STP Study M/s HydrotechParyavaran India Pvt Ltd CAA II UC  Chennai Auto Ancillary Industrial Infrastructure Up gradation Company Ambattur Industrial Estate  Near HCL Unit - V Chennai
STP  (Gross Size 30 mt x70 mt)
View of STP from Top
Coarse Bar Screen (Constructed earlier but renovated  by the firm ) Coarse  Bar Screen  Circular Tank Diameter 3 m depth 5 mt
Grit Chamber - constructed earlier  Grit  Chamber  I Diameter 4.5 mt  depth 6.5 mt  RCC const Grit Chamber  Ii Dia 5.0 mt depth 6.5 RCC Construction
Pumping Station  Submersible Pump set  2 no ( 1 +1 standbye)  each  of  7.5  HP  Collection tank dia 4.0 mt depth 6.5 mt RCC
Bye Pass structure Not  in use @the Time of visit
STP Control Unit (Inside Brick Masonry Room)
CI Inlet Pipe( i/d 300 mm 2 no) to Equalization Tank
Collection Tank Cum Equalization Tank Inlet (One  Inlet pipe  no effluent)  Excess effluent again fed to tank Diameter 11 mt  Depth RCC Const 3.8 mt
Over flow Out  Let  at Equalization Tank
Electric Control of Two no Submersible Pumps at Equalization Tank
Stilling Chamber Rectangular- RCC
Fine Bar Screen Two numbers
Grit Chamber
FAB II   (dia 7.3 mt ) Out let of FAB II to Clarifier Media in FAB II
MBBR Bio Reactor FAB I Oil and Grease in F AB I MBBR Media in FAB I
Return sludge in FAB I Return sludge Pump 2 HP Return  Sludge fed in to FAB  I Pipe dia 63 mm
Air Compressor Unit( 3 no Compressors)
Air compressor distribution Header
Sludge and Grit Out lets to sludge bed Grit  out let from Grit Chamber Sludge out at FAB I
RCC Clarifier  (Dia 8.7 mt)
Clarifier Out fall to disinfection  Settled Effluent at the out let of clarifier
Disinfection unit
Steel structures ( like stair and Platform)
Sludge Bed
Sludge infilitrate collection sump
Sludge Distribution
Out Let Houdi and Out let into pond
Katcha Pond used to collect Treated effluent
Raw sewage and Treated Sewage
Lab at Site
Inspecting Team
Observations Oil and grease has been observed in the FAB I so this needs to be removed at preliminary stage by constructing oil and grease trap . This may constructed by department also Return sludge is being fed in to FAB I . Normally in MBBR return sludge is not fed  STP was not running at Full capacity at the time of visit and no discharge meter was installed to check the flow Disinfection needs to be done regularly Handling and Disposal of sludge  agreement needs to be finalized with the operator   Plant was in good working condition . Lab should have more testing equipment Flow meter should be installed at STP Following officers were present during visit 1. Mr S Srinivasan Director  and Mr N Palaniraja Chennai auto Ancillary Industrial Infrastructure Up gradation Company  2.Mr RakeshVermaSr Manger Projects M/s Hydro Tech Paryavaran India Pvt Ltd  3Mr S Selvam  Site Engineer M/s Hydro Tech Paryavaran India Pvt Ltd  Mr S Srinivasan is satisfied with the performance of the Plant  executed by M/s Hydro Tech Paryavaran India Pvt Ltd  Project was allotted on June 19 2006 vide CAAIIUC/STP and WTP /920 dt 19/6/2006 and completion time was 15 months and it was completed June 17 2009 .The delay needs to be explained .and cost overruns  if any needs to be checked .

More Related Content

Viewers also liked

Mib 3.6 unit 2 on 17 09 2012
Mib 3.6 unit 2 on 17 09 2012Mib 3.6 unit 2 on 17 09 2012
Mib 3.6 unit 2 on 17 09 2012
Sanjeev Patel
 
New training materials
New training materialsNew training materials
New training materials
narayan1979
 

Viewers also liked (20)

Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 
Petrichor Energy (TSX.V - PTP) Corporate Presentation
Petrichor Energy (TSX.V - PTP) Corporate PresentationPetrichor Energy (TSX.V - PTP) Corporate Presentation
Petrichor Energy (TSX.V - PTP) Corporate Presentation
 
