Building the Next Major Iron Ore
Mine in the Labrador Trough
Corporate Presentation
August 1st , 2012




                               FSE: P02; OTCQX: CPMNF
FORWARD-LOOKING STATEMENTS

Certain information contained herein regarding Champion Minerals Inc., including
management’s assessment of future plans and operations, may constitute forward-looking
statements under applicable securities law and necessarily involve risks, including but not
limited to risks associated with mining exploration, operating costs, production costs, volatility
of share prices, currency fluctuations, imprecision of resource and reserve estimates,
environmental risks and ability to access sufficient capital from internal and external sources.

As a consequence, actual results may differ materially from those anticipated in any forward
looking statements. Plans, intentions or expectations disclosed in any forward-looking
statements or information should not be read as guarantees of future results or events, and will
not necessarily be accurate indications of whether or when or by which such results or events
will be achieved.

Except as required by law, Champion Minerals Inc., expressly disclaims any intention and
undertakes no obligation to update any forward looking statements or information as conditions
change.

The historical mineral resources mentioned are strictly historical in nature and are non-
compliant to National Instrument 43-101 mineral resources and mineral reserves standards,
and should therefore not be relied upon. A qualified person has not done sufficient work to
upgrade or classify the historical mineral resources as current National Instrument NI-43-101
compliant.

                                                                                                     2
About Champion Minerals
  Advanced iron ore exploration and development projects located in
  Canada’s principal iron ore district, the Labrador Trough

  Fermont Projects (710 km2)
   17 properties in the Fermont Quebec mining camp
   Flagship Fire Lake North project - currently in the
    feasibility stage.
   Over 4 billion tonnes of NI 43-101 compliant iron mineral
    resource estimates on 5 of 17 projects.
   100% direct interest, 3% NSR (C$1.5 million buyback for
    an additional 0.5% NSR).

  Attikamagen Property (310 km2)
   Champion Minerals holds a 44% interest.
   Century Iron Mines Corp. subsidiary (56% interest) has
    option to earn up to a 60% interest in the property by
    funding a further $3 million in exploration expenditures by
    May 2014*.

* CHM 44% / Century Iron Ore Mines subsidiary 56%; Investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M)
                                                                                                                  3
Quebec’s Next
Major Iron Ore Mine
Fire Lake North (FLN) Development Project
   Nov. 21 2011 PEA indicates ability to produce 8.7 million tonnes of
    concentrate per annum for the first 25 years of a 40-year mine life  the first
    5 years will average approximately 10 million tonnes of concentrate per annum

   Net Present Value of $4 billion at a discounted cash flow rate of 8% with an
    Internal Rate of Return of 41.5% and a payback period of 2.3 years

Established Iron Ore District
   Canada produces 44 mtpy of iron ore concentrate in the southern end of the
    Labrador Trough  this is expected to grow to 200 mtpy over the next 10 years if
    all proposed development projects are realized.

   Established rail, power and port infrastructure
     - Quebec’s Plan Nord: $80 billion investment over the next 25 years in
         northern Quebec for various projects including infrastructure projects
     -    Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012
     -    World-class multi-user port project (5mMtpy) underway.
Proven Team
   Strengthened advisory board and board of directors includes former
    Consolidated Thompson Iron Mines management and officers




                                                                                      4
Capital Structure

Share Data and Cash Position as of July 31, 2012.
                        Shares Outstanding     119.3 million
                                   Warrants    10.0 million @ C$2.59 (avg. strike price)
                                               (7.0 million @ C$3.00 not exerciseable until Nov. 2014
                                               0.8 million @ C$2.84 expiring Feb. 2013
                                               2.22 million @ C$1.50 expiring Oct. 2013, which are owned
                                               by insiders and advisors.)
                                    Options    11.6 million @ C$1.03 (avg. exercise price)
            Fully Diluted Shares Outstanding   141.1 million
                       Market Capitalization   C$112.2 million
                (based on $0.94 share price)
                              Cash Position    C$21.9 million
                 Fully Diluted Cash Position   C$59.7 million
           Management /Insiders Ownership      ~ 17%
                          Analyst Coverage     Canaccord Genuity                 Paradigm Capital
                                               Desjardins Capital Markets        Raymond James
                                               Dundee Capital Markets            RBC Capital Markets
                                               Fraser Mackenzie                  Salman Partners
                                               Haywood Securities                Scotia Capital
                                               Jennings Capital                  Stifel Nicolaus
                                               Macquarie Capital Markets         TD Securities


                                                                                                           5
Experienced Management Team
   Over 200 years of combined exploration and mine operations experience

Board of Directors                     Management Team
Tom Larsen                             Tom Larsen
Chairman                               President and CEO
Alexander Horvath, P.Eng.              Alexander Horvath, P.Eng.
Director                               Executive Vice President, Exploration
Jean Depatie, P.Geo.                   Martin Bourgoin, P.Geo.
Director                               Executive Vice President, Operations
Ashwath Mehra                          Jeff Hussey, P.Geo.
Director                               Executive Vice President, Corporate Business Development
Donald A. Sheldon, LLB., P.Eng.        Bruce Mitton, P.Geo.
Director                               Vice President, Exploration
Jean Lafleur P.Geo.                    Jean-Luc Chouinard, P Eng.
Director                               Vice President, Project Development
Francis Sauvé                          Miles Nagamatsu, CA
Director                               Chief Financial Officer
Joseph S. C. Chan                      Jorge Estepa
Director                               Vice President, Secretary-Treasurer
Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board
Advisory Board: Richard Quesnel, Paul Ankcorn, Doug Bache, William Harding
                                                                                                  6
Why invest in Champion Minerals?
                  Favourable Operating             Champion Minerals’
                      Environment                 Competitive Advantage
               •Established iron ore mining    •Fermont holdings: 17 iron ore
               district  the Labrador         Brownfield projects (710 km2).
               Trough.                         •Feasibility Stage Fire Lake
               •Favourable tax environment     North project (Surface deposit
               (40% tax rebate on              of coarse grained specular
               exploration expenditures).      Hematite) 
               •Access to low-cost power              Easier to liberate.
               and close to rail and port             Deleterious elements
               infrastructure.                         in concentrate are
               •Quebec`s Plan Nord  $80               well below industry
               billion over 25 years.                  specifications limits.
               •Quebec is a world class area   •Experienced team of project
               to develop mines.               developers and mine builders.
               •Unprecedented Iron Ore         •Upside potential for growth is
               price range and forecast.       high.
               •Skilled labor work force.      •Several de-risking initiatives
                                               underway.



