SlideShare a Scribd company logo
1 of 22
SUPPORTING ENERGY EFFICIENCY
ACTIVITIES IN CROATIA – ROLE OF THE
FUND
REPUBLIC OF CROATIA
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
Content
 About the Fund
 Organisation
 Administrative procedures
 Operation and achievements
 Investments in EE and RES in 2014
 Concluding remarks
2
About the Fund
 Established at the end of 2003 by the Law on
Environmental Protection and Energy Efficiency Fund
 Extra-budgetary public institution
 Goal
 ensuring financial means for supporting (co-financing)
environmental protection, EE and RES projects
 obliged to co-finance measures defined in the NEEAP by the
Law on Energy Efficiency
 Mechanism – polluter pays principle!
 environmental charges: emissions of CO2, SO2 and NOx;
waste; special charge on motor vehicles
 incomes from ETS
 EU funds 3
Organisation (1/2)
 Bodies of the Fund:
 Director
 Management board – 2 members of MoEnV, 1 of MoE, MoF,
Parliament, Chamber of Commerce, expert
 Internal organisation:
 Sector for fees and management of special categories of waste
 Sector for Environmental Protection
 Sector for EU funding
 Sector for Energy Efficiency
 Sector for financial affairs
 Sector for legal affairs
 Fund secretariat
4
Organisation (2/2)
5
Sector for Energy Efficiency
Department for EE and RES
projects
Team for
industry and
infrastructure
Team for RES
Team for
buildings
Team for clean
transport
Department for analysis and
horizontal measures
Team for energy
management
systems
Team for analysis
and support to
policy
implementation
Incomes and allocation
6
 Incomes in 2014:
 1,4 billion HRK (187 million EUR)
 Users
 Local and regional authorities, public
institutions and bodies, companies and
entrepreneurships, CSO, physical persons
 Types of aid
 Loans: 0% interest rate, period 5years (grace period 2
years)
 Grants
Amounts per project
40%
All others
60%
II. Group of
island
Mountain areas
II. group of
municipalities
80%
Special state
care
I. Group of
islands
I. Group of
municipalities
Protected
nature
100%
Government
decision
7
Absolute amount determined in every tender/call
Rules for awarding funding
 Conditions for users
 registered in Croatia
 invest their own funds in the implementation of the project
 fulfil specific terms stated in tenders/calls
 Conditions for projects
 detailed specification of technical conditions and eligible costs
 above current legislation levels!!
 preformed on own, legaly constructed and operated, property
 Conditions for financing
 required collaterals
 de minimis state aid rules
 no retroactive co-financing!
8
Mechanisms for allocating funds
Public tender
• Open 60 days
• Evaluation committee +
decision of the
Director/Managing Board ->
max.75 days
• Investment projects –
competition based on
quality of projects (eligibility
and selection criteria
defined in every tender)
Public call
• Open until end of year or
until all envisaged funds are
approved
• Fast decisions (max.45 days)
• Simpler project, no need for
ranking, eligibility criteria
must be fulfilled
• Better prepared
stakeholders in advantage
9Annual programme of public tenders and calls published
on the web site
Investments in EE and RES in 2014
21%
9%
22%
4%
3%
1%
7%
2%
15%
2%
6%
2%
2% 2% 2%
National energy programs
RES
Sustainable construction
Clean transport
Education, R&D
Other programs
Multy apartment buildings - refurbishment
Multy apartment buildings - documentation
Public buildings - refurbishment
Public buildings - documentation
Energy audits and certificates
Actions at local and national level
National energy policy
International cooperation
Information and promotion
201 million HRK (27 M€) allocated for EE and RES
projects
