1333 Gum Final

306 views

Published on

Successfully completed this project for one of our major clients

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
306
On SlideShare
0
From Embeds
0
Number of Embeds
8
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

1333 Gum Final

  1. 1. 1333 Gum Street MDA – NRRP Project DCD Construction – Owner 2 Bedrooms / 1 and a half Baths Approximately 1100 sq ft
  2. 2. 1333 Gum Street DCD Construction MDA – NRRP Project • Repair interior and prep for • Install new ceiling fans, painting lighting fixtures, vanities • Paint interior “wheat” and • Repair/Re-Install kitchen base “white” cabinets and counters • Install grinder pump and • Purchase new appliances repair/check all plumbing (stove, microwave, refrig) • Check and upgrade • Check ac unit and service electrical. Install “arc fault system breakers” for bedrooms • Install closets & shelving • Install flooring: tile/carpet throughout property (approx 1100 sq ft) • Clean interior/exterior of unit and prepare for Section #8 inspection
  3. 3. 1333 Gum Street MDA – NRRP Project Front picture of exterior upon Livingroom and hallway of completed completion of project rental
  4. 4. 1333 Gum Street MDA – NRRP Project Completed Livingroom Completed full bathroom
  5. 5. 1333 Gum Street MDA – NRRP Project Completed kitchen and utility room Completed kitchen
  6. 6. 1333 Gum Street MDA – NRRP Project Completed bedroom #1 Completed master bedroom
  7. 7. 1333 Gum Street MDA – NRRP Project Front of property before repairs Livingroom and hallway before repairs
  8. 8. 1333 Gum Street MDA – NRRP Project Half bath before repairs Full bath before repairs
  9. 9. 1333 Gum Street MDA – NRRP Project Utility room and kitchen before repairs Kitchen before repairs
  10. 10. 1333 Gum Street MDA – NRRP Project Bedroom #1 before repairs Master bedroom before repairs

×