                                                                                 7
Attikamagen




                                                         Rail Infrastructure
                                              Quebec North Shore & Labrador
                                              Railway (“QNS&L”)
                                     High     Fire Lake North PEA Base Case connection
                                    Voltage   to Bloom Lake railway requires 94 km of rail –
                                    Power
                                     Lines
                                              includes turnaround loop and sidings
                     Cluster 1                Participation in a private multi user rail
   Cluster 2                                  solution as an alternative transportation /
                                              haulage option is also under study to reduce
                                              mid and long term operating expenditures.
Cluster 3      Fermont
                                              QNS&L links to Sept-Iles and Pointe Noire.
                                              Bloom Lake and QNS&L railways are
                                  QNS&L       considered common carriers.
                    Cartier
                                   Rail
                    Private
                                 Common
                                              Common carriers allocate capacity on a first-
                    Rail                      come, first-serve basis.
                                  Carrier


                                              Cartier Railway:
                               Three Ports/
                                Stockpile      Linked to Port-Cartier
                                Locations
                                               Privately owned by ArcelorMittal
                     Gulf of St Lawrence
                                               Within Fire Lake North Project boundary.
                                                                                               8
World Class Port of Sept-Isle Infrastructure
Expanding to Meet Demand
Pointe Noire Multi User Wharf
 Announced long term agreement (20-40
  years) on July 18th, 2012.
 10 Mt ship loading capacity reserved with
  the possibility to increase tonnage.
 Completion March 31st, 2014; 18 months
  prior to "FLN" startup.                              Sept-Iles
 Phase 1: 50Mtpy $220 million.
 Federal Government announced $55
  million funding or 25% of project.                  Pointe Noire
 Phase 2: Planning for 100 Mtpy.

Port of Sept-Iles
 RTZ-IOC shipping facility.
Port-Cartier
 ArcelorMittal shipping facility.
 $2.1B expansion is underway and will                                   China Max ship capacity 300kt
  include concentrator expansion with port
  and rail infrastructure upgrades.
 Located 62 km west of Sept-Iles.

                                              Courtesy of the Port de Sept Isles                         9
Development: Fire Lake North Project
             Oil Can Project 6 km
           from FLN Concentrator




                                       10
11
Fire Lake North Development Project
    November 2011 Preliminary Economic Assessment Update – Highlights

      Key Results                                                                    Pre-Tax Basis
     Internal Rate of Return (IRR) (8% Discount Rate)                                     41.5%
     Undiscounted Cash Flow                                                              $10.9B
     Net Present Value @ 5% Discounted Cash Flow                                          $5.6B
     Net Present Value @ 8% Discounted Cash Flow                                          $4.0B

    Based upon the following Discounted Cash Flow
     Net Present Value @ 10% assumptions:                                                 $3.2B

     Payback Period (8% Discount Rate)                                                 2.3 Years

   Capital Costs:        US$1,368 million (includes rail and port infrastructure)
   Operating Costs:      US$51.01 per tonne (average 25 years);
                          US$39.46 per tonne (average years 1 to 5)
   Price assumptions:    US$115 per tonne of concentrate at 65% Fe
   Mine-Life:            40 years (average of 8.7 million tonnes/year for the first 25 years)
   Exchange rate:        $1.00 USD to $1.00 CDN
   Total Resources(1):   400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources)
                          661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)
   In Pit Resources      921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade
                                                                                                        12
Fire Lake North Project
Preliminary Economic Assessment Study
OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE)
                COST PARAMETERS                         AVERAGE 25 YEARS   AVERAGE YEARS 1 TO 5
Mining                                                       22.56                12.13
Concentrating, crushing and processing                       4.52                 3.97
Site infrastructure, sales and general administration        4.40                 3.39
Environmental tailings and management                        0.29                 0.26
Rail transport                                               15.52                16.14
Port facilities                                              3.72                 3.57
Equipment Lease Cost                                         1.67                 5.17
                                                Total        52.68                44.63


CAPITAL EXPENDITURES (US$ MILLIONS)
                                 COST CENTRES                                      $ MILLIONS
Pre-stripping of open pit areas                                                      97.5
Concentrator and site infrastructure including loadout facilities                    682.3
Railway (62km distance and 94km total including turnaround loop and sidings)         228.8
Port Facilities: Railcar unloading, stacker/reclaimer, conveyors                     96.8
Environmental and Tailings Management                                                27.9
Other Pre Production Costs                                                           34.0
                                                                      Sub-total      1,167
                                                                   Contingency        201
                                                                          Total      1,368
                                                                                                  13
Fire Lake North Project Schedule
Development, Construction, and Production


                                     2011        2012        2013        2014        2015
                                 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Diamond Drilling

Scoping Study

Feasibility Study

Environmental / Social Studies

Community Consultation

Permitting

Construction

Production




                                                                                               14
Fire Lake North Project
    Growth through Development


  Feasibility Study: Early Q4 2012.
  Press Release June 21, 2012: Over
   20,000 m feasibility definition drilling is
   completed for feasibility study.
  Strike length of both the West Pit (3500m)
   and the East Pit (2400m) synformal fold
   closures are open at depth.
  Resources are increasing outside the Nov.
   2011 PEA ultimate pit limits.
  Several de-risking initiatives are underway
  2 rail infrastructure solutions being studied




See www.championminerals.com for reports maps and assays
                                                           15
Fire Lake North – Metallurgy
Press Release, August 1st, 2012

 High quality sinter concentrate with very low deleterious elemental content.
 Liberates at 850 micron (-20 mesh) and produces a 65-66% iron concentrate.
 Alumina is 0.52% International Standard < 2%.
 Al : Si ratio 0.14 versus the industry specification limit of 1. This very low
  alumina to silica ratio is an ideal blending product for steel mills.
 No magnetic separation circuit required.