Programmes for energy refurbishment
of buildings
• Cooperation with local
authoritiesFamily houses
• Cooperation with building
management companies
Multi-apartment
buildings
• Direct application to
tender
Public /
Commercial
buildings
11
Family houses
12
Envisaged 50 Mkn (6,7 M€) in 2014
EE measures
Plan: 25 Mkn (3,35 M€)
Share of Fund:
40%, 60% or80%
Share of local authority:
10%, 5% or 2,5%
Approved
> 112 Mkn (15 M€)
for 3.400 houses!
RES systems
Plan: 25 Mkn (3,35 M€)
Share of Fund:
40%, 60% or80%
Share of local authority:
10%, 5% or 2,5%
Approved
> 43 Mkn (5,7 M€)
for 2.6000 systems!
Multi-apartment buildings
Envisaged 20 Mkn (2,7 M€) in 2014
Energy audits and
certificates
Plan: 1,5 Mkn (0,2 M€)
Share of Fund: 40%,
60% or 80%
of eligible costs
Approved
> 2,2 Mkn (0,3 M€)
for 447 buildings!
Project design document
Plan: 3,5 Mkn (0,5 M€)
Share of Fund: 100% of
eligible costs
(max. 35.000 or 200.000 kn)
Approved
> 8 Mkn (1 M€)
for 245 buildings!
Energy refurbishment
Plan: 15 Mkn (2 M€)
Share of Fund: 40%,
60% or 80%
of eligible costs
Approved
> 34 Mkn (4,5 M€)
for 82 buildings!
13
Public/commercial buildings
14
Envisaged 25 Mkn (3,3 M€) in 2014
For local authorities and companies!
EE measures in buildings and construction of new buildings (class A)
25 Mkn (3,3, M€)
Share of Fund: 40%, 60% or 80% of eligible costs
Approved > 43,6 Mkn (5,8 M€) for 75 buildings!
4 Mkn (0,5 M€) for 10 projects in commercial services sector
Public lighting systems
1. step
• Energy audit
• 1 Mkn (0,13 M€)
• Approved: 55 audits
2. step
• Project design documentation
• 1,6 Mkn (0,2 M€)
• Approved: 31 projects
3. step
• Reconstruction / construction
• 15 Mkn (2 M€)
• Approved: 19 projects
15
RES projects
 54 projects (50% of applications) – subsidies of
21 Mkn (2,8 M€)
 Solar thermal and photovoltaic systems
 Biomass fired boilers
 Production of solid biomass
 Heat pumps
16
Programme for clean transport
 Sustainable urban mobility plans
 Only 9 cities
 Eco-driving
 Pilot project: 8 to 18% savings
 700.000 kn (100.000 €) - > more than 1.300 educated drivers!
 Electric and hybrid vehicles
 15,5 Mkn (2 M€) for 440 vehicles!
 53 electric + 8 PHEV + 379 hybrid
 Other measures: conversion to CNG or electric, public bicycle
systems, electric bicycle, optimising distribution routes,
intelligent traffic signalisation
17
Other programmes of the Fund
 Energy audits and introduction of energy management
system ISO50001 in companies
 Education, research and development projects
 Supporting implementation of national climate-energy
policy
18
Instead of conclusion… for 1 kn of
incentives, 3 kn investments
19
> 4.300 implemented projects (status end of 2014)
> 1,3 billion kn (180 million EUR) – approved by the Fund
> 3,8 billion kn (400 million EUR) – total investments
Public lighting and industry
Sustainable construction (buildings)
Renewable energy sources
Clean transport
Education, research and development
Other projects (CSOs, international cooperation, energy policy
development and implementation, promotion)
Prerequisites for successful operation
 Clear and transparent procedures
 Users need to know what they can expects!
 Respect the deadlines
 Stable terms and conditions
 Frequent changes in technical and financing conditions should be
avoided
 Clear roles and responsibilities
 Who does what?
 Motivated staff
 Possibility to award overachieving and penalise underachieving
20
Plan for 2015
 25 public calls and tenders for energy efficiency
projects
 350 million kn for energy efficiency – 75%
increase in comparison to 2014
 Use of EU funds
21
Thank you for your attention!
vesna.bukarica@fzoeu.hr
REPUBLIC OF CROATIA
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND

More Related Content

What's hot

tew (09.10.18) - Implementation of remit in the energy community
tew (09.10.18) - Implementation of remit in the energy communitytew (09.10.18) - Implementation of remit in the energy community
tew (09.10.18) - Implementation of remit in the energy community
Денис Киркач
 
tew (09.10.18) - What is remit, wholesale market monitoring under remit
tew (09.10.18) - What is remit, wholesale market monitoring under remittew (09.10.18) - What is remit, wholesale market monitoring under remit
tew (09.10.18) - What is remit, wholesale market monitoring under remit
Денис Киркач
 
tew (09.10.18) - Inside information vs. transparency information
tew (09.10.18) - Inside information vs. transparency information tew (09.10.18) - Inside information vs. transparency information
tew (09.10.18) - Inside information vs. transparency information
Денис Киркач
 
Eu Regional Policy In The Balearics[1]
Eu Regional Policy In The Balearics[1]Eu Regional Policy In The Balearics[1]
Eu Regional Policy In The Balearics[1]
jesperllarsen
 

What's hot (20)

tew (10.10.18) - Policy guidelines for distribution network tariffs
tew (10.10.18) - Policy guidelines for distribution network tariffstew (10.10.18) - Policy guidelines for distribution network tariffs
tew (10.10.18) - Policy guidelines for distribution network tariffs
 
ESCAPE Kick-off meeting - WP1 (Feb 2019 - 2nd day)
ESCAPE Kick-off meeting - WP1 (Feb 2019 - 2nd day) ESCAPE Kick-off meeting - WP1 (Feb 2019 - 2nd day)
ESCAPE Kick-off meeting - WP1 (Feb 2019 - 2nd day)
 
tew (09.10.18) - Implementation of remit in the energy community
tew (09.10.18) - Implementation of remit in the energy communitytew (09.10.18) - Implementation of remit in the energy community
tew (09.10.18) - Implementation of remit in the energy community
 
EU pompt geld in Marokkaanse bosbouw
EU pompt geld in Marokkaanse bosbouwEU pompt geld in Marokkaanse bosbouw
EU pompt geld in Marokkaanse bosbouw
 
Importance of transparency in price formation
Importance of transparency in price formationImportance of transparency in price formation
Importance of transparency in price formation
 
2nd OTS - 50000&1SEAPs : Anette Jahn, EASME
2nd OTS - 50000&1SEAPs : Anette Jahn, EASME2nd OTS - 50000&1SEAPs : Anette Jahn, EASME
2nd OTS - 50000&1SEAPs : Anette Jahn, EASME
 
tew (09.10.18) - Oshchepkova
tew (09.10.18) - Oshchepkovatew (09.10.18) - Oshchepkova
tew (09.10.18) - Oshchepkova
 
tew (12.10.18) - Regulation of natural monopolies & competitive energy ma...
tew (12.10.18) - Regulation of natural monopolies & competitive energy ma...tew (12.10.18) - Regulation of natural monopolies & competitive energy ma...
tew (12.10.18) - Regulation of natural monopolies & competitive energy ma...
 
Mediterranean RES
Mediterranean RESMediterranean RES
Mediterranean RES
 
tew (09.10.18) - Marsenic
tew (09.10.18) - Marsenictew (09.10.18) - Marsenic
tew (09.10.18) - Marsenic
 
tew (09.10.18) - What is remit, wholesale market monitoring under remit
tew (09.10.18) - What is remit, wholesale market monitoring under remittew (09.10.18) - What is remit, wholesale market monitoring under remit
tew (09.10.18) - What is remit, wholesale market monitoring under remit
 
tew (09.10.18) - Garcia
tew (09.10.18) - Garciatew (09.10.18) - Garcia
tew (09.10.18) - Garcia
 
tew (09.10.18) - Inside information vs. transparency information
tew (09.10.18) - Inside information vs. transparency information tew (09.10.18) - Inside information vs. transparency information
tew (09.10.18) - Inside information vs. transparency information
 
Gas transparency requirements
Gas transparency requirementsGas transparency requirements
Gas transparency requirements
 
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
 
Transport for London - Low Emission Zones
Transport for London - Low Emission ZonesTransport for London - Low Emission Zones
Transport for London - Low Emission Zones
 
