SlideShare a Scribd company logo
1 of 27
April 16, 2015
Saxony Road & Quail Garden Drive
Traffic Calming Workshop
Traffic Calming Workshop #1
Overview of Presentation
• Introductions & Project Overview
• Traffic Calming 101
• Traffic Data from City
• Small Group Discussion
• Report Back
• Closing Comments & Next Steps
Traffic Calming Workshop #1
Introductions
• Encinitas Environmental
Education Cluster (E3)
 Encinitas Unified School
District
 Ecke YMCA
 San Diego Botanic
Garden
 Seacrest Village
Community
 Heritage Museum
 Leichtag Foundation
Traffic Calming Workshop #1
Dawn Wilson, PE TE
• Civil Engineering Degrees
from UC Irvine
• Traffic Engineer &
Professional Engineer
• 20 years in Transportation
Profession
• Resident of Carlsbad
• Summer Camps at YMCA
• Known for Leadership in
Traffic Calming Profession
• US Traffic Calming Manual
Prepared
Traffic Calming Plans for:
• Solana Beach
• Encinitas
• Oceanside
• Carlsbad
• San Diego
• Coronado
• County of San Diego
• Mission Viejo
• Los Altos
• West Hollywood
• Private Development
Traffic Calming Workshop #1
Why are We Here Tonight?
• Common Concern About Traffic
• Proactive Plan to Engage Neighbors
• Look for Solutions
• Aid in Funding Solutions
• City Participating, but Not Funding Plan
• Recent Success on Speed Reduction and Crosswalk
Installation
Traffic Calming Workshop #1
Ground Rules
• Focus on Traffic Concerns
• Respect Each Others Opinions
• Share Ideas
• Be Open to Identifying Solutions
Traffic Calming Workshop #1
Project Study Area
Traffic Calming Workshop #1
Concerns???
Community Concerns About Traffic
• Use Post-It Notes to
Share Concerns About
TRAFFIC
• One Idea Per Note
• Place Note on White
Paper
Reduce Traffic Speeds
• Bumps in the Road
• Narrow the Road
• Vary the Visual Effect of
the Road
• Reduce Lane Width
Reduce Traffic Volume
• Full Road Closure
• Partial Road Closure
• Road Diet
• Significantly Reduce
Traffic Speed
What will Traffic Calming Do?
Traffic Calming Workshop #1
City of Encinitas Neighborhood Traffic
Management Program (ENTMP)
Tools to Reduce Traffic Speeds
• Speed Humps, Lumps,
Bumps & Tables
• Chicanes
• Curb Extensions / Bulb
Outs
• Roundabout
• Traffic Circle
• Medians
• Gateway Treatment
• Street Narrowing (curbs)
• On-Street Parking
• Bicycle Lanes
Tools to Reduce Traffic Speeds
• Speed Humps, Lumps,
Bumps & Tables
• Chicanes
• Curb Extensions / Bulb
Outs
• Roundabout
• Traffic Circle
• Medians
• Gateway Treatment
• Street Narrowing (curbs)
• On-Street Parking
• Bicycle Lanes
Tools to Reduce Traffic Speeds
• Speed Humps, Lumps,
Bumps & Tables
• Chicanes
• Curb Extensions / Bulb
Outs
• Roundabout
• Traffic Circle
• Medians
• Gateway Treatment
• Street Narrowing (curbs)
• On-Street Parking
• Bicycle Lanes
Tools to Reduce Traffic Speeds
• Speed Humps, Lumps,
Bumps & Tables
• Chicanes
• Curb Extensions / Bulb
Outs
• Roundabout
• Traffic Circle
• Medians
• Gateway Treatment
• Street Narrowing (curbs)
• On-Street Parking
• Bicycle Lanes
Tools to Reduce Traffic Speeds
• Speed Humps, Lumps,
Bumps & Tables
• Chicanes
• Curb Extensions / Bulb
Outs
• Roundabout
• Traffic Circle
• Medians
• Gateway Treatment
• Street Narrowing (curbs)
• On-Street Parking
• Bicycle Lanes
Traffic & Speed Data from City
Traffic Calming Workshop #1
What do We Want to Accomplish?
• Gain consensus between property owners on
Traffic Calming Plan
• Present Recommendations to City of Encinitas
• Gain Council Support for Traffic Calming Plan
• Identify Funding Source for Traffic Calming Plan
• Reduce traffic speeds to 25 – 30 mph through E3
Properties
Traffic Calming Workshop #1
Preliminary Traffic Calming Ideas
Quail Gardens Drive
Challenges
Traffic Calming Workshop #1
Treated Colored Pavement &
Entry Monument
Traffic Calming Workshop #1
Traffic Circle at Ecke Ranch Road
Estimated Speed Reduction:
10 – 20% (design dependent results)
Estimated Cost:
$100,000-$150,000
for traffic circle
Traffic Calming Workshop #1
Raised Crosswalk & Rapid
Flashing Beacons
Traffic Calming Workshop #1
Median, Monument & Pavement
Treatment south of Botanical
Gardens Entrance
Estimated Cost:
$75,000 - $100,000
Estimated Speed Reduction:
5%
Traffic Calming Workshop #1
Hands On Exercise
• Review the Maps
• Identify Locations Where You
Would Like to See Traffic
Calming
• Discuss E3 Traffic Calming
Ideas
• Identify Potential Solutions
Report Back to Group
Traffic Calming Workshop #1
Next Steps
1
• Review Information from Workshop (April 2015)
2
• Develop Comprehensive Plan &
Recommendations (April/May 2015)
3
• Calculate Cost to Construct Plan (May 2015)
4
• Present Recommendations at Project
Information Meeting (May 2015)
5
• Present Recommendations to City Council for
Discussion (June/July 2015)
Traffic Calming Workshop #1
Questions ?
Closing Comments?

More Related Content

Similar to April 16 E3 workshop

Neighborhood Greenways
Neighborhood GreenwaysNeighborhood Greenways
Neighborhood Greenways
Trailnet
 
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
zataraik
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
Tim Pheby
 

Similar to April 16 E3 workshop (20)

April 14 E3 workshop
April 14 E3 workshopApril 14 E3 workshop
April 14 E3 workshop
 
CDOT South Loop Chicago Overview
CDOT South Loop Chicago OverviewCDOT South Loop Chicago Overview
CDOT South Loop Chicago Overview
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
Neighborhood Greenways
Neighborhood GreenwaysNeighborhood Greenways
Neighborhood Greenways
 
101 no qa
101 no qa101 no qa
101 no qa
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
Movement for Liveable London Street Talks - Ben Kennedy 22nd January 2014
 
2015 09 24 ppt presentation
2015 09 24 ppt presentation2015 09 24 ppt presentation
2015 09 24 ppt presentation
 
All nacto slides compiled
All nacto slides compiledAll nacto slides compiled
All nacto slides compiled
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT Presentation
 
NZC - Bracke
NZC - BrackeNZC - Bracke
NZC - Bracke
 
#78 Sustaining Complete Streets Momentum - Mullins
#78 Sustaining Complete Streets Momentum - Mullins#78 Sustaining Complete Streets Momentum - Mullins
#78 Sustaining Complete Streets Momentum - Mullins
 
Glendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy ReviewGlendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy Review
 
DMURS - DIT November 2014
DMURS - DIT November 2014 DMURS - DIT November 2014
DMURS - DIT November 2014
 
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
Partnerships for the Total Transit System APTA Multimodal 2013 Final 5-5-2013
 
#41 Times Change, People Change, Transportation Needs Change - LaPlante
#41 Times Change, People Change, Transportation Needs Change - LaPlante#41 Times Change, People Change, Transportation Needs Change - LaPlante
#41 Times Change, People Change, Transportation Needs Change - LaPlante
 
Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path Presentation
 
Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 

Recently uploaded

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Recently uploaded (20)

Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 

April 16 E3 workshop

  • 1. April 16, 2015 Saxony Road & Quail Garden Drive Traffic Calming Workshop
  • 2. Traffic Calming Workshop #1 Overview of Presentation • Introductions & Project Overview • Traffic Calming 101 • Traffic Data from City • Small Group Discussion • Report Back • Closing Comments & Next Steps
  • 3. Traffic Calming Workshop #1 Introductions • Encinitas Environmental Education Cluster (E3)  Encinitas Unified School District  Ecke YMCA  San Diego Botanic Garden  Seacrest Village Community  Heritage Museum  Leichtag Foundation
  • 4. Traffic Calming Workshop #1 Dawn Wilson, PE TE • Civil Engineering Degrees from UC Irvine • Traffic Engineer & Professional Engineer • 20 years in Transportation Profession • Resident of Carlsbad • Summer Camps at YMCA • Known for Leadership in Traffic Calming Profession • US Traffic Calming Manual Prepared Traffic Calming Plans for: • Solana Beach • Encinitas • Oceanside • Carlsbad • San Diego • Coronado • County of San Diego • Mission Viejo • Los Altos • West Hollywood • Private Development
  • 5. Traffic Calming Workshop #1 Why are We Here Tonight? • Common Concern About Traffic • Proactive Plan to Engage Neighbors • Look for Solutions • Aid in Funding Solutions • City Participating, but Not Funding Plan • Recent Success on Speed Reduction and Crosswalk Installation
  • 6. Traffic Calming Workshop #1 Ground Rules • Focus on Traffic Concerns • Respect Each Others Opinions • Share Ideas • Be Open to Identifying Solutions
  • 7. Traffic Calming Workshop #1 Project Study Area
  • 8. Traffic Calming Workshop #1 Concerns??? Community Concerns About Traffic • Use Post-It Notes to Share Concerns About TRAFFIC • One Idea Per Note • Place Note on White Paper
  • 9. Reduce Traffic Speeds • Bumps in the Road • Narrow the Road • Vary the Visual Effect of the Road • Reduce Lane Width Reduce Traffic Volume • Full Road Closure • Partial Road Closure • Road Diet • Significantly Reduce Traffic Speed What will Traffic Calming Do?
  • 10. Traffic Calming Workshop #1 City of Encinitas Neighborhood Traffic Management Program (ENTMP)
  • 11. Tools to Reduce Traffic Speeds • Speed Humps, Lumps, Bumps & Tables • Chicanes • Curb Extensions / Bulb Outs • Roundabout • Traffic Circle • Medians • Gateway Treatment • Street Narrowing (curbs) • On-Street Parking • Bicycle Lanes
  • 12. Tools to Reduce Traffic Speeds • Speed Humps, Lumps, Bumps & Tables • Chicanes • Curb Extensions / Bulb Outs • Roundabout • Traffic Circle • Medians • Gateway Treatment • Street Narrowing (curbs) • On-Street Parking • Bicycle Lanes
  • 13. Tools to Reduce Traffic Speeds • Speed Humps, Lumps, Bumps & Tables • Chicanes • Curb Extensions / Bulb Outs • Roundabout • Traffic Circle • Medians • Gateway Treatment • Street Narrowing (curbs) • On-Street Parking • Bicycle Lanes
  • 14. Tools to Reduce Traffic Speeds • Speed Humps, Lumps, Bumps & Tables • Chicanes • Curb Extensions / Bulb Outs • Roundabout • Traffic Circle • Medians • Gateway Treatment • Street Narrowing (curbs) • On-Street Parking • Bicycle Lanes
  • 15. Tools to Reduce Traffic Speeds • Speed Humps, Lumps, Bumps & Tables • Chicanes • Curb Extensions / Bulb Outs • Roundabout • Traffic Circle • Medians • Gateway Treatment • Street Narrowing (curbs) • On-Street Parking • Bicycle Lanes
  • 16. Traffic & Speed Data from City
  • 17. Traffic Calming Workshop #1 What do We Want to Accomplish? • Gain consensus between property owners on Traffic Calming Plan • Present Recommendations to City of Encinitas • Gain Council Support for Traffic Calming Plan • Identify Funding Source for Traffic Calming Plan • Reduce traffic speeds to 25 – 30 mph through E3 Properties
  • 18. Traffic Calming Workshop #1 Preliminary Traffic Calming Ideas
  • 20. Traffic Calming Workshop #1 Treated Colored Pavement & Entry Monument
  • 21. Traffic Calming Workshop #1 Traffic Circle at Ecke Ranch Road Estimated Speed Reduction: 10 – 20% (design dependent results) Estimated Cost: $100,000-$150,000 for traffic circle
  • 22. Traffic Calming Workshop #1 Raised Crosswalk & Rapid Flashing Beacons
  • 23. Traffic Calming Workshop #1 Median, Monument & Pavement Treatment south of Botanical Gardens Entrance Estimated Cost: $75,000 - $100,000 Estimated Speed Reduction: 5%
  • 24. Traffic Calming Workshop #1 Hands On Exercise • Review the Maps • Identify Locations Where You Would Like to See Traffic Calming • Discuss E3 Traffic Calming Ideas • Identify Potential Solutions
  • 25. Report Back to Group
  • 26. Traffic Calming Workshop #1 Next Steps 1 • Review Information from Workshop (April 2015) 2 • Develop Comprehensive Plan & Recommendations (April/May 2015) 3 • Calculate Cost to Construct Plan (May 2015) 4 • Present Recommendations at Project Information Meeting (May 2015) 5 • Present Recommendations to City Council for Discussion (June/July 2015)
  • 27. Traffic Calming Workshop #1 Questions ? Closing Comments?

Editor's Notes

  1. Variations in ROW, vertical curvature of road, on-street parking, Just as wide as Leaucadia Blvd.