SlideShare a Scribd company logo
1 of 44
Download to read offline
140211 KIUMA Electrical Proposal(S).docx 0 03 April 2014
Prepared by: Mobile Missions Maintenance (South Africa)
2014
KIUMA: Tanzania
Report: Electrical Installation of Kiuma Complex
Barry Thomas (Rev) (NDip Electrical Engineering – T3 Heavy Current)
Neil Eichstadt (Rev) (NDip Electrical – N6)
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 1 of 43
Contents
1. General Overview of Ministry .........................................................................................................3
2. Client brief..........................................................................................................................................5
3. MMMSA General Observations......................................................................................................5
4. MMMSA Visual Site Evaluations.....................................................................................................6
4.1 Generator Room and Equipment...........................................................................................6
4.2 Battery Room and Batteries....................................................................................................8
4.3 Solar Panel Array.....................................................................................................................10
4.4 Borehole Pump No.1..............................................................................................................10
4.5 Carpentry and Joinery Workshop ........................................................................................12
4.6 Motor Mechanic Workshop..................................................................................................12
4.7 Welding Workshop.................................................................................................................13
4.8 Overhead Reticulation Network...........................................................................................13
4.9 Milling Plant.............................................................................................................................15
4.10 Hospital.....................................................................................................................................15
4.11 General Site.............................................................................................................................16
5. MMMSA “General Impressions”...................................................................................................18
5.1 “Good practices”.....................................................................................................................18
5.2 “Bad practices”........................................................................................................................18
5.3 Safety (Electrical installation and machinery)....................................................................19
6. Loading Table (Including Loading Assumptions)........................................................................21
7. MMMSA Recommendations..........................................................................................................25
7.1 Essential 1 - Generator Room Upgrade...............................................................................25
7.2 Essential 2 - Battery Room Upgrade....................................................................................28
7.3 Essential 3 - Main Solar Array Maintenance......................................................................29
7.4 Essential 4 - Hospital Standby Generator Room................................................................29
7.5 Power supply ordering:..........................................................................................................29
8. MMMSA Suggested Options..........................................................................................................30
8.1 Option 1 – Status Quo............................................................................................................30
8.2 Option 2 - Upgrade Overhead Backbone System only .....................................................31
8.3 Option 3 - Teachers Training Centre Generator Room.....................................................32
8.4 Option 4 - Eastern Generator Room + Western Generator Room ................................33
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 2 of 43
8.5 Option 4a – two distinctly separated systems...................................................................34
8.6 Option 4b – both an independent system as well as a linked system...........................34
8.7 Option 5 – 1 x 500kVA 3Ø Central Generator....................................................................35
9. Conclusion ........................................................................................................................................35
10. Disclaimer.........................................................................................................................................36
11. Appendix A........................................................................................................................................37
12. Drawings...........................................................................................................................................40
12.1 General Existing Layout (Supplied by Wortundat)............................................................40
12.2 Single Line Diagram................................................................................................................41
12.3 Site Layout – (Detailing Future Extensions)........................................................................42
12.4 Overhead Reticulation Upgrade incorporating the Teachers Training Centre
GeneratorRoom / Eastern Generator Room + Western Generator Room....................43
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 3 of 43
1. GENERAL OVERVIEW OF MINISTRY
The KIUMA Ministry Complex is located in Southern Tanzania. It is a Christian based
organisation with a German heritage and so is currently receiving major financial backing from
the “wortundtat mission” based in Essen, Germany. There are currently approximately 1000
people housed on the site and this is expected to increase to 1500 in the future.
The ministry facilitates many outreach programmes and so utilises many various building
facilities:
• School
• School Hostel (boys & girls)
• Hospital (Patients and Training)
• 160 beds
• Operating Theatre
• Laboratory
Site
Ministry Location
Southern Tanzania
10°45’50.85” S
37°57’37.25” E
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 4 of 43
• Nurses Training Centre
• Nurse Accommodation Block
• Vocational Training Centre
• Welding
• Motor Mechanics
• Tailors
• Woodwork
• Brick Laying
• Church Building (+- 1000 seats)
• Conference Centre (+-2500 seats)
• Teachers Training Centre (Currently under construction so included in report)
• Dormitories
• Laboratories
• Lecture Rooms
• Dining hall
• Guesthouse (20 rooms)
• Directors House
• Staff Housing
• Administration Block
• Finance Block
• General buildings
When looking at the entire complex and the existing work already done by KIUMA, a huge
amount of progress has been achieved to date. It is never easy to establish and then run a
ministry successfully, especially, when the site is in a very rural area far away from resources
such as people, equipment and utilities. The impact KIUMA is making extends far beyond its
local physical boundaries.
However, due to the nature and magnitude of this complex it requires a fairly large and stable
electrical supply but with the increase in the ministry’s footprint and programmes the Electrical
Network Capabilities and Functionality are not at optimum utilisation.
As this electrical network needs “fine tuning” wortundtat mission contacted Operation
Mobilisation (OM) in Germany for assistance and so Mobile Mission Maintenance South Africa
Trust (MMMSAT) were contacted to carry out a site inspection with a view to proposing some
simple solutions to the existing problems.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 5 of 43
2. CLIENT BRIEF
The MMMSA Field Technical staff are to carry out a simple visual (non-intrusive) inspection of
the existing Electrical Network – this will include:
• Overhead Network
• Generator Room and related equipment
• Battery Room and related equipment
• Solar Panel Array
• General Inspection of Buildings, Equipment and (where possible) loading
On completion of the inspection, MMMSA is to provide a report / proposal that would see the
Electrical Network being used correctly, with equipment operating as expected and the loading
problems being addressed.
This report will be written – with both MMMSA and KIUMA – realising that the report will be for
information only and will not be a detailed operational directive nor a detailed plan / costing
proposal that is ready for immediate implementation.
Should KIUMA decide to utilise the MMMSA proposals then a detailed programme / costing /
implementation plan should be drawn up by a recognised, qualified planner / designer – this will
then be used as the “blueprint” for further upgrades or refurbishment of existing or future
equipment.
KIUMA would provide MMMSA with all necessary technical specifications, unlimited access to
all sites / equipment and where possible a “site technical assistant” who would be able to give
reasonable answers to network related questions raised by the MMMSA team. This assistant
should have a reasonable knowledge of the complex Electrical Network and the related “end
users”.
3. MMMSA GENERAL OBSERVATIONS
Overall observations are that the electrical network has both minor and major flaws in the way it
is constructed, utilised and maintained.
Minor flaws are generally directed towards simple installation procedures. It would appear is if
there are no STANDARD PROCEDURES or INSTALLATION DIRECTIVES for the internal
wiring of buildings nor are there any drawings available for any of the installations.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 6 of 43
Major flaws are directed towards overhead construction, generator usage, battery usage and
general cable / overhead lengths of line to end user point. These long lines result in volt drops
that are critical to the optimal running capacity of the O/H lines - which can also result in
damage to sensitive equipment – especially those that are near the end of such O/H runs.
Both of these “general observations” are discussed in point 6 “MMMSA General Impressions”
4. MMMSA VISUAL SITE EVALUATIONS
4.1 GENERATOR ROOM AND EQUIPMENT
Site is untidy – used as a storage facility
Site has poor lighting for safe working conditions
Site has exposed wiring and exposed contacts on contactors / switches
Contactors / switches are not labelled and have no interlocking protective devices –
this means that they can be operated out of correct sequence – possibly paralleling
units that cannot electrically be paralleled – this can cause personal injury through
accidental contact or “flashing”
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 7 of 43
Site has decommissioned wiring still connected to equipment which can lead to a
serious accident should it be energised accidently. This extraneous wiring makes it
very difficult to determine how the control gear works and makes fault finding even
more difficult
No labels are fitted to the equipment
Frequency meter reading incorrect Generation frequency (reading 47Hz yet should be
50Hz) – this could either be a calibration problem or a genuine under-frequency fault.
Under-frequency generation can lead to numerous faults / issues on the system
especially for frequency sensitive equipment (computers etc)
Load balancing of network is not correct: (readings taken with “clip-on” induction type
ammeter)
• IRØ = 55A This current fluctuated up to 70A which leads to the
imbalance current (In) in the Neutral
• IWØ = 34A
• IBØ = 35A
• N = 25A Problem – no current should flow in the Neutral if
system is correctly balanced.
This Imbalance Current (In) can result in severe damage to the equipment supplied by
the network. This is generally a current which creates high temperatures which in turn
damage insulation and windings. It was realised when registering this current that the
Generators do not have Negative Phase Sequence protection (Inps) nor Imbalance
Current protection (In) – it is a recommendation that this be installed.
(Note: The Control Panel Mounted Ammeter does not work and so discrepancies in
Current Flow cannot be detected)
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 8 of 43
4.2 BATTERY ROOM AND BATTERIES
Inadequate safety standards / precautions (see Point 6.iii – Safety)
Battery Room dirty
Main cable connections to battery bank poorly run and poorly connected
The 220Vac input to the inverter is faulty – needs to be repaired
Batteries not maintained – cells physically dirty which can lead to Leakage Current
(Ileak) which can damage batteries or cause a “flash” to other equipment or to
personnel operating on the batteries.
No hydrometer available to ensure correct Specific Gravity (SG) readings – this
monitors the Acid / Water mixture to ensure correct delivery of battery as well as help
manage a prolonged useful lifespan of the cells and the bank.
Discarded / de-commissioned batteries left in battery area
Discarded / de-commissioned Invertor Unit left in battery area
Exposed wiring is outside of the building and is “live’ – this is a serious hazard
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 9 of 43
Control gear is not labelled
Inadequate lighting to carry out maintenance or repairs safely
No drawings detailing the following:
• Charging circuits – how the battery bank is charged
• Outgoing connections – where the outgoing circuits go
• How the bank actually integrates with the rest of the system
It can be expected that the output voltage of the bank is “low” due to a number of cells
being decommissioned
(Note: It is the personal opinion of the writer that the batteries are nearing the end of
their useful lifespan due to negligence in maintenance and loading. A new bank
should be sourced ASAP and prepared to be installed. The new installation should be
done by a DC Battery Installation Professional so that all necessary safety and
operational standards are met)
It should also be noted that the Battery bank should only be utilised as a “back up”
system and not a regular supplier of power to end users. Generally it is the main
power feed that supplies the end users while simultaneously “trickle” charging the
bank. The bank only comes into operation should the main power supply fail. This
continual charge / discharge can harm the cells.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 10 of 43
4.3 SOLAR PANEL ARRAY
The array appears to be in relatively good condition however it could not be
determined if the array actually “follows the sun” and if it has the facility- “does the
function actually still work” – this should be determined, as the function will increase
the arrays efficiency by having more “sun time”
4.4 BOREHOLE PUMP NO.1
Readings taken while pump running
1Ø Voltage Readings 3Ø Voltage Readings Phase Currents
Voltage Swing Voltage Swing Current Swing
RØ - N 229V – 236V RØ – WØ 395V – 408V RØ 16.8A – 17.1A
WØ - N 227V – 234V RØ - BØ 394V – 405V WØ 16.5A – 16.7A
BØ - N 229V – 237V WØ - BØ 392V – 403V BØ 15.9A – 19.9A
Neutral 0.02A – 3.3A
This pump appears to be running well as the nameplate has a running current (Irun) of
18.8A. The voltages supplied from the source generator also appear to be well within
normal accepted values
+- 10% of base line voltage 207V-253V single phase with base = 230V (Ø-N)
360V-440V three phase with base = 400V (Ø-Ø)
When these reading were taken the pump was already running, however, when
looking at the supply cable some problems were noted:
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 11 of 43
• The supply cable run is approximately 500m-600m depending on the exact
route
• The cable changes size from generator room supply (10 or 16mm2) to the
pump supply (6mm2)
• The cable has joints in it (not normally a problem but if not done correctly could
create flow problems or leakage)
When a pump starts up – depending on whether it has Direct-on-line (DoL) starting or
Star-Delta (Υ ) starting – it can draw up to 7x the normal running current (therefore
Istart = Irun x 7 so the start-up current could be as high as 18.8A x 7 = 131.6A and this
raised current flow can last for up to 5 cycles) which means that a cable of this length
– if not sized correctly – could have a very dramatic volt drop (Vdrop) at the pump
connections.
This could lead to two things:
• Generator damage due to the high demand to start the pump (possible cause of
existing generator damage)
• Under voltage at the pump which could damage the windings during start-up
and ultimately lead to pump failure.
Note: This cable sizing needs to be addressed as a matter of urgency and if
necessary a larger cable needs to be installed or the pump should be supplied with its
own generator at the pump house. What is concerning is that another water supply
tank is currently being built – where will this pump be? If it is to be alongside the
existing pump house then it can be presumed that the pump will be supplied via the
same supply cable / generator connection. Damage is almost certain to occur. It is
