ADB Evaluation Study V :
Loan 1746-Philippines:
Pasig River Environmental Management
and Rehabilitation Sector Development
Development Communication
Second Trimester, AY 2020-2021
Asian Institute of Journalism and Communication
Submitted to :
JOHNNY F. GOLOYUGO
Professor
Submitted by:
BELLA CELESTE ALMEIDA-VELASCO and ARNOLFO B. LOVERIA
ADB Evaluation Study V :
Loan 1746-Philippines:
Pasig River Environmental Management
and Rehabilitation Sector Development
A Case Study of Pasig River Rehabilitation
Introduction, Rationale, and Objectives
Figure 1. Photograph of Pasig River with Ayala River, City of Manila at the background, ADB Evaluation Study V : Loan 1746-Philippines: Pasig
River Environmental Management and Rehabilitation Sector Development, 2006,
https://www.oecd.org/countries/philippines/47108497.pdf.
Introduction:
The Pasig River
โ€ข The Pasig River is a 23-kilometer waterway in the
Philippines that connects Laguna de Bay to Manila Bay. Its
length flows north-northwest through the market town of
Pasig and bisects Manila, then enters the bay between the
North and South harbors.
โ€ข Since the Spanish period, Pasig River has major influence
on trade, commerce, and urban development.
โ€ข To this day, Pasig River is still used as a transport route for
goods and passengers (through bancas).
โ€ข In 2019, Metro Manila Development Authority
(MMDA) relaunched the Pasig River Ferry Service
as an alternative public transportation.
โ€ข The same urban development and civilization
caused the pollution of the River which rendered it
uninhabitable by marine organisms.
โ€ข Contributors to its degradation: people
settlements and factories that discharge untreated
wastewater directly into the river
โ€ข The same urban development and civilization caused the
pollution of the River which rendered it uninhabitable by
marine organisms.
โ€ข Contributors to its degradation: people settlements and
factories that discharge untreated wastewater directly into
the river
Mitigating Efforts
โ€ข Implemented through the Pasig River Rehabilitation
Commission (PRRC)
โ€ข Loan Grants from the Asian Development Bank
Philippines: Pasig River Environmental Management
and Rehabilitation Sector Development Program
(Program Number 30308)
1. Loan 1745 - policy loan ($100 Million)
2. Loan 1746 โ€“ investment loan ($75 Million)
This study will focus on Loan 1746.
Rationale
In relation to the utility of Pasig River,
this study seeks:
1. to determine the intention of the
government in implementing the
Philippines: Pasig River Environmental
Management and Rehabilitation Sector
Development Program;
2. to present the status of Program and its
outcome when the Program ended.
Objectives
1. To present the aim and target outcome of the
Philippines: Pasig River Environmental
Management and Rehabilitation Sector
Development Program;
2. To determine the actual outcome(s) of the
implementation;
3. To determine if the Program has been a
success or a failure; and
4. To determine if the expenditure is
commensurate with the results.
METHODOLOGY
โ€ข This study is descriptive in nature.
โ€ข Gathering of data:
1. through internet research using related keywords
2. websites of the Asian Development Bank and other
websites, such as the Organisation for Economic Co-
operation and Development (OECD) website.
โ€ข Data availability: All materials can be accessed for free
in the internet; thus, no library research was needed.
โ€ข The data included were decided based on:
1. Criteria needed to present the case study
better; and
2. Description of the program and its
objectives.
โ€ข Photographs of the Pasig River at different
perspectives, as well as tables containing
necessary data were included in this study.
FINDINGS
1. The Pasig River Environmental Management
and Rehabilitation Sector Development
Program (PREMRP) was an assistance
package that integrated policy reforms and
investments.
2. If successful, the Pasig River, by 2014, would
have been given the Class C standard.