Mib 3.6 unit 2 on 17 09 2012
Mib 3.6 unit 2 on 17 09 2012Mib 3.6 unit 2 on 17 09 2012
Mib 3.6 unit 2 on 17 09 2012
 
New training materials
New training materialsNew training materials
New training materials
 
International trade course 4
International trade course 4International trade course 4
International trade course 4
 
Ucp600 (introductory articles)
Ucp600 (introductory articles)Ucp600 (introductory articles)
Ucp600 (introductory articles)
 
Stp study 125 kld at bch faridabad
Stp study 125 kld at  bch faridabadStp study 125 kld at  bch faridabad
Stp study 125 kld at bch faridabad
 
Design of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment PlantDesign of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment Plant
 
Dc ucp 600 for lc
Dc ucp 600 for lcDc ucp 600 for lc
Dc ucp 600 for lc
 
TBC Letter Of Credit
TBC   Letter Of CreditTBC   Letter Of Credit
TBC Letter Of Credit
 
Brain Death and Preparation for Organ Donation
Brain Death and Preparation for Organ DonationBrain Death and Preparation for Organ Donation
Brain Death and Preparation for Organ Donation
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
 
Sewage Treatment Plant Design Project
Sewage  Treatment  Plant  Design  ProjectSewage  Treatment  Plant  Design  Project
Sewage Treatment Plant Design Project
 
How to configure vlan, stp, dtp step by step guide
How to configure vlan, stp, dtp step by step guideHow to configure vlan, stp, dtp step by step guide
How to configure vlan, stp, dtp step by step guide
 
ETP- Effluent Treatment Plant
ETP- Effluent Treatment PlantETP- Effluent Treatment Plant
ETP- Effluent Treatment Plant
 
MTP & PTP
MTP & PTPMTP & PTP
MTP & PTP
 
Sewage treatment plant
Sewage treatment plantSewage treatment plant
Sewage treatment plant
 
Gsm architecture
Gsm architecture Gsm architecture
Gsm architecture
 
Stories from the PTP Battlefront - Corvil at STAC London
Stories from the PTP Battlefront - Corvil at STAC LondonStories from the PTP Battlefront - Corvil at STAC London
Stories from the PTP Battlefront - Corvil at STAC London
 
Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)Characteristics of Waste-Water (Unit-I)
Characteristics of Waste-Water (Unit-I)
 

Similar to Stp study chhenai

Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, EgyptDynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
IJERA Editor
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
Sunil Singh
 
Microtunneling presentation 2014
Microtunneling presentation 2014Microtunneling presentation 2014
Microtunneling presentation 2014
Jamal A'Bed
 
New Sands Retreatment Plant 2
New Sands Retreatment Plant 2New Sands Retreatment Plant 2
New Sands Retreatment Plant 2
Simba Munyaradzi
 

Similar to Stp study chhenai (20)

IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
IRJET- Design of Sewage Treatment Plant of 7.5 MLD Capacity based on Sequenti...
IRJET- Design of Sewage Treatment Plant of 7.5 MLD Capacity based on Sequenti...IRJET- Design of Sewage Treatment Plant of 7.5 MLD Capacity based on Sequenti...
IRJET- Design of Sewage Treatment Plant of 7.5 MLD Capacity based on Sequenti...
 
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, EgyptDynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
Dynamic Stability of Zaghloul Drainage Pumping Station, Kafr El Shiekh, Egypt
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Drip. irri ppt
Drip. irri pptDrip. irri ppt
Drip. irri ppt
 
Western Pipeway Presentation
Western Pipeway PresentationWestern Pipeway Presentation
Western Pipeway Presentation
 
VOLTAS- WATER MANAGEMENT BUSINESS DIVISION
VOLTAS- WATER MANAGEMENT BUSINESS DIVISIONVOLTAS- WATER MANAGEMENT BUSINESS DIVISION
VOLTAS- WATER MANAGEMENT BUSINESS DIVISION
 
Designing of sprinkler irrigation system
Designing of sprinkler irrigation systemDesigning of sprinkler irrigation system
Designing of sprinkler irrigation system
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Microtunneling presentation 2014
Microtunneling presentation 2014Microtunneling presentation 2014
Microtunneling presentation 2014
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
Case study - Pharmaceutical Pressure Vessels
Case study - Pharmaceutical Pressure VesselsCase study - Pharmaceutical Pressure Vessels
Case study - Pharmaceutical Pressure Vessels
 
