This document provides instructions for disassembling and assembling the alternator on a 245 Excavator. The disassembly process involves removing 30 different parts in a specific sequence, taking care not to damage any internal components. The assembly follows the reverse of the disassembly process and notes that all parts must be thoroughly cleaned before reassembly. Precautions are outlined to prevent damage to delicate internal windings and diodes during both disassembly and assembly.
This document provides instructions for disassembling and assembling the alternator on a 245 Excavator. The disassembly process involves 30 steps to remove components like the pulley, covers, regulator, leads, and internal parts. The assembly process reverses the disassembly with 13 steps, cleaning parts thoroughly and applying dielectric grease as needed. Special care is required to avoid damaging windings or shocks that could harm diodes or bearings.
The document provides instructions for disassembling and assembling an alternator. It lists 30 steps for disassembly, removing components like the pulley, cover, regulator, and internal diodes. It then lists 27 steps for assembly, reinstalling these components in reverse order. Cleanliness is emphasized throughout, and care is advised when handling sensitive components to avoid damage.
This document provides instructions for disassembling and assembling the alternator on a 245 Excavator. The disassembly process involves 30 steps to remove components like the pulley, covers, regulator, leads, and internal parts. The assembly process reverses the disassembly with 13 steps, cleaning parts thoroughly and applying dielectric grease as needed. Special care is required to avoid damaging windings or shocks that could harm diodes or bearings.
The document provides instructions for disassembling and assembling an alternator. It lists 30 steps for disassembly, removing components like the pulley, covers, regulator, and internal parts. It then lists 26 steps for assembly, reinstalling these components in reverse order. Cleanliness is emphasized throughout, and care is advised when handling delicate internal parts like windings and diodes.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, caps, and housing pieces. Cleanliness is emphasized throughout assembly and notes provide warnings about not damaging delicate parts like diodes, bearings, and windings.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease between parts. The document also provides disassembly instructions for an air cleaner housing, installing a turbocharger, and disassembling a turbocharger.
This document provides instructions for disassembling and assembling the alternator on a 245 Excavator. The disassembly process involves 30 steps to remove components like the pulley, covers, regulator, leads, and internal parts. The assembly process reverses the disassembly with 13 steps, cleaning parts thoroughly and applying dielectric grease as needed. Special care is required to avoid damaging windings or shocks that could harm diodes or bearings.
The document provides instructions for disassembling and assembling an alternator. It lists 30 steps for disassembly, removing components like the pulley, cover, regulator, and internal diodes. It then lists 27 steps for assembly, reinstalling these components in reverse order. Cleanliness is emphasized throughout, and care is advised when handling sensitive components to avoid damage.
This document provides instructions for disassembling and assembling the alternator on a 245 Excavator. The disassembly process involves 30 steps to remove components like the pulley, covers, regulator, leads, and internal parts. The assembly process reverses the disassembly with 13 steps, cleaning parts thoroughly and applying dielectric grease as needed. Special care is required to avoid damaging windings or shocks that could harm diodes or bearings.
The document provides instructions for disassembling and assembling an alternator. It lists 30 steps for disassembly, removing components like the pulley, covers, regulator, and internal parts. It then lists 26 steps for assembly, reinstalling these components in reverse order. Cleanliness is emphasized throughout, and care is advised when handling delicate internal parts like windings and diodes.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, caps, and housing pieces. Cleanliness is emphasized throughout assembly and notes provide warnings about not damaging delicate parts like diodes, bearings, and windings.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease between parts. The document also provides disassembly instructions for an air cleaner housing, installing a turbocharger, and disassembling a turbocharger.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease between parts. The document also provides disassembly instructions for an air cleaner housing, installing a turbocharger, and disassembling a turbocharger.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease to protected parts. The document also provides disassembly instructions for an air cleaner housing and removing/installing a turbocharger.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized throughout assembly and notes provide warnings about damaging parts during pressing or striking.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease to protected parts. The document also provides disassembly instructions for an air cleaner housing and removing/installing a turbocharger.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease to protected parts. The document also provides disassembly instructions for an air cleaner housing and removing/installing a turbocharger.