  High Grade – Coarse Specular Hematite       Quartz Specular Hematite Mineralization   16
Fire Lake North Development Project




                                      17
                                           17
Fire Lake North Development Project




                                      18
Moire Lake Project
Initial Mineral Resource Estimate: March 29, 2012
                                              Mineral Resource Estimate:
 Arcelor Mittal Property Boundary




                                                  Indicated Resources -164 million
                                                   tonnes grading 30.5% Total Iron.

                                                  Inferred Resources - 417 million
                                                   tonnes grading 29.4% Total Iron.
                                              DDH LM11-12: 503 m @ 31% total iron.
                                              Kilometric synform with hematite and
                                               magnetite outcrops at surface.
                                        A’    Adjacent to ArcelorMittal Mont-Wright mine.



                                    A
                                                                 500
                                                                 meters




                                                                                        19
Moire Lake Project
Infrastructure: Adjacent to rail (8km), road, and power




                                                          500
                                                          meters




                                                                   20
Oil Can Project
                                                                      Initial Mineral Resource Estimate
                                                                    Potential for low strip ratio < 1 : 1.
                                                                    Potential Bench width  150- 350m.
                                                                    972 Mt of iron oxide grading 33.2% at a
                                                                     15% iron cut-off.
                                                                    924 Mt of mixed iron oxide
                                                                     mineralization with a silicate component.
                                                                    This deposit is open at depth.
                                                                    Orientation metallurgical tests indicate a
                                                                     relatively coarse liberation grind size
                                                                        Commercial grade magnetite sinter
                                                                         feed concentrate can be produced




To view a larger more detailed version of this map please visit:
http://www.championminerals.com/vns-site/page-oil_can.html                                                    21
Oil Can Project
 Exploration Upside
 The 2011 drill program returned long magnetite-hematite iron formation
  intersections up to 545 metres in length.
 The 400 metre spaced drill program is completed.
 Mineral Resource Estimate scheduled for Q2 2012.
                           SELECTED* COMPOSITE ASSAY RESULTS
  HOLE-ID      HOLE LENGTH         AZIMUTH         DIP      FROM         TO       INTERVAL**       GRADE***

                   Metres           Degrees     Degrees     Metres     Metres        Metres         Total Fe%
  OC11-02            594              310          -45      188.5      590.0         401.5            30.7
  Including                                                 246.9      460.4         213.5            33.1
  OC11-05            545              020          -45      241.6      545.0         303.4            34.7
  Including                                                 407.2      538.0         130.8            36.5
  OC11-08            616              180          -50       67.0      612.7         545.7            33.7
  Including                                                  67.0      509.3         442.3            36.4
 * Selected Composite Assay Results are stated only for results recently received. The Selected Composites are
 not necessarily representative of the average grade or thickness of the mineral zones or potential resource.
 ** Intervals are down-hole lengths and not true widths of the mineral zones.
 *** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the
 “High Grade/Ores Method” and XRF analysis.
                                                                                                                 22
Oil Can Project
Exploration Upside
                                           South & East Zones
                                        Section 9800N (Facing North)


                         South Zone
             OC11-05
                       OC11-07                                               East Zone
                                       OC11-08
 303.4m @ 34.7%                                                OC11-02                   OC11-19
                                 Ovb                                                                  OC11-01
  incl. 130.8m @
       36.5%
                                                                         Assay Pending
                                          545.7m @ 33.7%                                  IF
                                            incl. 442.3 @
                                  IF            36.4%                                              190.0m @
                                                                                                     30.6%

             197.2m @ 26.8%
                                                      401.5m @ 30.7%
               incl. 145.5 @
                                                        incl. 213.5 @
                  28.1%
                                                            33.1%




                                                                                     200 metres




                                                                                                                23
Oil Can Project
Exploration Upside
                                        Central Zone
                                       (Facing Northwest)



                                        OC11-14 OC11-16
                                                          OC11-03
                                 191.7m @                           OC11-10
                                   28.2%                            Ovb



               311.4m @ 27.6%
                incl. 269.0m @
                     29.2%
                     224.0m @ 28.1%
                      incl. 140.0m @                          472.2m @ 28.0%
                           30.0%
                                                 IF            incl. 119.6m @
                                                                    35.2%




                                                                                200 metres




                                                                                             24
Oil Can Project
Exploration Upside
                                     North Zone
                              Section 5800E (Facing East)


                              OC11-12   OC11-13    OC11-15
                                                                                     OC11-04
                                                          141.5m @ 29.2%
                                   OC11-09                                  Ovb
            221.2m @ 25.0%
             incl. 128.9m @
                  28.7%

                                 Assays Pending                                179.5m @ 32.8%


                                             IF
                                        414.1m @ 25.1%
                                         incl. 139.0m @
                                              29.5%                        472.2m @ 28.0%
                                                                            incl. 119.6m @
                                                                                 35.2%




                                                                                  200 metres




                                                                                                25
Milestones




Fire Lake North Definition Drilling                                     Completed
Updated PEA on Fire Lake North                                          Completed

Initial NI 43-101 Mineral Resource Estimate for Oil Can Project
                                                                        Completed
(adjacent to Fire Lake North Project)

Metallurgical results - Fire Lake North, Moire Lake, Oil Can Projects   Completed

