Feasibility studies

aim to objectively and rationally uncover the strengths and weaknesses of the existing business or proposed venture,
opportunities and threats as presented by the environment, the resources required to carry through, and ultimately the
prospects for success.[1][2] In its simplest terms, the two criteria to judge feasibility are cost required and value to be
attained.[3] As such, a well-designed feasibility study should provide a historical background of the business or project,
description of the product or service, accounting statements, details of the operations and management, marketing
research and policies, financial data, legal requirements and tax obligations.[1] Generally, feasibility studies precede
technical development and project implementation. In its simplest form, a Feasibility Study represents a definition of a
problem or opportunity to be studied, an analysis of the current mode of operation, a definition of requirements, an
evaluation of alternatives, and an agreed upon course of action. As such, the activities for preparing a Feasibility Study
are generic in nature and can be applied to any type of project, be it for systems and software development, making an
acquisition, or any other project.

There are basically six parts to any effective Feasibility Study:

1. The PROJECT SCOPE which is used to define the business problem and/or opportunity to be addressed. The old adage,
"The problem well stated is half solved," is very apropos. The Scope should be definitive and to the point; rambling
narrative serves no purpose and can actually confuse project participants. It is also necessary to define the parts of the
business affected either directly or indirectly, including project participants and end-user areas affected by the project.
The project sponsor should be identified, particularly if he/she is footing the bill.

I have seen too many projects in the corporate world started without a well defined Project Scope. Consequently,
projects have wandered in and out of their boundaries causing them to produce either far too much or far too little than
what is truly needed.

2. The CURRENT ANALYSIS is used to define and understand the current method of implementation, such as a system, a
product, etc. From this analysis, it is not uncommon to discover there is actually nothing wrong with the current system
or product other than some misunderstandings regarding it or perhaps it needs some simple modifications as opposed
to a major overhaul. Also, the strengths and weaknesses of the current approach are identified (pros and cons). In
addition, there may very well be elements of the current system or product that may be used in its successor thus saving
time and money later on. Without such analysis, this may never be discovered.

Analysts are cautioned to avoid the temptation to stop and correct any problems encountered in the current system at
this time. Simply document your findings instead, otherwise you will spend more time unnecessarily in this stage (aka
"Analysis Paralysis").

3. REQUIREMENTS - how requirements are defined depends on the object of the project's attention. For example, how
requirements are specified for a product are substantially different than requirements for an edifice, a bridge, or an
information system. Each exhibits totally different properties and, as such, are defined differently. How you define
requirements for software is also substantially different than how you define them for systems. (See, "Understanding
the Specifications Puzzle")

4. The APPROACH represents the recommended solution or course of action to satisfy the requirements. Here, various
alternatives are considered along with an explanation as to why the preferred solution was selected. In terms of design
related projects, it is here where whole rough designs (e.g., "renderings") are developed in order to determine viability.
It is also at this point where the use of existing structures and commercial alternatives are considered (e.g., "build versus
buy" decisions). The overriding considerations though are:

        Does the recommended approach satisfy the requirements?
        Is it also a practical and viable solution? (Will it "Play in Poughkeepsie?")

A thorough analysis here is needed in order to perform the next step...
5. EVALUATION - examines the cost effectiveness of the Approach selected. This begins with an analysis of the
estimated total cost of the project. In addition to the recommended solution, other alternatives are estimated in order
to offer an economic comparison. For development projects, an estimate of labor and out-of-pocket expenses is
assembled along with a project schedule showing the project path and start-and-end dates.

After the total cost of the project has been calculated, a cost and evaluation summary is prepared which includes such
things as a cost/benefit analysis, return on investment, etc.

6. REVIEW - all of the preceding elements are then assembled into a Feasibility Study and a formal review is conducted
with all parties involved. The review serves two purposes: to substantiate the thoroughness and accuracy of the
Feasibility Study, and to make a project decision; either approve it, reject it, or ask that it be revised before making a
final decision. If approved, it is very important that all parties sign the document which expresses their acceptance and
commitment to it; it may be a seemingly small gesture, but signatures carry a lot of weight later on as the project
progresses. If the Feasibility Study is rejected, the reasons for its rejection should be explained and attached to the
document.

CONCLUSION

It should be remembered that a Feasibility Study is more of a way of thinking as opposed to a bureaucratic process. For
example, what I have just described is essentially the same process we all follow when purchasing an automobile or a
home. As the scope of the project grows, it becomes more important to document the Feasibility Study particularly if
large amounts of money are involved and/or the criticality of delivery. Not only should the Feasibility Study contain
sufficient detail to carry on to the next succeeding phase in the project, but it should also be used for comparative
analysis when preparing the final Project Audit which analyzes what was delivered versus what was proposed in the
Feasibility Study.

