Your SlideShare is downloading. ×
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Soft Rail L&R Symposium V8
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Soft Rail L&R Symposium V8

1,618

Published on

ron seiple and cta publish a presentation regarding the soft rail system.

ron seiple and cta publish a presentation regarding the soft rail system.

Published in: Business, Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,618
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
13
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • ALOHA A big Mahalo to ASNE for inviting us and the support while here. Soft Rail was sponsored by DARPA and accomplished in Hawaii. The effort is now completed. Soft Rail is definitely a paradigm shift from typical L and R Systems. Our Product is Patented
  • Transcript

    • 1. Soft Rail Launch and Recovery ASNE Launch and Recovery Symposium Annapolis, MD Presented By Ronald Seiple SOFT RAIL L AND R IS PATENTED # 7156036B2
    • 2. Soft Rail Approach
      • L&R at Speed
      • Take advantage of stability at 20-40ft depth
      • L&R in the wake “sweetspot”
      • Do L&R fast (<1 min)
      • Improve Safety
      • Maintain payload versatility
      • Make it Simple and Robust
    • 3. Soft Rail L&R Method
    • 4. Soft Rail Design Parameters Drogue Drag = 22,528kg Dive Force = 5632kg Scope Ratio = 4:1 Tow speed = 15 knots Depth = 10m Payload = 9200kg Soft Rail Tension = 26000kg Payload to Tension Ratio = 0.35 Launch Height = 4.0m Soft Rail Length = 56m Scope Angle = 9.46° to water (Modeled)
    • 5. Soft Rail Deck System
    • 6. C Commando
      • 2K Tons, 220 ft Long 56 ft B
    • 7. Soft Rail Deck Gear & RHIB
    • 8. Soft Rail D/d System
    • 9. Soft Rail Ready to Deploy
    • 10. Traditional L & R
    • 11. Soft Rail L & R
    • 12. Soft Rail UUV Concept
    • 13. Static Soft Rail Anchor Soft Rail Cables Tensioning Wench
    • 14. Soft Rail Demo Conclusions
      • Proven At Sea
      • Robust
      • Small Size
      • Deployment Speed 20kts
      • Simple
      • Cost Effective
      • Sea State 4 Achievable
      • Fast
      • Safe
    • 15. What Next
      • Depressor/Drogue:
      • Develop a unified design.
      • Transition
      • Partnership
    • 16. Soft Rail Questions

    ×