SlideShare a Scribd company logo
1 of 22
Data management best practices
&
CTRM/ETRM challenges
By: AJAY KOOMAR
CTRM/ETRM- THE SCORECARD
• Physical position reports for each location and commodity including
long and short status. (Position reports may be for current and
forward time periods.).
• Estimated profit and loss on completed transactions and processes
forecast present and future cash flows •
• Price risk exposure associated with current and forward positions •
• Credit risk exposure associated with current and forward positions •
• Operational risk exposure •
• Information required for regulatory compliance in areas such as
financial accounting, futures, exchange activity, price transaction
reporting, and government reporting.
THE SCORECARD DEPENDENCY-ON MARKET DATA
• ETRM system effectiveness depends on
accurate and timely reporting and market
information. Successful ETRM utilization
involves effective reporting and analysis to
navigate and improve trading performance.
The ETRM /CTRM system is a trading organization’s scorecard-Report
• Physical position reports for each location and commodity including long
and short status.
• (Position reports may be for current and forward time periods.)
• Estimated profit and loss on completed transactions and processes •
• Forecast present and future cash flows •
• Price risk exposure associated with current and forward positions •
• Credit risk exposure associated with current and forward positions •
• Operational risk exposure •
• Information required for regulatory compliance in areas such as financial
accounting, futures •
• Exchange activity, price transaction reporting, and government reporting.
ETRM/CTRM-DATA CHALLANGES
• Maintaining up to date market data overtime
and adding it to when needed is a significant
challenge for ETRM/CTRM sys-admin.
• Unexpected data changes.
• Market data provider supplies a correlation to
a previously published rate , the ETRM system
has to recognize the exception. In many cases
ETRM system finds it difficult to handle.
Data aggregator
CTRM/ETRM –Transaction life cycle
Capturing infrastructure, contracts and
counterparties
Pre-deal analysis
Deal capture
Scheduling operations and logistics
Risk analysis.
Settlement and Invoicing.
Market data
All commodity transactions companies would ultimately will require the
service of an external Data aggregation services to handle multi-
commodity, multi-source and multi-format market data.
External data dependency
Where trading is conducted with an exchange
rather than a company, exchange commodity
details and contracts have to be captured. These
include contract termination dates and delivery
timing, as well as broker intermediary details.
The quantity of information to be captured and
entered into the ETRM system before a
transaction occurs varies widely with the
business profile of the trading company.
Capturing infrastructure,
contracts and counterparties
External data dependency
Before executing a trade and entering the transaction into
the ETRM system, pre-deal analysis is usually performed.
Traders analyze current market prices and fundamentals to
identify optimal timing and pricing mechanisms for the
trade. Data requirements for pre-deal analysis, in particular
access to historical market prices and fundamental
information such as storage and weather data, are not well
served in ETRM/CTRM systems. Instead, analysts typically
use outside software tools that contain broader market
information. Access to market data within ETRM systems is a
challenge because the system tends to contain only the
market data needed to manage existing trades.
Pre-deal analysis
External data dependency
Deal capture includes all relevant transaction details. Typical
details might include trade number, quantity, commodity,
units of measure, counterparty, contract, delivery timing,
buy or sell, location, financial or physical, trader name, price
mechanism, transaction frequency, and link to other trades.
Data management challenges arise when deal volume is
high and errors in the details creep into the ETRM system,
even with automation. Deal entry errors are time consuming
to fix, render the scorecard inaccurate and threaten ETRM
system integrity.
Deal capture
External data dependency
Scheduling logistics require data interaction (often on paper)
