7. The Jalaur River Multipurpose
Project II
• 3 dams
• 102-meter main reservoir
• 40-meter afterbay dam
• 24-meter catch dam
• 6.6 megawatt hydropower plant
• 81-km high line canal
8. Government’s Promised Benefits of
the Jalaur mega-dam
• 17,000 jobs
• Increased agricultural production
through improved irrigation services
• Additional power generation
• Potable water supply
• Flood mitigation
• Eco-tourism, etc.
13. What have we done?
• Started campaign since October 2011 (8th TUMANDUK general
assembly) up to the present
• Organizations formed
• Jalaur River for the People’s Network (JRPM)
• Pamatuk-Dam (Oppose Dam) – local anti-dam IP org
• Lobby works
• Dialogues with NCIP
• Audience with the Korean Exim Bank rep in the Philippines
• Lobbying with Korean Exim bank through Korean networks
• Petition forms, and signature campaign (local and international)
• March protests, pickets to government offices
• Alliance formations and network building
• Writ of Kalikasan vs Jalaur mega dam (Nov 2013)
14. Gains
• Delayed the project since 2012,
starting target now is February 2016
• Broadened mass organizations
• Reached alliances and support networks
• Korean friends (KTNZ Watch, KHIS, Green ODA)
• International River Network (IRN)
• SAVE Rivers (Malaysia)
• World Indigenous Summit on Environment
and Rivers (WISER)
• EANP
• Continued IP vigilance
15. Future plans
• More pressure for the Korean Exim Bank
• Writ of Kalikasan continuance
• Expand alliances and networks
• Intensify people’s struggle
10th TUMANDUK Assembly and International Fact
Finding and Solidarity Mission (IFFSM)
March 2016