SlideShare a Scribd company logo
1 of 69
Sustainable, Successful,
and Repeatable
  Elad Amit
Current Reality Tree

 • Let’s dive into why this is a problem




                                                                   http://blog.crisp.se/henrikkniberg
                               http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW          HIGH STABILIZATION
            PREDICTABILITY         COSTS




 • Let’s dive into why this is a problem




                                                                             http://blog.crisp.se/henrikkniberg
                                         http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW          HIGH STABILIZATION
            PREDICTABILITY         COSTS




 • Let’s dive into why this is a problem                              HEAVEY
                                                                      MANUAL
                                                                      TESTING




                                                                             http://blog.crisp.se/henrikkniberg
                                         http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                     HIGH STABILIZATION
            PREDICTABILITY                    COSTS




 • Let’s dive into why this is a problem
                               LATE
                             FEEDBACK
                                                                                 HEAVEY
                                                                                 MANUAL
                                                                                 TESTING




                                                                                        http://blog.crisp.se/henrikkniberg
                                                    http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                     HIGH STABILIZATION
            PREDICTABILITY                    COSTS




 • Let’s dive into why this is a problem
                               LATE
                             FEEDBACK
                                             QUALITY
                                              @ THE
                                                                                 HEAVEY
                                                                                 MANUAL
                                               END                               TESTING




                                                                                        http://blog.crisp.se/henrikkniberg
                                                    http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                         HIGH STABILIZATION
            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
                               LATE
                             FEEDBACK
                                                  QUALITY
                                                   @ THE
                                                                                     HEAVEY
                                                                                     MANUAL
                                                    END                              TESTING




                                          BIG
                                        BATCHES




                                                                                            http://blog.crisp.se/henrikkniberg
                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                         HIGH STABILIZATION
            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
                               LATE
                             FEEDBACK
                                                  QUALITY
                                                   @ THE
                                                                                     HEAVEY
                                                                                     MANUAL
                                                    END                              TESTING




                                          BIG
                                        BATCHES




                                                                                            http://blog.crisp.se/henrikkniberg
                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                         HIGH STABILIZATION
            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
                               LATE
                             FEEDBACK
                                                  QUALITY
                                                   @ THE
                                                                                     HEAVEY
                                                                                     MANUAL
                                                    END                              TESTING




                                BIG       BIG
                             FEATURES   BATCHES




                                                                                            http://blog.crisp.se/henrikkniberg
                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                         HIGH STABILIZATION
            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
              LONG
              CYCLE
                               LATE
                             FEEDBACK
                                                  QUALITY
                                                   @ THE
                                                                                     HEAVEY
                                                                                     MANUAL
              TIMES                                 END                              TESTING




                                BIG       BIG
                             FEATURES   BATCHES




                                                                                            http://blog.crisp.se/henrikkniberg
                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                         HIGH STABILIZATION
            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
    LARGE
     WIP
              LONG
              CYCLE
                               LATE
                             FEEDBACK
                                                  QUALITY
                                                   @ THE
                                                                                     HEAVEY
                                                                                     MANUAL
              TIMES                                 END                              TESTING




                                BIG       BIG
                             FEATURES   BATCHES




                                                                                            http://blog.crisp.se/henrikkniberg
                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                LOW                         HIGH STABILIZATION
            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
    LARGE
     WIP
              LONG
              CYCLE
                               LATE
                             FEEDBACK
                                                  QUALITY
                                                   @ THE
                                                                                     HEAVEY
                                                                                     MANUAL
              TIMES                                 END                              TESTING




                                BIG       BIG
                             FEATURES   BATCHES




                                                                                            http://blog.crisp.se/henrikkniberg
                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree
                  LOW                         HIGH STABILIZATION
              PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
    LARGE
     WIP
                LONG
                CYCLE
                                 LATE
                               FEEDBACK
                                                    QUALITY
                                                     @ THE
                                                                                       HEAVEY
                                                                                       MANUAL
                TIMES                                 END                              TESTING