with third-party transportation systems. Without up-to-date
scheduling and logistics information, the ETRM scorecard
cannot present accurate position reports to management.
The data management challenge in scheduling and logistics
is capturing data from third-party transportation,
processing, and scheduling systems. Data may not be
available in a timely fashion, and changes or corrections to
volumetric measures may occur without notice.
Scheduling operations and
logistics
External data dependency
Risk management
RISK MANAGEMENT
1. Market risk(price risk).
2. Operational risk.
3. Counterparty risk.
4. Regulatory risk.
Market data management best practices
• Use straight-throughput processing and
automation to eliminate manual efforts •
• Reduce data feeds to a minimum •
• Ensure timely data updates •
• Perform pro-active data quality control •
• Maintain audit trails of data changes and track
corrections •
• Manage data permissions to ensure data
integrity
Pre-deal Analysis
• Traders analyze especially historical data.
• Manages only market data required for the
trade as against the broader market
information.
Pre-deal analysis
Deal capture
• Errors in the details creep into the ETRM
system even with automation for high deal
volume. Deal entry errors are time consuming
to fix, render the scorecard inaccurate and
threaten ETRM system integrity.
Deal capture
Data from third party transportation , processing and scheduling systems poses a quite a challenge
for the ETRM sys-admin.
Risk management
RISK MANAGEMENT
1. Market risk(price risk).
2. Operational risk.
3. Counterparty risk.
4. Regulatory risk.
•Market data to manage market risk is primarily pricing. Generating daily forward curve
prices from market data (mark to market) –Risk reporting.
•A forward curve for each forward position in the trading portfolio.
•Many commodities and in particular for periods further out into the future , no market
data is available .
RISK MANAGEMENT CHALLENGES
Market data from multiple
sources
Data often poorly
organized
Data requires
Further
massaging
ETRM
Forward curve- built
outside
SOLUTION
VAR calculation is data intensive where they use simulation method
Data manipulation in excel
Operational risk
•Transportation.
•Processing.
•Storage.
Primarily all the above mentioned data is coming from a third party
and the same needs to be feed into the ETRM system
Challenges
Counter party –credit risk
•Market data from credit rating agencies.
•Financial reports.
Third party data collection.
Challenges
Note : Clearing houses removes counter party credit risk but incur overhead cost to manage the clearing process
And meet daily margin calls.
Regulatory risk
• To comply with regulation, it is necessary to
understand where outside data originates and
track any changes occurring en-route to
ETRM.
Access to original set of data is an important advantage in this process.
Associated contract
Trading
infrastructure
CTRM/ETRM- transaction life cycle
ETRM
Data set-up
Market data
Data
Aggregator
Transaction life cycle
CONTRACTS
Credit limit
Qty
Price
Delivery
Standard contracts derived from International swaps and derivatives association (ISDA). North
America energy standard boards (NAESB).
Best practices of market data management
• Use straight-through processing.
• Reduce data feeds to minimum.
• Ensure timely data updates are available.
• Pro-active data quality control.
• Maintain audit trails of data changes and track
corrections.
• Manage data permissions.
In a era of “Free fall of crude oil prices , “cost management” has become the priority for energy companies /traders
Scope of cost optimizationCost centers
1.Product and commercial cost 1.Reduce number of product approvals.
2.Streamline portfolio (product overlapping
activities).
3.Standardize front office set up /systems.
2.Support cost(including control
requirements)
1.Reduce control and reporting
requirements by way of maximum
automation.
2.Streamline trade process and increase end
to end automation.
3.Consolidate functions and evaluate near
off shoring and outsourcing
3.Information and Technology Cost
1.Eliminate high cost /low benefit projects.
2.Streamline application landscape.
4.Location Cost
1.Optimize location set-up/spread of
departments.
2.Increase building utilization.