recommended then that should this be the future plan that a dedicated generator
supply is provided at the pump house.
Another solution to the starting Volt drop could be to install a Soft Start (SS) system –
this will need to be investigated further.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 12 of 43
4.5 CARPENTRY AND JOINERY WORKSHOP
Insufficient lighting for safe work practices
Distribution boards open and wiring exposed
Generally appears to have sufficient power outlets however due to the distance that
this building is situated from the generator supply room it can be expected that - when
the system is under loaded conditions – this area will have a negative influence on the
total system integrity should numerous cutting machines be activated simultaneously.
4.6 MOTOR MECHANIC WORKSHOP
Insufficient lighting for safe work practices
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 13 of 43
4.7 WELDING WORKSHOP
Insufficient lighting for safe working practices
Generally appears to have sufficient outlets however due to the distance that this
building is situated from the generator supply room it can be expected that - when the
system is under loaded conditions – this area will have a negative influence on the
total system integrity should numerous welders be activated simultaneously.
4.8 OVERHEAD RETICULATION NETWORK
Overhead lines use recognised conductor (Airdac) and recognised “manufacturer
tagged” poles.
It would appear too that all poles are buried to correct depths (+- 16% of total pole
length)
Attempts have been made to use a standard on O/H pole-tops with regards “bobbins”
and “tying in”. However there are many instances where the conductor is placed on
the wrong side of the bobbin and so the pressure of the angle is on the “binding wires”
and not on the bobbin as it should be.
Pole
Binding Wire
Incorrect
Bobbin
Conductor
Correct
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 14 of 43
This will result in the binding wire chaffing the conductor insulation and eventually
cause a break down which may result in an Earth fault (IEfault). This IEfault can either
cause a pole top fire or a resulting Negative Phase Sequence fault on the generator
which without the adequate protection could result in
the generator being damaged or destroyed.
However should the fault be of a very low value
Sensitive Earth fault (ISE/F) this could result in
damage to equipment or even a possible death due
to a leakage current that is not detected timeously.
Pole compaction is good
Stay wires are installed on angle poles (however it should be noted that many are
installed at incorrect angles and so the poles are leaning into the stress angle)
Take-offs are not always installed correctly nor are some of the take-offs in use –
however the connections are still on the pole – this can lead to accidental contact
PoleStay Wires
Incorrect
Conductor
Stress angle
* Sometimes a bisecting
stay may be necessary
to prevent pole toppling
Correct
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 15 of 43
In some case no insulators are used to fasten conductors to poles. This can cause
breakdown of insulation and therefore faults that may be very difficult to detect –
especially if there is no protection to detect the fault.
4.9 MILLING PLANT
No safety equipment being used by the operator
De-commissioned equipment still standing in working area
4.10 HOSPITAL
The hospital inspection was very superficial due to the being very limited access to the
site - however there are some minor issues where wires in boxes are exposed to
human contact.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 16 of 43
The battery bank appear to be relatively new and in good condition – this looks to be a
sealed maintenance free lead acid bank
The Solar Array appears to be operating well – supplying the hospital batteries -
however the 220Vac input to the inverter is faulty – needs to be repaired.
4.11 GENERAL SITE
It was noted in the new ‘Finance office” that the main Distribution Board has been
wired incorrectly. The main incoming feeds are fed into the bottom of the breakers
when they should be fed into the top with the load being taken from the bottom. This
means that the breakers may work when detecting a fault but may not work
correctly.
In the new Finance Room – there has been a splitting of phases and a splitting of
protection circuits – the standard / principle used here appears to be very irregular and
should be seen as hazardous – it is the writers recommendation that this buildings
wiring should be removed and re-instituted to acceptable safe standards
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 17 of 43
“Teeing” into lines to power a site is often done without the correct procedures or
materials.
Temporary installations are also done without “due diligence” to safety standards or
with regard to correct procedures – these are a hazard to personnel. The sight where
the photo below was taken is currently “standing” however the cables have been left in
position
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 18 of 43
5. MMMSA “GENERAL IMPRESSIONS”
5.1 “GOOD PRACTICES”
Overhead lines use recognised conductor (Airdac) and recognised “tagged”
poles. It would appear too that all poles are buried to correct depths (16% of
pole length)
Attempts have been made to use a standard on O/H pole-tops with regards
“bobbins” and “tying in”.
Pole compaction is good
Stay wire are installed on angle poles (however it should be noted that many
are installed at incorrect “bisecting” angles and so the poles are leaning into
the stress angle)
Original installations were done to a high standard (however they have since
deteriorated)
Building electrical installations appear to be safe and well installed (however
standard installation procedures are not consistent over the entire complex)
5.2 “BAD PRACTICES”
x No site “as built” Overhead system electrical drawings are available – detailing
conductor type, size, length or position
x No standards installation procedures are used for domestic installations:
• houses are wired according to each installers own interpretation
• excessive use of materials result in over expenditure at some
installations which also leads to redundancy on protection of systems
x Correct phase load balancing is not practised and so it appears as if the RedØ
is excessively loaded while the WhiteØ and BlueØ are under loaded. This has
resulted in a large imbalance on the O/H system as well as the Generator
supply. (See point 5.i)
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 19 of 43
x Trees are encroaching on the O/H lines and these can cause the lines to
break under windy conditions
x 3-Phase (3Ø) is used into some houses – this is totally redundant when
looking at loading. This may have been done because of Air Conditioner (A/C)
usage but it would be recommended that A/C units are only installed in
essential areas not domestic or office facilities as this places undue burden on
the Generator set as well as induces imbalance current should the loads not
be connected correctly to allow for Single Phase (1Ø) take-offs.
x Throughout the complex decommissioned wiring is left in place while
telephone and television wiring is running alongside power supply cabling –
this can lead to personal injury if handled by inexperienced or untrained staff
5.3 SAFETY (ELECTRICAL INSTALLATION AND MACHINERY)
No Safety Standards are in place and staff not trained in these standards
Staff who monitor equipment are not adequately trained
Some machinery has exposed moving parts – no guards in place to protect
operators or passers-by
No standard operating procedures in place for machinery or Electricity
Network operations
Operators of “noisy” machinery not using ear protection
Operators of “moving / cutting” machinery not using eye protection
Welders not using eye protection
Welding workshop has inadequate lighting for safe working
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 20 of 43
Carpentry / joinery workshop has inadequate lighting for safe working
Milling room has inadequate lighting for safe working
Battery room has no eye protection available (full face shield – splashing
Sulphuric Acid H2SO4)
Battery room has no hand protection available (full leather gloves)
Battery room has no body protection available (leather apron)
Battery room has no body cleaning protection available (shower / water
source)
Carpenters working on machinery not using breathing masks
Carpenters working on machinery not using eye protection
Carpenters working on machinery not using gloves
Carpenters working on machinery not using ear protection
Metal roofs are not adequately earthed – cannot dissipate faults
No lightning protection is installed at any of the supply points or end user
points
No lightning masts are installed around the property to alleviate the possibility
of building strikes
All fire extinguishers service dates outdated – should a fire occur then these
will be of no use
There is no central library / storage area for all documentation of manuals for
equipment
A major concern is around the earthing of the generators and the
reticulation network. Should this earthing be inadequate then the
possibility of serious injury to people of damage to equipment is
multiplied. Earthing is critical to the safe working and electrical integrity
of any system. This needs to be investigated as a matter of urgency.
140211 KIUMA Electrical Proposal(S).docx 21 03 April 2014
6. LOADING TABLE (INCLUDING LOADING ASSUMPTIONS)
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 22 of 43
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 23 of 43
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 24 of 43
140211 KIUMA Electrical Proposal(S).docx 25 03 April 2014
7. MMMSA RECOMMENDATIONS
7.1 ESSENTIAL 1 - GENERATOR ROOM UPGRADE
The # 1 JOHN DEERE diesel generator is currently in service supplying both the
complex as a whole and the small water pump alongside the generator room (details
unavailable)
This unit has the power capability of running the
entire complex under a load condition of 54%
diversity (see point 7 - loading table). It is
crucial to the electricity security of the complex
that this generator be serviced so that it is
available at all times to supply KIUMA
The only negative point with regard this unit is that its fuel consumption is high –
15L/hr
The # 2 IVECO AIFO diesel generator is currently out of service and it’s availability
for service could not be determined.
This unit has the power capability of running the
entire complex under a load condition of 35%
diversity (see point 7 - loading table).
Relatively high fuel consumption – 10L/hr
It is also essential that this unit be serviced and made ready for use. It stands as a
“back-up” to the #1 generator should that unit need servicing or repairs.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 26 of 43
The # 3 GREAZZO VICENZA ITALY diesel generator is currently running the water
pump at Borehole #1.
Fuel consumption – 5L/hr
This machine is far under-utilised for its power
delivery capacity and it is recommended that it be
moved to the site of the Borehole #1 pump house
and be used as a dedicated supply for both
Borehole #1 and the future Borehole #2 pump.
The #4 JOHN DEERE diesel generator is currently out-of-service at present and
needs urgent attention. It is also generally used to supply the pump at Borehole #1
when serviceable.
Fuel consumption – 7L/hr
It is also recommended that this generator be moved to the new site alongside the
Borehole #1 pump house. This can be used as a back-up to generator #3 when it is
moved. This will allow the other to be serviced / repaired without any loss of pumping
capacity.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 27 of 43
The generator room is in serious need of maintenance, cleaning and refurbishing (if
possible). There are numerous cables still attached to equipment that is no longer
serviceable or in use. These are a hazard.
It would also be recommended that the building be painted and adequate lighting
installed to ensure safe lit working conditions. The floor can also be painted with a
diesel repellent so as to protect the concrete from becoming corroded – this will also
allow for easier cleaning should a spillage occur.
It is also a recommendation that the main supply boards be removed and cabinet
mounted units be installed. These cabinets should be fitted with the necessary
generator electrical controls, generator protection relays and outgoing line protection.
As both Gen #1 and Gen #2 can / are to be used to supply the reticulation network it is
recommended that the cabinet be wired in such a way that they:
• can work independently of each other (“chop-over” installed)
or
• can be utilised in parallel – HOWEVER this facility needs careful attention as
the two units have differing output capacities and should they be running
simultaneously under heavy load (above 35% diversity) the load may be
distributed between them to the detriment of the smaller Gen#2. Requires
complicated control circuitry.
This cabinet will ensure safer operating conditions for the operating staff as well as
greater efficiency in supplying power to the complex.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 28 of 43
NB! - It is also recommended that a diesel fuel tank (with level indicator) be
installed adjacent to the building that will allow for a gravity feed into both
Generators (+- 500 litre capacity should be sufficient) – this can also be mounted on a
small platform to allow for sufficient “fall”. This tank will allow for at least 40 hours use
by the generators (when running singularly or 20 hours running in parallel). This tank
can be filled from outside of the generator room and so alleviates possible diesel spills
as well as the possibility of fire should the diesel ignite within the building.
7.2 ESSENTIAL 2 - BATTERY ROOM UPGRADE
At present, the battery room is a hazard. Cabling is in disarray, the control board is not
labelled adequately, the lighting is insufficient, the room is dirty and the batteries
themselves are filthy. It is difficult to determine how this system is integrated into the
rest of the network.
It is recommended that the room be painted with a
good white wall coating while the floor is provided with
a good covering that will protect the concrete from
spillage of acid.
The barricade to cordon the batteries off from the rest of the room is a hazard as it can
cause the operator to trip and fall into the batteries possibly cause a short circuit on
contact. This DC short circuit current can run in the hundreds/thousands of Amperes –
this may not be lethal contact but the operator can be severely burnt.
It is also recommended that the battery output be connected to an “insulated” copper
busbar that runs along the wall and is then connected into a control panel fitted to the
wall. This panel will house all the control circuitry and protection necessary to monitor,
control and protect the battery bank and its feed into the network. The capacity of the
bank needs to be calculated correctly - Full load Current (IFL) and No-load current (INL)
needs to be determined and the bank sized accordingly. A DC Battery Bank specialist
is recommended to do this calculation and a recognised installer be utilised to carry
out the necessary battery room upgrades and installations.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 29 of 43
The current invertor has no 220Vac input capability and the spare unit is
unserviceable – these faults need to be corrected as a matter of urgency – again by a
recognised DC specialist.
7.3 ESSENTIAL 3 - MAIN SOLAR ARRAY MAINTENANCE
The suitability of this bank needs to be ascertained by a recognised Solar Energy
Specialist and then if suitable it needs to be serviced – especially with regard “sun
tracking” and cabling. The connection to the battery bank needs to be checked and
corrected. This connection is not labelled nor can it be determined accurately how it
connects into the existing network.
7.4 ESSENTIAL 4 - HOSPITAL STANDBY GENERATOR ROOM
Due to the nature of the work carried out by the hospital it is essential that the hospital
have an “emergency services” supply capability. The power supply to the hospital
needs to be secure and stable. Should the power fail during surgery the resulting
disaster could have far-reaching effects on the KIUMA ministry in Tanzania.
Therefore, it is recommended that the hospital receive its own dedicated generator
supply room.
The hospital currently runs off the existing generator supply which is adequate. A
battery system with Solar Array charging is the standby supply. This system can be
maintained however it does need to be maintained and proper control panels installed
with correct labelling (this system can become back-up No.3). A new generator supply
room should be installed that will become back-up No.2.
7.5 POWER SUPPLY ORDERING:
1
st
.Main Generator supply
2nd
. Hospital Standby Generator
3
rd
. Battery / Solar Array
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 30 of 43
Should the main supply fail and the generator fail to start then the control panel should
engage the battery / solar back-up system. This new arrangement will ensure that the
hospital operating theatres are always supplied with power. The new system also
allows for maintenance for crucial supply units without endangering power supply
security.
KIUMA currently have a suitable generator in storage on site (DIMAGG Listen Petter
diesel 3Ø 180kVA). This unit should be suitable to supply current needs as well as