                                  BIG       BIG
                               FEATURES   BATCHES
    FEATURE
      PER
    PERSON




                                                                                              http://blog.crisp.se/henrikkniberg
                                                          http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree     LOW                         HIGH STABILIZATION
                     PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                       LONG
                       CYCLE
                                        LATE
                                      FEEDBACK
                                                           QUALITY
                                                            @ THE
                                                                                              HEAVEY
                                                                                              MANUAL
                       TIMES                                 END                              TESTING




                                         BIG       BIG
                                      FEATURES   BATCHES
           FEATURE
             PER
           PERSON




 SPECIALIZAT-
     ION




                                                                                                     http://blog.crisp.se/henrikkniberg
                                                                 http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree            LOW                         HIGH STABILIZATION
                            PREDICTABILITY                        COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                              LONG
                              CYCLE
                                               LATE
                                             FEEDBACK
                                                                  QUALITY
                                                                   @ THE
                                                                                                     HEAVEY
                                                                                                     MANUAL
                              TIMES                                 END                              TESTING




                                                BIG       BIG
                                             FEATURES   BATCHES
           FEATURE
             PER
           PERSON




 SPECIALIZAT-       LONE
     ION            WOLFS




                                                                                                            http://blog.crisp.se/henrikkniberg
                                                                        http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree            LOW                                HIGH STABILIZATION
                            PREDICTABILITY                               COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                              LONG
                              CYCLE
                                               LATE
                                             FEEDBACK
                                                                         QUALITY
                                                                          @ THE
                                                                                                            HEAVEY
                                                                                                            MANUAL
                              TIMES                                        END                              TESTING




                                                BIG              BIG
                                             FEATURES          BATCHES
           FEATURE
             PER
           PERSON




 SPECIALIZAT-       LONE
     ION            WOLFS

                                                                           LIMIT
                                                        SMALLER
                                                                          OPEN
                                                        FEATURES
                                                                         DEFECTS




                                                                                                                   http://blog.crisp.se/henrikkniberg
                                                                               http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                     LOW                                  HIGH STABILIZATION
                                     PREDICTABILITY                                 COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                       LONG
                                       CYCLE
                                                          LATE
                                                        FEEDBACK
                                                                                    QUALITY
                                                                                     @ THE
                                                                                                                       HEAVEY
                                                                                                                       MANUAL
                                       TIMES                                          END                              TESTING




                                                           BIG              BIG
                                                        FEATURES          BATCHES
           FEATURE
                            LIMIT FEATURES       DONE
             PER
                             IN PROGRESS         DONE
           PERSON




 SPECIALIZAT-       LONE
     ION            WOLFS

                                                                                      LIMIT
                                                                   SMALLER
                                                                                     OPEN
                                                                   FEATURES
                                                                                    DEFECTS




                                                                                                                              http://blog.crisp.se/henrikkniberg
                                                                                          http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                     LOW                                  HIGH STABILIZATION
                                     PREDICTABILITY                                 COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                       LONG
                                       CYCLE
                                                          LATE
                                                        FEEDBACK
                                                                                    QUALITY
                                                                                     @ THE
                                                                                                                       HEAVEY
                                                                                                                       MANUAL
                                       TIMES                                          END                              TESTING




                                                           BIG              BIG
                                                        FEATURES          BATCHES
           FEATURE
                            LIMIT FEATURES       DONE
             PER
                             IN PROGRESS         DONE                                                   AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                        PART OF DONE            INTEGRATION




 SPECIALIZAT-       LONE
     ION            WOLFS

                                                                                      LIMIT
                                                                   SMALLER
                                                                                     OPEN
                                                                   FEATURES
                                                                                    DEFECTS




                                                                                                                              http://blog.crisp.se/henrikkniberg
                                                                                          http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                     LOW                                  HIGH STABILIZATION
                                     PREDICTABILITY                                 COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                       LONG
                                       CYCLE
                                                          LATE
                                                        FEEDBACK
                                                                                    QUALITY
                                                                                     @ THE
                                                                                                                       HEAVEY
                                                                                                                       MANUAL
                                       TIMES                                          END                              TESTING




