3. USD 16.2 billion multinational group
based in Mumbai, India
Employs more than 155,000 people in
over 100 countries
4. Power Mobility
Enhance Urban
lifestyles
Increase business
efficiency
Drive rural
prosperity
Priorities
5. Pillars of guidance
Accept No
limit
Alternative
Thinking
Driving Positive
change in everything
6. About the Zaheerabad factory
ISO 14001:2004
(Environmental Management)
2500
Employees
OHSAS 18001:2007
(Occupational Health and Safety Management)
ISO 27001:2005
(Information Security Management System)
20. Old systems replaced by
more effective and efficient
28 W-T5
150 W SV/MV
45 W CFL
43 W LED
40W-T8
250 W MV/SV
250 W MV/SV
150 W MV/SV
21. Savings
No. of kWh Saved : 1.78 Lakhs kWh
Savings per annum : Rs. 17.21 Lakhs
Investment : Rs. 9.45 Lakhs
22. 3rd Idea
Energy conservation by changing a method of
cleaning
23. Paint Booth grills cleaning
Before
• High pressure Water Jet system used to clean Paint Booth Grills
• Physical forces produced by 110kW Motor
After
• Chemicals used to remove paint from booth grills
• The chemicals used are environment friendly
• No compromise on quality
• Chemical reactions are self-sustaining and do not require any
power source
24. Savings
No. of kWh Saved : 1.50 Lakhs kWh
Savings per annum : Rs. 14.51 Lakhs
Investment : Rs.7.2 Lakhs
26. Retro fitment of screw chilling compressor in
place of reciprocating compressor
Before
• 98 TR air cooled reciprocating chilling compressor
• 110 KW motor along with forced draft cooling tower
• Water circulation pump in throttled condition
After
• Replaced reciprocating compressor with 125 TR screw compressor (75 kW
motor)
• Natural draft cooling tower & VFD controlled water circulation pump
27. Savings
No. of kWh Saved : 1.02 Lakhs kWh
Savings per annum : Rs. 9.91 Lakhs
Investment : Rs. 14.9 Lakhs
28. Enhancing Energy Efficiency – ENCON Cell
• Suggestion Schemes
• Small Group Activities
• Total Productive Maintenance
• Low Cost and No Cost automation Techniques
2013-14 Targets
• Anticipated Investment – Rs. 58 lakhs
• Targeted Savings – Rs. 64 lakhs
Editor's Notes
Ministry of Power, Govt. of India
Mahindra Automotive sector has six manufacturing units, four in the state of Maharashtra located at Kandvili, Igatpuri, Chakan & Nasik; fifth unit located at Zaheerabad, Medak- Andhra Pradesh and the sixth unit located at Haridwar, Uttaranchal.
To enable people to rise through solutions that power mobility, drive rural prosperity, enhance urban lifestyles and increase business efficiency
Zaheerabad plant also takes various initiatives towards community
development in the areas of Health, Education and Environment.
Internally, Mahindra Group follow three basic tenets-Accepting no limits, Alternative
Thinking, and Driving positive change in everything we do. These brand pillars guide
all our actions and business decisions from deciding whether or not to enter a new
field or planning a portfolio of services.
The Zaheerabad unit is a certified ISO14001:2004 & OHSAS 18001:2007, ISO27001:2005 unit. Employees 2500 people
Planning an information security management system; risk assessment; risk treatment
It exists to help all kinds of organizations put in place demonstrably sound occupational health and safety performance.
manufacture of LCV's, Buses, UV's & 3 wheelers.
One of the unique features of this plant is its total dependence on ground water as
it does not get water supply from the state administration. The plant has taken
measures to become self sustainable by conserving water through rainwater
harvesting, ETP & STP -Waste water treatment, Bio filter treatment plant, Green
belt Development & Environmental projects etc.
Processing of 2 BMT cabins on one skid 4 cargos on one skid (one 2 ka 4)
Before:
Earlier the plant used to process One BMT
cabin and one cargo on one skid
Now plant is processing 2 cabins on one skid and 4 cargos on one skid meeting without
compromising product quality resulting in 4 BMT's processing in 3 skids against 4
skids earlier
No. of kWh Saved : 1.42 Lakhs kWh
Thermal Savings : 210 MkCal
Savings per annum : Rs. 23.82 Lakhs
Investment : Rs. 0.8 Lakhs
2. Introduction of Energy Efficient lighting system across plant
3. Paint Booth Grills cleaning with chemicals instead of high pressure
water jet system thereby elimination of 110 kW motor
No. of kWh Saved : 1.50 Lakhs kWh
Savings per annum : Rs. 14.51 Lakhs
Investment : Rs.7.2 Lakhs
4. Retro fitment of screw chilling compressor in place of reciprocating
compressor