3. Component measures for implementation:
a) establish a 10-meter environmental
preservation areas (EPAs) or easement
b) upgrade infrastructure and provide municipal
services and facilities in urban renewal areas
adjacent to EPAs
c) introduce a septic tank maintenance service
and provide septage treatment facility to
reduce the volume of untreated municipal
wastewater being discharged into the river,
d) eliminate the illegal dumping of municipal
solid waste into the river system
4. The Pasig River Loan 1746
- negotiated in 1999
- approved in July 2000
- The actual date of loan effectiveness was
August 17, 2000 (October 20, 2020 in loan
Agreement).
- The expected closing date was January 31,
2006 (in loan agreement), but the actual
closing date was March 5, 2009.
- Two extensions for the closing date were
granted, January 31 and September 30, 2008.
5. Roles/Tasks of Agencies
โ€ข The Executing Agency (EA) - Pasig River Rehabilitation
Commission (PRRC) created in 1999 under the
Executive Order No. 54 to rehabilitate the Pasig River
to its previous pristine condition
โ€ข For the development of resettlement sites and
relocation of families from the environmental
preservation areas (EPAs)
a) Housing and Urban Development Coordinating
Council (HUDCC),
b) National Housing Authority (NHA) and the
c) local government units along the river and its
tributaries
โ€ข Other institutions which performed in Pasig
River rehabilitation:
a) Environmental Management Bureau
b) Laguna Lake Development Authority (LLDA),
c) Metro Manila Development Authority
(MMDA),
d) Environmental Management Bureau (EMB),
and
e) Metro Manila Mayorโ€™s Council
6. On space allocation:
As to the 10-meter easement measurements,
negotiations and legal battles ensued between
the government and the Affected Families who
said a 3-meter easement would be enough.
In the end, the 10-meter easement was
sustained by the courts.
7. On the ADB Resettlement Plan:
โ€ข The entitlement package was not
received by the first batch of
relocates. (Table 1)
Table 1:
Resettlement Plan Entitlement Matrix
8. Only 56% accomplishment in 5 years
As of March 2006, the ADB-approved
Resettlement Plan relocated a total of 6,085
(56%) squatter families of the total 10,827
planned to be relocated during the first phase
of the implementation of the PRDP. (Table 2)
Table 2:
Summary of Relocation and Resettlement Operations,
as of March 7, 2006
9. Promised utilities and facilities
not given
โ€ข Lack of livable facilities and services in
the relocation sites (schools, health
facilities, water, power)
(Table 3)
Table 3:
Post-Relocation Access to Basic Utilities and Services
10. Other issues in the ADB
Resettlement Plan:
โ€ข Violent confrontations between the squatter
families and the demolition crews
โ€ข Distant location of the site to the APsโ€™
employment or income sources in Metro
Manila
โ€ข Loss of stable livelihood and Non-sustainable
home-based enterprises
โ€ข Lack of information, consultation, and
participation in impending eviction and
resettlement
SUMMARY AND CONCLUSIONS
The Pasig River Environmental
Management and
Rehabilitation Sector
Development Program was a
gargantuan program.
Effects on:
1. Environment
2. Resettlement
3. Lives and Livelihood
The Program was relevant,
as it supported the
Medium-Term
Development Plan
of the Philippines
The Program was relevant:
1) supported the Philippiness
Medium-Term Development Plan
2) based on the Pasig River
Development Program
Factors for challenges faced in
implementation:
1. complicated institutional structure
2. broad scope of activities, and
3. changing political climate.
Identified risks to implementation:
1. lack of political support;
2. weak enforcement of environmental
regulations; and
3. reluctance and refusal of the
informal settlers to relocate.
CATCH!
Loan 1746 closed on March 5, 2009.
But in 2015 (10 years after the program
implementation), the Commission on Audit
criticized PRRC for failing to hit the target of
rehabilitating the river and its
tributaries (Rappler, 2016).
COA reported that only 2,442
informal settler families (ISFs)
(82% of the 2,973 families)
that should have been relocated in
2015, were ACTUALLY relocated.