                                                           BIG              BIG
                                                        FEATURES          BATCHES
           FEATURE
                            LIMIT FEATURES       DONE
             PER
                             IN PROGRESS         DONE                                                   AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                        PART OF DONE            INTEGRATION




 SPECIALIZAT-       LONE
     ION            WOLFS

                                                                                      LIMIT
                                                                   SMALLER
                                                                                     OPEN
                                                                   FEATURES
                                                                                    DEFECTS

 COLLECTIVE
 OWNERSHIP




                                                                                                                              http://blog.crisp.se/henrikkniberg
                                                                                          http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                  HIGH STABILIZATION
                                        PREDICTABILITY                                 COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                             LATE
                                                           FEEDBACK
                                                                                       QUALITY
                                                                                        @ THE
                                                                                                                          HEAVEY
                                                                                                                          MANUAL
                                          TIMES                                          END                              TESTING




                                                              BIG              BIG
                                                           FEATURES          BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                   AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                           PART OF DONE            INTEGRATION




 SPECIALIZAT-       LONE
     ION            WOLFS

                                                                                         LIMIT
                                                                      SMALLER
                                                                                        OPEN
                                                                      FEATURES
                                                                                       DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL




                                                                                                                                 http://blog.crisp.se/henrikkniberg
                                                                                             http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                      HIGH STABILIZATION
                                        PREDICTABILITY                                     COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                           QUALITY
                                                                                            @ THE
                                                                                                                              HEAVEY
                                                                                                                              MANUAL
                                          TIMES                                              END                              TESTING




                                                                  BIG              BIG
                                                               FEATURES          BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                       AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                               PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-       LONE                            FREEZE
                               NOT EFFECTIVE
     ION            WOLFS                         POLICY TOO
                                                    STRICT
                                                                                             LIMIT
                                                                          SMALLER
                                                                                            OPEN
                                                                          FEATURES
                                                                                           DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL




                                                                                                                                     http://blog.crisp.se/henrikkniberg
                                                                                                 http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                      HIGH STABILIZATION
                                        PREDICTABILITY                                     COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                           QUALITY
                                                                                            @ THE
                                                                                                                              HEAVEY
                                                                                                                              MANUAL
                                          TIMES                                              END                              TESTING




                                                                  BIG              BIG
                                                               FEATURES          BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                       AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                               PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-       LONE                            FREEZE
                               NOT EFFECTIVE
     ION            WOLFS                         POLICY TOO
                                                    STRICT
                                                                                             LIMIT
                                                                          SMALLER
                                                                                            OPEN
                                                                          FEATURES
                                                                                           DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL
                                                                    LOSE
                                                                  SIGHT OF     LARGE        FIX M/L
                                                                   THE BIG    OVERHEAD     DEFECTS?
                                                                  PICTURE




                                                                                                                                     http://blog.crisp.se/henrikkniberg
                                                                                                 http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                      HIGH STABILIZATION
                                        PREDICTABILITY                                     COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                           QUALITY
                                                                                            @ THE
                                                                                                                              HEAVEY
                                                                                                                              MANUAL
                                          TIMES                                              END                              TESTING




                                                                  BIG              BIG
                                                               FEATURES          BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                       AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                               PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-       LONE                            FREEZE                                                                               OUR
                               NOT EFFECTIVE                                                                           HIGH             BUILD IS
     ION            WOLFS                         POLICY TOO
                                                    STRICT                                                             COST               NOT
                                                                                             LIMIT                                      STABLE
                                                                          SMALLER
                                                                                            OPEN
                                                                          FEATURES
                                                                                           DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL
                                                                    LOSE
                                                                  SIGHT OF     LARGE        FIX M/L
                                                                   THE BIG    OVERHEAD     DEFECTS?
                                                                  PICTURE