Feasibility Studies represent a commonsense approach to planning. Frankly, it is just plain good business to conduct
them. However, I have read where some people in the I.T. field, such as the "Agile" methodology proponents, consider
Feasibility Studies to be a colossal waste of time. If this is true, I've got a good used car I want to sell them.

Business Proposal


A business proposal is a written scheme from a seller to a prospective customer. The main purpose is to fulfill the
requirements of a client. A proposal includes a company's profile as well as its products and services offered. An
entrepreneur mentions profile and other components to convince a prospective client about the benefits of his products
and services for a client. A proposal also aims to demonstrate the credibility and authenticity of a company and its
products and services to win a client's confidence. A good proposal has the potential to portray a company unique and
credible that gives an edge over its competitors.

The       good       or      standard       business       proposal       consists      of      following      elements:

1.TITLE                                                                                                             PAGE

Most organizations specify the information to include in the title page. Some even providing special farms that
summarize basic administration and fiscal data. As a minimum, the title page should include the title, the name of
person or company to whom the proposal is submitted, the person submitting the proposal and the date.

2.EXECUTIVE                     SUMMARY,                       ABS                    TACT,                     SYNOPSIS

Brief proposal should have an executive summary. Because you will be competing with other for the same opportunity,
some evaluator will initially read only the executive summary seeking to gain a quick overview. So should give it careful
attention and time and effort. Budget figures are frequently omitted because proposal abstract may receive wide
distribution.

3.DRAFT                                                                                                           CONTRACT

A         draft     contact        allows       the        receiver       to       offer       a        counter        offer.

4.Table                                                     Of                                                     Contents

Brief proposal usually do not require a table of content. Long proposal do require one as well as a list of table, figure and
illustration.

5.INTRODUCTION

The                   proposal                     introduction                  section                  includes,
a)Purpose     in     which      u     mission      the     main     purpose     of     the     proposal    writing.
b)Problem in here a business proposal, show clearly that what u understand from the problem or problems & how you
overcome                                from                              that                           problem.
c)Scope should be precise specially when dealing with a foreign country or company.

6.BACKGROUND

In    short     proposal       no      need     have   background      while   long     proposal    includes;
•       Previous          work         completed      on       identical      or       related       project.
•   Possibly,    literature    reviews    on    the  subject,  particularly  your   evaluation   of    them.
• Statements showing how your proposal will build on the already completed projects and research.

7.PROCEDURES

In procedure, you give brief state, without exaggeration, how you will meet the requirement of your reader. A good way
to      review       your        proposal       they       will    be        different    in       each       situation.

8.EQUIPMENT                                                   AND                                                 FACILITIES

It shows that you have thought deeply to realize what facilities will be needed. If your proposal id for your company's bid
on an enormous construction job, probably several departments will cooperate with you in presenting needed facts and
figures.

9.PERSONNEL

If you did not include brief information of individuals involved in the project in the introduction then give full
information about the proposal and also the percentage of time that personal will devote to t6he project.

10.BUDGET

Organization requesting proposal frequently specify how the budget should be presented. Read such specifications
carefully.         Not           all          groups          allow          the          same            costs.

11.APPENDIXES

More Related Content

Similar to Feasibility studies

ajay Technical_Proposal.ppt
ajay Technical_Proposal.pptajay Technical_Proposal.ppt
ajay Technical_Proposal.pptAjay912711
 
Construction project management ch3
Construction project management ch3Construction project management ch3
Construction project management ch3ruih
 
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxPearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxAASTHA76
 
83 Chapter 5 PROJECT.docx
83                                Chapter 5    PROJECT.docx83                                Chapter 5    PROJECT.docx
83 Chapter 5 PROJECT.docxransayo
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementCatherine Bendell
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementAssociation for Project Management
 
Project Management Practitioner: Project Initiation
Project Management Practitioner: Project InitiationProject Management Practitioner: Project Initiation
Project Management Practitioner: Project Initiationmoldyreasoning957
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxbettymakuve1
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report Harish Satya
 
Writing a research brief
Writing a research briefWriting a research brief
Writing a research briefKKylle
 
Business plan template
Business plan templateBusiness plan template
Business plan templateInsightory
 
1. what is a feasibility study
1. what is a feasibility study1. what is a feasibility study
1. what is a feasibility studyRudy Flores
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -Hossam Maghrabi
 