the future extensions and related power demands. All that is required is the necessary
room, control equipment, fuel supply unit and cabling into the existing supply network
NOTE: This standby unit should not be used to “shore up” the existing power
network as this may have a negative effect on its performance and emergency
status.
The position of the standby room is recommended to be alongside the current Hospital
Solar Array as this allows for minimal cabling into the existing network.
8. MMMSA SUGGESTED OPTIONS
8.1 OPTION 1 – STATUS QUO
This option is available however it comes with many negatives. At present the
electrical system operates but not at optimum capacity.
Should this option be exercised then KIUMA need to understand that the current
problems will not only continue but will in all probability worsen:
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 31 of 43
• Loading imbalances become greater
• Overhead backbone system becomes increasingly overloaded
• Overhead backbone system becomes increasingly susceptible to faults and
downtime
• Battery capacity diminishes with each loading cycle and will eventually fail
• Solar Array capacity diminishes
• Internal building wiring and security remains without standards or procedures
and so becomes a liability to all users and operators
• Fault finding remains a hazard
• The possibility of extended downtime of power supply multiplies as the existing
network setup ages.
8.2 OPTION 2 - UPGRADE OVERHEAD BACKBONE SYSTEM ONLY
This option provides for minimal system enhancements at minimum cost. The current
system overheads are running near capacity which means that the effective lifespan is
diminishing due to overloading - as new user points are added the loading increases
and the aging process increases. By upgrading the overhead backbone (main supply)
the loading rate decreases which allows for more end users to be connected. This,
however, cannot provide an unlimited source of supply points and so needs to be
monitored closely – the ability to carry full load for an unlimited time is not possible.
The end users / loadings added will determine the lifespan and capacity of the newly
installed backbone.
It is recommended that the backbone be upgraded to either 25mm2 Aerial Bundle
Conductor (ABC) or 25mm2 Airdac (3 x single phase lines + Neutral). This system
however will need to be determined and calculated by a recognised professional line
designer utilising a power flow / profiling package.
The system should also be fitted with the necessary hardware (poles, bobbins, ties,
stays etc) as well as in-line links to facilitate easier fault finding and system versatility.
Normally Open Points (NOP’s) should also be incorporated into the design to allow for
the network to be “fed via different routes” – this will allow for easier fault finding and
system versatility.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 32 of 43
All take-off points to end users should be via a Pole-top Box (PTB) that incorporates a
protective device (MCB) to protect the overhead line from end user faults. The integrity
of the overhead line is better using these PTB’s.
8.3 OPTION 3 - TEACHERS TRAINING CENTRE GENERATOR ROOM
This option keeps the existing system connected as it is (or allows for the backbone
upgrade) but allows for an additional Generator room to be built at the proposed
Teachers Training Centre (TTC). This will cater for all expansions around this area of
the complex but does not alleviate problems caused by the long supply run to the
Vocational School Workshops fed from the existing generator room – this area does
put a certain drain onto the supply network.
It is also a rather costly exercise as a new generator needs to be purchased and a
room built to house the generator and all its related control and protection circuitry.
It only alleviates a minimal loading problem and should not be seen as a long term
solution to the current electrical system shortcomings.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 33 of 43
8.4 OPTION 4 - EASTERN GENERATOR ROOM + WESTERN GENERATOR
ROOM
This option would be the costliest recommendation but will be the best solution to all
the current problems as well as the future loading considerations.
This option relies on the understanding that Essential 1-4 have been carried out.
As well as upgrading the overhead backbone system this option calls for the
installation of an additional Generator Supply Room designated Western Generator
Room (WGR). The existing generator room is designated Eastern generator Room
(EGR).
(Existing Generator Room) (New Generator Room)
Eastern Generator Room Western Generator Room
Main Line
Take Offs
These connection parameters can be decided on through optimal routes/loadings
being developed by using a simulation computer programme – this means that exact
areas of supply will need to be clearly defined and implemented.
EGR
This Generator room feeds all
existing network excluding:
• TTC
• Borehole #1 pump house
(self- supplying)
• Vocational School Workshops
WGR
This Generator room feeds:
• TTC
• Vocational School Workshops
• new developments west of
the “old Runway”
NOP
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 34 of 43
8.5 OPTION 4A – TWO DISTINCTLY SEPARATED SYSTEMS.
These two generator rooms are coupled in such a way that they run independently of
each other – feeding independent systems – with a Normally Open Point (NoP)
ensuring that they cannot be run in parallel. This means that each generator room is
equipped with two by generators (Main & Standby) that are capable of maintaining a
secure supply to all end users. The NoP is designed in such a way that the two lines
cannot be linked together – how this is achieved will be decided on by the designer
and installer.
8.6 OPTION 4B – BOTH AN INDEPENDENT SYSTEM AS WELL AS A LINKED
SYSTEM.
Running in parallel (NoP closed via links) could create problems but with some
expensive protection and control circuitry these problems could be alleviated
(Synchronising relays, phase angle monitors, speed monitoring relays etc).
The two systems are linked together by means of a set of pole mounted links that
have an interlocking system connected to them. This system will only allow the links to
be closed should all the necessary requirements be met by both generator rooms ie
• synchronised speed
• correct phase angle
• correct phasing
• balanced load
(These are not the only criteria and so this system does need to be designed and
installed by a competent recognised person / company)
Running with either of these options - 4a or 4b - allows for a marked increase in
system capability – each has distinct advantages and disadvantages – these will need
to be explored by KIUMA (and the relevant designers) to see which will give maximum
benefit to the complex for least capital outlay (although capital outlay should not be an
exclusion detail).
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 35 of 43
• Option 4a will be the cheaper option but will give limited long term benefits.
• Option 4b may be the most expensive yet the long term benefits will support the
capital outlay.
(Will the outlay compensate for future expansion and bring a greater return – that
needs to be decided by KIUMA)
8.7 OPTION 5 – 1 X 500KVA 3Ø CENTRAL GENERATOR
A simple solution is to upgrade the existing overhead network and install 1 x 500kVA
generator with all related control circuitry and protection devices. This unit is then
connected to the network which then encompasses the entire complex Eastern area
and Western Area
9. CONCLUSION
The complex appears to be able to cope with the existing loading and design of the electrical
network – however the current situation will not be sufficient for the KIUMA complex to continue
operating well into the near future.
Equipment is not being maintained,
New buildings are being added to the loading without the network capacity being
upgraded to meet the new requirements
Standard installation procedures are not being used – this leads to a variety of
practices all of which affect the safety, capacity and electrical integrity of the current
system (and future system should this not be addressed)
A variety of “imported” equipment is being used – this does not allow for easy
maintenance or for readily available spares to be obtained. Local equipment needs
to be utilised or sufficient spares need to be kept on site (this can be a very costly
exercise)
Installation staff are not suitably trained
An intervention is required soon to reduce the drain on the current supply network as well as to
determine a set of compliance standards – should this be delayed then the network is going to
collapse or personnel are going to be injured.
MMMSA is available to continue the investigation process however this will need to be
negotiated as this process will need more time, more equipment and more personnel.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 36 of 43
10. DISCLAIMER
Due to the high-level visual inspection concept applied to this project and the fact that no in-
depth testing or intrusive inspection was done it should be noted that the recommendations of
MMMSA are for guidance and planning purposes only.
Precise and specific recommendations can only be made after:
1. specific load studies are carried out
2. O/H routes and lengths are determined accurately
3. underground cable route, cable sizes and cable lengths are determined accurately
4. detailed reticulation load studies have been carried out
5. future loading expectations have been determined
6. future building plans have been determined
7. existing “out of commission” equipment has been restored to service as this will
determine capacity
MMMSA cannot be held responsible should any of its planning recommendations be
implemented without further detailed investigations or designs being carried by qualified
professional persons.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 37 of 43
11. APPENDIX A
Report supplied by wortuntdat (Germany)
– “Current electric report”- Jakob Adolph (Project Manager)
Power supply generators GENERAL
We have two big questions.
1) How can the diesel generators be used best for all the electric power needs in
KIUMA?
2) Knowing that there always be long hours of generator use every day, how can the
solar power and battery banks be designed to cover the generator OFF hours and
emergencies for the hospital and vital administration (directors house) and
communication needs.?
The bottom line
• We need to find a Tanzanian technology provider for each of these questions,
preferably one that can give us qualified answers to both issues. (best use of
generators and solar power)
• We want to provide a reasonable learning and work experience for all staff
and students in KIUMA.
• We want to reduce times when “things cannot be done” because there is no
electric power, yet at the same time we want to maximize the use of electric
power when it is ON.
• We want to have an emergency power system in place, for situations when
the generator power is interrupted, no matter for how long.
The remarks below are not in any order of priority.
• Appropriate sized generators should be chosen for different times of the day.
• The water pump needs to run on the same generator as the general electric
supply. Currently the water pump runs only on an “exclusive” generator #3 or #4. This
is due to water pump failures in the past. The “mix” of pumping water and generating
power for various applications in KIUMA was blamed. Possible reasons for these past
failures could have been the “consumption spike” when various electric motors start up
with the generator. Possibly the max. available power was reached on startups. It must
be assured that the generator in use is powerful enough to start ALL attached electric
motors including the “startup spike”.
Before this new “hookup” is tested it must be assured that there is a “spare” water pump
in KIUMA in case this would not work of other not yet identified reasons for failure.
• A detailed List of electric power consumers must be established. There are too many to
mention here, but the biggest ones are:
-All hospital surgery equipment (high wattage lamps, AC´s etc)
-All lights on the entire compound, especially the high beam in the church and the Aula,
there are approximately 130 different sized buildings, providing housing, schooling
facilities, and general living quarters. There are more than 1100 People on the property,
not counted the inpatients at the hospital, a different sized groups that might come for
various meetings and conferences.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 38 of 43
With the extensions and growth expected in the next 24 month, everything should be planned
for at least 1500 residents.
-Various water heaters (especially in the hostel and the Level “A” housing units
-All carpentry and joinery woodworking machinery
-All welding and fabrication machinery
Schedules need to be made of which equipment can NOT be used at the same times! For
example (not more than 3 electric machines in the woodworking shop at the same time or not
more than 2 electric welding machine in the welding and fabrication workshop etc.) These
schedules need to be based on realistic evaluation of the power needs in KIUMA.
• The current generator times need to be adjusted to the agreed times:
08:30-11:30
19:00-23:00
At least, to raise life quality of all personnel and students, and to increase the time the
water pump is running to increase water quantity.
(A second well and pump might be considered for 2014 to cover the expected growth of
the project and to provide water to the Milonde village)
Also it should be considered to run the generator in the afternoons to give more work
time to the VTC machinery, the hospital and the IT classes.
A completely new schedule might be considered, covering the mornings, afternoons
and evenings.
Battery bank and solar power
• KIUMA has two separated solar panel systems, both with its individual battery bank.
(See attached schematic document)
The system at the hospital is vital and it should be the first priority to have an
independent working system in place.
The system supplying the hostel and the directors house is of secondary priority and it
should be a KIUMA decision on how large this system needs to be and if the
guesthouse really needs a 24/7 power supply.
In both cases the reality is that due to the size and type of electric appliances used,
there will be no meaningful “solar only” solution, but there will always be a need to run
diesel generators for the biggest consumers.
So any new or revamped installation should be taken into account that there is a generator
running a few hours every day anyway. At the same time, for cases of emergency the hospital
needs to be able to run for long periods of time only on battery and solar power.
• It also should be considered to combine all solar panels and battery banks into one
powerful system at the hospital (or at the generator house) with the option of supplying
a small Amp line to the directors house for emergencies (to run the lights, satellite
communications and IT)
• All batteries are quite old and tired (with a small exception of added batteries), a full
replacement needs to be considered.
• It needs to be discussed with the hospital doctors which of the equipment needs to be
running in any power situation to find out what the minimum size of the solar and power
bank system needs to be.
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 39 of 43
#1 Generator John Deere, diesel installed 2011 (15Ltr/h)
KVA/KW 23/18
Max KVA/KW 260/208
Volt 400/230
Freq. 50Hz
RPM 1500
Phase 3
Used only when the other generator is in maintenance, due to the higher consumption
Never used to pump water from well.
#2 Generator IVECO AIFO, diesel Installed 2004 (10Ltr/h)
KVA/KW 15/12
Volt 400/230
Freq. 50Hz
RPM 1500
Phase 3
Used most of the time for electric power only, never for pumping water from well
#3 Generator GREAZZO VICENZA ITALY, diesel Installed 2005 (5Ltr/h)
KVA/KW 6/4,8
Volt 110/200/230/400
Freq 50Hz
RPM 1500
Phase 3
Main Generator to pump water from well. Exclusive!
#4 Generator JOHN DEERE, diesel installed 2011 (7Ltr/h)
KVA/KW 6/4,8
Volt 400/230
Freq 50Hz
RPM 1500
Phase 3
Secondary generator exclusive for pumping water from well.
Normal daily current per phase = 75A=17.25 Kw
Daily total current per 3phase=225A=51.75 Kw
These total kilowatt are generated only by #1 and/or #2 generator.
#3 and #4 generators run only the water pump:
Kw 7.50
Volt 400
Amp 18.8
Rpm 2850
Running the waterpump on #1 or #2 generator has led to failure of waterpumps in the past.
A brand-new generator is available in a container:
#5 Generator DIMAGG Listen Petter
KVA/Kw 18.1/14.4
Volt 400
Amp 28.7
RPM 1500
MMMSA Note: KVA rating is 230kVA
KW rating is 180kW
MMMSA Note: KVA rating is 150kVA
KW rating is 120kW
MMMSA Note: KVA rating is 60kVA
KW rating is 48kW
MMMSA Note: KVA rating is 60kVA
KW rating is 48kW
MMMSA Note: KVA rating is 180kVA
KW rating is 144kW
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 40 of 43
12. DRAWINGS
12.1 GENERAL EXISTING LAYOUT (SUPPLIED BY WORTUNDAT)
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 41 of 43
12.2 SINGLE LINE DIAGRAM
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 42 of 43
12.3 SITE LAYOUT – (DETAILING FUTURE EXTENSIONS)
140211 KIUMA Electrical Proposal(S).docx 24 March 2014
Page 43 of 43
12.4 OVERHEAD RETICULATION UPGRADE INCORPORATING THE TEACHERS
TRAINING CENTRE GENERATORROOM / EASTERN GENERATOR ROOM +
WESTERN GENERATOR ROOM

