Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...Hosmac India Pvt Ltd
 
Compliance with CPGs-related QI accreditation standards
Compliance with CPGs-related QI accreditation standardsCompliance with CPGs-related QI accreditation standards
Compliance with CPGs-related QI accreditation standardsYasser Sami Abdel Dayem Amer
 
Joint Commission International (JCI)
Joint Commission International (JCI)Joint Commission International (JCI)
Joint Commission International (JCI)RadhaDeosthalee
 
Nabh safe1 knowledge management
Nabh safe1  knowledge managementNabh safe1  knowledge management
Nabh safe1 knowledge managementPrajakta_06
 
Case study of an accredited hospital final
Case study of an accredited hospital finalCase study of an accredited hospital final
Case study of an accredited hospital finalRaju Nsd
 
Iasosol- NABH Quality presentation
Iasosol- NABH Quality presentationIasosol- NABH Quality presentation
Iasosol- NABH Quality presentationbhaveensheth
 
JCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz Ahmed
JCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz AhmedJCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz Ahmed
JCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz AhmedMumtaz Ahmed
 
Hospital management nabh
Hospital management nabh  Hospital management nabh
Hospital management nabh Anvita Bhargava
 
Gap analysis of NABH 3rd and 4th Edition
Gap analysis of NABH 3rd and 4th EditionGap analysis of NABH 3rd and 4th Edition
Gap analysis of NABH 3rd and 4th EditionDr.Deepak Rajendiran
 
JCI SQE Standards by Dr.Mahboob ali khan
JCI SQE Standards by Dr.Mahboob ali khan JCI SQE Standards by Dr.Mahboob ali khan
JCI SQE Standards by Dr.Mahboob ali khan Healthcare consultant
 
NABH 5th edition hospital std april 2020
NABH  5th edition hospital std april 2020NABH  5th edition hospital std april 2020
NABH 5th edition hospital std april 2020anjalatchi
 

What's hot (20)

Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...
Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...
Ensuring Quality Beyond Accreditation - What Hospitals Need to Do to Stay One...
 
Standards & survey process orientation sspo cbahi
Standards  & survey  process orientation sspo cbahiStandards  & survey  process orientation sspo cbahi
Standards & survey process orientation sspo cbahi
 
6333147 how-to-get-started-with-jci-accreditation
6333147 how-to-get-started-with-jci-accreditation6333147 how-to-get-started-with-jci-accreditation
6333147 how-to-get-started-with-jci-accreditation
 
Hac ppt-execom (05.05.2014) (1)
Hac ppt-execom (05.05.2014) (1)Hac ppt-execom (05.05.2014) (1)
Hac ppt-execom (05.05.2014) (1)
 
International Healthcare Accreditation by Dr.Mahboob ali khan Phd
International Healthcare Accreditation by Dr.Mahboob ali khan Phd International Healthcare Accreditation by Dr.Mahboob ali khan Phd
International Healthcare Accreditation by Dr.Mahboob ali khan Phd
 
Standard infrastructure for quality eye care services
Standard infrastructure for quality eye care servicesStandard infrastructure for quality eye care services
Standard infrastructure for quality eye care services
 
Finalization of Hospital Accreditation Standards
Finalization of Hospital Accreditation StandardsFinalization of Hospital Accreditation Standards
Finalization of Hospital Accreditation Standards
 
Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...
Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...
Achieving Patient delight with Quality - Dr V.P Thomas at Knowledge Series Se...
 