Similar to Feasibility studies (20)

ajay Technical_Proposal.ppt
ajay Technical_Proposal.pptajay Technical_Proposal.ppt
ajay Technical_Proposal.ppt
 
Construction project management ch3
Construction project management ch3Construction project management ch3
Construction project management ch3
 
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docxPearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
Pearson HND BTEC Level 5 HNDManaging a Successful Business Pr.docx
 
Components of FS,Th&BP.pptx
Components of FS,Th&BP.pptxComponents of FS,Th&BP.pptx
Components of FS,Th&BP.pptx
 
Ep 05
Ep 05Ep 05
Ep 05
 
83 Chapter 5 PROJECT.docx
83                                Chapter 5    PROJECT.docx83                                Chapter 5    PROJECT.docx
83 Chapter 5 PROJECT.docx
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract management
 
Contract and procuremet guide evening launch slides 05 10-17
Contract and procuremet guide evening launch slides 05 10-17 Contract and procuremet guide evening launch slides 05 10-17
Contract and procuremet guide evening launch slides 05 10-17
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract management
 
Banglka.pptx
Banglka.pptxBanglka.pptx
Banglka.pptx
 
Project Management Practitioner: Project Initiation
Project Management Practitioner: Project InitiationProject Management Practitioner: Project Initiation
Project Management Practitioner: Project Initiation
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptx
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report
 
Writing a research brief
Writing a research briefWriting a research brief
Writing a research brief
 
Business Case
Business CaseBusiness Case
Business Case
 
Business plan template
Business plan templateBusiness plan template
Business plan template
 
1. what is a feasibility study
1. what is a feasibility study1. what is a feasibility study
1. what is a feasibility study
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 

