1. Personal Information
Name : Arkar Zaw
Father's Name : U Than Zaw
Passport No : MA443305
Fin : G8407414X
D.O.B : 11.12.1983
Age : 32
Nationality : Myanmar
Gender : Male
Marital Status : Married
Contact Address : Blk 345 #14-103 Kang Ching Road S610345
Contact Mobile No. : 8363 1476
E-mail : 11arkar@gmail.com
Skype : arkar201515
Current Salary : S$3,500
Expected Salary : S$3,500
Education History
Degree Name of University From To
B.E Yangon Technological University 2001 2007
Other Knowledge & Skill
- CertifiedWeldingInspector–AWS
- Certificate inAutoCAD(2Dimensions, 3Dimensions)
- Certificate in M&E Drawing (ACMV, Fire, Plumbing & Sanitary and Electrical)
- Certificate in PLC Course (Omron CPMIA)
- Certificate in CNC Course
- Certify by Myanmar Engineering Society
- Knowledge of MSword,excel,powerpointandPhotoshop
- Driving License in Myanmar
- Can Speak English
Hoot
2. Working History
Name of Company Position From To
Nippon Express Pte Ltd
Piping Supervisor &
Mechanical Design
Engineer
Aug-2012 Up to Now
Duties of responsibilities
- Design Piping Isometric and detail drawing for Steel structure and Mechanical parts by using AutoCAD
- Calculate Bill of material, Man power for Quotation
- Prepare project schedule and technical support to clients
- Understand first angle and third angle orthographic projection and hydro testing equipment on sites
- Lead to Fabrication Group to fabricate piping & structure
- Communicate with Material suppliers and Sub-contractors
- Knowledge of Welding such as SMAW, TIG, FCAW
- Understand WPS, PQR, WPQR
Contact Address : No.17 Sakra Road Jurong Island S627886
Name of Company Position From To
WIT Engineering Pte Ltd Drafter & QS Oct-2008 Oct-2010
Duties of responsibilities
- Draw and understand piping with P&ID, Steel Structure, Pressure Vessel and Mechanical parts
- Draw 2D, 3D solid modelling, Isometric and detail drawing by using AutoCAD 2012.
- Inspect incoming, in-progress, outgoing materials according to drawings
- Prepare Measurement of final dimension inspection report according to drawings
- Prepare documentation for manufacturer data report(MDR), Material Traceability Report(MTR), Bill of
Material(BOM), fit-up inspection report, visual inspection report, final dimension inspection report, hydro test
report, pneumatic test report
-
Contact Address : 4 Thus Avenue 13 S638976.
Reason for Leaving : Finished Contract
3. Name of Company Position From To
Myint Myat Kyaw Co.Ltd
Automation Control
Engineer
Nov-2010 Nov-2011
Duties of responsibilities
- Maintenance forindustrial electrical control system
- Installationelectrical wiringsystem
- Findingfaultinhydraulicandpneumaticcontrol system
- Installationsensor,limitswitch,hydraulicandpneumaticcontrol valve,cylinder,counter,encoder
- writingplccontrol system
- Operatingrollershutterautomatedmachines,C-channel automatedmachines
Contact Address : No.527 Lower Pazundaung Road, Yangon, Myanmar.
Reason for Leaving : To improve my professional
Name of Company Position From To
Htun Padethar Industrials and Trading Co.
Ltd
Project Engineer Nov-2011 May-2012
Duties of responsibilities
- Making schedule forprojecttofinishin time
- Dealingwithmaterial suppliertogetrequiredquality
- Estimationbill of material accordingtodesigndrawing
- Checkingsite conditionregularly
- Making weeklyreportforprojectflow
- Providestechnical assistance toconstructionandfabricationteam
Contact Address : No.167 Lanmadaw Road, Lanmadaw TownshipYangon,Myanmar.
Reason for Leaving : To improve my professional