This document provides instructions for assembling an alternator. It describes 29 steps to assemble internal components like diodes, bushings, coils, and housings. Cleanliness is important during assembly to avoid issues. Diodes and bearings should not be struck as it can damage them. Dielectric grease should be applied where noted. The final steps include installing external components like the mounting plate, regulator, and cover.
This document provides instructions for assembling an alternator. It describes 29 steps to assemble internal components like diodes, bushings, coils, and housings. Cleanliness is important during assembly to avoid issues. Diodes and bearings should not be struck as it can damage them. Dielectric grease should be reapplied if removed. The final steps include installing external components like the mounting plate, regulator, and cover.
This document provides assembly instructions for an alternator and turbocharger. It consists of 30 steps to assemble the alternator, beginning with cleaning parts and pressing components together. It instructs to install diodes, coils, housing pieces and leads. For the turbocharger, it outlines 14 steps to disassemble it by removing housings, wheels and seals. It then lists 15 steps for reassembling the turbocharger, including installing new seals, bearings and ensuring oil passages are clean.
This document provides assembly instructions for an alternator and turbocharger. It consists of 30 steps to assemble the alternator, beginning with cleaning parts and pressing components together. It instructs to install diodes, coils, housings and ends by connecting wires. It also outlines 14 steps to disassemble a turbocharger, including removing housings, wheels and seals, and 13 steps to reassemble it, such as installing bearings, seals and housings. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar Cat 330C FM EXCAVATOR (Prefix B4N) Service Repair Manual Instant ...yan77xunhao
This document provides instructions for servicing components of a Caterpillar 330C FM Excavator engine, including:
- Installing the cylinder head, which involves positioning a new gasket, attaching lifting tools to the cylinder head, applying anti-seize compound to bolts, and tightening bolts in a specific sequence.
- Removing and installing the camshaft, which requires removing other components like the rocker arm first, ensuring timing marks are aligned, and lubricating the camshaft lobes during installation.
- Removing and installing the camshaft gear by pressing it off the camshaft, aligning the keyway, and heating the gear to the proper temperature during installation.
The document provides instructions for disassembling a transmission (power shift) from a 416E Backhoe Loader. It lists required tools and outlines 25 steps to remove the transmission, including draining fluids, disconnecting electrical and hydraulic connections, removing mounting hardware, and lifting the transmission off with a hydraulic jack. The transmission weighs approximately 255 kg (562 lb) and special care must be taken when handling it and containing any fluids.
CASE CX700 CRAWLER EXCAVATOR Service Repair Manual Instant Download.pdfyan77xunhao
CASE/AKCELA hydraulic fluid is recommended for use in the hydraulic system. The specific fluid to use depends on the ambient temperature range. For temperate climates from -20°C to +40°C, use CASE/AKCELA HYDRAULIC EXCAVATOR FLUID. For hot climates from 0°C to +50°C, use CASE/AKCELA AW HYDRAULIC FLUID 68 HV.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling major transmission components like gears, shafts, bearings, springs and seals. Proper cleaning and lubrication of parts is emphasized. Safety notes warn of risks from improper handling of spring-loaded components.
The document provides instructions for removing and installing the boom on a 420F Backhoe Loader. It describes:
1) Disconnecting hoses and removing pins/bolts to separate the boom from the loader.
2) Using pullers and lifting devices to remove bearings and the boom cylinder.
3) Reversing the process to install the new or repaired boom by pressing in bearings and reattaching components.
This document provides instructions for removing and installing fuel injection nozzles on a Caterpillar 3054 engine. It describes:
- Removing fuel injection lines before removing nozzles
- Loosening the threaded nut and removing the nozzle and seat washer from the cylinder block
- Cleaning parts and installing a new seat washer before installing the nozzle
- Carefully tightening the nut to the specified torque
Caterpillar Cat 345B Series II Excavator (Prefix CCC) Service Repair Manual I...yan77xunhao
The document provides instructions for removing and installing the rocker shaft, pushrods, cylinder head, and related components on a 345B Series II Excavator with a 3176C engine. The removal procedure involves disconnecting sensors, tubes, and wiring before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning mating surfaces, installing new gaskets and seals, and using guide bolts to position the cylinder head before reconnecting components.