REFERENCES
ADB Evaluation Study . (2006, October). Retrieved March 2021, from
https://www.oecd.org/countries/philippines/47108497.pdf
ADB Validation Report. (2012, November). Retrieved March 2021, from
https://www.adb.org/sites/default/files/evaluation-document/36027/files/pvr-
187.pdf
Asian Development Bank. (2003, January). Country Assistance Program Evaluation in
the Philippines. Retrieved March 2021, from
https://www.adb.org/sites/default/files/evaluation-document/35041/files/cap-phi-
200304.pdf
Asian Development Bank. (2000 March).
https://www.adb.org/sites/default/files/project-document/71641/rrp-phi-30308.pdf
Cruz, R. T. (1997). Case Study III* - The Pasig River, Philippines . Retrieved March 2021,
from
https://www.who.int/water_sanitation_health/resourcesquality/wpccasestudy3.pdf
Rivas, R. (2018, October 17). Look: Now 'Instagram-worthy' Pasig River bags
international award. Retrieved March 2021, from Rappler:
https://www.rappler.com/environment/pasig-river-asia-riverprize-award-2018
Rivas, R. (2019, August 14). Huge fish from Pasig River not safe to eat. Retrieved March
2021, from Rappler: https://www.rappler.com/environment/prrc-says-huge-fish-pasig-
river-not-safe-eat
The Editors of Encyclopaedia Britannica. (2021). Pasig River. Retrieved March 2021,
from Encyclopaedia Britannica, Inc.: https://www.britannica.com/place/Pasig-River
Water Environment Partnership in Asia. (n.d.). Pasig River. Retrieved March 2021, from
WEPA: http://www.wepa-
db.net/policies/measures/background/philippines/pasigriver.htm
Note: ADB Evaluation Study V : Loan 1746-Philippines: Pasig River
Environmental Management and Rehabilitation Sector Development, 2006,
https://www.oecd.org/countries/philippines/47108497.pdf.
Figure 1
Figure 2
Note: ADB Evaluation Study V : Loan 1746-Philippines: Pasig River
Environmental Management and Rehabilitation Sector Development, 2006,
https://www.oecd.org/countries/philippines/47108497.pdf.
Table 1
Table 2
Table 3

More Related Content

Similar to Pasig River Rehabilitation ADB-Evaluation-Study V Loan 1746.pdf

Managing and Planning Water Services-PEC Paper
Managing and Planning Water Services-PEC PaperManaging and Planning Water Services-PEC Paper
Managing and Planning Water Services-PEC Paper
Col Islam Ul Haq
ย 
Implementer's Guide to Lime Stabilization for Septage Management in the Phili...
Implementer's Guide to Lime Stabilization for Septage Management in the Phili...Implementer's Guide to Lime Stabilization for Septage Management in the Phili...
Implementer's Guide to Lime Stabilization for Septage Management in the Phili...
David Robbins
ย 
3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china
objectiveassociates
ย 
Water-Balance-Pakistan
Water-Balance-PakistanWater-Balance-Pakistan
Water-Balance-Pakistan
Raza Farrukh
ย 

Similar to Pasig River Rehabilitation ADB-Evaluation-Study V Loan 1746.pdf (20)

Managing and Planning Water Services-PEC Paper
Managing and Planning Water Services-PEC PaperManaging and Planning Water Services-PEC Paper
Managing and Planning Water Services-PEC Paper
ย 
Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]
ย 
Implementer's Guide to Lime Stabilization for Septage Management in the Phili...
Implementer's Guide to Lime Stabilization for Septage Management in the Phili...Implementer's Guide to Lime Stabilization for Septage Management in the Phili...
Implementer's Guide to Lime Stabilization for Septage Management in the Phili...
ย 
20161216 angolan national plan for rural water & sanitation (nrwssp) af...
20161216 angolan national plan for rural water & sanitation (nrwssp)   af...20161216 angolan national plan for rural water & sanitation (nrwssp)   af...
20161216 angolan national plan for rural water & sanitation (nrwssp) af...