                                                                                                                                     http://blog.crisp.se/henrikkniberg
                                                                                                 http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                      HIGH STABILIZATION
                                        PREDICTABILITY                                     COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                           QUALITY
                                                                                            @ THE
                                                                                                                              HEAVEY
                                                                                                                              MANUAL
                                          TIMES                                              END                              TESTING




                                                                  BIG              BIG
                                                               FEATURES          BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                       AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                               PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                               OUR
                               NOT EFFECTIVE                                                                           HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                             COST               NOT
                                                                                             LIMIT                                      STABLE
                                                                          SMALLER
                                                                                            OPEN
                                                                          FEATURES
                                                                                           DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL
                                                                    LOSE
                                                                  SIGHT OF     LARGE        FIX M/L
                                                                   THE BIG    OVERHEAD     DEFECTS?
         EXISTING                                                 PICTURE
         GAP IS TO
           BIG




                                                                                                                                     http://blog.crisp.se/henrikkniberg
                                                                                                 http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                      HIGH STABILIZATION
                                        PREDICTABILITY                                     COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                           QUALITY
                                                                                            @ THE
                                                                                                                              HEAVEY
                                                                                                                              MANUAL
                                          TIMES                                              END                              TESTING




                                                                  BIG              BIG
                                                               FEATURES          BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                       AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                               PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                               OUR
                               NOT EFFECTIVE                                                                           HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                             COST               NOT
                                                                                             LIMIT                                      STABLE
                                                                          SMALLER
                                                                                            OPEN
                                                                          FEATURES
                                                                                           DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL
                                                                    LOSE
                                                                  SIGHT OF     LARGE        FIX M/L
                                                                   THE BIG    OVERHEAD     DEFECTS?
         EXISTING                                                 PICTURE
         GAP IS TO
           BIG




        TRANSITION
         BASED ON
        NECESSITY



                                                                                                                                     http://blog.crisp.se/henrikkniberg
                                                                                                 http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                       HIGH STABILIZATION
                                        PREDICTABILITY                                      COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                            QUALITY
                                                                                             @ THE
                                                                                                                               HEAVEY
                                                                                                                               MANUAL
                                          TIMES                                               END                              TESTING




                                                                  BIG               BIG
                                                               FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                        AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                OUR
                               NOT EFFECTIVE                                                                            HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                              COST               NOT
                                                                                              LIMIT                                      STABLE
                                                                          SMALLER
                                                                                             OPEN
                                                                          FEATURES
                                                                                            DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL
                                                                    LOSE
                                                                  SIGHT OF      LARGE        FIX M/L
                                                                   THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                 PICTURE
         GAP IS TO
           BIG



                                                                          EFFECTIVE
        TRANSITION                                                         SLICING
         BASED ON
        NECESSITY



                                                                                                                                      http://blog.crisp.se/henrikkniberg
                                                                                                  http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                       HIGH STABILIZATION
                                        PREDICTABILITY                                      COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                             QUALITY
                                                                                              @ THE
                                                                                                                                HEAVEY
                                                                                                                                MANUAL
                                          TIMES                                                END                              TESTING




                                                                  BIG               BIG
                                                               FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                         AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                 PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                 OUR
                               NOT EFFECTIVE                                                                             HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                               COST               NOT
                                                                                              LIMIT                                       STABLE
                                                                          SMALLER
                                                                                             OPEN
                                                                          FEATURES
                                                                                            DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE
 OWNERSHIP
                   LEVEL
                                                                    LOSE
                                                                  SIGHT OF      LARGE        FIX M/L
                                                                   THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                 PICTURE
         GAP IS TO
           BIG


                                                                                            PRAGMATIC
                                                                          EFFECTIVE
        TRANSITION                                                                             RISK
                                                                           SLICING
         BASED ON                                                                           PROFILING
        NECESSITY