This document provides instructions for removing the cylinder head from a Caterpillar 3054C engine. The steps include:
1. Draining the coolant and engine oil from the engine oil cooler.
2. Removing the air filter hose.
3. Removing any attached components to the cylinder head like the valve cover, rocker arms, pushrods, etc.
4. Removing the cylinder head bolts and removing the cylinder head.
The document provides instructions for disassembling and assembling components of the control valve for an excavator model 385B. It describes 25 steps to disassemble parts like actuators, manifolds, solenoids, valves, seals and more. The assembly section outlines 14 steps and provides warnings to properly install spring-loaded parts to prevent injury. Precautions are noted to clean parts and check for wear before reassembly.
Caterpillar Cat 385C and 385C L Excavator (Prefix JCM) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 385C excavator. It lists 34 steps for disassembly, removing components like housing covers, gears, shafts and seals. It notes the importance of cleanliness. For assembly, it lists 1 step to reassemble the final drive on a repair stand and cribbing, referring to other assembly instructions. Tools, torque specs and notes on lubrication and seals are provided. The goal is to disassemble, clean, inspect for wear, replace worn parts, and reassemble the final drive while maintaining cleanliness.
More Related Content
Similar to Caterpillar Cat 245 EXCAVATOR (Prefix 95V) Service Repair Manual Instant Download.pdf
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease between parts. The document also provides disassembly instructions for an air cleaner housing, installing a turbocharger, and disassembling a turbocharger.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease to protected parts. The document also provides disassembly instructions for an air cleaner housing and removing/installing a turbocharger.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized and notes provide warnings about handling delicate parts carefully to avoid damage.
This document provides assembly instructions for an alternator. It describes 29 steps to assemble the various components of the alternator in the proper order, including installing diodes, bearings, coils, housing pieces, terminals and making electrical connections. Cleanliness is emphasized throughout assembly and notes provide warnings about damaging parts during pressing or striking.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease to protected parts. The document also provides disassembly instructions for an air cleaner housing and removing/installing a turbocharger.
This document provides instructions for assembling an alternator. It describes in detail each step of the assembly process with notes about proper handling of parts. Some key steps include pressing bearings and bushings into place without striking them, joining housing components, connecting wiring harnesses, and applying dielectric grease to protected parts. The document also provides disassembly instructions for an air cleaner housing and removing/installing a turbocharger.
This document provides instructions for assembling an alternator. It describes 29 steps to assemble internal components like diodes, bushings, coils, and housings. Cleanliness is important during assembly to avoid issues. Diodes and bearings should not be struck as it can damage them. Dielectric grease should be applied where noted. The final steps include installing external components like the mounting plate, regulator, and cover.
This document provides instructions for assembling an alternator. It describes 29 steps to assemble internal components like diodes, bushings, coils, and housings. Cleanliness is important during assembly to avoid issues. Diodes and bearings should not be struck as it can damage them. Dielectric grease should be reapplied if removed. The final steps include installing external components like the mounting plate, regulator, and cover.
This document provides assembly instructions for an alternator and turbocharger. It consists of 30 steps to assemble the alternator, beginning with cleaning parts and pressing components together. It instructs to install diodes, coils, housing pieces and leads. For the turbocharger, it outlines 14 steps to disassemble it by removing housings, wheels and seals. It then lists 15 steps for reassembling the turbocharger, including installing new seals, bearings and ensuring oil passages are clean.
This document provides assembly instructions for an alternator and turbocharger. It consists of 30 steps to assemble the alternator, beginning with cleaning parts and pressing components together. It instructs to install diodes, coils, housings and ends by connecting wires. It also outlines 14 steps to disassemble a turbocharger, including removing housings, wheels and seals, and 13 steps to reassemble it, such as installing bearings, seals and housings. Proper cleaning and lubrication of parts is emphasized throughout.
Similar to Caterpillar Cat 245 EXCAVATOR (Prefix 95V) Service Repair Manual Instant Download.pdf (12)
Caterpillar Cat 330C FM EXCAVATOR (Prefix B4N) Service Repair Manual Instant ...yan77xunhao
This document provides instructions for servicing components of a Caterpillar 330C FM Excavator engine, including:
- Installing the cylinder head, which involves positioning a new gasket, attaching lifting tools to the cylinder head, applying anti-seize compound to bolts, and tightening bolts in a specific sequence.
