2Q09 Results
Presentation




                                         São Paulo, August 17th 2009


          © Todos os direitos reservados para CTEEP
Agenda




                    Company Update

                    2Q09 Results

                    Capital Market Performance

                    Subsequent Events




2Q09 Results Presentation      © Todos os direitos reservados para CTEEP   2
Company Update


                                                                  Leading private sector energy
                                                                 transmission concessionaire in
                                                                             Brazil.

                                                                 Responsible for transmission of
                                                                30% of electricity produced in the
                                                                country and 60% of consumption
                                                                        in the Southeast.


                                                                First São Paulo electricity energy
                                                                company to sign up to Bovespa’s
                                                                 Level 1 Corporate Governance.


                                                                        Footprint in 12 states.



2Q09 Results Presentation   © Todos os direitos reservados para CTEEP                             3
12,140 km of Transmission Lines                     102 Substations




High Technology




                                                                         Miguel Reale
                                                                         Substation
 2Q09 Results Presentation   © Todos os direitos reservados para CTEEP                  4
COT- Transmission Operating Center - Jundiaí




COR- Backup Operations
Center - Cabreúva




2Q09 Results Presentation   © Todos os direitos reservados para CTEEP   5
CTEEP and its Shareholder’s Breakdown

    Common Shares - TRPL3                                         Preferred Shares – TRPL4
    (42% of total)                                               (58% of total)

  9.85%              0.75%                                                          35.59%
                                     ISA Capital do Brasil                                                  Eletrobrás

                                     Eletrobrás                                                             Secretaria da Fazenda

                                     Other                                                                  Other




                                89.40%                           10.77%                               53.64%



                Total Paid Up Capital

                                                                                         ISA Capital do Brasil
                        27.25%
                                                                          37.46%         Eletrobrás

                                                                                         Other
                            35.29%




2Q09 Results Presentation                    © Todos os direitos reservados para CTEEP                                          6
Agenda




                   Company Update

                   2Q09 Results

                   Capital Market Performance

                   Subsequent Events




2Q09 Results Presentation         © Todos os direitos reservados para CTEEP   7
Net Revenue


               Revenue linked to uptime of the Company’s assets
     (R$ million)




                                                 +14.9%

                                                                   -1.6%

                                                   419.9                        413.1
                            359.6




                            2Q08                   1Q09                         2Q09


                  )




2Q09 Results Presentation           © Todos os direitos reservados para CTEEP           8
Cost of Operating Expenses

 2Q09/2Q08 main changes:

   The increase in personnel expenses in 2Q09 against the same period in 2008 is due to the annual wage
 bargain agreement of 6.8% in June 2008, the increase in CESP Foundation expenses and the lower income
 expected from the retirement plans (CVM Decision 371);

    The increase in third party IT services and outsourced transmission line maintenance;

    In 2Q09, expenses relating to allowances for contingencies fell by 75.8% as compared with 2Q08;

   The positive value for expenditures with materials in 2Q09 is due to a reclassification for permanent
 assets in progress of a expense of R$ 2,357 thousand booked in 1Q09.


                            Cost of Services and General and Administrative Expenses
                                                                                               Change %    Change %
      (R$' 000)                                     2Q09           1Q09              2Q08
                                                                                              1Q09/2Q09   2Q08/2Q09

      Personnel                                    -28,373        -30,840        -23,137        -8.0%      22.6%

      Material                                       108           -4,474            -2,745    -102.4%     -103.9%

      Services                                     -22,792        -19,432        -16,201       17.3%       40.7%

      Depreciation                                 -47,012        -46,576        -44,436        0.9%        5.8%
      Contingencies                                 -2,390         -3,468            -9,870    -31.1%      -75.8%
      Other                                         -6,762         -6,981            -8,320     -3.1%      -18.7%

      Total                                       -107,221       -111,771       -104,709       -4.1%        2.4%




2Q09 Results Presentation                © Todos os direitos reservados para CTEEP                                    9
EBITDA

                                    Strong Cash Generation

   (R$ million)

                                                                                   85.4%   8

                                                      84.5%                                8

                            83.2%                                                          8
                                                   +17.9%
                                                                                           8
                                                                      -0.5%

                                                      354.7                        352.9   8
                            299.4
                                                                                           8

                                                                                           8




                            2Q08                      1Q09                         2Q09

                                     Ebitda                               Ebitda Margim




2Q09 Results Presentation              © Todos os direitos reservados para CTEEP               10
Financial Results

    The principal factor impacting this item was the growth in charges on debt, most notably on
  commercial papers repaid in 2Q09.

    Excluding interest on shareholders’ equity from financial expenses, the financial result would have
  reported an expense of R$ 17.2 million in the quarter.


                                                                                                Change %
                            Financial Income (R$' 000)                  2Q09          2Q08
                                                                                               2Q08/2Q09

                    Income from financial investments                   4,383        5,063      -13.4%
                    Interest on assets                                   943         1,070      -11.9%
                    Net monetary variations                             3,377        3,025      11.6%
                    Other                                                200          188        6.4%
                    Total Financial Income                             8,903         9,346      -4.7%

                                                                                                Change %
                            Financial Expenses (R$' 000)                2Q09          2Q08
                                                                                               2Q08/2Q09

                    Interest on own capital                            (63,938)     (58,311)     9.6%
                    Interest on liabilities                            (15,944)     (16,283)     -2.1%
                    Charges on promissory notes                        (9,279)            -        -
                    Other                                               (889)        (2,342)    -62.0%
                    Total Financial Expenses                          (90,050) (76,936)         17.0%

                    Financial result, net (R$' 000)                   (81,147) (67,590)         20.1%




2Q09 Results Presentation                     © Todos os direitos reservados para CTEEP                    11
Net Income

  (R$ million)




                                                 +14.9%

                                                                   -1.6%

                                                   419.9                        413.1
                            359.6




                            2Q08                   1Q09                         2Q09




                 Earnings per share of R$ 1.47 in the second quarter of 2009.


2Q09 Results Presentation           © Todos os direitos reservados para CTEEP           12
Breakdown of Debt in 2Q09


                            Optimization of Capital Structure




 (R$' 000)                  2Q09              1Q09
 Non - Current
 TJLP + 2,3% year     602,825    71.1%   625,984    73.1%
 Current                                                              TJLP
 120% of CDI              -        -     207,013    24.2%            71.1%
 119,5% of CDI         202,622   23.9%       -         -
 123% of CDI           20,084    2.4%     20,462     2.4%
 113% of CDI           20,008    2.4%        -         -
 Others                 2,889    0.3%      3351      0.4%
                                                                                                CDI
 TOTAL                848,428 100% 856,810 100%                                                28.6%

                                                                                      Others
                                                                                      0.3%




2Q09 Results Presentation                 © Todos os direitos reservados para CTEEP                    13
Company Update

                    2Q09 Results

                    Capital Market Performance

                    Subsequent Events




2Q09 Results Presentation      © Todos os direitos reservados para CTEEP   14
Capital Market Performance
Trading Financial - 2Q09
(R$ million)
                                          Total: R$ 705,86 million                        Daily Avarege: R$ 11,57 million
 $35.00
 $30.00
 $25.00
 $20.00
 $15.00
 $10.00
  $5.00
  $0.00
     abr-09                               mai-09                                        jun-09



                                                                        52.5 thousand trading transactions in
                    EVOLUTION - 1H09                                   2Q09 (860 daily average traded). Growth of
                IBOV x IEE x TRPL4 x TRPL3                             93.8% compared with 2Q08;

    37.06%
                    33.66%
                                                                        Present on all trade days;

                                 14.50%
                                                                        27.25% Free-float ;
                                                   10.99%

                                                                        Component of Ibovespa;
     IBOV            IEE         TRPL4             TRPL3
                                                                        R$ 7.4 billion market capitalization.


 2Q09 Results Presentation                  © Todos os direitos reservados para CTEEP                                       15
2Q09 Shareholder Remuneration




     Date                                                                          Date of
                            Type     Regarding            P/ share                                 Amount
   Approved                                                                       Payment

   6/30/2009           Dividend        2009             R$ 0.407557               7/21/2009   R$ 60,842,176.35
                      Interest on
   6/19/2009         stockholders'     2009             R$ 0.428297               7/1/2009    R$ 63,938,332.64
                        equity
   4/15/2009           Dividend        2008             R$ 0.709319               4/24/2009   R$ 105,890,687.96
                                                       R$ 1.545173                            R$ 230,671,196.95




    In 2Q09, the Company authorized the payout of R$ 63.9 million in interest on shareholders’
   equity corresponding to R$ 0.428297 per shares and R$ 166.7 million in dividends, equivalent
                                   to R$ 1.116876 per share.




2Q09 Results Presentation             © Todos os direitos reservados para CTEEP                                   16
2Q09 Investor Relations Events


      A roadshow to launch the 3rd Commercial Papers Issue;

      2 domestic non-deal roadshows;

      3 Broker Conference presentations with more than 30 participants involving
      one on one meetings at each event;

      Some 30 meetings held at the Company’s head offices and more than 200
      responses by e-mail and telephone during the quarter;

      An APIMEC meeting held on June 4 2009 in which the Company presented
      its results for 1Q09;

      9 institutions provide coverage and publish investment research reports on
      the Company – an increase of 80% in the past nine months.




2Q09 Results Presentation          © Todos os direitos reservados para CTEEP       17
Agenda




                    Company Update

                   2Q09 Results

                   Capital Market Performance

                   Subsequent Events




2Q09 Results Presentation      © Todos os direitos reservados para CTEEP   18
Capitalization of Goodwill

   The Extraordinary General Meeting of June 16 approved the increase
   in the capital stock of up to R$ 70.5 million with the following characteristics:

         R$ 26.4 million in favor of the controlling shareholder, ISA Capital do Brasil,
         paid from the special reserve for goodwill as registered in CTEEP’s
         shareholders’ equity;
         The right to subscribe up to R$ 44.1 million was granted to the other
         shareholders in such a way as not to dilute their stakes in the Company’s
         capital stock;
         The average price established at R$ 45.97 per share for both classes of
         share considering the average trading price for preferred shares in the two
         months prior to the last trading day before the EGM;
         The maximum quantity of new shares to be issued is 1,534,717, which
         would represent an increase in capital stock of 1.03% in the number of
         shares; and
         The subscription period was from June 17 2009 to July 17 2009.

 Following the termination of the subscription period on July 17 the total amount
 subscribed was R$ 63,049,004.25, corresponding to 89.4% of the total capital
 increase proposed.
2Q09 Results Presentation        © Todos os direitos reservados para CTEEP             19
3rd Commercial Papers Issue

 Through the bookbuilding procedure of July 8, the Company was able to reduce the
 cost of remuneration from 115% to 106.5% of the CDI, the lowest remuneration
 to date for securities with the same characteristics.

 The characteristics of the offering are as follows:

      Issue rating: Fitch F1+(bra);

      Nominal Unit Value: R$ 500 thousand;

      Remuneration: 106.5% of the CDI;

      Financial Settlement on July 17 2009;

      Use of Resources: cash reinforcement following the payment of the
      Company’s 1st commercial papers issue.




2Q09 Results Presentation        © Todos os direitos reservados para CTEEP    20
Disclaimer




          All statements contained herein with regard to the Company’s
          business prospects, projected results and the potential growth
          of its business aremere forecasts, based on local management
           expectationsin relation to the Company’s future performance.
            Dependent as they are on market shifts and on the overall
                performance of the Brazilian economy and the sector
                     and international markets, such estimates
                               are subject to changes.




2Q09 Results Presentation     © Todos os direitos reservados para CTEEP    21
Investor Relations

      Phone: +55 11 3138-7557
      email: ri@cteep.com.br
      www.cteep.com.br/ir



2Q09 Results Presentation       © Todos os direitos reservados para CTEEP   22

More Related Content

What's hot (9)

3Q12 Presentation Results
3Q12 Presentation Results3Q12 Presentation Results
3Q12 Presentation Results
 
Regulatory Strategies For Selected Member States
Regulatory Strategies For Selected Member StatesRegulatory Strategies For Selected Member States
Regulatory Strategies For Selected Member States
 
4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results
 
A 5 auction results
A 5 auction resultsA 5 auction results
A 5 auction results
 
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
 
Grid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergyGrid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest Energy
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse Conference
 
Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017Corporate Presentation CPFL Energia - March 2017
Corporate Presentation CPFL Energia - March 2017
 
Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10Status of hydro power in india 23.03.10
Status of hydro power in india 23.03.10
 

Viewers also liked (6)

Employers law
Employers lawEmployers law
Employers law
 
课程设计
课程设计课程设计
课程设计
 
Progress
ProgressProgress
Progress
 
7 datta-well point-selectingmetrics
7 datta-well point-selectingmetrics7 datta-well point-selectingmetrics
7 datta-well point-selectingmetrics
 
20 Sites to Make Your WebQuest Pop
20 Sites to Make Your WebQuest Pop20 Sites to Make Your WebQuest Pop
20 Sites to Make Your WebQuest Pop
 
Simpeg
SimpegSimpeg
Simpeg
 

Similar to CTEEP - 2nd Quarter 2009 Results Presentation

4 3 q09 results presentation
4   3 q09 results presentation4   3 q09 results presentation
4 3 q09 results presentation
Cteep
 
2009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q092009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q09
Cteep_ri
 
2009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q092009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q09
Cteep
 
1q10
1q101q10
1q10
Cteep
 
3 1 q10 results presentation
3   1 q10 results presentation3   1 q10 results presentation
3 1 q10 results presentation
Cteep
 
Cteep release 3_q11
Cteep release 3_q11Cteep release 3_q11
Cteep release 3_q11
Cteep
 
3 q10 presentation
3 q10 presentation3 q10 presentation
3 q10 presentation
Equatorial
 
6 transmissão paulista february 20 2008
6   transmissão paulista february 20 20086   transmissão paulista february 20 2008
6 transmissão paulista february 20 2008
Cteep
 
3 q07 financial and operating results presentation
3 q07 financial and operating results presentation3 q07 financial and operating results presentation
3 q07 financial and operating results presentation
Equatorial
 
4 q10 presentation
4 q10 presentation4 q10 presentation
4 q10 presentation
Equatorial
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ing
Cteep
 
10º Conferência Annual da América Latina'
10º Conferência Annual da América Latina'10º Conferência Annual da América Latina'
10º Conferência Annual da América Latina'
CPFL RI
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007
AES Tietê
 
2 q08 earnings call presentation
2 q08 earnings call presentation2 q08 earnings call presentation
2 q08 earnings call presentation
AES Tietê
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call Presentation
AES Tietê
 

Similar to CTEEP - 2nd Quarter 2009 Results Presentation (20)

4 3 q09 results presentation
4   3 q09 results presentation4   3 q09 results presentation
4 3 q09 results presentation
 
2009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q092009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q09
 
2009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q092009 11-16 cteep-presentation_3_q09
2009 11-16 cteep-presentation_3_q09
 
1q10
1q101q10
1q10
 
3 1 q10 results presentation
3   1 q10 results presentation3   1 q10 results presentation
3 1 q10 results presentation
 
Cteep release 3_q11
Cteep release 3_q11Cteep release 3_q11
Cteep release 3_q11
 
3 q10 presentation
3 q10 presentation3 q10 presentation
3 q10 presentation
 
CTEEP - Presentation 2007 Results - UBS
CTEEP - Presentation 2007 Results - UBSCTEEP - Presentation 2007 Results - UBS
CTEEP - Presentation 2007 Results - UBS
 
6 transmissão paulista february 20 2008
6   transmissão paulista february 20 20086   transmissão paulista february 20 2008
6 transmissão paulista february 20 2008
 
3 q07 financial and operating results presentation
3 q07 financial and operating results presentation3 q07 financial and operating results presentation
3 q07 financial and operating results presentation
 
4 q10 presentation
4 q10 presentation4 q10 presentation
4 q10 presentation
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ing
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ing
 
Webcast 3 q12 eng
Webcast 3 q12 engWebcast 3 q12 eng
Webcast 3 q12 eng
 
10º Conferência Annual da América Latina'
10º Conferência Annual da América Latina'10º Conferência Annual da América Latina'
10º Conferência Annual da América Latina'
 
Apre 2 t07
Apre 2 t07Apre 2 t07
Apre 2 t07
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007
 
Webcast 3Q11 eng
Webcast 3Q11 engWebcast 3Q11 eng
Webcast 3Q11 eng
 
2 q08 earnings call presentation
2 q08 earnings call presentation2 q08 earnings call presentation
2 q08 earnings call presentation
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call Presentation
 

Recently uploaded

Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
Probe Gold
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Probe Gold
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
Terna SpA
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
dharasingh5698
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Sheetaleventcompany
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 

CTEEP - 2nd Quarter 2009 Results Presentation

  • 1. 2Q09 Results Presentation São Paulo, August 17th 2009 © Todos os direitos reservados para CTEEP
  • 2. Agenda Company Update 2Q09 Results Capital Market Performance Subsequent Events 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 2
  • 3. Company Update Leading private sector energy transmission concessionaire in Brazil. Responsible for transmission of 30% of electricity produced in the country and 60% of consumption in the Southeast. First São Paulo electricity energy company to sign up to Bovespa’s Level 1 Corporate Governance. Footprint in 12 states. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 3
  • 4. 12,140 km of Transmission Lines 102 Substations High Technology Miguel Reale Substation 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 4
  • 5. COT- Transmission Operating Center - Jundiaí COR- Backup Operations Center - Cabreúva 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 5
  • 6. CTEEP and its Shareholder’s Breakdown Common Shares - TRPL3 Preferred Shares – TRPL4 (42% of total) (58% of total) 9.85% 0.75% 35.59% ISA Capital do Brasil Eletrobrás Eletrobrás Secretaria da Fazenda Other Other 89.40% 10.77% 53.64% Total Paid Up Capital ISA Capital do Brasil 27.25% 37.46% Eletrobrás Other 35.29% 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 6
  • 7. Agenda Company Update 2Q09 Results Capital Market Performance Subsequent Events 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 7
  • 8. Net Revenue Revenue linked to uptime of the Company’s assets (R$ million) +14.9% -1.6% 419.9 413.1 359.6 2Q08 1Q09 2Q09 ) 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 8
  • 9. Cost of Operating Expenses 2Q09/2Q08 main changes: The increase in personnel expenses in 2Q09 against the same period in 2008 is due to the annual wage bargain agreement of 6.8% in June 2008, the increase in CESP Foundation expenses and the lower income expected from the retirement plans (CVM Decision 371); The increase in third party IT services and outsourced transmission line maintenance; In 2Q09, expenses relating to allowances for contingencies fell by 75.8% as compared with 2Q08; The positive value for expenditures with materials in 2Q09 is due to a reclassification for permanent assets in progress of a expense of R$ 2,357 thousand booked in 1Q09. Cost of Services and General and Administrative Expenses Change % Change % (R$' 000) 2Q09 1Q09 2Q08 1Q09/2Q09 2Q08/2Q09 Personnel -28,373 -30,840 -23,137 -8.0% 22.6% Material 108 -4,474 -2,745 -102.4% -103.9% Services -22,792 -19,432 -16,201 17.3% 40.7% Depreciation -47,012 -46,576 -44,436 0.9% 5.8% Contingencies -2,390 -3,468 -9,870 -31.1% -75.8% Other -6,762 -6,981 -8,320 -3.1% -18.7% Total -107,221 -111,771 -104,709 -4.1% 2.4% 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 9
  • 10. EBITDA Strong Cash Generation (R$ million) 85.4% 8 84.5% 8 83.2% 8 +17.9% 8 -0.5% 354.7 352.9 8 299.4 8 8 2Q08 1Q09 2Q09 Ebitda Ebitda Margim 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 10
  • 11. Financial Results The principal factor impacting this item was the growth in charges on debt, most notably on commercial papers repaid in 2Q09. Excluding interest on shareholders’ equity from financial expenses, the financial result would have reported an expense of R$ 17.2 million in the quarter. Change % Financial Income (R$' 000) 2Q09 2Q08 2Q08/2Q09 Income from financial investments 4,383 5,063 -13.4% Interest on assets 943 1,070 -11.9% Net monetary variations 3,377 3,025 11.6% Other 200 188 6.4% Total Financial Income 8,903 9,346 -4.7% Change % Financial Expenses (R$' 000) 2Q09 2Q08 2Q08/2Q09 Interest on own capital (63,938) (58,311) 9.6% Interest on liabilities (15,944) (16,283) -2.1% Charges on promissory notes (9,279) - - Other (889) (2,342) -62.0% Total Financial Expenses (90,050) (76,936) 17.0% Financial result, net (R$' 000) (81,147) (67,590) 20.1% 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 11
  • 12. Net Income (R$ million) +14.9% -1.6% 419.9 413.1 359.6 2Q08 1Q09 2Q09 Earnings per share of R$ 1.47 in the second quarter of 2009. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 12
  • 13. Breakdown of Debt in 2Q09 Optimization of Capital Structure (R$' 000) 2Q09 1Q09 Non - Current TJLP + 2,3% year 602,825 71.1% 625,984 73.1% Current TJLP 120% of CDI - - 207,013 24.2% 71.1% 119,5% of CDI 202,622 23.9% - - 123% of CDI 20,084 2.4% 20,462 2.4% 113% of CDI 20,008 2.4% - - Others 2,889 0.3% 3351 0.4% CDI TOTAL 848,428 100% 856,810 100% 28.6% Others 0.3% 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 13
  • 14. Company Update 2Q09 Results Capital Market Performance Subsequent Events 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 14
  • 15. Capital Market Performance Trading Financial - 2Q09 (R$ million) Total: R$ 705,86 million Daily Avarege: R$ 11,57 million $35.00 $30.00 $25.00 $20.00 $15.00 $10.00 $5.00 $0.00 abr-09 mai-09 jun-09 52.5 thousand trading transactions in EVOLUTION - 1H09 2Q09 (860 daily average traded). Growth of IBOV x IEE x TRPL4 x TRPL3 93.8% compared with 2Q08; 37.06% 33.66% Present on all trade days; 14.50% 27.25% Free-float ; 10.99% Component of Ibovespa; IBOV IEE TRPL4 TRPL3 R$ 7.4 billion market capitalization. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 15
  • 16. 2Q09 Shareholder Remuneration Date Date of Type Regarding P/ share Amount Approved Payment 6/30/2009 Dividend 2009 R$ 0.407557 7/21/2009 R$ 60,842,176.35 Interest on 6/19/2009 stockholders' 2009 R$ 0.428297 7/1/2009 R$ 63,938,332.64 equity 4/15/2009 Dividend 2008 R$ 0.709319 4/24/2009 R$ 105,890,687.96 R$ 1.545173 R$ 230,671,196.95 In 2Q09, the Company authorized the payout of R$ 63.9 million in interest on shareholders’ equity corresponding to R$ 0.428297 per shares and R$ 166.7 million in dividends, equivalent to R$ 1.116876 per share. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 16
  • 17. 2Q09 Investor Relations Events A roadshow to launch the 3rd Commercial Papers Issue; 2 domestic non-deal roadshows; 3 Broker Conference presentations with more than 30 participants involving one on one meetings at each event; Some 30 meetings held at the Company’s head offices and more than 200 responses by e-mail and telephone during the quarter; An APIMEC meeting held on June 4 2009 in which the Company presented its results for 1Q09; 9 institutions provide coverage and publish investment research reports on the Company – an increase of 80% in the past nine months. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 17
  • 18. Agenda Company Update 2Q09 Results Capital Market Performance Subsequent Events 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 18
  • 19. Capitalization of Goodwill The Extraordinary General Meeting of June 16 approved the increase in the capital stock of up to R$ 70.5 million with the following characteristics: R$ 26.4 million in favor of the controlling shareholder, ISA Capital do Brasil, paid from the special reserve for goodwill as registered in CTEEP’s shareholders’ equity; The right to subscribe up to R$ 44.1 million was granted to the other shareholders in such a way as not to dilute their stakes in the Company’s capital stock; The average price established at R$ 45.97 per share for both classes of share considering the average trading price for preferred shares in the two months prior to the last trading day before the EGM; The maximum quantity of new shares to be issued is 1,534,717, which would represent an increase in capital stock of 1.03% in the number of shares; and The subscription period was from June 17 2009 to July 17 2009. Following the termination of the subscription period on July 17 the total amount subscribed was R$ 63,049,004.25, corresponding to 89.4% of the total capital increase proposed. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 19
  • 20. 3rd Commercial Papers Issue Through the bookbuilding procedure of July 8, the Company was able to reduce the cost of remuneration from 115% to 106.5% of the CDI, the lowest remuneration to date for securities with the same characteristics. The characteristics of the offering are as follows: Issue rating: Fitch F1+(bra); Nominal Unit Value: R$ 500 thousand; Remuneration: 106.5% of the CDI; Financial Settlement on July 17 2009; Use of Resources: cash reinforcement following the payment of the Company’s 1st commercial papers issue. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 20
  • 21. Disclaimer All statements contained herein with regard to the Company’s business prospects, projected results and the potential growth of its business aremere forecasts, based on local management expectationsin relation to the Company’s future performance. Dependent as they are on market shifts and on the overall performance of the Brazilian economy and the sector and international markets, such estimates are subject to changes. 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 21
  • 22. Investor Relations Phone: +55 11 3138-7557 email: ri@cteep.com.br www.cteep.com.br/ir 2Q09 Results Presentation © Todos os direitos reservados para CTEEP 22