ย 
Pakistan earthquake - water and sanitation reconstruction strategy
Pakistan earthquake - water and sanitation reconstruction strategyPakistan earthquake - water and sanitation reconstruction strategy
Pakistan earthquake - water and sanitation reconstruction strategy
ย 
WASH Presentation - PCIV.pptx
WASH Presentation - PCIV.pptxWASH Presentation - PCIV.pptx
WASH Presentation - PCIV.pptx
ย 
Presentation: Environmental Protection of the Rรญo de la Plata and its Mariti...
Presentation: Environmental Protection of the Rรญo de la Plata  and its Mariti...Presentation: Environmental Protection of the Rรญo de la Plata  and its Mariti...
Presentation: Environmental Protection of the Rรญo de la Plata and its Mariti...
ย 
3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china3 dave tickner strategic water mgt china
3 dave tickner strategic water mgt china
ย 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design
ย 
Baltimore Urban Waters Meeting minutes 12.10.15
Baltimore Urban Waters Meeting minutes 12.10.15Baltimore Urban Waters Meeting minutes 12.10.15
Baltimore Urban Waters Meeting minutes 12.10.15
ย 
WATER SUPPLY AND SANITATION DEVELOPMENT.pdf
WATER SUPPLY AND SANITATION DEVELOPMENT.pdfWATER SUPPLY AND SANITATION DEVELOPMENT.pdf
WATER SUPPLY AND SANITATION DEVELOPMENT.pdf
ย 
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
ย 
Rural Water Supply Services in Cambodia
Rural Water Supply Services in Cambodia  Rural Water Supply Services in Cambodia
Rural Water Supply Services in Cambodia
ย 
Integrated Management of Land- Based Activities in the Sao Francisco River Ba...
Integrated Management of Land- Based Activities in the Sao Francisco River Ba...Integrated Management of Land- Based Activities in the Sao Francisco River Ba...
Integrated Management of Land- Based Activities in the Sao Francisco River Ba...
ย 
Upgrading, Governing and Financing Water Infrastructure in Brazil
Upgrading, Governing and Financing Water Infrastructure in BrazilUpgrading, Governing and Financing Water Infrastructure in Brazil
Upgrading, Governing and Financing Water Infrastructure in Brazil
ย 
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
Mr. Anju Gaur IEWP @ Workshop on River Basin Management Planning and Governan...
ย 
Upgrading, Governing and Financing Water Infrastructure in Brazil
Upgrading, Governing and Financing Water Infrastructure in BrazilUpgrading, Governing and Financing Water Infrastructure in Brazil
Upgrading, Governing and Financing Water Infrastructure in Brazil
ย 
Water protection act 1974
Water protection act 1974Water protection act 1974
Water protection act 1974
ย 
GEF Hai River Basin Integrated Water and Environment Management Project
GEF Hai River Basin Integrated Water and Environment Management ProjectGEF Hai River Basin Integrated Water and Environment Management Project
GEF Hai River Basin Integrated Water and Environment Management Project
ย 
Water-Balance-Pakistan
Water-Balance-PakistanWater-Balance-Pakistan
Water-Balance-Pakistan
ย 

Recently uploaded

Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Sareena Khatun
ย 
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Sareena Khatun
ย 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
ย 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
ย 
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
kumargunjan9515
ย 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
kumargunjan9515
ย 
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelCall Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
kumargunjan9515
ย 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
kumargunjan9515
ย 

Recently uploaded (20)

Call Girl in Faridabad โ‚น7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad โ‚น7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad โ‚น7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad โ‚น7.5k Pick Up & Drop With Cash Payment #8168257667
ย 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
ย 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
ย 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
ย 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
ย 
Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl โ‚น7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
ย 
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
Call Girls Pimpri Chinchwad / 8250092165 Genuine Call girls with real Photos ...
ย 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
ย 
Only Cash On Delivery Call Girls Service In Kanpur ๐Ÿงฟ 6378878445 ๐Ÿงฟ High Class...