Report steffones
Report steffonesReport steffones
Report steffones
 
Stage presentation v07
Stage presentation v07Stage presentation v07
Stage presentation v07
 
New Sands Retreatment Plant 2
New Sands Retreatment Plant 2New Sands Retreatment Plant 2
New Sands Retreatment Plant 2
 
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
 
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
 
5th GGT - Maren Brehme - TU Delft
5th GGT - Maren Brehme - TU Delft5th GGT - Maren Brehme - TU Delft
5th GGT - Maren Brehme - TU Delft
 

Recently uploaded

Recently uploaded (20)

Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Stp study chhenai

  • 1. STP Study M/s HydrotechParyavaran India Pvt Ltd CAA II UC Chennai Auto Ancillary Industrial Infrastructure Up gradation Company Ambattur Industrial Estate Near HCL Unit - V Chennai
  • 2. STP (Gross Size 30 mt x70 mt)
  • 3. View of STP from Top
  • 4. Coarse Bar Screen (Constructed earlier but renovated by the firm ) Coarse Bar Screen Circular Tank Diameter 3 m depth 5 mt
  • 5. Grit Chamber - constructed earlier Grit Chamber I Diameter 4.5 mt depth 6.5 mt RCC const Grit Chamber Ii Dia 5.0 mt depth 6.5 RCC Construction
  • 6. Pumping Station Submersible Pump set 2 no ( 1 +1 standbye) each of 7.5 HP Collection tank dia 4.0 mt depth 6.5 mt RCC
  • 7. Bye Pass structure Not in use @the Time of visit
  • 8. STP Control Unit (Inside Brick Masonry Room)
  • 9. CI Inlet Pipe( i/d 300 mm 2 no) to Equalization Tank
  • 10. Collection Tank Cum Equalization Tank Inlet (One Inlet pipe no effluent) Excess effluent again fed to tank Diameter 11 mt Depth RCC Const 3.8 mt
  • 11. Over flow Out Let at Equalization Tank
  • 12. Electric Control of Two no Submersible Pumps at Equalization Tank
  • 14. Fine Bar Screen Two numbers
  • 16. FAB II (dia 7.3 mt ) Out let of FAB II to Clarifier Media in FAB II
  • 17. MBBR Bio Reactor FAB I Oil and Grease in F AB I MBBR Media in FAB I
  • 18. Return sludge in FAB I Return sludge Pump 2 HP Return Sludge fed in to FAB I Pipe dia 63 mm
  • 19. Air Compressor Unit( 3 no Compressors)
  • 21. Sludge and Grit Out lets to sludge bed Grit out let from Grit Chamber Sludge out at FAB I
  • 22. RCC Clarifier (Dia 8.7 mt)
  • 23. Clarifier Out fall to disinfection Settled Effluent at the out let of clarifier
  • 25. Steel structures ( like stair and Platform)
  • 29. Out Let Houdi and Out let into pond
  • 30. Katcha Pond used to collect Treated effluent
  • 31. Raw sewage and Treated Sewage
  • 34. Observations Oil and grease has been observed in the FAB I so this needs to be removed at preliminary stage by constructing oil and grease trap . This may constructed by department also Return sludge is being fed in to FAB I . Normally in MBBR return sludge is not fed STP was not running at Full capacity at the time of visit and no discharge meter was installed to check the flow Disinfection needs to be done regularly Handling and Disposal of sludge agreement needs to be finalized with the operator Plant was in good working condition . Lab should have more testing equipment Flow meter should be installed at STP Following officers were present during visit 1. Mr S Srinivasan Director and Mr N Palaniraja Chennai auto Ancillary Industrial Infrastructure Up gradation Company 2.Mr RakeshVermaSr Manger Projects M/s Hydro Tech Paryavaran India Pvt Ltd 3Mr S Selvam Site Engineer M/s Hydro Tech Paryavaran India Pvt Ltd Mr S Srinivasan is satisfied with the performance of the Plant executed by M/s Hydro Tech Paryavaran India Pvt Ltd Project was allotted on June 19 2006 vide CAAIIUC/STP and WTP /920 dt 19/6/2006 and completion time was 15 months and it was completed June 17 2009 .The delay needs to be explained .and cost overruns if any needs to be checked .