Compliance with CPGs-related QI accreditation standards
Compliance with CPGs-related QI accreditation standardsCompliance with CPGs-related QI accreditation standards
Compliance with CPGs-related QI accreditation standards
 
Joint Commission International (JCI)
Joint Commission International (JCI)Joint Commission International (JCI)
Joint Commission International (JCI)
 
NABH Extended
NABH Extended NABH Extended
NABH Extended
 
Nabh safe1 knowledge management
Nabh safe1  knowledge managementNabh safe1  knowledge management
Nabh safe1 knowledge management
 
Case study of an accredited hospital final
Case study of an accredited hospital finalCase study of an accredited hospital final
Case study of an accredited hospital final
 
Iasosol- NABH Quality presentation
Iasosol- NABH Quality presentationIasosol- NABH Quality presentation
Iasosol- NABH Quality presentation
 
JCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz Ahmed
JCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz AhmedJCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz Ahmed
JCI Accreditation Status and way-forward in Saudi Arabia in 2013 by Mumtaz Ahmed
 
Jci material
Jci materialJci material
Jci material
 
Hospital management nabh
Hospital management nabh  Hospital management nabh
Hospital management nabh
 
Gap analysis of NABH 3rd and 4th Edition
Gap analysis of NABH 3rd and 4th EditionGap analysis of NABH 3rd and 4th Edition
Gap analysis of NABH 3rd and 4th Edition
 
JCI SQE Standards by Dr.Mahboob ali khan
JCI SQE Standards by Dr.Mahboob ali khan JCI SQE Standards by Dr.Mahboob ali khan
JCI SQE Standards by Dr.Mahboob ali khan
 
NABH 5th edition hospital std april 2020
NABH  5th edition hospital std april 2020NABH  5th edition hospital std april 2020
NABH 5th edition hospital std april 2020
 

Similar to B.g.h ada'a-health most-improved-services-hospitals final-1

Collaborative tools in healthcare
Collaborative tools in healthcareCollaborative tools in healthcare
Collaborative tools in healthcareSawad thotathil
 
Mathias presentation Kabarole District Perform to Scale progect
Mathias presentation Kabarole District Perform to Scale progectMathias presentation Kabarole District Perform to Scale progect
Mathias presentation Kabarole District Perform to Scale progectMtMt37
 
Quality Improvement Through Effective Staff Handover
Quality Improvement Through Effective Staff Handover Quality Improvement Through Effective Staff Handover
Quality Improvement Through Effective Staff Handover anne spencer
 
Performance evaluation ppt
Performance evaluation ppt Performance evaluation ppt
Performance evaluation ppt DrHeena tiwari
 
A budget planning model for health care hospitals
A budget planning model for health care hospitalsA budget planning model for health care hospitals
A budget planning model for health care hospitalsAlexander Decker
 
PDSA - Front Board Rev - OFC
PDSA - Front Board Rev - OFCPDSA - Front Board Rev - OFC
PDSA - Front Board Rev - OFCalfred lopez
 
Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...
Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...
Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...Cancer Institute NSW
 
Cadth symposium 2015 d3 pro presentation apr 2015 - for deb
Cadth symposium 2015 d3 pro presentation   apr 2015 - for debCadth symposium 2015 d3 pro presentation   apr 2015 - for deb
Cadth symposium 2015 d3 pro presentation apr 2015 - for debCADTH Symposium
 
Identifying Problems
Identifying ProblemsIdentifying Problems
Identifying Problemsljmcneill33
 
Hospital Harm Measure: Can It Really Be Used For Improvement?
Hospital Harm Measure: Can It Really Be Used For Improvement? Hospital Harm Measure: Can It Really Be Used For Improvement?
Hospital Harm Measure: Can It Really Be Used For Improvement? Canadian Patient Safety Institute
 
professional resume
professional resumeprofessional resume
professional resumeBeverly Fick
 
Can Pushing help our ED PET
Can Pushing help our ED PETCan Pushing help our ED PET
Can Pushing help our ED PETEugene Farrell
 
1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi
 1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi 1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi
1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doiMargaritoWhitt221
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxtodd581
 
Week 4 Examples CollapseTop of FormTotal views 17 (Your v.docx
Week 4 Examples CollapseTop of FormTotal views 17 (Your v.docxWeek 4 Examples CollapseTop of FormTotal views 17 (Your v.docx
Week 4 Examples CollapseTop of FormTotal views 17 (Your v.docxmelbruce90096
 