Only Cash On Delivery Call Girls Service In Kanpur  ๐Ÿงฟ 6378878445 ๐Ÿงฟ High Class...Only Cash On Delivery Call Girls Service In Kanpur  ๐Ÿงฟ 6378878445 ๐Ÿงฟ High Class...
Only Cash On Delivery Call Girls Service In Kanpur ๐Ÿงฟ 6378878445 ๐Ÿงฟ High Class...
ย 
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
Call Girls in Kapadvanj - 8250092165 Our call girls are sure to provide you w...
ย 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
ย 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
ย 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
ย 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
ย 
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
Unlimited Short Call Girls in Koppal { 9332606886 } VVIP NISHA Call Girls Nea...
ย 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
ย 
Climate Change
Climate ChangeClimate Change
Climate Change
ย 
Premium Call Girls Nashik Call Girls Service ๐Ÿ‘‰๐Ÿ“ž 6378878445 ๐Ÿ‘‰๐Ÿ“ž Just๐Ÿ“ฒ Call Ruhi...
Premium Call Girls Nashik Call Girls Service ๐Ÿ‘‰๐Ÿ“ž 6378878445 ๐Ÿ‘‰๐Ÿ“ž Just๐Ÿ“ฒ Call Ruhi...Premium Call Girls Nashik Call Girls Service ๐Ÿ‘‰๐Ÿ“ž 6378878445 ๐Ÿ‘‰๐Ÿ“ž Just๐Ÿ“ฒ Call Ruhi...
Premium Call Girls Nashik Call Girls Service ๐Ÿ‘‰๐Ÿ“ž 6378878445 ๐Ÿ‘‰๐Ÿ“ž Just๐Ÿ“ฒ Call Ruhi...
ย 
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelCall Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Call Girls in Banswara { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
ย 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
ย 

Pasig River Rehabilitation ADB-Evaluation-Study V Loan 1746.pdf

  • 1. ADB Evaluation Study V : Loan 1746-Philippines: Pasig River Environmental Management and Rehabilitation Sector Development Development Communication Second Trimester, AY 2020-2021 Asian Institute of Journalism and Communication Submitted to : JOHNNY F. GOLOYUGO Professor Submitted by: BELLA CELESTE ALMEIDA-VELASCO and ARNOLFO B. LOVERIA
  • 2. ADB Evaluation Study V : Loan 1746-Philippines: Pasig River Environmental Management and Rehabilitation Sector Development A Case Study of Pasig River Rehabilitation
  • 3. Introduction, Rationale, and Objectives Figure 1. Photograph of Pasig River with Ayala River, City of Manila at the background, ADB Evaluation Study V : Loan 1746-Philippines: Pasig River Environmental Management and Rehabilitation Sector Development, 2006, https://www.oecd.org/countries/philippines/47108497.pdf.
  • 4. Introduction: The Pasig River โ€ข The Pasig River is a 23-kilometer waterway in the Philippines that connects Laguna de Bay to Manila Bay. Its length flows north-northwest through the market town of Pasig and bisects Manila, then enters the bay between the North and South harbors. โ€ข Since the Spanish period, Pasig River has major influence on trade, commerce, and urban development. โ€ข To this day, Pasig River is still used as a transport route for goods and passengers (through bancas).
  • 5. โ€ข In 2019, Metro Manila Development Authority (MMDA) relaunched the Pasig River Ferry Service as an alternative public transportation. โ€ข The same urban development and civilization caused the pollution of the River which rendered it uninhabitable by marine organisms. โ€ข Contributors to its degradation: people settlements and factories that discharge untreated wastewater directly into the river
  • 6. โ€ข The same urban development and civilization caused the pollution of the River which rendered it uninhabitable by marine organisms. โ€ข Contributors to its degradation: people settlements and factories that discharge untreated wastewater directly into the river
  • 7. Mitigating Efforts โ€ข Implemented through the Pasig River Rehabilitation Commission (PRRC) โ€ข Loan Grants from the Asian Development Bank Philippines: Pasig River Environmental Management and Rehabilitation Sector Development Program (Program Number 30308) 1. Loan 1745 - policy loan ($100 Million) 2. Loan 1746 โ€“ investment loan ($75 Million) This study will focus on Loan 1746.