FN mag 159 machinegeweren leveren aan Belgisch leger
FN mag 159 machinegeweren leveren aan Belgisch legerFN mag 159 machinegeweren leveren aan Belgisch leger
FN mag 159 machinegeweren leveren aan Belgisch leger
 
The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)The European Strategic Energy Technology Plan (SET-Plan)
The European Strategic Energy Technology Plan (SET-Plan)
 
Electricity transparency requirements
Electricity transparency requirementsElectricity transparency requirements
Electricity transparency requirements
 
Eu Regional Policy In The Balearics[1]
Eu Regional Policy In The Balearics[1]Eu Regional Policy In The Balearics[1]
Eu Regional Policy In The Balearics[1]
 

Viewers also liked (6)

Eubce 2016 skreiberg-rsk for print
Eubce 2016   skreiberg-rsk for printEubce 2016   skreiberg-rsk for print
Eubce 2016 skreiberg-rsk for print
 
The potential for wind energy in lebanon
The potential for wind energy in lebanonThe potential for wind energy in lebanon
The potential for wind energy in lebanon
 
RECUWATT Conference - Joan Mata lecture
RECUWATT Conference - Joan Mata lectureRECUWATT Conference - Joan Mata lecture
RECUWATT Conference - Joan Mata lecture
 
Sources Of Energy Slide Show
Sources Of Energy Slide ShowSources Of Energy Slide Show
Sources Of Energy Slide Show
 
Energy forms and_changes
Energy forms and_changesEnergy forms and_changes
Energy forms and_changes
 
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
Hydropower Electricity in Lebanon - Beirut Energy Forum 2014
 

Similar to ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND

ELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.lELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.l
Marina Turcati
 
Mo at cec conference eu policy assessment
Mo at cec conference   eu policy assessmentMo at cec conference   eu policy assessment
Mo at cec conference eu policy assessment
reeep
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
UNDPhr
 
Практика ЄС щодо впровадження гарантій походження енергії
Практика ЄС щодо впровадження гарантій походження енергіїПрактика ЄС щодо впровадження гарантій походження енергії
Environment Sector in SERBIA Overview of EU Assistance
Environment Sector in SERBIA Overview of EU Assistance Environment Sector in SERBIA Overview of EU Assistance
Environment Sector in SERBIA Overview of EU Assistance
Euic BG
 

Similar to ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND (20)

Croatia’s experience in improving access to finance for green SMEs
Croatia’s experience in improving access to finance for green SMEsCroatia’s experience in improving access to finance for green SMEs
Croatia’s experience in improving access to finance for green SMEs
 
ELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.lELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.l
 
Mo at cec conference eu policy assessment
Mo at cec conference   eu policy assessmentMo at cec conference   eu policy assessment
Mo at cec conference eu policy assessment
 
Financing energy efficiency - looking beyond horizon
Financing energy efficiency - looking beyond horizon Financing energy efficiency - looking beyond horizon
Financing energy efficiency - looking beyond horizon
 
Report on water services & waste management
Report on water services & waste managementReport on water services & waste management
Report on water services & waste management
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
 
Good practices and tools in Barcelona - Fontbernat
Good practices and tools in Barcelona - FontbernatGood practices and tools in Barcelona - Fontbernat
Good practices and tools in Barcelona - Fontbernat
 
3.1 spinelli eu
3.1 spinelli eu3.1 spinelli eu
3.1 spinelli eu
 
Energoefektivitātes pakalpojuma līgumi Slovēnijā
Energoefektivitātes pakalpojuma līgumi SlovēnijāEnergoefektivitātes pakalpojuma līgumi Slovēnijā
Energoefektivitātes pakalpojuma līgumi Slovēnijā
 
Практика ЄС щодо впровадження гарантій походження енергії
Практика ЄС щодо впровадження гарантій походження енергіїПрактика ЄС щодо впровадження гарантій походження енергії
Практика ЄС щодо впровадження гарантій походження енергії
 