Dr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public Hospital
Dr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public HospitalDr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public Hospital
Dr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public HospitalInforma Australia
 
Case Presentation Eliminating waste and building capacity
Case Presentation Eliminating waste and building capacityCase Presentation Eliminating waste and building capacity
Case Presentation Eliminating waste and building capacityCarlos Frederico Pinto
 
CHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docx
CHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docxCHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docx
CHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docxsleeperharwell
 
Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...
Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...
Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...Health IT Conference – iHT2
 

Similar to B.g.h ada'a-health most-improved-services-hospitals final-1 (20)

Collaborative tools in healthcare
Collaborative tools in healthcareCollaborative tools in healthcare
Collaborative tools in healthcare
 
Mathias presentation Kabarole District Perform to Scale progect
Mathias presentation Kabarole District Perform to Scale progectMathias presentation Kabarole District Perform to Scale progect
Mathias presentation Kabarole District Perform to Scale progect
 
Quality Improvement Through Effective Staff Handover
Quality Improvement Through Effective Staff Handover Quality Improvement Through Effective Staff Handover
Quality Improvement Through Effective Staff Handover
 
Performance evaluation ppt
Performance evaluation ppt Performance evaluation ppt
Performance evaluation ppt
 
A budget planning model for health care hospitals
A budget planning model for health care hospitalsA budget planning model for health care hospitals
A budget planning model for health care hospitals
 
PDSA - Front Board Rev - OFC
PDSA - Front Board Rev - OFCPDSA - Front Board Rev - OFC
PDSA - Front Board Rev - OFC
 
Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...
Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...
Optimising the Model of Care for Patient Management at The Tweed Cancer Care ...
 
Cadth symposium 2015 d3 pro presentation apr 2015 - for deb
Cadth symposium 2015 d3 pro presentation   apr 2015 - for debCadth symposium 2015 d3 pro presentation   apr 2015 - for deb
Cadth symposium 2015 d3 pro presentation apr 2015 - for deb
 
Identifying Problems
Identifying ProblemsIdentifying Problems
Identifying Problems
 
Hospital Harm Measure: Can It Really Be Used For Improvement?
Hospital Harm Measure: Can It Really Be Used For Improvement? Hospital Harm Measure: Can It Really Be Used For Improvement?
Hospital Harm Measure: Can It Really Be Used For Improvement?
 
professional resume
professional resumeprofessional resume
professional resume
 
Can Pushing help our ED PET
Can Pushing help our ED PETCan Pushing help our ED PET
Can Pushing help our ED PET
 
1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi
 1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi 1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi
1Alshammary SA, et al. BMJ Open Quality 2021;10e001391. doi
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
 
Week 4 Examples CollapseTop of FormTotal views 17 (Your v.docx
Week 4 Examples CollapseTop of FormTotal views 17 (Your v.docxWeek 4 Examples CollapseTop of FormTotal views 17 (Your v.docx
Week 4 Examples CollapseTop of FormTotal views 17 (Your v.docx
 
Dr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public Hospital
Dr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public HospitalDr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public Hospital
Dr Michele Genevieve and Dr Matt Summerscales - SJG Midland Public Hospital
 
Case Presentation Eliminating waste and building capacity
Case Presentation Eliminating waste and building capacityCase Presentation Eliminating waste and building capacity
Case Presentation Eliminating waste and building capacity
 
CHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docx
CHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docxCHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docx
CHANGE PROPOSAL OUTLINE2Change Proposal OutlineTime and Re.docx
 
Services marketing
Services marketing Services marketing
Services marketing
 
Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...
Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...
Health IT Summit Houston 2014 - Case Study "EHR Optimization for Organization...
 

Recently uploaded

Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Gabriel Guevara MD
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfMedicoseAcademics
 
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort ServiceCall Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Serviceparulsinha
 
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service LucknowVIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknownarwatsonia7
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Modelssonalikaur4
 
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...Miss joya
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Miss joya
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...narwatsonia7
 
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Servicesonalikaur4
 
Glomerular Filtration and determinants of glomerular filtration .pptx
Glomerular Filtration and  determinants of glomerular filtration .pptxGlomerular Filtration and  determinants of glomerular filtration .pptx
Glomerular Filtration and determinants of glomerular filtration .pptxDr.Nusrat Tariq
 
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000aliya bhat
 
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...narwatsonia7
 
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...Miss joya
 
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Miss joya
 
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbaisonalikaur4
 

Recently uploaded (20)

Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hosur Just Call 7001305949 Top Class Call Girl Service Available
 
Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
 
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort ServiceCall Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
Call Girls Service In Shyam Nagar Whatsapp 8445551418 Independent Escort Service
 
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service LucknowVIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
 
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
College Call Girls Pune Mira 9907093804 Short 1500 Night 6000 Best call girls...
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
 
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls ServiceCall Girls Thane Just Call 9910780858 Get High Class Call Girls Service
Call Girls Thane Just Call 9910780858 Get High Class Call Girls Service
 
Glomerular Filtration and determinants of glomerular filtration .pptx
Glomerular Filtration and  determinants of glomerular filtration .pptxGlomerular Filtration and  determinants of glomerular filtration .pptx
Glomerular Filtration and determinants of glomerular filtration .pptx
 
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
 
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
Call Girls Kanakapura Road Just Call 7001305949 Top Class Call Girl Service A...
 
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
VIP Call Girls Pune Vrinda 9907093804 Short 1500 Night 6000 Best call girls S...
 
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
Call Girls ITPL Just Call 7001305949 Top Class Call Girl Service Available
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
 
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in Connaught Place  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in Connaught Place DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
 