  • 8. Rationale In relation to the utility of Pasig River, this study seeks: 1. to determine the intention of the government in implementing the Philippines: Pasig River Environmental Management and Rehabilitation Sector Development Program; 2. to present the status of Program and its outcome when the Program ended.
  • 9. Objectives 1. To present the aim and target outcome of the Philippines: Pasig River Environmental Management and Rehabilitation Sector Development Program; 2. To determine the actual outcome(s) of the implementation; 3. To determine if the Program has been a success or a failure; and 4. To determine if the expenditure is commensurate with the results.
  • 10. METHODOLOGY โ€ข This study is descriptive in nature. โ€ข Gathering of data: 1. through internet research using related keywords 2. websites of the Asian Development Bank and other websites, such as the Organisation for Economic Co- operation and Development (OECD) website. โ€ข Data availability: All materials can be accessed for free in the internet; thus, no library research was needed.
  • 11. โ€ข The data included were decided based on: 1. Criteria needed to present the case study better; and 2. Description of the program and its objectives. โ€ข Photographs of the Pasig River at different perspectives, as well as tables containing necessary data were included in this study.
  • 12. FINDINGS 1. The Pasig River Environmental Management and Rehabilitation Sector Development Program (PREMRP) was an assistance package that integrated policy reforms and investments. 2. If successful, the Pasig River, by 2014, would have been given the Class C standard.
  • 13. 3. Component measures for implementation: a) establish a 10-meter environmental preservation areas (EPAs) or easement b) upgrade infrastructure and provide municipal services and facilities in urban renewal areas adjacent to EPAs c) introduce a septic tank maintenance service and provide septage treatment facility to reduce the volume of untreated municipal wastewater being discharged into the river, d) eliminate the illegal dumping of municipal solid waste into the river system
  • 14. 4. The Pasig River Loan 1746 - negotiated in 1999 - approved in July 2000 - The actual date of loan effectiveness was August 17, 2000 (October 20, 2020 in loan Agreement). - The expected closing date was January 31, 2006 (in loan agreement), but the actual closing date was March 5, 2009. - Two extensions for the closing date were granted, January 31 and September 30, 2008.
  • 15. 5. Roles/Tasks of Agencies โ€ข The Executing Agency (EA) - Pasig River Rehabilitation Commission (PRRC) created in 1999 under the Executive Order No. 54 to rehabilitate the Pasig River to its previous pristine condition โ€ข For the development of resettlement sites and relocation of families from the environmental preservation areas (EPAs) a) Housing and Urban Development Coordinating Council (HUDCC), b) National Housing Authority (NHA) and the c) local government units along the river and its tributaries
  • 16. โ€ข Other institutions which performed in Pasig River rehabilitation: a) Environmental Management Bureau b) Laguna Lake Development Authority (LLDA), c) Metro Manila Development Authority (MMDA), d) Environmental Management Bureau (EMB), and e) Metro Manila Mayorโ€™s Council
  • 17. 6. On space allocation: As to the 10-meter easement measurements, negotiations and legal battles ensued between the government and the Affected Families who said a 3-meter easement would be enough. In the end, the 10-meter easement was sustained by the courts.