Fire Lake North Feasibility Study including Marketing Study              Q3 2012

Fire Lake North Construction Start                                       Q4 2013
Fire Lake North Production                                                2015




                                                                                    26
Why Invest in
Champion Minerals?
 Fire Lake North NPV: $4 Billion @ 8% DCF.
 Adjacent Oil Can Initial Resource Estimate 1,896Mt @ 28.7%.
 17 Brownfield projects (710 km2) near 5 operating mines.
 Experienced team: Exploration; development; construction;
  commissioning & operations management.
 Financed through to feasibility; Favourable tax environment.
 Quebec`s Plan Nord: Object to attract $80B in investment.
 Access to power and close to rail and port.
 Multi-user port is in construction ; Trans-shipping is an option.
 Two railway options are at feasibility stage.
 Iron price range and forecasts is unprecedented.
 Several de-risking initiatives associated to mine start-up
  underway.


                                                                27
Thank You

            FSE: P02; OTCQX: CPMNF




                                     28




                                          28
Fire Lake North Exploration Camp




                                          Coarse Grained
Coarse Specular Hematite in Drill Core
                                         Specular Hematite




                                                             29
O’Keefe Purdy Project
Exploration Upside




                        30
Advanced Exploration
Bellechasse Project                                   Harvey Tuttle Project
NI 43-101 Resource Estimate:                         NI 43-101 Inferred Resource Estimate:
                                                      717Mt @ 25% iron; magnetite rich.
Inferred Resources; 215Mt @ 29% Iron;
                                                      Intersected multiple significant iron formation
Magnetite rich iron formation.                       intervals in 2010 drill program.
Historical resources was 91Mt; remaining upside
                                                      Total of 13,165m of drilling completed.
potential.
                                                      Less than 50% of the kilometric scale magnetic
Adjacent to Hwy 389; 10km from Fire Lake North.
                                                      anomalies have been tested.
Synform geometry is favorable for open pit mining.
                                                      Metallurgical tests underway.
                                                      Located 25 km NW of Fire Lake North.
                                                      Within conveying distance from Fire Lake North
                                                      planned concentrator (20-30km).




                                                                                                         31
Labrador Trough Annual Production
Iron Ore Production Upside

                                                           Current Annual       Future
                     Company
                                                            Production      Annual Forecast
 IOC/RTZ                                                      17 mtpy          26 mtpy1

 ArcelorMittal                                                13 mtpy          24 mtpy2

 Cliffs Natural Resources (Wuhan)                             12 mtpy           28 mtpy

 Labrador Iron Mines                                           2 mtpy           5 mtpy

 Adriana Resources (Wuhan)                                       0              50 mtpy

 New Millennium (Tata)                                           0              27 mtpy

 Century Iron Mines (Wuhan)                                      0             ~22 mtpy

 Champion Minerals                                               0             ~18 mtpy

 Alderon Iron Ore Corp.                                          0             ~16 mtpy

 Total Current and Forecasted Production                        44            ~ 200 mtpy


  1.   Possibility of expanding production up to 50 mtpy
  2.   Possibility of expanding production to 50 mtpy
                                                                                              32
Global Steel Production Shows
    Continued Demand for Iron Ore
1,600,000



1,400,000                       China’s CAGR* is 9.88% over
                               the last 30 years vs. 2.30% for
1,200,000
                                total global steel production
                                   over the same period.
1,000,000
                                                                                 China

 800,000
                                                                                 Japan

 600,000                                                                         Rest of the
                                                                                 World

 400,000



 200,000



       -
            1980           1985             1990   1995     2000   2005   2010

  Source: World Steel Association website
  * CAGR: Compound annual growth rate                                                          33
Iron Ore Types




                             Coarse Grained Specular Hematite
    Direct Shipping Ore




   Magnetite Rich Taconite   Coarse Grained Specular Hematite   34
Fermont Iron Ore District
              (“FIOD”)

Historically the Fermont and Labrador mining
        camps have produced 33 Mta.

           RTZ/IOC = 17 Mta.
          ArcelorMittal = 13 Mta.
            Wabush = 3 Mta.

               “ Marginal Era”:
         For 30-40 years pre-2003
     the price per tonne of concentrate
            was $25- $30/tonne,
        costs per tonne were similar.

     Current 3 years moving average is
              $115-120/tonne.

2011 spot price averaged ~$150-170/tonne.


                                           35

More Related Content

What's hot

Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012shosein2011
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 enshosein2011
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25thshosein2011
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012shosein2011
 
Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012shosein2011
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011shosein2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011shosein2011
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011shosein2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011shosein2011
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltdSymposium
 
SkyHarbour Resources Investor Presentation
SkyHarbour Resources Investor PresentationSkyHarbour Resources Investor Presentation
SkyHarbour Resources Investor PresentationCompany Spotlight
 
1640 phillip bruce
1640 phillip bruce1640 phillip bruce
1640 phillip bruceSymposium
 

What's hot (19)

Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012Champion Minerals Corporate Presentation February 2 2012
Champion Minerals Corporate Presentation February 2 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron mines october 2, 2012
English champion iron mines october 2, 2012English champion iron mines october 2, 2012
English champion iron mines october 2, 2012
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Champion iron mines nov. 2012 en
Champion iron mines nov. 2012 enChampion iron mines nov. 2012 en
Champion iron mines nov. 2012 en
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012Champion Corporate Presentation - Feb 24, 2012
Champion Corporate Presentation - Feb 24, 2012
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011
 
Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011Champion Minerals Corporate Presentation - December 2011
Champion Minerals Corporate Presentation - December 2011
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltd
 
SkyHarbour Resources Investor Presentation
SkyHarbour Resources Investor PresentationSkyHarbour Resources Investor Presentation
SkyHarbour Resources Investor Presentation
 
1640 phillip bruce
1640 phillip bruce1640 phillip bruce
1640 phillip bruce
 
World class production centre in Greenland
World class production centre in GreenlandWorld class production centre in Greenland
World class production centre in Greenland
 
Cypress Development Corp.
Cypress Development Corp.Cypress Development Corp.
Cypress Development Corp.
 