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
 

B.g.h ada'a-health most-improved-services-hospitals final-1

  • 1. Ada’a Health – Most Improved Services Hospitals
  • 2. Name and type of organization Contact Details Baish General Hospital Jazan Name(s) of author(s) Hind Hamoud Kherat 0553345875 Contact Number Email hkherat@moh.gov.sa Jubran Hamoud Albeshi 0534068413 Contact Number Email jalbeshi@moh.gov.sa
  • 4. Description of innovative approaches (Hospitals)  ED patients have a long wait to be admit to the ward and ICU when a bed is available due to poor communication between ED and IP staff which leading to solve this issue through:  Assign ED bed coordinator to manage and follow patients disposition to other department  ED team create a dashboard that include patient journey with time in each destination and recorded which resulted in KPI improvement.  Centralized Bed Management Department Activated in hospital  IP team and bed management team create electronic form & use a tool called (RED 2 Green). This tool design to collect data about each patient journey and that its' indicate whether the patient is ready for discharge and what reasons are delaying their discharge. If they are not discharged must recorded as having a red day with a clear reasons. A Green day when patient receives value adding acute care that progress towards discharge and when everything planned is done.  Bed management and quality team created flow chart of patients' admission from ED, OR and OPD.  Create "organization chart" of bed management unit that include different area in hospital (ED, OR, IP and OPD) with a good impact to launch many projects correlation each other with effective outcome. For example in ED Bed coordinator project that help to manage patients flow and disposition within 4 hours, whereas create OR coordinator to manage patient flow between IP and OPD to schedule elective.  Increased percentage of now-show rate in OPD which leading to solve this issue through launch call center team project in OPD  OPD team create an Excel sheet to collect data and analyzed reason of no-show rate. This demographic information obtained to determined top 15 % of patients most likely to no-show. Begin calling patient 7 days before schedule appointment as remainder which impact in monitoring and maintaining the KPI.  Improve staff skills through conduct training and workshops in different area (ED staff, OR, OPD and IP staff).
  • 5. Engagement with clinicians in improvement activities RED 2 GREEN Training program with the participation of all relevant clinicians  Clinicians had participate in approval of policy and procedure of projects.  Increase awareness of clinicians the importance of provide care within 4 hours and follow that by dashboard in ED.  Weekly meeting between medical director, nursing director and domain leader, quality assurance director and bed management unit to facilitate improve the procedure of patients' admission.  In IP, clinicians have a clear role and engagement in bed management unit, that help to improve LoS and weekend discharge indicators.  Weekly meeting with patients experience department, PIO, CA and domain leaders of OPD, ED and IP that to measure patients satisfaction.  Monthly meeting with hospital director and stakeholders to discuss and mentor recommendation for each projects.
  • 6. Description: In 2020- the Percentage of patient disposition within 4 hours were slightly affected due to the pandemic of COVID 19, after launch the project of Assign a bed coordinator supervisor to reduce waiting time between ED and admission to ward/ICU; the KPI of door to disposition has sustained steady performance. Moreover, establish dashboard in the ED was the main key to mentors and improve KPIs during the project. Door to… 96.00% 98.00% 100.00% Jan Feb Mar Apr May Jun Jul 98.30% 100.00% 100.00% 100.00% 100.00% 99.80% 100.00% Door to disposition 4 h 2021 Door to disposition (% Patients seen within 4 hours) Patient Satisfaction -2021 Dashboard that Created at ED to follow patients'disposition CASE STUDY 1 0.00% 20.00% 40.00% 60.00% 80.00% 100.00% Apr May 100% Baseline Data For April and May of 2020 100%  Emergency Department (MANDATORY)
  • 7. Description: IN Outpatient department, the percentage of no-show was high which let OPD team to create the project of Calling team Center to call patients before their appointments as a reminder, to decrease no-shows. In 2021 the KPI of No-show has reach to target percentage 8% and sustained steady performance. However, this project has a good resulted by increasing patients’ satisfaction and changed customer culture which that courage them do not miss their appointment. Patient Satisfaction -2021 CASE STUDY 2 0.00% 5.00% 10.00% J A N F E B M A R A P R M A Y J U N J U L 9.20% 8.10% 6.90% 1.90% 1.80% 1.70% 0.80% 0.00% 20.00% 40.00% 60.00% A P R M A Y 20.00% 44.40% Baseline Data For April and May of 2020 2021 No-show Rate  Outpatient Department
  • 8. Description: Length of stay in the inpatient department rose above recommended level and percentage of weekend discharge was much lower than world-class level due to covid-19, however after the project of centralized bed management activated; the LOS decreased and percentage of weekend discharge increased and improve staff skills and knowledge of KPIs that sustained steady performance and met the goal. Length Of Stay Rate Patient Satisfaction -2021 CASE STUDY 3 0 5 jan feb mar apr may jun jul 3.8 3.3 3.6 3.2 1.7 3.9 3 Length Of Stay Rate 0.00% 50.00% Jan Feb Mar Apr May Jun Jul 23.30% 27.20% 17.30% 24.50% 23.00% 21.60% 23.70% Selected By PWC as a success story in southern region -2021 0.00% 20.00% Apr May 8.50% 11.60% Baseline Data For April and May of 2020 2021 6 8 10 apr may 8.2 7 2021 2021 Baseline Data For April and May of 2020 Weekend Discharge Rate 2021  Inpatient Department
  • 9. Sharing of lessons learned with other facilities  Create a poster of bed management unit and share with south region as success story.  Exchange experience of call center team project with Asir central hospital through PWC.  Sharing the experience of kainexues website and monitor projects with other colleagues from different hospitals in the region and RHD.  PIO and CA visited the command center in RHD to discuss focus improvement projects and learning new skills with dashboard.
  • 10. Endorsement of facility director Mr. Essa Abdullah Jafari Hospital Director The hospital director has assigned and approved an improvement projects with stakeholders. He encouraged the developments in the areas that need to improve as well as provided full support. Certificate of thanks and praise were presented to all staff involved in the projects improvement process. the participation in Ada’a health awards 2021 approved by hospital director.
  • 11. We Thank You for Your Participation in Ada’a Health Awards 2021 End of Application