More Related Content

What's hot

Internship Report - Rizwan Asif
Internship Report - Rizwan AsifInternship Report - Rizwan Asif
Internship Report - Rizwan Asif
Rizwan Asif
 
Grid Codes Comparison SWEDEN
Grid Codes Comparison SWEDENGrid Codes Comparison SWEDEN
Grid Codes Comparison SWEDEN
Power System Operation
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)
Sindhuja Balaji
 
Power distribution planning_reference_book__second_edition__power_engineering...
Power distribution planning_reference_book__second_edition__power_engineering...Power distribution planning_reference_book__second_edition__power_engineering...
Power distribution planning_reference_book__second_edition__power_engineering...
sushrut p
 

What's hot (20)

Optimal design and static simulation of a hybrid solar vehicle
Optimal design and static simulation of a hybrid solar vehicleOptimal design and static simulation of a hybrid solar vehicle
Optimal design and static simulation of a hybrid solar vehicle
 
Internship Report - Rizwan Asif
Internship Report - Rizwan AsifInternship Report - Rizwan Asif
Internship Report - Rizwan Asif
 
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
 
Grid Codes Comparison SWEDEN
Grid Codes Comparison SWEDENGrid Codes Comparison SWEDEN
Grid Codes Comparison SWEDEN
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)
 
78 ratna
78 ratna78 ratna
78 ratna
 
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
 
Report
ReportReport
Report
 
Partial Shading in Building Integrated PV System: Causes, Effects and Mitigat...
Partial Shading in Building Integrated PV System: Causes, Effects and Mitigat...Partial Shading in Building Integrated PV System: Causes, Effects and Mitigat...
Partial Shading in Building Integrated PV System: Causes, Effects and Mitigat...
 
unity
unityunity
unity
 
IRJET- Microgrid State of Charge Sharing and Reactive Power Control
IRJET- Microgrid State of Charge Sharing and Reactive Power ControlIRJET- Microgrid State of Charge Sharing and Reactive Power Control
IRJET- Microgrid State of Charge Sharing and Reactive Power Control
 
The Cost of Losses for Future Network Investment
The Cost of Losses for Future Network Investment The Cost of Losses for Future Network Investment
The Cost of Losses for Future Network Investment
 
CV YUVARAJS
CV YUVARAJSCV YUVARAJS
CV YUVARAJS
 
IRJET- Design and Simulation of Solar PV DC Microgrid for Rural Electrification
IRJET- Design and Simulation of Solar PV DC Microgrid for Rural ElectrificationIRJET- Design and Simulation of Solar PV DC Microgrid for Rural Electrification
IRJET- Design and Simulation of Solar PV DC Microgrid for Rural Electrification
 
Index
IndexIndex
Index
 
Power distribution planning_reference_book__second_edition__power_engineering...
Power distribution planning_reference_book__second_edition__power_engineering...Power distribution planning_reference_book__second_edition__power_engineering...
Power distribution planning_reference_book__second_edition__power_engineering...
 
Ijsdr1701014
Ijsdr1701014Ijsdr1701014
Ijsdr1701014
 
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way ForwardLarge Scale Grid Integration of Renewable Energy Sources - Way Forward
Large Scale Grid Integration of Renewable Energy Sources - Way Forward
 
Optimization Modeling and Decision Support for Wireless Infrastructure Deploy...
Optimization Modeling and Decision Support for Wireless Infrastructure Deploy...Optimization Modeling and Decision Support for Wireless Infrastructure Deploy...
Optimization Modeling and Decision Support for Wireless Infrastructure Deploy...
 
Rapid metro gurgaon report
Rapid metro gurgaon report Rapid metro gurgaon report
Rapid metro gurgaon report
 

Viewers also liked

Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
rexcris
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
Ritesh Ambadkar
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
Biswajit Pratihari
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
Abhik Rathod
 

Viewers also liked (20)

Total energy conservation and energy management solutions for intensive energ...
Total energy conservation and energy management solutions for intensive energ...Total energy conservation and energy management solutions for intensive energ...
Total energy conservation and energy management solutions for intensive energ...
 
Proposal of a 550MW electrical power Station
Proposal of a 550MW electrical power StationProposal of a 550MW electrical power Station
Proposal of a 550MW electrical power Station
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
Building Electrical Systems Design
Building Electrical Systems DesignBuilding Electrical Systems Design
Building Electrical Systems Design
 
Basics of earthing
Basics of earthingBasics of earthing
Basics of earthing
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Concepts
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Electrical wiring BY Jemish
Electrical wiring BY JemishElectrical wiring BY Jemish
Electrical wiring BY Jemish
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 
ELECTRICAL WIRING
ELECTRICAL WIRINGELECTRICAL WIRING
ELECTRICAL WIRING
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentation
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project Proposal
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 
Types of wires,cables,connectors and switches
Types of wires,cables,connectors and switchesTypes of wires,cables,connectors and switches
Types of wires,cables,connectors and switches
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 

Similar to 140211 KIUMA Electrical Proposal(S)

Optimum performances of ramallah
Optimum performances of ramallahOptimum performances of ramallah
Optimum performances of ramallah
slmnsvn
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
Paul Soko
 
A motor controller for solar car
A motor controller for solar carA motor controller for solar car
A motor controller for solar car
ibolix
 
ECESD201415_ECE-team07-Enokian_FR (1)
ECESD201415_ECE-team07-Enokian_FR (1)ECESD201415_ECE-team07-Enokian_FR (1)
ECESD201415_ECE-team07-Enokian_FR (1)
Maria Enokian
 
Optimum performance of tulkarim governorate network
Optimum performance of tulkarim governorate networkOptimum performance of tulkarim governorate network
Optimum performance of tulkarim governorate network
slmnsvn
 
BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...
BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...
BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...
Michael Smith
 
Building A Stronger And Smarter Electrical Energy Infrastructure IEEE-USA
Building A Stronger And Smarter Electrical Energy Infrastructure   IEEE-USABuilding A Stronger And Smarter Electrical Energy Infrastructure   IEEE-USA
Building A Stronger And Smarter Electrical Energy Infrastructure IEEE-USA
John Ragan
 
REPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENT
REPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENTREPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENT
REPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENT
Himanshu Paghdal
 
Optimum design and performance for nablus network
Optimum design and performance for nablus networkOptimum design and performance for nablus network
Optimum design and performance for nablus network
slmnsvn
 
From nwokolo eric onyekachi(mini project 492)
From nwokolo eric onyekachi(mini project 492)From nwokolo eric onyekachi(mini project 492)
From nwokolo eric onyekachi(mini project 492)
Eric Brendan
 

Similar to 140211 KIUMA Electrical Proposal(S) (20)

Power system operations
Power system operationsPower system operations
Power system operations
 
Optimum performances of ramallah
Optimum performances of ramallahOptimum performances of ramallah
Optimum performances of ramallah
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
 
Bl dez wt-uen103511
Bl dez wt-uen103511Bl dez wt-uen103511
Bl dez wt-uen103511
 
A motor controller for solar car
A motor controller for solar carA motor controller for solar car
A motor controller for solar car
 
TNB Esah v3.1
TNB Esah v3.1TNB Esah v3.1
TNB Esah v3.1
 
etd7288_MHamidirad
etd7288_MHamidiradetd7288_MHamidirad
etd7288_MHamidirad
 
ECESD201415_ECE-team07-Enokian_FR (1)
ECESD201415_ECE-team07-Enokian_FR (1)ECESD201415_ECE-team07-Enokian_FR (1)
ECESD201415_ECE-team07-Enokian_FR (1)
 
Optimum performance of tulkarim governorate network
Optimum performance of tulkarim governorate networkOptimum performance of tulkarim governorate network
Optimum performance of tulkarim governorate network
 
BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...
BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...
BlackHat 2010 - Electricity for Free - The Dirty Underbelly of SCADA and Smar...
 
Building A Stronger And Smarter Electrical Energy Infrastructure IEEE-USA
Building A Stronger And Smarter Electrical Energy Infrastructure   IEEE-USABuilding A Stronger And Smarter Electrical Energy Infrastructure   IEEE-USA
Building A Stronger And Smarter Electrical Energy Infrastructure IEEE-USA
 
my project
my projectmy project
my project
 
REPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENT
REPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENTREPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENT
REPORT- RADIAL FEEDER PROTECTION PANEL DEVELOPMENT
 
Optimum design and performance for nablus network
Optimum design and performance for nablus networkOptimum design and performance for nablus network
Optimum design and performance for nablus network
 
energy dispatch using virtual power plant
energy dispatch using virtual power plantenergy dispatch using virtual power plant
energy dispatch using virtual power plant
 
From nwokolo eric onyekachi(mini project 492)
From nwokolo eric onyekachi(mini project 492)From nwokolo eric onyekachi(mini project 492)
From nwokolo eric onyekachi(mini project 492)
 
AC_Microgrid_Versus_DC_Microgrid_A_Revie.pdf
AC_Microgrid_Versus_DC_Microgrid_A_Revie.pdfAC_Microgrid_Versus_DC_Microgrid_A_Revie.pdf
AC_Microgrid_Versus_DC_Microgrid_A_Revie.pdf
 
Report on Telecommunication
Report on TelecommunicationReport on Telecommunication
Report on Telecommunication
 
Sustainable Energy for All – A multidisciplinary educational approach.
Sustainable Energy for All – A multidisciplinary educational approach.Sustainable Energy for All – A multidisciplinary educational approach.
Sustainable Energy for All – A multidisciplinary educational approach.
 
Best Protection Practices for HV and EHV AC-Transmission Systems of ENTSO-E E...
Best Protection Practices for HV and EHV AC-Transmission Systems of ENTSO-E E...Best Protection Practices for HV and EHV AC-Transmission Systems of ENTSO-E E...
Best Protection Practices for HV and EHV AC-Transmission Systems of ENTSO-E E...
 

140211 KIUMA Electrical Proposal(S)

  • 1. 140211 KIUMA Electrical Proposal(S).docx 0 03 April 2014 Prepared by: Mobile Missions Maintenance (South Africa) 2014 KIUMA: Tanzania Report: Electrical Installation of Kiuma Complex Barry Thomas (Rev) (NDip Electrical Engineering – T3 Heavy Current) Neil Eichstadt (Rev) (NDip Electrical – N6)
  • 2. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 1 of 43 Contents 1. General Overview of Ministry .........................................................................................................3 2. Client brief..........................................................................................................................................5 3. MMMSA General Observations......................................................................................................5 4. MMMSA Visual Site Evaluations.....................................................................................................6 4.1 Generator Room and Equipment...........................................................................................6 4.2 Battery Room and Batteries....................................................................................................8 4.3 Solar Panel Array.....................................................................................................................10 4.4 Borehole Pump No.1..............................................................................................................10 4.5 Carpentry and Joinery Workshop ........................................................................................12 4.6 Motor Mechanic Workshop..................................................................................................12 4.7 Welding Workshop.................................................................................................................13 4.8 Overhead Reticulation Network...........................................................................................13 4.9 Milling Plant.............................................................................................................................15 4.10 Hospital.....................................................................................................................................15 4.11 General Site.............................................................................................................................16 5. MMMSA “General Impressions”...................................................................................................18 5.1 “Good practices”.....................................................................................................................18 5.2 “Bad practices”........................................................................................................................18 5.3 Safety (Electrical installation and machinery)....................................................................19 6. Loading Table (Including Loading Assumptions)........................................................................21 7. MMMSA Recommendations..........................................................................................................25 7.1 Essential 1 - Generator Room Upgrade...............................................................................25 7.2 Essential 2 - Battery Room Upgrade....................................................................................28 7.3 Essential 3 - Main Solar Array Maintenance......................................................................29 7.4 Essential 4 - Hospital Standby Generator Room................................................................29 7.5 Power supply ordering:..........................................................................................................29 8. MMMSA Suggested Options..........................................................................................................30 8.1 Option 1 – Status Quo............................................................................................................30 8.2 Option 2 - Upgrade Overhead Backbone System only .....................................................31 8.3 Option 3 - Teachers Training Centre Generator Room.....................................................32 8.4 Option 4 - Eastern Generator Room + Western Generator Room ................................33
  • 3. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 2 of 43 8.5 Option 4a – two distinctly separated systems...................................................................34 8.6 Option 4b – both an independent system as well as a linked system...........................34 8.7 Option 5 – 1 x 500kVA 3Ø Central Generator....................................................................35 9. Conclusion ........................................................................................................................................35 10. Disclaimer.........................................................................................................................................36 11. Appendix A........................................................................................................................................37 12. Drawings...........................................................................................................................................40 12.1 General Existing Layout (Supplied by Wortundat)............................................................40 12.2 Single Line Diagram................................................................................................................41 12.3 Site Layout – (Detailing Future Extensions)........................................................................42 12.4 Overhead Reticulation Upgrade incorporating the Teachers Training Centre GeneratorRoom / Eastern Generator Room + Western Generator Room....................43
  • 4. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 3 of 43 1. GENERAL OVERVIEW OF MINISTRY The KIUMA Ministry Complex is located in Southern Tanzania. It is a Christian based organisation with a German heritage and so is currently receiving major financial backing from the “wortundtat mission” based in Essen, Germany. There are currently approximately 1000 people housed on the site and this is expected to increase to 1500 in the future. The ministry facilitates many outreach programmes and so utilises many various building facilities: • School • School Hostel (boys & girls) • Hospital (Patients and Training) • 160 beds • Operating Theatre • Laboratory Site Ministry Location Southern Tanzania 10°45’50.85” S 37°57’37.25” E
  • 5. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 4 of 43 • Nurses Training Centre • Nurse Accommodation Block • Vocational Training Centre • Welding • Motor Mechanics • Tailors • Woodwork • Brick Laying • Church Building (+- 1000 seats) • Conference Centre (+-2500 seats) • Teachers Training Centre (Currently under construction so included in report) • Dormitories • Laboratories • Lecture Rooms • Dining hall • Guesthouse (20 rooms) • Directors House • Staff Housing • Administration Block • Finance Block • General buildings When looking at the entire complex and the existing work already done by KIUMA, a huge amount of progress has been achieved to date. It is never easy to establish and then run a ministry successfully, especially, when the site is in a very rural area far away from resources such as people, equipment and utilities. The impact KIUMA is making extends far beyond its local physical boundaries. However, due to the nature and magnitude of this complex it requires a fairly large and stable electrical supply but with the increase in the ministry’s footprint and programmes the Electrical Network Capabilities and Functionality are not at optimum utilisation. As this electrical network needs “fine tuning” wortundtat mission contacted Operation Mobilisation (OM) in Germany for assistance and so Mobile Mission Maintenance South Africa Trust (MMMSAT) were contacted to carry out a site inspection with a view to proposing some simple solutions to the existing problems.
  • 6. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 5 of 43 2. CLIENT BRIEF The MMMSA Field Technical staff are to carry out a simple visual (non-intrusive) inspection of the existing Electrical Network – this will include: • Overhead Network • Generator Room and related equipment • Battery Room and related equipment • Solar Panel Array • General Inspection of Buildings, Equipment and (where possible) loading On completion of the inspection, MMMSA is to provide a report / proposal that would see the Electrical Network being used correctly, with equipment operating as expected and the loading problems being addressed. This report will be written – with both MMMSA and KIUMA – realising that the report will be for information only and will not be a detailed operational directive nor a detailed plan / costing proposal that is ready for immediate implementation. Should KIUMA decide to utilise the MMMSA proposals then a detailed programme / costing / implementation plan should be drawn up by a recognised, qualified planner / designer – this will then be used as the “blueprint” for further upgrades or refurbishment of existing or future equipment. KIUMA would provide MMMSA with all necessary technical specifications, unlimited access to all sites / equipment and where possible a “site technical assistant” who would be able to give reasonable answers to network related questions raised by the MMMSA team. This assistant should have a reasonable knowledge of the complex Electrical Network and the related “end users”. 3. MMMSA GENERAL OBSERVATIONS Overall observations are that the electrical network has both minor and major flaws in the way it is constructed, utilised and maintained. Minor flaws are generally directed towards simple installation procedures. It would appear is if there are no STANDARD PROCEDURES or INSTALLATION DIRECTIVES for the internal wiring of buildings nor are there any drawings available for any of the installations.
  • 7. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 6 of 43 Major flaws are directed towards overhead construction, generator usage, battery usage and general cable / overhead lengths of line to end user point. These long lines result in volt drops that are critical to the optimal running capacity of the O/H lines - which can also result in damage to sensitive equipment – especially those that are near the end of such O/H runs. Both of these “general observations” are discussed in point 6 “MMMSA General Impressions” 4. MMMSA VISUAL SITE EVALUATIONS 4.1 GENERATOR ROOM AND EQUIPMENT Site is untidy – used as a storage facility Site has poor lighting for safe working conditions Site has exposed wiring and exposed contacts on contactors / switches Contactors / switches are not labelled and have no interlocking protective devices – this means that they can be operated out of correct sequence – possibly paralleling units that cannot electrically be paralleled – this can cause personal injury through accidental contact or “flashing”
  • 8. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 7 of 43 Site has decommissioned wiring still connected to equipment which can lead to a serious accident should it be energised accidently. This extraneous wiring makes it very difficult to determine how the control gear works and makes fault finding even more difficult No labels are fitted to the equipment Frequency meter reading incorrect Generation frequency (reading 47Hz yet should be 50Hz) – this could either be a calibration problem or a genuine under-frequency fault. Under-frequency generation can lead to numerous faults / issues on the system especially for frequency sensitive equipment (computers etc) Load balancing of network is not correct: (readings taken with “clip-on” induction type ammeter) • IRØ = 55A This current fluctuated up to 70A which leads to the imbalance current (In) in the Neutral • IWØ = 34A • IBØ = 35A • N = 25A Problem – no current should flow in the Neutral if system is correctly balanced. This Imbalance Current (In) can result in severe damage to the equipment supplied by the network. This is generally a current which creates high temperatures which in turn damage insulation and windings. It was realised when registering this current that the Generators do not have Negative Phase Sequence protection (Inps) nor Imbalance Current protection (In) – it is a recommendation that this be installed. (Note: The Control Panel Mounted Ammeter does not work and so discrepancies in Current Flow cannot be detected)
  • 9. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 8 of 43 4.2 BATTERY ROOM AND BATTERIES Inadequate safety standards / precautions (see Point 6.iii – Safety) Battery Room dirty Main cable connections to battery bank poorly run and poorly connected The 220Vac input to the inverter is faulty – needs to be repaired Batteries not maintained – cells physically dirty which can lead to Leakage Current (Ileak) which can damage batteries or cause a “flash” to other equipment or to personnel operating on the batteries. No hydrometer available to ensure correct Specific Gravity (SG) readings – this monitors the Acid / Water mixture to ensure correct delivery of battery as well as help manage a prolonged useful lifespan of the cells and the bank. Discarded / de-commissioned batteries left in battery area Discarded / de-commissioned Invertor Unit left in battery area Exposed wiring is outside of the building and is “live’ – this is a serious hazard
  • 10. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 9 of 43 Control gear is not labelled Inadequate lighting to carry out maintenance or repairs safely No drawings detailing the following: • Charging circuits – how the battery bank is charged • Outgoing connections – where the outgoing circuits go • How the bank actually integrates with the rest of the system It can be expected that the output voltage of the bank is “low” due to a number of cells being decommissioned (Note: It is the personal opinion of the writer that the batteries are nearing the end of their useful lifespan due to negligence in maintenance and loading. A new bank should be sourced ASAP and prepared to be installed. The new installation should be done by a DC Battery Installation Professional so that all necessary safety and operational standards are met) It should also be noted that the Battery bank should only be utilised as a “back up” system and not a regular supplier of power to end users. Generally it is the main power feed that supplies the end users while simultaneously “trickle” charging the bank. The bank only comes into operation should the main power supply fail. This continual charge / discharge can harm the cells.
  • 11. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 10 of 43 4.3 SOLAR PANEL ARRAY The array appears to be in relatively good condition however it could not be determined if the array actually “follows the sun” and if it has the facility- “does the function actually still work” – this should be determined, as the function will increase the arrays efficiency by having more “sun time” 4.4 BOREHOLE PUMP NO.1 Readings taken while pump running 1Ø Voltage Readings 3Ø Voltage Readings Phase Currents Voltage Swing Voltage Swing Current Swing RØ - N 229V – 236V RØ – WØ 395V – 408V RØ 16.8A – 17.1A WØ - N 227V – 234V RØ - BØ 394V – 405V WØ 16.5A – 16.7A BØ - N 229V – 237V WØ - BØ 392V – 403V BØ 15.9A – 19.9A Neutral 0.02A – 3.3A This pump appears to be running well as the nameplate has a running current (Irun) of 18.8A. The voltages supplied from the source generator also appear to be well within normal accepted values +- 10% of base line voltage 207V-253V single phase with base = 230V (Ø-N) 360V-440V three phase with base = 400V (Ø-Ø) When these reading were taken the pump was already running, however, when looking at the supply cable some problems were noted:
  • 12. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 11 of 43 • The supply cable run is approximately 500m-600m depending on the exact route • The cable changes size from generator room supply (10 or 16mm2) to the pump supply (6mm2) • The cable has joints in it (not normally a problem but if not done correctly could create flow problems or leakage) When a pump starts up – depending on whether it has Direct-on-line (DoL) starting or Star-Delta (Υ ) starting – it can draw up to 7x the normal running current (therefore Istart = Irun x 7 so the start-up current could be as high as 18.8A x 7 = 131.6A and this raised current flow can last for up to 5 cycles) which means that a cable of this length – if not sized correctly – could have a very dramatic volt drop (Vdrop) at the pump connections. This could lead to two things: • Generator damage due to the high demand to start the pump (possible cause of existing generator damage) • Under voltage at the pump which could damage the windings during start-up and ultimately lead to pump failure. Note: This cable sizing needs to be addressed as a matter of urgency and if necessary a larger cable needs to be installed or the pump should be supplied with its own generator at the pump house. What is concerning is that another water supply tank is currently being built – where will this pump be? If it is to be alongside the existing pump house then it can be presumed that the pump will be supplied via the same supply cable / generator connection. Damage is almost certain to occur. It is recommended then that should this be the future plan that a dedicated generator supply is provided at the pump house. Another solution to the starting Volt drop could be to install a Soft Start (SS) system – this will need to be investigated further.
  • 13. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 12 of 43 4.5 CARPENTRY AND JOINERY WORKSHOP Insufficient lighting for safe work practices Distribution boards open and wiring exposed Generally appears to have sufficient power outlets however due to the distance that this building is situated from the generator supply room it can be expected that - when the system is under loaded conditions – this area will have a negative influence on the total system integrity should numerous cutting machines be activated simultaneously. 4.6 MOTOR MECHANIC WORKSHOP Insufficient lighting for safe work practices
  • 14. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 13 of 43 4.7 WELDING WORKSHOP Insufficient lighting for safe working practices Generally appears to have sufficient outlets however due to the distance that this building is situated from the generator supply room it can be expected that - when the system is under loaded conditions – this area will have a negative influence on the total system integrity should numerous welders be activated simultaneously. 4.8 OVERHEAD RETICULATION NETWORK Overhead lines use recognised conductor (Airdac) and recognised “manufacturer tagged” poles. It would appear too that all poles are buried to correct depths (+- 16% of total pole length) Attempts have been made to use a standard on O/H pole-tops with regards “bobbins” and “tying in”. However there are many instances where the conductor is placed on the wrong side of the bobbin and so the pressure of the angle is on the “binding wires” and not on the bobbin as it should be. Pole Binding Wire Incorrect Bobbin Conductor Correct
  • 15. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 14 of 43 This will result in the binding wire chaffing the conductor insulation and eventually cause a break down which may result in an Earth fault (IEfault). This IEfault can either cause a pole top fire or a resulting Negative Phase Sequence fault on the generator which without the adequate protection could result in the generator being damaged or destroyed. However should the fault be of a very low value Sensitive Earth fault (ISE/F) this could result in damage to equipment or even a possible death due to a leakage current that is not detected timeously. Pole compaction is good Stay wires are installed on angle poles (however it should be noted that many are installed at incorrect angles and so the poles are leaning into the stress angle) Take-offs are not always installed correctly nor are some of the take-offs in use – however the connections are still on the pole – this can lead to accidental contact PoleStay Wires Incorrect Conductor Stress angle * Sometimes a bisecting stay may be necessary to prevent pole toppling Correct
  • 16. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 15 of 43 In some case no insulators are used to fasten conductors to poles. This can cause breakdown of insulation and therefore faults that may be very difficult to detect – especially if there is no protection to detect the fault. 4.9 MILLING PLANT No safety equipment being used by the operator De-commissioned equipment still standing in working area 4.10 HOSPITAL The hospital inspection was very superficial due to the being very limited access to the site - however there are some minor issues where wires in boxes are exposed to human contact.
  • 17. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 16 of 43 The battery bank appear to be relatively new and in good condition – this looks to be a sealed maintenance free lead acid bank The Solar Array appears to be operating well – supplying the hospital batteries - however the 220Vac input to the inverter is faulty – needs to be repaired. 4.11 GENERAL SITE It was noted in the new ‘Finance office” that the main Distribution Board has been wired incorrectly. The main incoming feeds are fed into the bottom of the breakers when they should be fed into the top with the load being taken from the bottom. This means that the breakers may work when detecting a fault but may not work correctly. In the new Finance Room – there has been a splitting of phases and a splitting of protection circuits – the standard / principle used here appears to be very irregular and should be seen as hazardous – it is the writers recommendation that this buildings wiring should be removed and re-instituted to acceptable safe standards
  • 18. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 17 of 43 “Teeing” into lines to power a site is often done without the correct procedures or materials. Temporary installations are also done without “due diligence” to safety standards or with regard to correct procedures – these are a hazard to personnel. The sight where the photo below was taken is currently “standing” however the cables have been left in position
  • 19. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 18 of 43 5. MMMSA “GENERAL IMPRESSIONS” 5.1 “GOOD PRACTICES” Overhead lines use recognised conductor (Airdac) and recognised “tagged” poles. It would appear too that all poles are buried to correct depths (16% of pole length) Attempts have been made to use a standard on O/H pole-tops with regards “bobbins” and “tying in”. Pole compaction is good Stay wire are installed on angle poles (however it should be noted that many are installed at incorrect “bisecting” angles and so the poles are leaning into the stress angle) Original installations were done to a high standard (however they have since deteriorated) Building electrical installations appear to be safe and well installed (however standard installation procedures are not consistent over the entire complex) 5.2 “BAD PRACTICES” x No site “as built” Overhead system electrical drawings are available – detailing conductor type, size, length or position x No standards installation procedures are used for domestic installations: • houses are wired according to each installers own interpretation • excessive use of materials result in over expenditure at some installations which also leads to redundancy on protection of systems x Correct phase load balancing is not practised and so it appears as if the RedØ is excessively loaded while the WhiteØ and BlueØ are under loaded. This has resulted in a large imbalance on the O/H system as well as the Generator supply. (See point 5.i)
  • 20. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 19 of 43 x Trees are encroaching on the O/H lines and these can cause the lines to break under windy conditions x 3-Phase (3Ø) is used into some houses – this is totally redundant when looking at loading. This may have been done because of Air Conditioner (A/C) usage but it would be recommended that A/C units are only installed in essential areas not domestic or office facilities as this places undue burden on the Generator set as well as induces imbalance current should the loads not be connected correctly to allow for Single Phase (1Ø) take-offs. x Throughout the complex decommissioned wiring is left in place while telephone and television wiring is running alongside power supply cabling – this can lead to personal injury if handled by inexperienced or untrained staff 5.3 SAFETY (ELECTRICAL INSTALLATION AND MACHINERY) No Safety Standards are in place and staff not trained in these standards Staff who monitor equipment are not adequately trained Some machinery has exposed moving parts – no guards in place to protect operators or passers-by No standard operating procedures in place for machinery or Electricity Network operations Operators of “noisy” machinery not using ear protection Operators of “moving / cutting” machinery not using eye protection Welders not using eye protection Welding workshop has inadequate lighting for safe working
  • 21. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 20 of 43 Carpentry / joinery workshop has inadequate lighting for safe working Milling room has inadequate lighting for safe working Battery room has no eye protection available (full face shield – splashing Sulphuric Acid H2SO4) Battery room has no hand protection available (full leather gloves) Battery room has no body protection available (leather apron) Battery room has no body cleaning protection available (shower / water source) Carpenters working on machinery not using breathing masks Carpenters working on machinery not using eye protection Carpenters working on machinery not using gloves Carpenters working on machinery not using ear protection Metal roofs are not adequately earthed – cannot dissipate faults No lightning protection is installed at any of the supply points or end user points No lightning masts are installed around the property to alleviate the possibility of building strikes All fire extinguishers service dates outdated – should a fire occur then these will be of no use There is no central library / storage area for all documentation of manuals for equipment A major concern is around the earthing of the generators and the reticulation network. Should this earthing be inadequate then the possibility of serious injury to people of damage to equipment is multiplied. Earthing is critical to the safe working and electrical integrity of any system. This needs to be investigated as a matter of urgency.
  • 22. 140211 KIUMA Electrical Proposal(S).docx 21 03 April 2014 6. LOADING TABLE (INCLUDING LOADING ASSUMPTIONS)
  • 23. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 22 of 43
  • 24. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 23 of 43
  • 25. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 24 of 43
  • 26. 140211 KIUMA Electrical Proposal(S).docx 25 03 April 2014 7. MMMSA RECOMMENDATIONS 7.1 ESSENTIAL 1 - GENERATOR ROOM UPGRADE The # 1 JOHN DEERE diesel generator is currently in service supplying both the complex as a whole and the small water pump alongside the generator room (details unavailable) This unit has the power capability of running the entire complex under a load condition of 54% diversity (see point 7 - loading table). It is crucial to the electricity security of the complex that this generator be serviced so that it is available at all times to supply KIUMA The only negative point with regard this unit is that its fuel consumption is high – 15L/hr The # 2 IVECO AIFO diesel generator is currently out of service and it’s availability for service could not be determined. This unit has the power capability of running the entire complex under a load condition of 35% diversity (see point 7 - loading table). Relatively high fuel consumption – 10L/hr It is also essential that this unit be serviced and made ready for use. It stands as a “back-up” to the #1 generator should that unit need servicing or repairs.
  • 27. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 26 of 43 The # 3 GREAZZO VICENZA ITALY diesel generator is currently running the water pump at Borehole #1. Fuel consumption – 5L/hr This machine is far under-utilised for its power delivery capacity and it is recommended that it be moved to the site of the Borehole #1 pump house and be used as a dedicated supply for both Borehole #1 and the future Borehole #2 pump. The #4 JOHN DEERE diesel generator is currently out-of-service at present and needs urgent attention. It is also generally used to supply the pump at Borehole #1 when serviceable. Fuel consumption – 7L/hr It is also recommended that this generator be moved to the new site alongside the Borehole #1 pump house. This can be used as a back-up to generator #3 when it is moved. This will allow the other to be serviced / repaired without any loss of pumping capacity.
  • 28. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 27 of 43 The generator room is in serious need of maintenance, cleaning and refurbishing (if possible). There are numerous cables still attached to equipment that is no longer serviceable or in use. These are a hazard. It would also be recommended that the building be painted and adequate lighting installed to ensure safe lit working conditions. The floor can also be painted with a diesel repellent so as to protect the concrete from becoming corroded – this will also allow for easier cleaning should a spillage occur. It is also a recommendation that the main supply boards be removed and cabinet mounted units be installed. These cabinets should be fitted with the necessary generator electrical controls, generator protection relays and outgoing line protection. As both Gen #1 and Gen #2 can / are to be used to supply the reticulation network it is recommended that the cabinet be wired in such a way that they: • can work independently of each other (“chop-over” installed) or • can be utilised in parallel – HOWEVER this facility needs careful attention as the two units have differing output capacities and should they be running simultaneously under heavy load (above 35% diversity) the load may be distributed between them to the detriment of the smaller Gen#2. Requires complicated control circuitry. This cabinet will ensure safer operating conditions for the operating staff as well as greater efficiency in supplying power to the complex.
  • 29. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 28 of 43 NB! - It is also recommended that a diesel fuel tank (with level indicator) be installed adjacent to the building that will allow for a gravity feed into both Generators (+- 500 litre capacity should be sufficient) – this can also be mounted on a small platform to allow for sufficient “fall”. This tank will allow for at least 40 hours use by the generators (when running singularly or 20 hours running in parallel). This tank can be filled from outside of the generator room and so alleviates possible diesel spills as well as the possibility of fire should the diesel ignite within the building. 7.2 ESSENTIAL 2 - BATTERY ROOM UPGRADE At present, the battery room is a hazard. Cabling is in disarray, the control board is not labelled adequately, the lighting is insufficient, the room is dirty and the batteries themselves are filthy. It is difficult to determine how this system is integrated into the rest of the network. It is recommended that the room be painted with a good white wall coating while the floor is provided with a good covering that will protect the concrete from spillage of acid. The barricade to cordon the batteries off from the rest of the room is a hazard as it can cause the operator to trip and fall into the batteries possibly cause a short circuit on contact. This DC short circuit current can run in the hundreds/thousands of Amperes – this may not be lethal contact but the operator can be severely burnt. It is also recommended that the battery output be connected to an “insulated” copper busbar that runs along the wall and is then connected into a control panel fitted to the wall. This panel will house all the control circuitry and protection necessary to monitor, control and protect the battery bank and its feed into the network. The capacity of the bank needs to be calculated correctly - Full load Current (IFL) and No-load current (INL) needs to be determined and the bank sized accordingly. A DC Battery Bank specialist is recommended to do this calculation and a recognised installer be utilised to carry out the necessary battery room upgrades and installations.
  • 30. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 29 of 43 The current invertor has no 220Vac input capability and the spare unit is unserviceable – these faults need to be corrected as a matter of urgency – again by a recognised DC specialist. 7.3 ESSENTIAL 3 - MAIN SOLAR ARRAY MAINTENANCE The suitability of this bank needs to be ascertained by a recognised Solar Energy Specialist and then if suitable it needs to be serviced – especially with regard “sun tracking” and cabling. The connection to the battery bank needs to be checked and corrected. This connection is not labelled nor can it be determined accurately how it connects into the existing network. 7.4 ESSENTIAL 4 - HOSPITAL STANDBY GENERATOR ROOM Due to the nature of the work carried out by the hospital it is essential that the hospital have an “emergency services” supply capability. The power supply to the hospital needs to be secure and stable. Should the power fail during surgery the resulting disaster could have far-reaching effects on the KIUMA ministry in Tanzania. Therefore, it is recommended that the hospital receive its own dedicated generator supply room. The hospital currently runs off the existing generator supply which is adequate. A battery system with Solar Array charging is the standby supply. This system can be maintained however it does need to be maintained and proper control panels installed with correct labelling (this system can become back-up No.3). A new generator supply room should be installed that will become back-up No.2. 7.5 POWER SUPPLY ORDERING: 1 st .Main Generator supply 2nd . Hospital Standby Generator 3 rd . Battery / Solar Array