Environment Sector in SERBIA Overview of EU Assistance
Environment Sector in SERBIA Overview of EU Assistance Environment Sector in SERBIA Overview of EU Assistance
Environment Sector in SERBIA Overview of EU Assistance
 
Enterprise Europe Network | C-Energy Input to SG IEE | Piotr Swiatek
Enterprise Europe Network | C-Energy Input to SG IEE | Piotr SwiatekEnterprise Europe Network | C-Energy Input to SG IEE | Piotr Swiatek
Enterprise Europe Network | C-Energy Input to SG IEE | Piotr Swiatek
 
Jacopo Bordignon, Directorate-General for Research and Innovation, European C...
Jacopo Bordignon, Directorate-General for Research and Innovation, European C...Jacopo Bordignon, Directorate-General for Research and Innovation, European C...
Jacopo Bordignon, Directorate-General for Research and Innovation, European C...
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
 
3 nigel-jollands-aef-21-may-2014
3 nigel-jollands-aef-21-may-20143 nigel-jollands-aef-21-may-2014
3 nigel-jollands-aef-21-may-2014
 
1st issue of LiCEA newsletter
1st issue of LiCEA newsletter1st issue of LiCEA newsletter
1st issue of LiCEA newsletter
 
2 2016 11 03 kerebel 500001 sea_ps webinar
2 2016 11 03 kerebel 500001 sea_ps webinar2 2016 11 03 kerebel 500001 sea_ps webinar
2 2016 11 03 kerebel 500001 sea_ps webinar
 
Kf w elena Sarlat
Kf w elena SarlatKf w elena Sarlat
Kf w elena Sarlat
 
Michël TOMA, MT Partenaires Ingénierie and Didier BOUTEILLER, City of Lorient...
Michël TOMA, MT Partenaires Ingénierie and Didier BOUTEILLER, City of Lorient...Michël TOMA, MT Partenaires Ingénierie and Didier BOUTEILLER, City of Lorient...
Michël TOMA, MT Partenaires Ingénierie and Didier BOUTEILLER, City of Lorient...
 

More from UNDPhr

More from UNDPhr (20)

Plan razvoja Jadrtovca i Morinja
Plan razvoja Jadrtovca i MorinjaPlan razvoja Jadrtovca i Morinja
Plan razvoja Jadrtovca i Morinja
 
Sustav za praćenje, mjerenje i verifikaciju ušteda energije
Sustav za praćenje, mjerenje i verifikaciju ušteda energijeSustav za praćenje, mjerenje i verifikaciju ušteda energije
Sustav za praćenje, mjerenje i verifikaciju ušteda energije
 
UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015
 
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEAEnergetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
 
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitostNacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
 
HEP - Current status and perspectives of ESCO projects in Croatia
HEP - Current status and   perspectives of ESCO projects in CroatiaHEP - Current status and   perspectives of ESCO projects in Croatia
HEP - Current status and perspectives of ESCO projects in Croatia
 
Energy Insitute Hrvoje Pozar
Energy Insitute Hrvoje PozarEnergy Insitute Hrvoje Pozar
Energy Insitute Hrvoje Pozar
 
APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015
 
Projektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županijaProjektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županija
 
Projektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županijaProjektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županija
 
Projektni paket - Karlovačka zupanija
Projektni paket  - Karlovačka zupanijaProjektni paket  - Karlovačka zupanija
Projektni paket - Karlovačka zupanija
 
Strateške smjernice - Sisačko-moslavačka županija
Strateške smjernice - Sisačko-moslavačka županijaStrateške smjernice - Sisačko-moslavačka županija
Strateške smjernice - Sisačko-moslavačka županija
 
Strateške smjernice - Ličko-senjska županija
Strateške smjernice - Ličko-senjska županijaStrateške smjernice - Ličko-senjska županija
Strateške smjernice - Ličko-senjska županija
 
Strateške smjernice - Karlovačka županija
Strateške smjernice - Karlovačka županijaStrateške smjernice - Karlovačka županija
Strateške smjernice - Karlovačka županija
 
Sustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western BalkansSustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western Balkans
 
Cooperation EU and the Western Balkans
Cooperation EU and the Western BalkansCooperation EU and the Western Balkans
Cooperation EU and the Western Balkans
 
Sustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseSustainable Energy - Martin Krause
Sustainable Energy - Martin Krause
 
Better project - Introduction
Better project - IntroductionBetter project - Introduction
Better project - Introduction
 
EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014
 
Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014
 

Recently uploaded

Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 

Recently uploaded (20)

Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 

ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND

  • 1. SUPPORTING ENERGY EFFICIENCY ACTIVITIES IN CROATIA – ROLE OF THE FUND REPUBLIC OF CROATIA ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
  • 2. Content  About the Fund  Organisation  Administrative procedures  Operation and achievements  Investments in EE and RES in 2014  Concluding remarks 2
  • 3. About the Fund  Established at the end of 2003 by the Law on Environmental Protection and Energy Efficiency Fund  Extra-budgetary public institution  Goal  ensuring financial means for supporting (co-financing) environmental protection, EE and RES projects  obliged to co-finance measures defined in the NEEAP by the Law on Energy Efficiency  Mechanism – polluter pays principle!  environmental charges: emissions of CO2, SO2 and NOx; waste; special charge on motor vehicles  incomes from ETS  EU funds 3
  • 4. Organisation (1/2)  Bodies of the Fund:  Director  Management board – 2 members of MoEnV, 1 of MoE, MoF, Parliament, Chamber of Commerce, expert  Internal organisation:  Sector for fees and management of special categories of waste  Sector for Environmental Protection  Sector for EU funding  Sector for Energy Efficiency  Sector for financial affairs  Sector for legal affairs  Fund secretariat 4
  • 5. Organisation (2/2) 5 Sector for Energy Efficiency Department for EE and RES projects Team for industry and infrastructure Team for RES Team for buildings Team for clean transport Department for analysis and horizontal measures Team for energy management systems Team for analysis and support to policy implementation
  • 6. Incomes and allocation 6  Incomes in 2014:  1,4 billion HRK (187 million EUR)  Users  Local and regional authorities, public institutions and bodies, companies and entrepreneurships, CSO, physical persons  Types of aid  Loans: 0% interest rate, period 5years (grace period 2 years)  Grants
  • 7. Amounts per project 40% All others 60% II. Group of island Mountain areas II. group of municipalities 80% Special state care I. Group of islands I. Group of municipalities Protected nature 100% Government decision 7 Absolute amount determined in every tender/call
  • 8. Rules for awarding funding  Conditions for users  registered in Croatia  invest their own funds in the implementation of the project  fulfil specific terms stated in tenders/calls  Conditions for projects  detailed specification of technical conditions and eligible costs  above current legislation levels!!  preformed on own, legaly constructed and operated, property  Conditions for financing  required collaterals  de minimis state aid rules  no retroactive co-financing! 8
  • 9. Mechanisms for allocating funds Public tender • Open 60 days • Evaluation committee + decision of the Director/Managing Board -> max.75 days • Investment projects – competition based on quality of projects (eligibility and selection criteria defined in every tender) Public call • Open until end of year or until all envisaged funds are approved • Fast decisions (max.45 days) • Simpler project, no need for ranking, eligibility criteria must be fulfilled • Better prepared stakeholders in advantage 9Annual programme of public tenders and calls published on the web site