Similar to Aug1chmcpe

Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012shosein2011
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011shosein2011
 
Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011shosein2011
 
Champion Minerals Corporate Presentation October 13 2011
Champion Minerals  Corporate Presentation October 13 2011Champion Minerals  Corporate Presentation October 13 2011
Champion Minerals Corporate Presentation October 13 2011shosein2011
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011Crocodile Gold
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationCompany Spotlight
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold
 
Andean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor PresentationAndean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor PresentationAndean American Gold
 
Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Gold
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013QMX Gold Corporation
 
25 04 12 reservoir minerals_v01_si (2)
25 04 12 reservoir minerals_v01_si  (2)25 04 12 reservoir minerals_v01_si  (2)
25 04 12 reservoir minerals_v01_si (2)reservoirminerals
 
January.2012.CorporatePresentation
January.2012.CorporatePresentationJanuary.2012.CorporatePresentation
January.2012.CorporatePresentationWestern Potash Corp.
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Symposium
 

Similar to Aug1chmcpe (16)

Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012Champion Minerals Corporate Presentation - Aug 1st 2012
Champion Minerals Corporate Presentation - Aug 1st 2012
 
Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011Champion Minerals Corporate Presentation Sept 2011
Champion Minerals Corporate Presentation Sept 2011
 
Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011Champion Minerals Presentation - Oct 19, 2011
Champion Minerals Presentation - Oct 19, 2011
 
Champion Minerals Corporate Presentation October 13 2011
Champion Minerals  Corporate Presentation October 13 2011Champion Minerals  Corporate Presentation October 13 2011
Champion Minerals Corporate Presentation October 13 2011
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Crk marketing pres european gold forum 2011
Crk marketing pres   european gold forum 2011Crk marketing pres   european gold forum 2011
Crk marketing pres european gold forum 2011
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
 
Presentation: Critical Elements (May 2011)
Presentation: Critical Elements (May 2011)Presentation: Critical Elements (May 2011)
Presentation: Critical Elements (May 2011)
 
Andean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor PresentationAndean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor Presentation
 
Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013
 
25 04 12 reservoir minerals_v01_si (2)
25 04 12 reservoir minerals_v01_si  (2)25 04 12 reservoir minerals_v01_si  (2)
25 04 12 reservoir minerals_v01_si (2)
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
January.2012.CorporatePresentation
January.2012.CorporatePresentationJanuary.2012.CorporatePresentation
January.2012.CorporatePresentation
 
Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 

More from shosein2011

Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012shosein2011
 
Fr champion iron mines november 2012
Fr champion iron mines november 2012Fr champion iron mines november 2012
Fr champion iron mines november 2012shosein2011
 
German champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxGerman champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxshosein2011
 
12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]shosein2011
 
12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012shosein2011
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012shosein2011
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012shosein2011
 
August1 chinesecp
August1 chinesecpAugust1 chinesecp
August1 chinesecpshosein2011
 
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - ChineseChampion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - Chineseshosein2011
 

More from shosein2011 (17)

Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012Chinese champion iron mines november, 2012
Chinese champion iron mines november, 2012
 
Fr champion iron mines november 2012
Fr champion iron mines november 2012Fr champion iron mines november 2012
Fr champion iron mines november 2012
 
German champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsxGerman champion iron mines nov 1, 2012 tsx
German champion iron mines nov 1, 2012 tsx
 
12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]12 oct 22_presentation_corporative_chm[1]
12 oct 22_presentation_corporative_chm[1]
 
12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]12 oct presentation_corporative_chm[1]
12 oct presentation_corporative_chm[1]
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012Chinese champion iron mines october 2, 2012
Chinese champion iron mines october 2, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012Chinese champion iron mines sept 5, 2012
Chinese champion iron mines sept 5, 2012
 
Aug1chmcpc
Aug1chmcpcAug1chmcpc
Aug1chmcpc
 
Aug1chmcpc
Aug1chmcpcAug1chmcpc
Aug1chmcpc
 
Aug1chmcpg
Aug1chmcpgAug1chmcpg
Aug1chmcpg
 
August1 chinesecp
August1 chinesecpAugust1 chinesecp
August1 chinesecp
 
August1germancp
August1germancpAugust1germancp
August1germancp
 
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - ChineseChampion Minerals Corporate Presentation June 28, 2012 - Chinese
Champion Minerals Corporate Presentation June 28, 2012 - Chinese
 

Recently uploaded

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 

Recently uploaded (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 

Aug1chmcpe

  • 1. Building the Next Major Iron Ore Mine in the Labrador Trough Corporate Presentation August 1st , 2012 FSE: P02; OTCQX: CPMNF
  • 2. FORWARD-LOOKING STATEMENTS Certain information contained herein regarding Champion Minerals Inc., including management’s assessment of future plans and operations, may constitute forward-looking statements under applicable securities law and necessarily involve risks, including but not limited to risks associated with mining exploration, operating costs, production costs, volatility of share prices, currency fluctuations, imprecision of resource and reserve estimates, environmental risks and ability to access sufficient capital from internal and external sources. As a consequence, actual results may differ materially from those anticipated in any forward looking statements. Plans, intentions or expectations disclosed in any forward-looking statements or information should not be read as guarantees of future results or events, and will not necessarily be accurate indications of whether or when or by which such results or events will be achieved. Except as required by law, Champion Minerals Inc., expressly disclaims any intention and undertakes no obligation to update any forward looking statements or information as conditions change. The historical mineral resources mentioned are strictly historical in nature and are non- compliant to National Instrument 43-101 mineral resources and mineral reserves standards, and should therefore not be relied upon. A qualified person has not done sufficient work to upgrade or classify the historical mineral resources as current National Instrument NI-43-101 compliant. 2
  • 3. About Champion Minerals Advanced iron ore exploration and development projects located in Canada’s principal iron ore district, the Labrador Trough Fermont Projects (710 km2)  17 properties in the Fermont Quebec mining camp  Flagship Fire Lake North project - currently in the feasibility stage.  Over 4 billion tonnes of NI 43-101 compliant iron mineral resource estimates on 5 of 17 projects.  100% direct interest, 3% NSR (C$1.5 million buyback for an additional 0.5% NSR). Attikamagen Property (310 km2)  Champion Minerals holds a 44% interest.  Century Iron Mines Corp. subsidiary (56% interest) has option to earn up to a 60% interest in the property by funding a further $3 million in exploration expenditures by May 2014*. * CHM 44% / Century Iron Ore Mines subsidiary 56%; Investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M) 3
  • 4. Quebec’s Next Major Iron Ore Mine Fire Lake North (FLN) Development Project  Nov. 21 2011 PEA indicates ability to produce 8.7 million tonnes of concentrate per annum for the first 25 years of a 40-year mine life  the first 5 years will average approximately 10 million tonnes of concentrate per annum  Net Present Value of $4 billion at a discounted cash flow rate of 8% with an Internal Rate of Return of 41.5% and a payback period of 2.3 years Established Iron Ore District  Canada produces 44 mtpy of iron ore concentrate in the southern end of the Labrador Trough  this is expected to grow to 200 mtpy over the next 10 years if all proposed development projects are realized.  Established rail, power and port infrastructure - Quebec’s Plan Nord: $80 billion investment over the next 25 years in northern Quebec for various projects including infrastructure projects - Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012 - World-class multi-user port project (5mMtpy) underway. Proven Team  Strengthened advisory board and board of directors includes former Consolidated Thompson Iron Mines management and officers 4
  • 5. Capital Structure Share Data and Cash Position as of July 31, 2012. Shares Outstanding 119.3 million Warrants 10.0 million @ C$2.59 (avg. strike price) (7.0 million @ C$3.00 not exerciseable until Nov. 2014 0.8 million @ C$2.84 expiring Feb. 2013 2.22 million @ C$1.50 expiring Oct. 2013, which are owned by insiders and advisors.) Options 11.6 million @ C$1.03 (avg. exercise price) Fully Diluted Shares Outstanding 141.1 million Market Capitalization C$112.2 million (based on $0.94 share price) Cash Position C$21.9 million Fully Diluted Cash Position C$59.7 million Management /Insiders Ownership ~ 17% Analyst Coverage Canaccord Genuity Paradigm Capital Desjardins Capital Markets Raymond James Dundee Capital Markets RBC Capital Markets Fraser Mackenzie Salman Partners Haywood Securities Scotia Capital Jennings Capital Stifel Nicolaus Macquarie Capital Markets TD Securities 5
  • 6. Experienced Management Team Over 200 years of combined exploration and mine operations experience Board of Directors Management Team Tom Larsen Tom Larsen Chairman President and CEO Alexander Horvath, P.Eng. Alexander Horvath, P.Eng. Director Executive Vice President, Exploration Jean Depatie, P.Geo. Martin Bourgoin, P.Geo. Director Executive Vice President, Operations Ashwath Mehra Jeff Hussey, P.Geo. Director Executive Vice President, Corporate Business Development Donald A. Sheldon, LLB., P.Eng. Bruce Mitton, P.Geo. Director Vice President, Exploration Jean Lafleur P.Geo. Jean-Luc Chouinard, P Eng. Director Vice President, Project Development Francis Sauvé Miles Nagamatsu, CA Director Chief Financial Officer Joseph S. C. Chan Jorge Estepa Director Vice President, Secretary-Treasurer Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board Advisory Board: Richard Quesnel, Paul Ankcorn, Doug Bache, William Harding 6