  • 31. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 30 of 43 Should the main supply fail and the generator fail to start then the control panel should engage the battery / solar back-up system. This new arrangement will ensure that the hospital operating theatres are always supplied with power. The new system also allows for maintenance for crucial supply units without endangering power supply security. KIUMA currently have a suitable generator in storage on site (DIMAGG Listen Petter diesel 3Ø 180kVA). This unit should be suitable to supply current needs as well as the future extensions and related power demands. All that is required is the necessary room, control equipment, fuel supply unit and cabling into the existing supply network NOTE: This standby unit should not be used to “shore up” the existing power network as this may have a negative effect on its performance and emergency status. The position of the standby room is recommended to be alongside the current Hospital Solar Array as this allows for minimal cabling into the existing network. 8. MMMSA SUGGESTED OPTIONS 8.1 OPTION 1 – STATUS QUO This option is available however it comes with many negatives. At present the electrical system operates but not at optimum capacity. Should this option be exercised then KIUMA need to understand that the current problems will not only continue but will in all probability worsen:
  • 32. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 31 of 43 • Loading imbalances become greater • Overhead backbone system becomes increasingly overloaded • Overhead backbone system becomes increasingly susceptible to faults and downtime • Battery capacity diminishes with each loading cycle and will eventually fail • Solar Array capacity diminishes • Internal building wiring and security remains without standards or procedures and so becomes a liability to all users and operators • Fault finding remains a hazard • The possibility of extended downtime of power supply multiplies as the existing network setup ages. 8.2 OPTION 2 - UPGRADE OVERHEAD BACKBONE SYSTEM ONLY This option provides for minimal system enhancements at minimum cost. The current system overheads are running near capacity which means that the effective lifespan is diminishing due to overloading - as new user points are added the loading increases and the aging process increases. By upgrading the overhead backbone (main supply) the loading rate decreases which allows for more end users to be connected. This, however, cannot provide an unlimited source of supply points and so needs to be monitored closely – the ability to carry full load for an unlimited time is not possible. The end users / loadings added will determine the lifespan and capacity of the newly installed backbone. It is recommended that the backbone be upgraded to either 25mm2 Aerial Bundle Conductor (ABC) or 25mm2 Airdac (3 x single phase lines + Neutral). This system however will need to be determined and calculated by a recognised professional line designer utilising a power flow / profiling package. The system should also be fitted with the necessary hardware (poles, bobbins, ties, stays etc) as well as in-line links to facilitate easier fault finding and system versatility. Normally Open Points (NOP’s) should also be incorporated into the design to allow for the network to be “fed via different routes” – this will allow for easier fault finding and system versatility.
  • 33. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 32 of 43 All take-off points to end users should be via a Pole-top Box (PTB) that incorporates a protective device (MCB) to protect the overhead line from end user faults. The integrity of the overhead line is better using these PTB’s. 8.3 OPTION 3 - TEACHERS TRAINING CENTRE GENERATOR ROOM This option keeps the existing system connected as it is (or allows for the backbone upgrade) but allows for an additional Generator room to be built at the proposed Teachers Training Centre (TTC). This will cater for all expansions around this area of the complex but does not alleviate problems caused by the long supply run to the Vocational School Workshops fed from the existing generator room – this area does put a certain drain onto the supply network. It is also a rather costly exercise as a new generator needs to be purchased and a room built to house the generator and all its related control and protection circuitry. It only alleviates a minimal loading problem and should not be seen as a long term solution to the current electrical system shortcomings.
  • 34. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 33 of 43 8.4 OPTION 4 - EASTERN GENERATOR ROOM + WESTERN GENERATOR ROOM This option would be the costliest recommendation but will be the best solution to all the current problems as well as the future loading considerations. This option relies on the understanding that Essential 1-4 have been carried out. As well as upgrading the overhead backbone system this option calls for the installation of an additional Generator Supply Room designated Western Generator Room (WGR). The existing generator room is designated Eastern generator Room (EGR). (Existing Generator Room) (New Generator Room) Eastern Generator Room Western Generator Room Main Line Take Offs These connection parameters can be decided on through optimal routes/loadings being developed by using a simulation computer programme – this means that exact areas of supply will need to be clearly defined and implemented. EGR This Generator room feeds all existing network excluding: • TTC • Borehole #1 pump house (self- supplying) • Vocational School Workshops WGR This Generator room feeds: • TTC • Vocational School Workshops • new developments west of the “old Runway” NOP
  • 35. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 34 of 43 8.5 OPTION 4A – TWO DISTINCTLY SEPARATED SYSTEMS. These two generator rooms are coupled in such a way that they run independently of each other – feeding independent systems – with a Normally Open Point (NoP) ensuring that they cannot be run in parallel. This means that each generator room is equipped with two by generators (Main & Standby) that are capable of maintaining a secure supply to all end users. The NoP is designed in such a way that the two lines cannot be linked together – how this is achieved will be decided on by the designer and installer. 8.6 OPTION 4B – BOTH AN INDEPENDENT SYSTEM AS WELL AS A LINKED SYSTEM. Running in parallel (NoP closed via links) could create problems but with some expensive protection and control circuitry these problems could be alleviated (Synchronising relays, phase angle monitors, speed monitoring relays etc). The two systems are linked together by means of a set of pole mounted links that have an interlocking system connected to them. This system will only allow the links to be closed should all the necessary requirements be met by both generator rooms ie • synchronised speed • correct phase angle • correct phasing • balanced load (These are not the only criteria and so this system does need to be designed and installed by a competent recognised person / company) Running with either of these options - 4a or 4b - allows for a marked increase in system capability – each has distinct advantages and disadvantages – these will need to be explored by KIUMA (and the relevant designers) to see which will give maximum benefit to the complex for least capital outlay (although capital outlay should not be an exclusion detail).
  • 36. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 35 of 43 • Option 4a will be the cheaper option but will give limited long term benefits. • Option 4b may be the most expensive yet the long term benefits will support the capital outlay. (Will the outlay compensate for future expansion and bring a greater return – that needs to be decided by KIUMA) 8.7 OPTION 5 – 1 X 500KVA 3Ø CENTRAL GENERATOR A simple solution is to upgrade the existing overhead network and install 1 x 500kVA generator with all related control circuitry and protection devices. This unit is then connected to the network which then encompasses the entire complex Eastern area and Western Area 9. CONCLUSION The complex appears to be able to cope with the existing loading and design of the electrical network – however the current situation will not be sufficient for the KIUMA complex to continue operating well into the near future. Equipment is not being maintained, New buildings are being added to the loading without the network capacity being upgraded to meet the new requirements Standard installation procedures are not being used – this leads to a variety of practices all of which affect the safety, capacity and electrical integrity of the current system (and future system should this not be addressed) A variety of “imported” equipment is being used – this does not allow for easy maintenance or for readily available spares to be obtained. Local equipment needs to be utilised or sufficient spares need to be kept on site (this can be a very costly exercise) Installation staff are not suitably trained An intervention is required soon to reduce the drain on the current supply network as well as to determine a set of compliance standards – should this be delayed then the network is going to collapse or personnel are going to be injured. MMMSA is available to continue the investigation process however this will need to be negotiated as this process will need more time, more equipment and more personnel.
  • 37. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 36 of 43 10. DISCLAIMER Due to the high-level visual inspection concept applied to this project and the fact that no in- depth testing or intrusive inspection was done it should be noted that the recommendations of MMMSA are for guidance and planning purposes only. Precise and specific recommendations can only be made after: 1. specific load studies are carried out 2. O/H routes and lengths are determined accurately 3. underground cable route, cable sizes and cable lengths are determined accurately 4. detailed reticulation load studies have been carried out 5. future loading expectations have been determined 6. future building plans have been determined 7. existing “out of commission” equipment has been restored to service as this will determine capacity MMMSA cannot be held responsible should any of its planning recommendations be implemented without further detailed investigations or designs being carried by qualified professional persons.
  • 38. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 37 of 43 11. APPENDIX A Report supplied by wortuntdat (Germany) – “Current electric report”- Jakob Adolph (Project Manager) Power supply generators GENERAL We have two big questions. 1) How can the diesel generators be used best for all the electric power needs in KIUMA? 2) Knowing that there always be long hours of generator use every day, how can the solar power and battery banks be designed to cover the generator OFF hours and emergencies for the hospital and vital administration (directors house) and communication needs.? The bottom line • We need to find a Tanzanian technology provider for each of these questions, preferably one that can give us qualified answers to both issues. (best use of generators and solar power) • We want to provide a reasonable learning and work experience for all staff and students in KIUMA. • We want to reduce times when “things cannot be done” because there is no electric power, yet at the same time we want to maximize the use of electric power when it is ON. • We want to have an emergency power system in place, for situations when the generator power is interrupted, no matter for how long. The remarks below are not in any order of priority. • Appropriate sized generators should be chosen for different times of the day. • The water pump needs to run on the same generator as the general electric supply. Currently the water pump runs only on an “exclusive” generator #3 or #4. This is due to water pump failures in the past. The “mix” of pumping water and generating power for various applications in KIUMA was blamed. Possible reasons for these past failures could have been the “consumption spike” when various electric motors start up with the generator. Possibly the max. available power was reached on startups. It must be assured that the generator in use is powerful enough to start ALL attached electric motors including the “startup spike”. Before this new “hookup” is tested it must be assured that there is a “spare” water pump in KIUMA in case this would not work of other not yet identified reasons for failure. • A detailed List of electric power consumers must be established. There are too many to mention here, but the biggest ones are: -All hospital surgery equipment (high wattage lamps, AC´s etc) -All lights on the entire compound, especially the high beam in the church and the Aula, there are approximately 130 different sized buildings, providing housing, schooling facilities, and general living quarters. There are more than 1100 People on the property, not counted the inpatients at the hospital, a different sized groups that might come for various meetings and conferences.
  • 39. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 38 of 43 With the extensions and growth expected in the next 24 month, everything should be planned for at least 1500 residents. -Various water heaters (especially in the hostel and the Level “A” housing units -All carpentry and joinery woodworking machinery -All welding and fabrication machinery Schedules need to be made of which equipment can NOT be used at the same times! For example (not more than 3 electric machines in the woodworking shop at the same time or not more than 2 electric welding machine in the welding and fabrication workshop etc.) These schedules need to be based on realistic evaluation of the power needs in KIUMA. • The current generator times need to be adjusted to the agreed times: 08:30-11:30 19:00-23:00 At least, to raise life quality of all personnel and students, and to increase the time the water pump is running to increase water quantity. (A second well and pump might be considered for 2014 to cover the expected growth of the project and to provide water to the Milonde village) Also it should be considered to run the generator in the afternoons to give more work time to the VTC machinery, the hospital and the IT classes. A completely new schedule might be considered, covering the mornings, afternoons and evenings. Battery bank and solar power • KIUMA has two separated solar panel systems, both with its individual battery bank. (See attached schematic document) The system at the hospital is vital and it should be the first priority to have an independent working system in place. The system supplying the hostel and the directors house is of secondary priority and it should be a KIUMA decision on how large this system needs to be and if the guesthouse really needs a 24/7 power supply. In both cases the reality is that due to the size and type of electric appliances used, there will be no meaningful “solar only” solution, but there will always be a need to run diesel generators for the biggest consumers. So any new or revamped installation should be taken into account that there is a generator running a few hours every day anyway. At the same time, for cases of emergency the hospital needs to be able to run for long periods of time only on battery and solar power. • It also should be considered to combine all solar panels and battery banks into one powerful system at the hospital (or at the generator house) with the option of supplying a small Amp line to the directors house for emergencies (to run the lights, satellite communications and IT) • All batteries are quite old and tired (with a small exception of added batteries), a full replacement needs to be considered. • It needs to be discussed with the hospital doctors which of the equipment needs to be running in any power situation to find out what the minimum size of the solar and power bank system needs to be.
  • 40. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 39 of 43 #1 Generator John Deere, diesel installed 2011 (15Ltr/h) KVA/KW 23/18 Max KVA/KW 260/208 Volt 400/230 Freq. 50Hz RPM 1500 Phase 3 Used only when the other generator is in maintenance, due to the higher consumption Never used to pump water from well. #2 Generator IVECO AIFO, diesel Installed 2004 (10Ltr/h) KVA/KW 15/12 Volt 400/230 Freq. 50Hz RPM 1500 Phase 3 Used most of the time for electric power only, never for pumping water from well #3 Generator GREAZZO VICENZA ITALY, diesel Installed 2005 (5Ltr/h) KVA/KW 6/4,8 Volt 110/200/230/400 Freq 50Hz RPM 1500 Phase 3 Main Generator to pump water from well. Exclusive! #4 Generator JOHN DEERE, diesel installed 2011 (7Ltr/h) KVA/KW 6/4,8 Volt 400/230 Freq 50Hz RPM 1500 Phase 3 Secondary generator exclusive for pumping water from well. Normal daily current per phase = 75A=17.25 Kw Daily total current per 3phase=225A=51.75 Kw These total kilowatt are generated only by #1 and/or #2 generator. #3 and #4 generators run only the water pump: Kw 7.50 Volt 400 Amp 18.8 Rpm 2850 Running the waterpump on #1 or #2 generator has led to failure of waterpumps in the past. A brand-new generator is available in a container: #5 Generator DIMAGG Listen Petter KVA/Kw 18.1/14.4 Volt 400 Amp 28.7 RPM 1500 MMMSA Note: KVA rating is 230kVA KW rating is 180kW MMMSA Note: KVA rating is 150kVA KW rating is 120kW MMMSA Note: KVA rating is 60kVA KW rating is 48kW MMMSA Note: KVA rating is 60kVA KW rating is 48kW MMMSA Note: KVA rating is 180kVA KW rating is 144kW
  • 41. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 40 of 43 12. DRAWINGS 12.1 GENERAL EXISTING LAYOUT (SUPPLIED BY WORTUNDAT)
  • 42. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 41 of 43 12.2 SINGLE LINE DIAGRAM
  • 43. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 42 of 43 12.3 SITE LAYOUT – (DETAILING FUTURE EXTENSIONS)
  • 44. 140211 KIUMA Electrical Proposal(S).docx 24 March 2014 Page 43 of 43 12.4 OVERHEAD RETICULATION UPGRADE INCORPORATING THE TEACHERS TRAINING CENTRE GENERATORROOM / EASTERN GENERATOR ROOM + WESTERN GENERATOR ROOM