  • 10. Investments in EE and RES in 2014 21% 9% 22% 4% 3% 1% 7% 2% 15% 2% 6% 2% 2% 2% 2% National energy programs RES Sustainable construction Clean transport Education, R&D Other programs Multy apartment buildings - refurbishment Multy apartment buildings - documentation Public buildings - refurbishment Public buildings - documentation Energy audits and certificates Actions at local and national level National energy policy International cooperation Information and promotion 201 million HRK (27 M€) allocated for EE and RES projects
  • 11. Programmes for energy refurbishment of buildings • Cooperation with local authoritiesFamily houses • Cooperation with building management companies Multi-apartment buildings • Direct application to tender Public / Commercial buildings 11
  • 12. Family houses 12 Envisaged 50 Mkn (6,7 M€) in 2014 EE measures Plan: 25 Mkn (3,35 M€) Share of Fund: 40%, 60% or80% Share of local authority: 10%, 5% or 2,5% Approved > 112 Mkn (15 M€) for 3.400 houses! RES systems Plan: 25 Mkn (3,35 M€) Share of Fund: 40%, 60% or80% Share of local authority: 10%, 5% or 2,5% Approved > 43 Mkn (5,7 M€) for 2.6000 systems!
  • 13. Multi-apartment buildings Envisaged 20 Mkn (2,7 M€) in 2014 Energy audits and certificates Plan: 1,5 Mkn (0,2 M€) Share of Fund: 40%, 60% or 80% of eligible costs Approved > 2,2 Mkn (0,3 M€) for 447 buildings! Project design document Plan: 3,5 Mkn (0,5 M€) Share of Fund: 100% of eligible costs (max. 35.000 or 200.000 kn) Approved > 8 Mkn (1 M€) for 245 buildings! Energy refurbishment Plan: 15 Mkn (2 M€) Share of Fund: 40%, 60% or 80% of eligible costs Approved > 34 Mkn (4,5 M€) for 82 buildings! 13
  • 14. Public/commercial buildings 14 Envisaged 25 Mkn (3,3 M€) in 2014 For local authorities and companies! EE measures in buildings and construction of new buildings (class A) 25 Mkn (3,3, M€) Share of Fund: 40%, 60% or 80% of eligible costs Approved > 43,6 Mkn (5,8 M€) for 75 buildings! 4 Mkn (0,5 M€) for 10 projects in commercial services sector
  • 15. Public lighting systems 1. step • Energy audit • 1 Mkn (0,13 M€) • Approved: 55 audits 2. step • Project design documentation • 1,6 Mkn (0,2 M€) • Approved: 31 projects 3. step • Reconstruction / construction • 15 Mkn (2 M€) • Approved: 19 projects 15
  • 16. RES projects  54 projects (50% of applications) – subsidies of 21 Mkn (2,8 M€)  Solar thermal and photovoltaic systems  Biomass fired boilers  Production of solid biomass  Heat pumps 16
  • 17. Programme for clean transport  Sustainable urban mobility plans  Only 9 cities  Eco-driving  Pilot project: 8 to 18% savings  700.000 kn (100.000 €) - > more than 1.300 educated drivers!  Electric and hybrid vehicles  15,5 Mkn (2 M€) for 440 vehicles!  53 electric + 8 PHEV + 379 hybrid  Other measures: conversion to CNG or electric, public bicycle systems, electric bicycle, optimising distribution routes, intelligent traffic signalisation 17
  • 18. Other programmes of the Fund  Energy audits and introduction of energy management system ISO50001 in companies  Education, research and development projects  Supporting implementation of national climate-energy policy 18
  • 19. Instead of conclusion… for 1 kn of incentives, 3 kn investments 19 > 4.300 implemented projects (status end of 2014) > 1,3 billion kn (180 million EUR) – approved by the Fund > 3,8 billion kn (400 million EUR) – total investments Public lighting and industry Sustainable construction (buildings) Renewable energy sources Clean transport Education, research and development Other projects (CSOs, international cooperation, energy policy development and implementation, promotion)
  • 20. Prerequisites for successful operation  Clear and transparent procedures  Users need to know what they can expects!  Respect the deadlines  Stable terms and conditions  Frequent changes in technical and financing conditions should be avoided  Clear roles and responsibilities  Who does what?  Motivated staff  Possibility to award overachieving and penalise underachieving 20
  • 21. Plan for 2015  25 public calls and tenders for energy efficiency projects  350 million kn for energy efficiency – 75% increase in comparison to 2014  Use of EU funds 21
  • 22. Thank you for your attention! vesna.bukarica@fzoeu.hr REPUBLIC OF CROATIA ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND