SlideShare a Scribd company logo
1 of 12
AGENDA 1. Quotes
2. What is Total Productive
Maintenance?
3. Why TPM?
4. Benefits of TPM
5. 8 Pillars of TPM
6. Implementation in 7 Steps
7. Key Figures of TPM
8. Objectives of TPM
9. Losses in the Production
Process
10. Implementation of TPM
11. Roles and Responsibilities
12. Sustainment of the TPM
Concept
DEFINITION
What is Total Productive Maintenance?
 Refers to all departments,
facilities and processes
 Participation of all employees
 Aim to eliminate all defects,
breakdowns,accidents etc.
 Maximization of the efficiency
of the production system
 Production of goods and
services that exceed the
customers’expectations
 Minimization of obstacles
within the production process
 Improvementof the efficiency
of facilities and plant
 Continuoussustainment
and improvementof the
overall condition of plant
and machinery
 Concerns whole life cycle
of the production system
TOTAL PRODUCTIVE MAINTENANCE
BENEFITS OF TPM
 Reduction of defects, interruptions
and waste
 Increase of productivity and running times
 Lower costs for maintenance and production
 Improved control of maintenance costs
 Less time for set-up and adjustment
of facilities
 Machines can be operated and maintained
more easily
 Improvement of standards for job safety
and process reliability
 Higher customer satisfaction
 Improved delivery results
DIRECT BENEFITS INDIRECT BENEFITS
 Increase of employee motivation
and satisfaction
 Varied and challenging work
 Sustainment of a clean, structured,
attractive work place
 Reaching goals in team work
 Exchange of knowledge and experience
 Higher qualification through education
and trainings
 Maintenance measures can be exercised
by the operator himself
 Employee feels responsible for avoiding
mistakes at “his” machine
 More participation and voice for employees
TYPES OF MAINTENANCE
Simple Approach
MAINTENANCE
PREVENTIVE CORRECTIVE
CALENDAR BASED CONDITION BASED PLANNED UNPLANNED
8 PILLARS OF TPM
Design
Total Productive Maintenance
5S
QualityManagement
SafetyandHealthatWork,
EnvironmentProtection
ContinuousImprovement
PreventiveMaintenance
TrainingsandEducation
Start-upMonitoring
TPMinAdministration
AutonomousMaintenance
8 PILLARS OF TPM
1. Continuous Improvement
 Applied elimination of major losses
2. Autonomous Maintenance
 Operator executes inspections, cleanings
and maintenance independently
3. Preventive Maintenance
 Undisturbed machines and facilities produce
faultless goods for total customer satisfaction
 Educated maintenance staff instructs machine operator
to improve the maintenance of their equipment
 Documentation of deficits with the help of scarcity cards
Continuous Improvement
Autonomous Maintenance
PreventiveMaintenance
Trainings and Education
Start-upMonitoring
Quality Management
TPM in Administration
Safetyand Healthat Work,
Environment Protection
IMPLEMENTATION OF PILLARS IN 7 STEPS
Initial cleaning of machines, equipment and surroundings
Elimination of problem sources and inaccessible areas
Draw up cleaning and lubrication standards
Conduction of general inspections
Conduction of autonomous inspections
Standards through visualization
Full autonomous maintenance
Step 4
Step 2
Step 3
Step 1
Step 5
Step 6
Step 7
QUALITATIVE OBJECTIVES
GOAL 6
Improvement of
cross-functional teamwork
GOAL 4
Optimization of
business performance
GOAL 3
Improvement of
corporate culture and image
GOAL 7
Increase of worker satisfaction
GOAL 8
Maximization of facility
efficiency
GOAL 2
Establish maintenance
throughout total equipment
life cycle
GOAL 5
Improvement of working environment
GOAL 1
Improvement of machine availability
Download at www.PresentationLoad.com
IMPLEMENTATION OF TPM
12 Steps Approach
PREPARATION
IMPLE-
MENTATION
START
STABILIZATION
6. Invitation of customers, affiliated companies and subcontractors
12. Raise TPM levels after perfect implementation
9. Development of an autonomous maintenance program
8. Development of a planned maintenance program
7. Development of an equipment management program
11. Development of equipment management program
10. Increase skills of production and maintenance staff
3. Promotion of TPM by special committees
2. Introductory education campaign for the workforce
1. Announcement to introduce TPM
5. Preparation and formulation of a master plan
4. Establishment of basic TPM policies and goals
Download at www.PresentationLoad.com
LOSSES IN PRODUCTION
6 Major Losses
OVERALL
EQUIPMENT
EFFECTIVENESS
AVAILABILITY
QUALITY
Breakdowns
Setups and
Adjustments
Reduced Speed
Stops and
Idle Times
Defects and
Rework
Startup and
Machine breakdowns over 10
minutes, > once a month
Times for set-up and
adjustment > 10 minutes
Suboptimal cycle times
and machine pulsing
Stoppages and idle times
over 10 minutes
Rework rate higher than 0,1%
Profit cuts by startup
difficulties
PERFORMANCE
1
2
3
4
5
6
Download at www.PresentationLoad.com
Click here to visit www.PresentationLoad.com
DOWNLOAD POWERPOINT SLIDES

More Related Content

More from PresentationLoad

More from PresentationLoad (20)

💬 Kostenlose Powerpoint-Vorlage Corona-Virus (Covid 19) zum Download
💬 Kostenlose Powerpoint-Vorlage Corona-Virus (Covid 19) zum Download💬 Kostenlose Powerpoint-Vorlage Corona-Virus (Covid 19) zum Download
💬 Kostenlose Powerpoint-Vorlage Corona-Virus (Covid 19) zum Download
 
💬 Free Powerpoint Template Coronavirus (Covid-19) for Download
💬 Free Powerpoint Template Coronavirus (Covid-19) for Download💬 Free Powerpoint Template Coronavirus (Covid-19) for Download
💬 Free Powerpoint Template Coronavirus (Covid-19) for Download
 
💬 Remote Work. Rethink Presentations. - Strategien, Chancen und Maßnahmen für...
💬 Remote Work. Rethink Presentations. - Strategien, Chancen und Maßnahmen für...💬 Remote Work. Rethink Presentations. - Strategien, Chancen und Maßnahmen für...
💬 Remote Work. Rethink Presentations. - Strategien, Chancen und Maßnahmen für...
 
💬 Remote Work / Home Office - PowerPoint-Präsentation, PPT-Vorlage - Business...
💬 Remote Work / Home Office - PowerPoint-Präsentation, PPT-Vorlage - Business...💬 Remote Work / Home Office - PowerPoint-Präsentation, PPT-Vorlage - Business...
💬 Remote Work / Home Office - PowerPoint-Präsentation, PPT-Vorlage - Business...
 
💬 Remote work home office powerpoint presentation template
💬 Remote work home office powerpoint presentation template💬 Remote work home office powerpoint presentation template
💬 Remote work home office powerpoint presentation template
 
Behavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplateBehavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide Template
 
Quality Function Deployment PPT Slide Template
Quality Function Deployment PPT Slide TemplateQuality Function Deployment PPT Slide Template
Quality Function Deployment PPT Slide Template
 
5 Tipps für ein erfolgreiches Präsentationsende
5 Tipps für ein erfolgreiches Präsentationsende5 Tipps für ein erfolgreiches Präsentationsende
5 Tipps für ein erfolgreiches Präsentationsende
 
5 Tips For A Successful Ending To Your Presentation - Slideshow
5 Tips For A Successful Ending To Your Presentation - Slideshow5 Tips For A Successful Ending To Your Presentation - Slideshow
5 Tips For A Successful Ending To Your Presentation - Slideshow
 
Marketing Controlling PPT Slide Template
Marketing Controlling PPT Slide TemplateMarketing Controlling PPT Slide Template
Marketing Controlling PPT Slide Template
 
Customer & Buyer Personas
Customer & Buyer PersonasCustomer & Buyer Personas
Customer & Buyer Personas
 
Triz
Triz Triz
Triz
 
Data Warehouse
Data WarehouseData Warehouse
Data Warehouse
 
Big Data
Big DataBig Data
Big Data
 
Customer Journey Experience Map
Customer Journey Experience MapCustomer Journey Experience Map
Customer Journey Experience Map
 
Flat design-diagrams
Flat design-diagramsFlat design-diagrams
Flat design-diagrams
 
Puzzle toolbox 2D
Puzzle toolbox 2DPuzzle toolbox 2D
Puzzle toolbox 2D
 
Design-Thinking
Design-ThinkingDesign-Thinking
Design-Thinking
 
Creativity Tools
Creativity ToolsCreativity Tools
Creativity Tools
 
Process Management
Process ManagementProcess Management
Process Management
 

Recently uploaded

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Recently uploaded (20)

Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 

Total Productive Maintenance by PresentationLoad

  • 1.
  • 2. AGENDA 1. Quotes 2. What is Total Productive Maintenance? 3. Why TPM? 4. Benefits of TPM 5. 8 Pillars of TPM 6. Implementation in 7 Steps 7. Key Figures of TPM 8. Objectives of TPM 9. Losses in the Production Process 10. Implementation of TPM 11. Roles and Responsibilities 12. Sustainment of the TPM Concept
  • 3. DEFINITION What is Total Productive Maintenance?  Refers to all departments, facilities and processes  Participation of all employees  Aim to eliminate all defects, breakdowns,accidents etc.  Maximization of the efficiency of the production system  Production of goods and services that exceed the customers’expectations  Minimization of obstacles within the production process  Improvementof the efficiency of facilities and plant  Continuoussustainment and improvementof the overall condition of plant and machinery  Concerns whole life cycle of the production system TOTAL PRODUCTIVE MAINTENANCE
  • 4. BENEFITS OF TPM  Reduction of defects, interruptions and waste  Increase of productivity and running times  Lower costs for maintenance and production  Improved control of maintenance costs  Less time for set-up and adjustment of facilities  Machines can be operated and maintained more easily  Improvement of standards for job safety and process reliability  Higher customer satisfaction  Improved delivery results DIRECT BENEFITS INDIRECT BENEFITS  Increase of employee motivation and satisfaction  Varied and challenging work  Sustainment of a clean, structured, attractive work place  Reaching goals in team work  Exchange of knowledge and experience  Higher qualification through education and trainings  Maintenance measures can be exercised by the operator himself  Employee feels responsible for avoiding mistakes at “his” machine  More participation and voice for employees
  • 5. TYPES OF MAINTENANCE Simple Approach MAINTENANCE PREVENTIVE CORRECTIVE CALENDAR BASED CONDITION BASED PLANNED UNPLANNED
  • 6. 8 PILLARS OF TPM Design Total Productive Maintenance 5S QualityManagement SafetyandHealthatWork, EnvironmentProtection ContinuousImprovement PreventiveMaintenance TrainingsandEducation Start-upMonitoring TPMinAdministration AutonomousMaintenance
  • 7. 8 PILLARS OF TPM 1. Continuous Improvement  Applied elimination of major losses 2. Autonomous Maintenance  Operator executes inspections, cleanings and maintenance independently 3. Preventive Maintenance  Undisturbed machines and facilities produce faultless goods for total customer satisfaction  Educated maintenance staff instructs machine operator to improve the maintenance of their equipment  Documentation of deficits with the help of scarcity cards Continuous Improvement Autonomous Maintenance PreventiveMaintenance Trainings and Education Start-upMonitoring Quality Management TPM in Administration Safetyand Healthat Work, Environment Protection
  • 8. IMPLEMENTATION OF PILLARS IN 7 STEPS Initial cleaning of machines, equipment and surroundings Elimination of problem sources and inaccessible areas Draw up cleaning and lubrication standards Conduction of general inspections Conduction of autonomous inspections Standards through visualization Full autonomous maintenance Step 4 Step 2 Step 3 Step 1 Step 5 Step 6 Step 7
  • 9. QUALITATIVE OBJECTIVES GOAL 6 Improvement of cross-functional teamwork GOAL 4 Optimization of business performance GOAL 3 Improvement of corporate culture and image GOAL 7 Increase of worker satisfaction GOAL 8 Maximization of facility efficiency GOAL 2 Establish maintenance throughout total equipment life cycle GOAL 5 Improvement of working environment GOAL 1 Improvement of machine availability Download at www.PresentationLoad.com
  • 10. IMPLEMENTATION OF TPM 12 Steps Approach PREPARATION IMPLE- MENTATION START STABILIZATION 6. Invitation of customers, affiliated companies and subcontractors 12. Raise TPM levels after perfect implementation 9. Development of an autonomous maintenance program 8. Development of a planned maintenance program 7. Development of an equipment management program 11. Development of equipment management program 10. Increase skills of production and maintenance staff 3. Promotion of TPM by special committees 2. Introductory education campaign for the workforce 1. Announcement to introduce TPM 5. Preparation and formulation of a master plan 4. Establishment of basic TPM policies and goals Download at www.PresentationLoad.com
  • 11. LOSSES IN PRODUCTION 6 Major Losses OVERALL EQUIPMENT EFFECTIVENESS AVAILABILITY QUALITY Breakdowns Setups and Adjustments Reduced Speed Stops and Idle Times Defects and Rework Startup and Machine breakdowns over 10 minutes, > once a month Times for set-up and adjustment > 10 minutes Suboptimal cycle times and machine pulsing Stoppages and idle times over 10 minutes Rework rate higher than 0,1% Profit cuts by startup difficulties PERFORMANCE 1 2 3 4 5 6 Download at www.PresentationLoad.com
  • 12. Click here to visit www.PresentationLoad.com DOWNLOAD POWERPOINT SLIDES