                                                                                                                                       http://blog.crisp.se/henrikkniberg
                                                                                                   http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                       HIGH STABILIZATION
                                        PREDICTABILITY                                      COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                             QUALITY
                                                                                              @ THE
                                                                                                                                HEAVEY
                                                                                                                                MANUAL
                                          TIMES                                                END                              TESTING




                                                                  BIG               BIG
                                                               FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                         AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                 PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                 OUR
                               NOT EFFECTIVE                                                                             HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                               COST               NOT
                                                                                              LIMIT                                       STABLE
                                                                          SMALLER
                                                                                             OPEN
                                                                          FEATURES
                                                                                            DEFECTS
                LIMIT AT THE
 COLLECTIVE
                  FEATURE                                                                                       WHOLE          AUTOMATION
 OWNERSHIP
                   LEVEL                                                                                        TEAM            PYRAMID
                                                                    LOSE
                                                                  SIGHT OF      LARGE        FIX M/L
                                                                   THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                 PICTURE
         GAP IS TO
           BIG


                                                                                            PRAGMATIC
                                                                          EFFECTIVE
        TRANSITION                                                                             RISK
                                                                           SLICING
         BASED ON                                                                           PROFILING
        NECESSITY



                                                                                                                                       http://blog.crisp.se/henrikkniberg
                                                                                                   http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                       HIGH STABILIZATION
                                        PREDICTABILITY                                      COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                 LATE
                                                               FEEDBACK
                                                                                             QUALITY
                                                                                              @ THE
                                                                                                                                HEAVEY
                                                                                                                                MANUAL
                                          TIMES                                                END                              TESTING




                                                                  BIG               BIG
                                                               FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES       DONE
             PER
                                IN PROGRESS         DONE                                                         AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                 PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                 OUR
                               NOT EFFECTIVE                                                                             HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                               COST               NOT
                                                                                              LIMIT                                       STABLE
                                                                          SMALLER
                                                                                             OPEN
                                                                          FEATURES
                                                                                            DEFECTS
                LIMIT AT THE
 COLLECTIVE                                                                                                                                           INVEST IN
                  FEATURE                                                                                       WHOLE          AUTOMATION
 OWNERSHIP                                                                                                                                            REMOVING
                   LEVEL                                                                                        TEAM            PYRAMID
                                                                                                                                                     INSTABILITY
                                                                    LOSE
                                                                  SIGHT OF      LARGE        FIX M/L
                                                                   THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                 PICTURE
         GAP IS TO
           BIG


                                                                                            PRAGMATIC
                                                                          EFFECTIVE
        TRANSITION                                                                             RISK
                                                                           SLICING
         BASED ON                                                                           PROFILING
        NECESSITY



                                                                                                                                       http://blog.crisp.se/henrikkniberg
                                                                                                   http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                         HIGH STABILIZATION
                                        PREDICTABILITY                                        COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                   LATE
                                                                 FEEDBACK
                                                                                               QUALITY
                                                                                                @ THE
                                                                                                                                  HEAVEY
                                                                                                                                  MANUAL
                                          TIMES                                                  END                              TESTING




                                                                    BIG               BIG
                                                                 FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES        DONE
             PER
                                IN PROGRESS          DONE                                                          AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                   PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                   OUR
                               NOT EFFECTIVE                                                                               HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                                 COST               NOT
                                                                                                LIMIT                                       STABLE
                                                                            SMALLER
                                                                                               OPEN
                                                                            FEATURES
                                                                                              DEFECTS
                LIMIT AT THE
 COLLECTIVE                                       START AS IS,                                                                                          INVEST IN
                  FEATURE                                                                                         WHOLE          AUTOMATION
 OWNERSHIP                                         SHORTEN                                                                                              REMOVING
                   LEVEL                                                                                          TEAM            PYRAMID
                                                     WHEN                                                                                              INSTABILITY
                                                  PREDICTABLE         LOSE
                                                                    SIGHT OF      LARGE        FIX M/L
                                                                     THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                   PICTURE
         GAP IS TO
           BIG


                                                                                              PRAGMATIC
                                                                            EFFECTIVE
        TRANSITION                                                                               RISK
                                                                             SLICING
         BASED ON                                                                             PROFILING
        NECESSITY



                                                                                                                                         http://blog.crisp.se/henrikkniberg
                                                                                                     http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                         HIGH STABILIZATION
                                        PREDICTABILITY                                        COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                   LATE
                                                                 FEEDBACK
                                                                                               QUALITY
                                                                                                @ THE
                                                                                                                                  HEAVEY
                                                                                                                                  MANUAL
                                          TIMES                                                  END                              TESTING




                                                                    BIG               BIG
                                                                 FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES        DONE
             PER
                                IN PROGRESS          DONE                                                          AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                   PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                   OUR
                               NOT EFFECTIVE                                                                               HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                                 COST               NOT
                                                                                                LIMIT                                       STABLE
                                                                            SMALLER
                                                                                               OPEN
                                                                            FEATURES
                                                                                              DEFECTS
                LIMIT AT THE
 COLLECTIVE                                       START AS IS,                                                                                          INVEST IN
                  FEATURE                                                                                         WHOLE          AUTOMATION
 OWNERSHIP                     IMPROVEMENT         SHORTEN                                                                                              REMOVING
                   LEVEL                                                                                          TEAM            PYRAMID
                                 BACKLOG             WHEN                                                                                              INSTABILITY
                                                  PREDICTABLE         LOSE
                                                                    SIGHT OF      LARGE        FIX M/L
                                                                     THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                   PICTURE
         GAP IS TO
           BIG


                                                                                              PRAGMATIC
                                                                            EFFECTIVE
        TRANSITION                                                                               RISK
                                                                             SLICING
         BASED ON                                                                             PROFILING
        NECESSITY



                                                                                                                                         http://blog.crisp.se/henrikkniberg
                                                                                                     http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
Current Reality Tree                        LOW                                         HIGH STABILIZATION
                                        PREDICTABILITY                                        COSTS




 • Let’s dive into why this is a problem
            LARGE
             WIP
                                          LONG
                                          CYCLE
                                                                   LATE
                                                                 FEEDBACK
                                                                                               QUALITY
                                                                                                @ THE
                                                                                                                                  HEAVEY
                                                                                                                                  MANUAL
                                          TIMES                                                  END                              TESTING




                                                                    BIG               BIG
                                                                 FEATURES           BATCHES
           FEATURE
                               LIMIT FEATURES        DONE
             PER
                                IN PROGRESS          DONE                                                          AUTOMATE AS             CONTINUOUS
           PERSON
                                                                                                                   PART OF DONE            INTEGRATION



                                                   FEATURE
 SPECIALIZAT-        LONE                           FREEZE                                                                                   OUR
                               NOT EFFECTIVE                                                                               HIGH             BUILD IS
     ION             WOLFS                        POLICY TOO
                                                    STRICT                                                                 COST               NOT
                                                                                                LIMIT                                       STABLE
                                                                            SMALLER
                                                                                               OPEN
                                                                            FEATURES
                                                                                              DEFECTS
                LIMIT AT THE
 COLLECTIVE                                       START AS IS,                                                                                          INVEST IN
                  FEATURE                                                                                         WHOLE          AUTOMATION
 OWNERSHIP                     IMPROVEMENT         SHORTEN                                                                                              REMOVING
                   LEVEL                                                                                          TEAM            PYRAMID
                                 BACKLOG             WHEN                                                                                              INSTABILITY
                                                  PREDICTABLE         LOSE
                                                                    SIGHT OF      LARGE        FIX M/L
                                                                     THE BIG     OVERHEAD     DEFECTS?
         EXISTING                                                   PICTURE
         GAP IS TO
           BIG


                                                                                              PRAGMATIC
                                                                            EFFECTIVE
        TRANSITION                                                                               RISK
                                                                             SLICING
         BASED ON                                                                             PROFILING
        NECESSITY



                                                                                                                                         http://blog.crisp.se/henrikkniberg
                                                                                                     http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
PO Workshop               Automation / CI        Limit Features in Progress     Done Done / Limit Defects Backlog




Learn   Backlog Grooming                                  Release Flow Workshop


                                Automation Backlog with
        Try to break 3 largest
                                Effort and Saved Manual Dry run of release execution      VSM
        Features
                                Cost
        Avg Feature Size – ½ of Allocate Automation tasks Plan for ½ Features in Progress
                                                                                          DoD for Each Stage
        last release            % of release capacity     compared to last
Plan                            Automation tasks as Slack
                                                          Pull Policy for Everyone        defect Leakage/MTBF ½ of last
                                Opportunity / Flexibility
                                                                                          Open Defects threshold for
                                                                                          stopping the line

        READY verifies size      Nightly Build            Feature-Driven Pull              Work according to DoD
                                                          Tactical plan for enabling Focus
                                 CI
 Do                                                       on Features
                               Auto Sanity in CI
                               Hand Hold until X% Health
        Monitor Feature Size   Monitor Auto Debt
                                                         Manage CFD                         Monitor Defects In/Out Flow
        Control Chart          Progress
        Monitor actual Feature Monitor Build MTBF,
                                                         Enforce Pull                       Monitor Defects Leakage/MTBF
        Cycle Time             MTRR
Check                                                    Monitor overall Features in        Stop the line if Defects Backlog
                                                         Progress                           above threshold
                                                         Monitor “Total size of Features
                                                         in Progress”

        POOGI on features that POOGI on Features were POOGI on Bottlenecks affecting POOGI on reasons for Stopping
        turned out big         Automation was expensive flow                         the Line
 Act                           POOGI On long and tough POOGI on Features that were POOGI on Defects with highest
                               build failures           hard to parallelize/focus on MTBF/Leakage
                                                        Improve Parallelism
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable
Sustainable, Successful, and Repeatable

More Related Content

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Recently uploaded (20)

Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Sustainable, Successful, and Repeatable

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Current Reality Tree • Let’s dive into why this is a problem http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 13. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 14. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem HEAVEY MANUAL TESTING http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 15. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LATE FEEDBACK HEAVEY MANUAL TESTING http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 16. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL END TESTING http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 17. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL END TESTING BIG BATCHES http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 18. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL END TESTING BIG BATCHES http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 19. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL END TESTING BIG BIG FEATURES BATCHES http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 20. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 21. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 22. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 23. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE PER PERSON http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 24. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE PER PERSON SPECIALIZAT- ION http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 25. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE PER PERSON SPECIALIZAT- LONE ION WOLFS http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 26. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE PER PERSON SPECIALIZAT- LONE ION WOLFS LIMIT SMALLER OPEN FEATURES DEFECTS http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 27. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE PERSON SPECIALIZAT- LONE ION WOLFS LIMIT SMALLER OPEN FEATURES DEFECTS http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 28. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION SPECIALIZAT- LONE ION WOLFS LIMIT SMALLER OPEN FEATURES DEFECTS http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 29. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION SPECIALIZAT- LONE ION WOLFS LIMIT SMALLER OPEN FEATURES DEFECTS COLLECTIVE OWNERSHIP http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 30. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION SPECIALIZAT- LONE ION WOLFS LIMIT SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 31. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE NOT EFFECTIVE ION WOLFS POLICY TOO STRICT LIMIT SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 32. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE NOT EFFECTIVE ION WOLFS POLICY TOO STRICT LIMIT SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? PICTURE http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 33. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? PICTURE http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 34. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 35. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG TRANSITION BASED ON NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 36. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG EFFECTIVE TRANSITION SLICING BASED ON NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 37. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE OWNERSHIP LEVEL LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG PRAGMATIC EFFECTIVE TRANSITION RISK SLICING BASED ON PROFILING NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 38. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE FEATURE WHOLE AUTOMATION OWNERSHIP LEVEL TEAM PYRAMID LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG PRAGMATIC EFFECTIVE TRANSITION RISK SLICING BASED ON PROFILING NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 39. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE INVEST IN FEATURE WHOLE AUTOMATION OWNERSHIP REMOVING LEVEL TEAM PYRAMID INSTABILITY LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG PRAGMATIC EFFECTIVE TRANSITION RISK SLICING BASED ON PROFILING NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 40. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE START AS IS, INVEST IN FEATURE WHOLE AUTOMATION OWNERSHIP SHORTEN REMOVING LEVEL TEAM PYRAMID WHEN INSTABILITY PREDICTABLE LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG PRAGMATIC EFFECTIVE TRANSITION RISK SLICING BASED ON PROFILING NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 41. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE START AS IS, INVEST IN FEATURE WHOLE AUTOMATION OWNERSHIP IMPROVEMENT SHORTEN REMOVING LEVEL TEAM PYRAMID BACKLOG WHEN INSTABILITY PREDICTABLE LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG PRAGMATIC EFFECTIVE TRANSITION RISK SLICING BASED ON PROFILING NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 42. Current Reality Tree LOW HIGH STABILIZATION PREDICTABILITY COSTS • Let’s dive into why this is a problem LARGE WIP LONG CYCLE LATE FEEDBACK QUALITY @ THE HEAVEY MANUAL TIMES END TESTING BIG BIG FEATURES BATCHES FEATURE LIMIT FEATURES DONE PER IN PROGRESS DONE AUTOMATE AS CONTINUOUS PERSON PART OF DONE INTEGRATION FEATURE SPECIALIZAT- LONE FREEZE OUR NOT EFFECTIVE HIGH BUILD IS ION WOLFS POLICY TOO STRICT COST NOT LIMIT STABLE SMALLER OPEN FEATURES DEFECTS LIMIT AT THE COLLECTIVE START AS IS, INVEST IN FEATURE WHOLE AUTOMATION OWNERSHIP IMPROVEMENT SHORTEN REMOVING LEVEL TEAM PYRAMID BACKLOG WHEN INSTABILITY PREDICTABLE LOSE SIGHT OF LARGE FIX M/L THE BIG OVERHEAD DEFECTS? EXISTING PICTURE GAP IS TO BIG PRAGMATIC EFFECTIVE TRANSITION RISK SLICING BASED ON PROFILING NECESSITY http://blog.crisp.se/henrikkniberg http://www.flickr.com/photos/librarygoblin/4307610546/lightbox/
  • 43.
  • 44. PO Workshop Automation / CI Limit Features in Progress Done Done / Limit Defects Backlog Learn Backlog Grooming Release Flow Workshop Automation Backlog with Try to break 3 largest Effort and Saved Manual Dry run of release execution VSM Features Cost Avg Feature Size – ½ of Allocate Automation tasks Plan for ½ Features in Progress DoD for Each Stage last release % of release capacity compared to last Plan Automation tasks as Slack Pull Policy for Everyone defect Leakage/MTBF ½ of last Opportunity / Flexibility Open Defects threshold for stopping the line READY verifies size Nightly Build Feature-Driven Pull Work according to DoD Tactical plan for enabling Focus CI Do on Features Auto Sanity in CI Hand Hold until X% Health Monitor Feature Size Monitor Auto Debt Manage CFD Monitor Defects In/Out Flow Control Chart Progress Monitor actual Feature Monitor Build MTBF, Enforce Pull Monitor Defects Leakage/MTBF Cycle Time MTRR Check Monitor overall Features in Stop the line if Defects Backlog Progress above threshold Monitor “Total size of Features in Progress” POOGI on features that POOGI on Features were POOGI on Bottlenecks affecting POOGI on reasons for Stopping turned out big Automation was expensive flow the Line Act POOGI On long and tough POOGI on Features that were POOGI on Defects with highest build failures hard to parallelize/focus on MTBF/Leakage Improve Parallelism