More Related Content

Viewers also liked

Data Management Best Practices
Data Management Best PracticesData Management Best Practices
Data Management Best PracticesChristopher Eaker
 
Asignacion 3
Asignacion 3Asignacion 3
Asignacion 3edgarys
 
Vinay Kumar M-Profile
Vinay Kumar M-ProfileVinay Kumar M-Profile
Vinay Kumar M-Profilevinay kumar
 
Informativo condomundo agosto_2016
Informativo condomundo agosto_2016Informativo condomundo agosto_2016
Informativo condomundo agosto_2016sindiconet
 
Pioneer city Rate Bilaspur,9136824702
Pioneer city  Rate Bilaspur,9136824702Pioneer city  Rate Bilaspur,9136824702
Pioneer city Rate Bilaspur,9136824702sahilkharkara3
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...systred
 
Informativo condomundo julho_2016
Informativo condomundo julho_2016Informativo condomundo julho_2016
Informativo condomundo julho_2016sindiconet
 
[경북] I'mcloud opensight
[경북] I'mcloud opensight[경북] I'mcloud opensight
[경북] I'mcloud opensightstartupkorea
 
Introduction to DCAM, the Data Management Capability Assessment Model
Introduction to DCAM, the Data Management Capability Assessment ModelIntroduction to DCAM, the Data Management Capability Assessment Model
Introduction to DCAM, the Data Management Capability Assessment ModelElement22
 

Viewers also liked (11)

Data Management Best Practices
Data Management Best PracticesData Management Best Practices
Data Management Best Practices
 
Asignacion 3
Asignacion 3Asignacion 3
Asignacion 3
 
Vinay Kumar M-Profile
Vinay Kumar M-ProfileVinay Kumar M-Profile
Vinay Kumar M-Profile
 
Informativo condomundo agosto_2016
Informativo condomundo agosto_2016Informativo condomundo agosto_2016
Informativo condomundo agosto_2016
 
Letter of Rec
Letter of RecLetter of Rec
Letter of Rec
 
Pioneer city Rate Bilaspur,9136824702
Pioneer city  Rate Bilaspur,9136824702Pioneer city  Rate Bilaspur,9136824702
Pioneer city Rate Bilaspur,9136824702
 
Ümumi̇ ki̇mya
Ümumi̇ ki̇myaÜmumi̇ ki̇mya
Ümumi̇ ki̇mya
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
 
Informativo condomundo julho_2016
Informativo condomundo julho_2016Informativo condomundo julho_2016
Informativo condomundo julho_2016
 
[경북] I'mcloud opensight
[경북] I'mcloud opensight[경북] I'mcloud opensight
[경북] I'mcloud opensight
 
Introduction to DCAM, the Data Management Capability Assessment Model
Introduction to DCAM, the Data Management Capability Assessment ModelIntroduction to DCAM, the Data Management Capability Assessment Model
Introduction to DCAM, the Data Management Capability Assessment Model
 

Similar to Data management best practices

CTRM Value Survey and Analysis
 CTRM Value Survey and Analysis CTRM Value Survey and Analysis
CTRM Value Survey and AnalysisCTRM Center
 
Trade And Settlement Process
Trade And Settlement ProcessTrade And Settlement Process
Trade And Settlement ProcessKartik Mehta
 
INFORMATION TECHNOLOGY FRAMEWORK.pptx
INFORMATION TECHNOLOGY FRAMEWORK.pptxINFORMATION TECHNOLOGY FRAMEWORK.pptx
INFORMATION TECHNOLOGY FRAMEWORK.pptxEzAzMahmood1
 
eDelta Trading Platform Marketing-2015
eDelta Trading Platform Marketing-2015eDelta Trading Platform Marketing-2015
eDelta Trading Platform Marketing-2015Frank Castelluccio
 
How tech-is-used-real-time-monitoring-dodd-frank-trade-reporting
How tech-is-used-real-time-monitoring-dodd-frank-trade-reportingHow tech-is-used-real-time-monitoring-dodd-frank-trade-reporting
How tech-is-used-real-time-monitoring-dodd-frank-trade-reportingjKool
 
Blog selection of an etrm
Blog   selection of an etrmBlog   selection of an etrm
Blog selection of an etrmAdamRice38
 
ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...
ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...
ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...Gary S. Kaminsky
 
True Portfolio Diversification
True Portfolio Diversification True Portfolio Diversification
True Portfolio Diversification drewday
 
Market Abuse Detection
Market Abuse DetectionMarket Abuse Detection
Market Abuse DetectionRaja Das
 
Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...
Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...
Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...Resolver Inc.
 
Performance measurement and exception management in investment processing
Performance measurement and exception management in investment processingPerformance measurement and exception management in investment processing
Performance measurement and exception management in investment processingNIIT Technologies
 
use of IT in supply chain management
use of IT in supply chain managementuse of IT in supply chain management
use of IT in supply chain managementRohit Bhabal
 
Taming the regulatory tiger with jwg and smartlogic
Taming the regulatory tiger with jwg and smartlogicTaming the regulatory tiger with jwg and smartlogic
Taming the regulatory tiger with jwg and smartlogicAnn Kelly
 
Keeping up with Sec T+1 Settlement Cycle!
Keeping up with Sec T+1 Settlement Cycle!Keeping up with Sec T+1 Settlement Cycle!
Keeping up with Sec T+1 Settlement Cycle!Emily Jones
 

Similar to Data management best practices (20)

CTRM Value Survey and Analysis
 CTRM Value Survey and Analysis CTRM Value Survey and Analysis
CTRM Value Survey and Analysis
 
ETRM System 360
ETRM System 360ETRM System 360
ETRM System 360
 
Tps revision 2017
Tps revision 2017Tps revision 2017
Tps revision 2017
 
Trade And Settlement Process
Trade And Settlement ProcessTrade And Settlement Process
Trade And Settlement Process
 
INFORMATION TECHNOLOGY FRAMEWORK.pptx
INFORMATION TECHNOLOGY FRAMEWORK.pptxINFORMATION TECHNOLOGY FRAMEWORK.pptx
INFORMATION TECHNOLOGY FRAMEWORK.pptx
 
Transaction Processing System
Transaction Processing SystemTransaction Processing System
Transaction Processing System
 
eDelta Trading Platform Marketing-2015
eDelta Trading Platform Marketing-2015eDelta Trading Platform Marketing-2015
eDelta Trading Platform Marketing-2015
 
How tech-is-used-real-time-monitoring-dodd-frank-trade-reporting
How tech-is-used-real-time-monitoring-dodd-frank-trade-reportingHow tech-is-used-real-time-monitoring-dodd-frank-trade-reporting
How tech-is-used-real-time-monitoring-dodd-frank-trade-reporting
 
Blog selection of an etrm
Blog   selection of an etrmBlog   selection of an etrm
Blog selection of an etrm
 
ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...
ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...
ConceptOne - Whitepaper - Achieving Regulatory Alpha Through Regulatory Risk ...
 
True Portfolio Diversification
True Portfolio Diversification True Portfolio Diversification
True Portfolio Diversification
 
Kermit Product Sheet
Kermit Product SheetKermit Product Sheet
Kermit Product Sheet
 
Market Abuse Detection
Market Abuse DetectionMarket Abuse Detection
Market Abuse Detection
 
Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...
Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...
Why You Should Prioritize Third Party Risk Management (TPRM) in Today's Marke...
 
Performance measurement and exception management in investment processing
Performance measurement and exception management in investment processingPerformance measurement and exception management in investment processing
Performance measurement and exception management in investment processing
 
Introduction to Market Data providers.pptx
Introduction to Market Data providers.pptxIntroduction to Market Data providers.pptx
Introduction to Market Data providers.pptx
 
use of IT in supply chain management
use of IT in supply chain managementuse of IT in supply chain management
use of IT in supply chain management
 
Taming the regulatory tiger with jwg and smartlogic
Taming the regulatory tiger with jwg and smartlogicTaming the regulatory tiger with jwg and smartlogic
Taming the regulatory tiger with jwg and smartlogic
 
Keeping up with Sec T+1 Settlement Cycle!
Keeping up with Sec T+1 Settlement Cycle!Keeping up with Sec T+1 Settlement Cycle!
Keeping up with Sec T+1 Settlement Cycle!
 
RPA in Finance v2
RPA in Finance v2RPA in Finance v2
RPA in Finance v2
 

More from Ajay Koomar

Multi cloud strategy
Multi cloud strategyMulti cloud strategy
Multi cloud strategyAjay Koomar
 
Cognitive analytics
Cognitive analyticsCognitive analytics
Cognitive analyticsAjay Koomar
 
Nurturing datadriven culture
Nurturing datadriven cultureNurturing datadriven culture
Nurturing datadriven cultureAjay Koomar
 
IIt and business collaboration
IIt and business collaborationIIt and business collaboration
IIt and business collaborationAjay Koomar
 
Enterprise application integration
Enterprise application  integrationEnterprise application  integration
Enterprise application integrationAjay Koomar
 

More from Ajay Koomar (6)

Multi cloud strategy
Multi cloud strategyMulti cloud strategy
Multi cloud strategy
 
