1. Personal Information:
Name in full: MOHAMED WALID AHMED ABD EL SALAM EL AGAMY
Nationality: Egyptian
Religion: Muslim
Sex: Male
Date of Birth: 26-2-1972
Telephone Number: 002-01028222117 , 00213-0770659536
Address: 13, Abd Alah EL Geryany, Sababasha, Alexandria, Egypt.
Marital status: Married
Military Status: Final
E-mail : waildagamy24@gmail.com
Education:
B.Sc. Electrical Power Engineering
Date of Graduation: June - 1994
Graduation Project:
Power : Supervisory Control and Data Acquisition (SCADA) Very Good Degree
Machine: Design of Distribution Transformer Excellent Degree
Languages:
Good command of English and Arabic written and spoken.
2. General Knowledge:
Very Good using Computer
Courses:
Course in Cathodic Protection system.
Course in Distributed Control System (DCS) in Development Research and
Technological Planning Center in CAIRO UNIVERSITY.
Course in Windows 98.
Course in Microsoft Word 2000.
Course in Excel 2000.
Experience:
From 9/94 to 12/94 in Alexandria Engineering and Building CO. as a
Construction Engineer.
From 12/94 to 3/95 in Transport and Engineering CO. as a Maintenance
Engineer.
From 4/95 the current job in Petrojet as a Construction Engineer working in
the following projects.
From 1/2015 up till now the current job in EPCCS of Accommodation Camps
(Base Camp & Security Base) for REGGANE NORD DEVELOPMENT
PROJECT as Site Manager the client is Groubment REGGAN Algeria.
From 6/2014 to 1/2015 now the current job in Ethylene Utility project as Assistant
General Manager the client is Ethydco.
From 1/2013 to 6/2014 the current job in Entissar-Sarir pipeline project-Libya as
Assistant General Manager the client is GASLY-LIBYA.
From 2/2010 to 1/2013 the current job in E.STERNECS project-Egypt as E&I
Manager the client is ESTERNECS-EGYPT.
From 2/2009 to 2/2010 in Kharir Development - YEMEN- as E&I Manager the
client is TOTAL – FRANCE.
From 7/2007 to 2/2009 in Salam Gas Train 3&4 Project as an E&I
Superintendent, the client is Petrofac international – SHARJAH.
3. From 9/2006 to 7/2007 in Yemen Liquefied Natural Gas (Y-LNG.) Project as an
Electrical and Instrument Quality Control Superintendent, the client was
YEMGAS - FRANCE.
From 12/2005 to 9/2006 in Egyptian Linear Alkyl Benzene (ELAB) Project as
Electrical Technical office Manger, the client was GS E&G - KORIA.
From 8/2005 to 12/2005 in WASCO Phase II (El-Wastany) Project as E&I
Superintendent, the client was HANOVER- USA.
From 5/2005 to 8/2005 in El-Obid (BAPETCO) Project as E&I Superintendent,
the client was BADR EL DEEN CO.
From 3/2003 to 5/2005 in Egyptian Liquefied Natural Gas (E-LNG) Project as an
Train 1- Electrical Superintendent, the client was BECHTEL-USA.
From 5/2002 to 3/2003 in Development of Council of Ministers Building in
Alexandria Project as an Electrical Site Manger and Technical office Engineer
the client was GASCO.
From 5/2001 to 5/2002 in Extension of the Control Room for (INRPC) Project as
a Project Manger for the electrical contract, the client was INRPC.
From 7/98 to 5/2001 in Middle East Oil Refinery (MIDOR) Project working in the
Electrical system, Fire alarm system and Lightning system in Buildings and
working in Power system for (Laboratory & Workshop) in Buildings as a Electrical
Building Superintendent, the client was TECHNIP TTIL-SNC ITALY.
From 10/95 to 7/98 in Expansion of Sumed Storage Project working in Substation,
Earthing, Laying Power and Instrument cables, Fire fighting and Fire alarm system
for tanks and buildings as an Electrical engineer, the client was SUMED.
From 4/95 to 10/95 in L.P.G. Recovery Plant (GASCO) Project working in
Lighting and Cathodic protection system as an Electrical engineer, the client was
ENPPI.