  • 7. Why invest in Champion Minerals? Favourable Operating Champion Minerals’ Environment Competitive Advantage •Established iron ore mining •Fermont holdings: 17 iron ore district  the Labrador Brownfield projects (710 km2). Trough. •Feasibility Stage Fire Lake •Favourable tax environment North project (Surface deposit (40% tax rebate on of coarse grained specular exploration expenditures). Hematite)  •Access to low-cost power  Easier to liberate. and close to rail and port  Deleterious elements infrastructure. in concentrate are •Quebec`s Plan Nord  $80 well below industry billion over 25 years. specifications limits. •Quebec is a world class area •Experienced team of project to develop mines. developers and mine builders. •Unprecedented Iron Ore •Upside potential for growth is price range and forecast. high. •Skilled labor work force. •Several de-risking initiatives underway. 7
  • 8. Attikamagen Rail Infrastructure Quebec North Shore & Labrador Railway (“QNS&L”) High Fire Lake North PEA Base Case connection Voltage to Bloom Lake railway requires 94 km of rail – Power Lines includes turnaround loop and sidings Cluster 1 Participation in a private multi user rail Cluster 2 solution as an alternative transportation / haulage option is also under study to reduce mid and long term operating expenditures. Cluster 3 Fermont QNS&L links to Sept-Iles and Pointe Noire. Bloom Lake and QNS&L railways are QNS&L considered common carriers. Cartier Rail Private Common Common carriers allocate capacity on a first- Rail come, first-serve basis. Carrier Cartier Railway: Three Ports/ Stockpile  Linked to Port-Cartier Locations  Privately owned by ArcelorMittal Gulf of St Lawrence  Within Fire Lake North Project boundary. 8
  • 9. World Class Port of Sept-Isle Infrastructure Expanding to Meet Demand Pointe Noire Multi User Wharf  Announced long term agreement (20-40 years) on July 18th, 2012.  10 Mt ship loading capacity reserved with the possibility to increase tonnage.  Completion March 31st, 2014; 18 months prior to "FLN" startup. Sept-Iles  Phase 1: 50Mtpy $220 million.  Federal Government announced $55 million funding or 25% of project. Pointe Noire  Phase 2: Planning for 100 Mtpy. Port of Sept-Iles  RTZ-IOC shipping facility. Port-Cartier  ArcelorMittal shipping facility.  $2.1B expansion is underway and will China Max ship capacity 300kt include concentrator expansion with port and rail infrastructure upgrades.  Located 62 km west of Sept-Iles. Courtesy of the Port de Sept Isles 9
  • 10. Development: Fire Lake North Project Oil Can Project 6 km from FLN Concentrator 10
  • 11. 11
  • 12. Fire Lake North Development Project November 2011 Preliminary Economic Assessment Update – Highlights Key Results Pre-Tax Basis Internal Rate of Return (IRR) (8% Discount Rate) 41.5% Undiscounted Cash Flow $10.9B Net Present Value @ 5% Discounted Cash Flow $5.6B Net Present Value @ 8% Discounted Cash Flow $4.0B Based upon the following Discounted Cash Flow Net Present Value @ 10% assumptions: $3.2B Payback Period (8% Discount Rate) 2.3 Years  Capital Costs: US$1,368 million (includes rail and port infrastructure)  Operating Costs: US$51.01 per tonne (average 25 years); US$39.46 per tonne (average years 1 to 5)  Price assumptions: US$115 per tonne of concentrate at 65% Fe  Mine-Life: 40 years (average of 8.7 million tonnes/year for the first 25 years)  Exchange rate: $1.00 USD to $1.00 CDN  Total Resources(1): 400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources) 661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)  In Pit Resources 921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade 12
  • 13. Fire Lake North Project Preliminary Economic Assessment Study OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE) COST PARAMETERS AVERAGE 25 YEARS AVERAGE YEARS 1 TO 5 Mining 22.56 12.13 Concentrating, crushing and processing 4.52 3.97 Site infrastructure, sales and general administration 4.40 3.39 Environmental tailings and management 0.29 0.26 Rail transport 15.52 16.14 Port facilities 3.72 3.57 Equipment Lease Cost 1.67 5.17 Total 52.68 44.63 CAPITAL EXPENDITURES (US$ MILLIONS) COST CENTRES $ MILLIONS Pre-stripping of open pit areas 97.5 Concentrator and site infrastructure including loadout facilities 682.3 Railway (62km distance and 94km total including turnaround loop and sidings) 228.8 Port Facilities: Railcar unloading, stacker/reclaimer, conveyors 96.8 Environmental and Tailings Management 27.9 Other Pre Production Costs 34.0 Sub-total 1,167 Contingency 201 Total 1,368 13
  • 14. Fire Lake North Project Schedule Development, Construction, and Production 2011 2012 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Diamond Drilling Scoping Study Feasibility Study Environmental / Social Studies Community Consultation Permitting Construction Production 14
  • 15. Fire Lake North Project Growth through Development  Feasibility Study: Early Q4 2012.  Press Release June 21, 2012: Over 20,000 m feasibility definition drilling is completed for feasibility study.  Strike length of both the West Pit (3500m) and the East Pit (2400m) synformal fold closures are open at depth.  Resources are increasing outside the Nov. 2011 PEA ultimate pit limits.  Several de-risking initiatives are underway  2 rail infrastructure solutions being studied See www.championminerals.com for reports maps and assays 15
  • 16. Fire Lake North – Metallurgy Press Release, August 1st, 2012  High quality sinter concentrate with very low deleterious elemental content.  Liberates at 850 micron (-20 mesh) and produces a 65-66% iron concentrate.  Alumina is 0.52% International Standard < 2%.  Al : Si ratio 0.14 versus the industry specification limit of 1. This very low alumina to silica ratio is an ideal blending product for steel mills.  No magnetic separation circuit required. High Grade – Coarse Specular Hematite Quartz Specular Hematite Mineralization 16
  • 17. Fire Lake North Development Project 17 17
  • 18. Fire Lake North Development Project 18
  • 19. Moire Lake Project Initial Mineral Resource Estimate: March 29, 2012  Mineral Resource Estimate: Arcelor Mittal Property Boundary  Indicated Resources -164 million tonnes grading 30.5% Total Iron.  Inferred Resources - 417 million tonnes grading 29.4% Total Iron.  DDH LM11-12: 503 m @ 31% total iron.  Kilometric synform with hematite and magnetite outcrops at surface. A’  Adjacent to ArcelorMittal Mont-Wright mine. A 500 meters 19
  • 20. Moire Lake Project Infrastructure: Adjacent to rail (8km), road, and power 500 meters 20
  • 21. Oil Can Project Initial Mineral Resource Estimate  Potential for low strip ratio < 1 : 1.  Potential Bench width  150- 350m.  972 Mt of iron oxide grading 33.2% at a 15% iron cut-off.  924 Mt of mixed iron oxide mineralization with a silicate component.  This deposit is open at depth.  Orientation metallurgical tests indicate a relatively coarse liberation grind size  Commercial grade magnetite sinter feed concentrate can be produced To view a larger more detailed version of this map please visit: http://www.championminerals.com/vns-site/page-oil_can.html 21
  • 22. Oil Can Project Exploration Upside  The 2011 drill program returned long magnetite-hematite iron formation intersections up to 545 metres in length.  The 400 metre spaced drill program is completed.  Mineral Resource Estimate scheduled for Q2 2012. SELECTED* COMPOSITE ASSAY RESULTS HOLE-ID HOLE LENGTH AZIMUTH DIP FROM TO INTERVAL** GRADE*** Metres Degrees Degrees Metres Metres Metres Total Fe% OC11-02 594 310 -45 188.5 590.0 401.5 30.7 Including 246.9 460.4 213.5 33.1 OC11-05 545 020 -45 241.6 545.0 303.4 34.7 Including 407.2 538.0 130.8 36.5 OC11-08 616 180 -50 67.0 612.7 545.7 33.7 Including 67.0 509.3 442.3 36.4 * Selected Composite Assay Results are stated only for results recently received. The Selected Composites are not necessarily representative of the average grade or thickness of the mineral zones or potential resource. ** Intervals are down-hole lengths and not true widths of the mineral zones. *** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis. 22
  • 23. Oil Can Project Exploration Upside South & East Zones Section 9800N (Facing North) South Zone OC11-05 OC11-07 East Zone OC11-08 303.4m @ 34.7% OC11-02 OC11-19 Ovb OC11-01 incl. 130.8m @ 36.5% Assay Pending 545.7m @ 33.7% IF incl. 442.3 @ IF 36.4% 190.0m @ 30.6% 197.2m @ 26.8% 401.5m @ 30.7% incl. 145.5 @ incl. 213.5 @ 28.1% 33.1% 200 metres 23
  • 24. Oil Can Project Exploration Upside Central Zone (Facing Northwest) OC11-14 OC11-16 OC11-03 191.7m @ OC11-10 28.2% Ovb 311.4m @ 27.6% incl. 269.0m @ 29.2% 224.0m @ 28.1% incl. 140.0m @ 472.2m @ 28.0% 30.0% IF incl. 119.6m @ 35.2% 200 metres 24
  • 25. Oil Can Project Exploration Upside North Zone Section 5800E (Facing East) OC11-12 OC11-13 OC11-15 OC11-04 141.5m @ 29.2% OC11-09 Ovb 221.2m @ 25.0% incl. 128.9m @ 28.7% Assays Pending 179.5m @ 32.8% IF 414.1m @ 25.1% incl. 139.0m @ 29.5% 472.2m @ 28.0% incl. 119.6m @ 35.2% 200 metres 25
  • 26. Milestones Fire Lake North Definition Drilling Completed Updated PEA on Fire Lake North Completed Initial NI 43-101 Mineral Resource Estimate for Oil Can Project Completed (adjacent to Fire Lake North Project) Metallurgical results - Fire Lake North, Moire Lake, Oil Can Projects Completed Fire Lake North Feasibility Study including Marketing Study Q3 2012 Fire Lake North Construction Start Q4 2013 Fire Lake North Production 2015 26
  • 27. Why Invest in Champion Minerals?  Fire Lake North NPV: $4 Billion @ 8% DCF.  Adjacent Oil Can Initial Resource Estimate 1,896Mt @ 28.7%.  17 Brownfield projects (710 km2) near 5 operating mines.  Experienced team: Exploration; development; construction; commissioning & operations management.  Financed through to feasibility; Favourable tax environment.  Quebec`s Plan Nord: Object to attract $80B in investment.  Access to power and close to rail and port.  Multi-user port is in construction ; Trans-shipping is an option.  Two railway options are at feasibility stage.  Iron price range and forecasts is unprecedented.  Several de-risking initiatives associated to mine start-up underway. 27
  • 28. Thank You FSE: P02; OTCQX: CPMNF 28 28
  • 29. Fire Lake North Exploration Camp Coarse Grained Coarse Specular Hematite in Drill Core Specular Hematite 29
  • 31. Advanced Exploration Bellechasse Project Harvey Tuttle Project NI 43-101 Resource Estimate: NI 43-101 Inferred Resource Estimate: 717Mt @ 25% iron; magnetite rich. Inferred Resources; 215Mt @ 29% Iron; Intersected multiple significant iron formation Magnetite rich iron formation. intervals in 2010 drill program. Historical resources was 91Mt; remaining upside Total of 13,165m of drilling completed. potential. Less than 50% of the kilometric scale magnetic Adjacent to Hwy 389; 10km from Fire Lake North. anomalies have been tested. Synform geometry is favorable for open pit mining. Metallurgical tests underway. Located 25 km NW of Fire Lake North. Within conveying distance from Fire Lake North planned concentrator (20-30km). 31
  • 32. Labrador Trough Annual Production Iron Ore Production Upside Current Annual Future Company Production Annual Forecast IOC/RTZ 17 mtpy 26 mtpy1 ArcelorMittal 13 mtpy 24 mtpy2 Cliffs Natural Resources (Wuhan) 12 mtpy 28 mtpy Labrador Iron Mines 2 mtpy 5 mtpy Adriana Resources (Wuhan) 0 50 mtpy New Millennium (Tata) 0 27 mtpy Century Iron Mines (Wuhan) 0 ~22 mtpy Champion Minerals 0 ~18 mtpy Alderon Iron Ore Corp. 0 ~16 mtpy Total Current and Forecasted Production 44 ~ 200 mtpy 1. Possibility of expanding production up to 50 mtpy 2. Possibility of expanding production to 50 mtpy 32
  • 33. Global Steel Production Shows Continued Demand for Iron Ore 1,600,000 1,400,000 China’s CAGR* is 9.88% over the last 30 years vs. 2.30% for 1,200,000 total global steel production over the same period. 1,000,000 China 800,000 Japan 600,000 Rest of the World 400,000 200,000 - 1980 1985 1990 1995 2000 2005 2010 Source: World Steel Association website * CAGR: Compound annual growth rate 33
  • 34. Iron Ore Types Coarse Grained Specular Hematite Direct Shipping Ore Magnetite Rich Taconite Coarse Grained Specular Hematite 34
  • 35. Fermont Iron Ore District (“FIOD”) Historically the Fermont and Labrador mining camps have produced 33 Mta. RTZ/IOC = 17 Mta. ArcelorMittal = 13 Mta. Wabush = 3 Mta. “ Marginal Era”: For 30-40 years pre-2003 the price per tonne of concentrate was $25- $30/tonne, costs per tonne were similar. Current 3 years moving average is $115-120/tonne. 2011 spot price averaged ~$150-170/tonne. 35