Feasibility studies

  • 1. Feasibility studies aim to objectively and rationally uncover the strengths and weaknesses of the existing business or proposed venture, opportunities and threats as presented by the environment, the resources required to carry through, and ultimately the prospects for success.[1][2] In its simplest terms, the two criteria to judge feasibility are cost required and value to be attained.[3] As such, a well-designed feasibility study should provide a historical background of the business or project, description of the product or service, accounting statements, details of the operations and management, marketing research and policies, financial data, legal requirements and tax obligations.[1] Generally, feasibility studies precede technical development and project implementation. In its simplest form, a Feasibility Study represents a definition of a problem or opportunity to be studied, an analysis of the current mode of operation, a definition of requirements, an evaluation of alternatives, and an agreed upon course of action. As such, the activities for preparing a Feasibility Study are generic in nature and can be applied to any type of project, be it for systems and software development, making an acquisition, or any other project. There are basically six parts to any effective Feasibility Study: 1. The PROJECT SCOPE which is used to define the business problem and/or opportunity to be addressed. The old adage, "The problem well stated is half solved," is very apropos. The Scope should be definitive and to the point; rambling narrative serves no purpose and can actually confuse project participants. It is also necessary to define the parts of the business affected either directly or indirectly, including project participants and end-user areas affected by the project. The project sponsor should be identified, particularly if he/she is footing the bill. I have seen too many projects in the corporate world started without a well defined Project Scope. Consequently, projects have wandered in and out of their boundaries causing them to produce either far too much or far too little than what is truly needed. 2. The CURRENT ANALYSIS is used to define and understand the current method of implementation, such as a system, a product, etc. From this analysis, it is not uncommon to discover there is actually nothing wrong with the current system or product other than some misunderstandings regarding it or perhaps it needs some simple modifications as opposed to a major overhaul. Also, the strengths and weaknesses of the current approach are identified (pros and cons). In addition, there may very well be elements of the current system or product that may be used in its successor thus saving time and money later on. Without such analysis, this may never be discovered. Analysts are cautioned to avoid the temptation to stop and correct any problems encountered in the current system at this time. Simply document your findings instead, otherwise you will spend more time unnecessarily in this stage (aka "Analysis Paralysis"). 3. REQUIREMENTS - how requirements are defined depends on the object of the project's attention. For example, how requirements are specified for a product are substantially different than requirements for an edifice, a bridge, or an information system. Each exhibits totally different properties and, as such, are defined differently. How you define requirements for software is also substantially different than how you define them for systems. (See, "Understanding the Specifications Puzzle") 4. The APPROACH represents the recommended solution or course of action to satisfy the requirements. Here, various alternatives are considered along with an explanation as to why the preferred solution was selected. In terms of design related projects, it is here where whole rough designs (e.g., "renderings") are developed in order to determine viability. It is also at this point where the use of existing structures and commercial alternatives are considered (e.g., "build versus buy" decisions). The overriding considerations though are: Does the recommended approach satisfy the requirements? Is it also a practical and viable solution? (Will it "Play in Poughkeepsie?") A thorough analysis here is needed in order to perform the next step...
  • 2. 5. EVALUATION - examines the cost effectiveness of the Approach selected. This begins with an analysis of the estimated total cost of the project. In addition to the recommended solution, other alternatives are estimated in order to offer an economic comparison. For development projects, an estimate of labor and out-of-pocket expenses is assembled along with a project schedule showing the project path and start-and-end dates. After the total cost of the project has been calculated, a cost and evaluation summary is prepared which includes such things as a cost/benefit analysis, return on investment, etc. 6. REVIEW - all of the preceding elements are then assembled into a Feasibility Study and a formal review is conducted with all parties involved. The review serves two purposes: to substantiate the thoroughness and accuracy of the Feasibility Study, and to make a project decision; either approve it, reject it, or ask that it be revised before making a final decision. If approved, it is very important that all parties sign the document which expresses their acceptance and commitment to it; it may be a seemingly small gesture, but signatures carry a lot of weight later on as the project progresses. If the Feasibility Study is rejected, the reasons for its rejection should be explained and attached to the document. CONCLUSION It should be remembered that a Feasibility Study is more of a way of thinking as opposed to a bureaucratic process. For example, what I have just described is essentially the same process we all follow when purchasing an automobile or a home. As the scope of the project grows, it becomes more important to document the Feasibility Study particularly if large amounts of money are involved and/or the criticality of delivery. Not only should the Feasibility Study contain sufficient detail to carry on to the next succeeding phase in the project, but it should also be used for comparative analysis when preparing the final Project Audit which analyzes what was delivered versus what was proposed in the Feasibility Study. Feasibility Studies represent a commonsense approach to planning. Frankly, it is just plain good business to conduct them. However, I have read where some people in the I.T. field, such as the "Agile" methodology proponents, consider Feasibility Studies to be a colossal waste of time. If this is true, I've got a good used car I want to sell them. Business Proposal A business proposal is a written scheme from a seller to a prospective customer. The main purpose is to fulfill the requirements of a client. A proposal includes a company's profile as well as its products and services offered. An entrepreneur mentions profile and other components to convince a prospective client about the benefits of his products and services for a client. A proposal also aims to demonstrate the credibility and authenticity of a company and its products and services to win a client's confidence. A good proposal has the potential to portray a company unique and credible that gives an edge over its competitors. The good or standard business proposal consists of following elements: 1.TITLE PAGE Most organizations specify the information to include in the title page. Some even providing special farms that summarize basic administration and fiscal data. As a minimum, the title page should include the title, the name of person or company to whom the proposal is submitted, the person submitting the proposal and the date. 2.EXECUTIVE SUMMARY, ABS TACT, SYNOPSIS Brief proposal should have an executive summary. Because you will be competing with other for the same opportunity, some evaluator will initially read only the executive summary seeking to gain a quick overview. So should give it careful attention and time and effort. Budget figures are frequently omitted because proposal abstract may receive wide
  • 3. distribution. 3.DRAFT CONTRACT A draft contact allows the receiver to offer a counter offer. 4.Table Of Contents Brief proposal usually do not require a table of content. Long proposal do require one as well as a list of table, figure and illustration. 5.INTRODUCTION The proposal introduction section includes, a)Purpose in which u mission the main purpose of the proposal writing. b)Problem in here a business proposal, show clearly that what u understand from the problem or problems & how you overcome from that problem. c)Scope should be precise specially when dealing with a foreign country or company. 6.BACKGROUND In short proposal no need have background while long proposal includes; • Previous work completed on identical or related project. • Possibly, literature reviews on the subject, particularly your evaluation of them. • Statements showing how your proposal will build on the already completed projects and research. 7.PROCEDURES In procedure, you give brief state, without exaggeration, how you will meet the requirement of your reader. A good way to review your proposal they will be different in each situation. 8.EQUIPMENT AND FACILITIES It shows that you have thought deeply to realize what facilities will be needed. If your proposal id for your company's bid on an enormous construction job, probably several departments will cooperate with you in presenting needed facts and figures. 9.PERSONNEL If you did not include brief information of individuals involved in the project in the introduction then give full information about the proposal and also the percentage of time that personal will devote to t6he project. 10.BUDGET Organization requesting proposal frequently specify how the budget should be presented. Read such specifications carefully. Not all groups allow the same costs. 11.APPENDIXES