  • 18. 7. On the ADB Resettlement Plan: โ€ข The entitlement package was not received by the first batch of relocates. (Table 1)
  • 19. Table 1: Resettlement Plan Entitlement Matrix
  • 20. 8. Only 56% accomplishment in 5 years As of March 2006, the ADB-approved Resettlement Plan relocated a total of 6,085 (56%) squatter families of the total 10,827 planned to be relocated during the first phase of the implementation of the PRDP. (Table 2)
  • 21. Table 2: Summary of Relocation and Resettlement Operations, as of March 7, 2006
  • 22. 9. Promised utilities and facilities not given โ€ข Lack of livable facilities and services in the relocation sites (schools, health facilities, water, power) (Table 3)
  • 23. Table 3: Post-Relocation Access to Basic Utilities and Services
  • 24. 10. Other issues in the ADB Resettlement Plan: โ€ข Violent confrontations between the squatter families and the demolition crews โ€ข Distant location of the site to the APsโ€™ employment or income sources in Metro Manila โ€ข Loss of stable livelihood and Non-sustainable home-based enterprises โ€ข Lack of information, consultation, and participation in impending eviction and resettlement
  • 26. The Pasig River Environmental Management and Rehabilitation Sector Development Program was a gargantuan program.
  • 27. Effects on: 1. Environment 2. Resettlement 3. Lives and Livelihood
  • 28. The Program was relevant, as it supported the Medium-Term Development Plan of the Philippines
  • 29. The Program was relevant: 1) supported the Philippiness Medium-Term Development Plan 2) based on the Pasig River Development Program
  • 30. Factors for challenges faced in implementation: 1. complicated institutional structure 2. broad scope of activities, and 3. changing political climate.
  • 31. Identified risks to implementation: 1. lack of political support; 2. weak enforcement of environmental regulations; and 3. reluctance and refusal of the informal settlers to relocate.
  • 32. CATCH! Loan 1746 closed on March 5, 2009. But in 2015 (10 years after the program implementation), the Commission on Audit criticized PRRC for failing to hit the target of rehabilitating the river and its tributaries (Rappler, 2016).
  • 33. COA reported that only 2,442 informal settler families (ISFs) (82% of the 2,973 families) that should have been relocated in 2015, were ACTUALLY relocated.
  • 34. REFERENCES ADB Evaluation Study . (2006, October). Retrieved March 2021, from https://www.oecd.org/countries/philippines/47108497.pdf ADB Validation Report. (2012, November). Retrieved March 2021, from https://www.adb.org/sites/default/files/evaluation-document/36027/files/pvr- 187.pdf Asian Development Bank. (2003, January). Country Assistance Program Evaluation in the Philippines. Retrieved March 2021, from https://www.adb.org/sites/default/files/evaluation-document/35041/files/cap-phi- 200304.pdf Asian Development Bank. (2000 March). https://www.adb.org/sites/default/files/project-document/71641/rrp-phi-30308.pdf Cruz, R. T. (1997). Case Study III* - The Pasig River, Philippines . Retrieved March 2021, from https://www.who.int/water_sanitation_health/resourcesquality/wpccasestudy3.pdf
  • 35. Rivas, R. (2018, October 17). Look: Now 'Instagram-worthy' Pasig River bags international award. Retrieved March 2021, from Rappler: https://www.rappler.com/environment/pasig-river-asia-riverprize-award-2018 Rivas, R. (2019, August 14). Huge fish from Pasig River not safe to eat. Retrieved March 2021, from Rappler: https://www.rappler.com/environment/prrc-says-huge-fish-pasig- river-not-safe-eat The Editors of Encyclopaedia Britannica. (2021). Pasig River. Retrieved March 2021, from Encyclopaedia Britannica, Inc.: https://www.britannica.com/place/Pasig-River Water Environment Partnership in Asia. (n.d.). Pasig River. Retrieved March 2021, from WEPA: http://www.wepa- db.net/policies/measures/background/philippines/pasigriver.htm
  • 36. Note: ADB Evaluation Study V : Loan 1746-Philippines: Pasig River Environmental Management and Rehabilitation Sector Development, 2006, https://www.oecd.org/countries/philippines/47108497.pdf. Figure 1
  • 37. Figure 2 Note: ADB Evaluation Study V : Loan 1746-Philippines: Pasig River Environmental Management and Rehabilitation Sector Development, 2006, https://www.oecd.org/countries/philippines/47108497.pdf.