Cognitive analytics
Cognitive analyticsCognitive analytics
Cognitive analytics
 
Nurturing datadriven culture
Nurturing datadriven cultureNurturing datadriven culture
Nurturing datadriven culture
 
IIt and business collaboration
IIt and business collaborationIIt and business collaboration
IIt and business collaboration
 
C/Etrm gap
C/Etrm gapC/Etrm gap
C/Etrm gap
 
Enterprise application integration
Enterprise application  integrationEnterprise application  integration
Enterprise application integration
 

Recently uploaded

HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607dollysharma2066
 
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756dollysharma2066
 
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样7pn7zv3i
 
办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书
办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书
办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书zdzoqco
 
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证jdkhjh
 

Recently uploaded (6)

HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
HI-Profiles Call girls in Hyatt Residency Delhi | 8377087607
 
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
NIGHT DREAN Genuine Call girls in Vasant Vihar Delhi | 83778 77756
 
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
办理学位证(USC文凭证书)南加州大学毕业证成绩单原版一模一样
 
办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书
办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书
办理昆特兰理工大学毕业证成绩单|购买加拿大KPU文凭证书
 
9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR
9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR
9953056974 Low Rate Call Girls In Ashok Nagar Delhi NCR
 
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
原版1:1复刻明尼苏达大学毕业证UMN毕业证留信学历认证
 

Data management best practices

  • 1. Data management best practices & CTRM/ETRM challenges By: AJAY KOOMAR
  • 2. CTRM/ETRM- THE SCORECARD • Physical position reports for each location and commodity including long and short status. (Position reports may be for current and forward time periods.). • Estimated profit and loss on completed transactions and processes forecast present and future cash flows • • Price risk exposure associated with current and forward positions • • Credit risk exposure associated with current and forward positions • • Operational risk exposure • • Information required for regulatory compliance in areas such as financial accounting, futures, exchange activity, price transaction reporting, and government reporting.
  • 3. THE SCORECARD DEPENDENCY-ON MARKET DATA • ETRM system effectiveness depends on accurate and timely reporting and market information. Successful ETRM utilization involves effective reporting and analysis to navigate and improve trading performance.
  • 4. The ETRM /CTRM system is a trading organization’s scorecard-Report • Physical position reports for each location and commodity including long and short status. • (Position reports may be for current and forward time periods.) • Estimated profit and loss on completed transactions and processes • • Forecast present and future cash flows • • Price risk exposure associated with current and forward positions • • Credit risk exposure associated with current and forward positions • • Operational risk exposure • • Information required for regulatory compliance in areas such as financial accounting, futures • • Exchange activity, price transaction reporting, and government reporting.
  • 5.
  • 6. ETRM/CTRM-DATA CHALLANGES • Maintaining up to date market data overtime and adding it to when needed is a significant challenge for ETRM/CTRM sys-admin. • Unexpected data changes. • Market data provider supplies a correlation to a previously published rate , the ETRM system has to recognize the exception. In many cases ETRM system finds it difficult to handle.
  • 7. Data aggregator CTRM/ETRM –Transaction life cycle Capturing infrastructure, contracts and counterparties Pre-deal analysis Deal capture Scheduling operations and logistics Risk analysis. Settlement and Invoicing. Market data All commodity transactions companies would ultimately will require the service of an external Data aggregation services to handle multi- commodity, multi-source and multi-format market data.
  • 8. External data dependency Where trading is conducted with an exchange rather than a company, exchange commodity details and contracts have to be captured. These include contract termination dates and delivery timing, as well as broker intermediary details. The quantity of information to be captured and entered into the ETRM system before a transaction occurs varies widely with the business profile of the trading company. Capturing infrastructure, contracts and counterparties
  • 9. External data dependency Before executing a trade and entering the transaction into the ETRM system, pre-deal analysis is usually performed. Traders analyze current market prices and fundamentals to identify optimal timing and pricing mechanisms for the trade. Data requirements for pre-deal analysis, in particular access to historical market prices and fundamental information such as storage and weather data, are not well served in ETRM/CTRM systems. Instead, analysts typically use outside software tools that contain broader market information. Access to market data within ETRM systems is a challenge because the system tends to contain only the market data needed to manage existing trades. Pre-deal analysis
  • 10. External data dependency Deal capture includes all relevant transaction details. Typical details might include trade number, quantity, commodity, units of measure, counterparty, contract, delivery timing, buy or sell, location, financial or physical, trader name, price mechanism, transaction frequency, and link to other trades. Data management challenges arise when deal volume is high and errors in the details creep into the ETRM system, even with automation. Deal entry errors are time consuming to fix, render the scorecard inaccurate and threaten ETRM system integrity. Deal capture
  • 11. External data dependency Scheduling logistics require data interaction (often on paper) with third-party transportation systems. Without up-to-date scheduling and logistics information, the ETRM scorecard cannot present accurate position reports to management. The data management challenge in scheduling and logistics is capturing data from third-party transportation, processing, and scheduling systems. Data may not be available in a timely fashion, and changes or corrections to volumetric measures may occur without notice. Scheduling operations and logistics
  • 12. External data dependency Risk management RISK MANAGEMENT 1. Market risk(price risk). 2. Operational risk. 3. Counterparty risk. 4. Regulatory risk.
  • 13. Market data management best practices • Use straight-throughput processing and automation to eliminate manual efforts • • Reduce data feeds to a minimum • • Ensure timely data updates • • Perform pro-active data quality control • • Maintain audit trails of data changes and track corrections • • Manage data permissions to ensure data integrity
  • 14. Pre-deal Analysis • Traders analyze especially historical data. • Manages only market data required for the trade as against the broader market information. Pre-deal analysis
  • 15. Deal capture • Errors in the details creep into the ETRM system even with automation for high deal volume. Deal entry errors are time consuming to fix, render the scorecard inaccurate and threaten ETRM system integrity. Deal capture Data from third party transportation , processing and scheduling systems poses a quite a challenge for the ETRM sys-admin.
  • 16. Risk management RISK MANAGEMENT 1. Market risk(price risk). 2. Operational risk. 3. Counterparty risk. 4. Regulatory risk. •Market data to manage market risk is primarily pricing. Generating daily forward curve prices from market data (mark to market) –Risk reporting. •A forward curve for each forward position in the trading portfolio. •Many commodities and in particular for periods further out into the future , no market data is available . RISK MANAGEMENT CHALLENGES Market data from multiple sources Data often poorly organized Data requires Further massaging ETRM Forward curve- built outside SOLUTION VAR calculation is data intensive where they use simulation method Data manipulation in excel
  • 17. Operational risk •Transportation. •Processing. •Storage. Primarily all the above mentioned data is coming from a third party and the same needs to be feed into the ETRM system Challenges
  • 18. Counter party –credit risk •Market data from credit rating agencies. •Financial reports. Third party data collection. Challenges Note : Clearing houses removes counter party credit risk but incur overhead cost to manage the clearing process And meet daily margin calls.
  • 19. Regulatory risk • To comply with regulation, it is necessary to understand where outside data originates and track any changes occurring en-route to ETRM. Access to original set of data is an important advantage in this process.
  • 20. Associated contract Trading infrastructure CTRM/ETRM- transaction life cycle ETRM Data set-up Market data Data Aggregator Transaction life cycle CONTRACTS Credit limit Qty Price Delivery Standard contracts derived from International swaps and derivatives association (ISDA). North America energy standard boards (NAESB).
  • 21. Best practices of market data management • Use straight-through processing. • Reduce data feeds to minimum. • Ensure timely data updates are available. • Pro-active data quality control. • Maintain audit trails of data changes and track corrections. • Manage data permissions.
  • 22. In a era of “Free fall of crude oil prices , “cost management” has become the priority for energy companies /traders Scope of cost optimizationCost centers 1.Product and commercial cost 1.Reduce number of product approvals. 2.Streamline portfolio (product overlapping activities). 3.Standardize front office set up /systems. 2.Support cost(including control requirements) 1.Reduce control and reporting requirements by way of maximum automation. 2.Streamline trade process and increase end to end automation. 3.Consolidate functions and evaluate near off shoring and outsourcing 3.Information and Technology Cost 1.Eliminate high cost /low benefit projects. 2.Streamline application landscape. 4.Location Cost 1.Optimize location set-up/spread of departments. 2.Increase building utilization.