Heating and Air Conditioning System Installation for a Mixed-Use Facility - Atlanta, GA
1.
2. Project Name
1010 Midtown
Project Location
Atlanta, Georgia
Project Team
Owner: Daniel Corporation
General Contractor:
Brasfield & Gorrie
Architect: Rule Joy
Trammell + Rubio
Engineer: Jordan & Skala
Project Status
Completed
LEED® Certification Level
N/A
3. McKenney’s installed a heating and air conditioning system at a new
mixed-use, multi-family high-rise condominium.
4. The Challenge
McKenney’s needed to install a complete condenser water plant
including pumps and cooling towers. Simultaneously, water source heat
pumps in each of the approximately 350 units spread over 35-floors had
to be installed in the condominium tower. Rough-in had to be
coordinated in very tight spaces with nine-foot floor-to-floor heights.
The Solution
Extensive planning, shop drawings, prefabrication of piping and sheet
metal ductwork, and off-site pre-assembly contributed to the successful
installation. The team also carefully coordinated equipment, material
deliveries and packaging necessary for lifting the components to all 35
floors. They also helped create and drive the schedule to complete the
work at one time and minimize return trips into the condominiums.
5. The Results
Building owner Daniel Corporation was impressed by the team’s very
high productivity and quality work that resulted in on-time completion
with no injuries.
6. 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
Atlanta Office:
Charlotte Office:
www.mckenneys.com
7. 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
Atlanta Office:
Charlotte Office:
www.mckenneys.com