- Removing and installing the camshaft, which requires removing other components like the rocker arm first, ensuring timing marks are aligned, and lubricating the camshaft lobes during installation.
- Removing and installing the camshaft gear by pressing it off the camshaft, aligning the keyway, and heating the gear to the proper temperature during installation.
The document provides instructions for disassembling a transmission (power shift) from a 416E Backhoe Loader. It lists required tools and outlines 25 steps to remove the transmission, including draining fluids, disconnecting electrical and hydraulic connections, removing mounting hardware, and lifting the transmission off with a hydraulic jack. The transmission weighs approximately 255 kg (562 lb) and special care must be taken when handling it and containing any fluids.
CASE CX700 CRAWLER EXCAVATOR Service Repair Manual Instant Download.pdfyan77xunhao
CASE/AKCELA hydraulic fluid is recommended for use in the hydraulic system. The specific fluid to use depends on the ambient temperature range. For temperate climates from -20°C to +40°C, use CASE/AKCELA HYDRAULIC EXCAVATOR FLUID. For hot climates from 0°C to +50°C, use CASE/AKCELA AW HYDRAULIC FLUID 68 HV.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling major transmission components like gears, shafts, bearings, springs and seals. Proper cleaning and lubrication of parts is emphasized. Safety notes warn of risks from improper handling of spring-loaded components.
The document provides instructions for removing and installing the boom on a 420F Backhoe Loader. It describes:
1) Disconnecting hoses and removing pins/bolts to separate the boom from the loader.
2) Using pullers and lifting devices to remove bearings and the boom cylinder.
3) Reversing the process to install the new or repaired boom by pressing in bearings and reattaching components.
This document provides instructions for removing and installing fuel injection nozzles on a Caterpillar 3054 engine. It describes:
- Removing fuel injection lines before removing nozzles
- Loosening the threaded nut and removing the nozzle and seat washer from the cylinder block
- Cleaning parts and installing a new seat washer before installing the nozzle
- Carefully tightening the nut to the specified torque
Caterpillar Cat 345B Series II Excavator (Prefix CCC) Service Repair Manual I...yan77xunhao
The document provides instructions for removing and installing the rocker shaft, pushrods, cylinder head, and related components on a 345B Series II Excavator with a 3176C engine. The removal procedure involves disconnecting sensors, tubes, and wiring before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning mating surfaces, installing new gaskets and seals, and using guide bolts to position the cylinder head before reconnecting components.
This document provides instructions for removing the cylinder head from a Caterpillar 3054C engine. The steps include:
1. Draining the coolant and engine oil from the engine oil cooler.
2. Removing the air filter hose.
3. Removing any attached components to the cylinder head like the valve cover, rocker arms, pushrods, etc.
4. Removing the cylinder head bolts and removing the cylinder head.
The document provides instructions for disassembling and assembling components of the control valve for an excavator model 385B. It describes 25 steps to disassemble parts like actuators, manifolds, solenoids, valves, seals and more. The assembly section outlines 14 steps and provides warnings to properly install spring-loaded parts to prevent injury. Precautions are noted to clean parts and check for wear before reassembly.
Caterpillar Cat 385C and 385C L Excavator (Prefix JCM) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 385C excavator. It lists 34 steps for disassembly, removing components like housing covers, gears, shafts and seals. It notes the importance of cleanliness. For assembly, it lists 1 step to reassemble the final drive on a repair stand and cribbing, referring to other assembly instructions. Tools, torque specs and notes on lubrication and seals are provided. The goal is to disassemble, clean, inspect for wear, replace worn parts, and reassemble the final drive while maintaining cleanliness.
This document provides instructions for disassembling and assembling the final drive of a 385B excavator. It describes:
1) Removing over 30 components of the final drive including gears, shafts, housings and seals using various tools.
2) Cleaning and inspecting parts prior to assembly.
3) Assembling the components in reverse order, applying lubricants to bearings and sealing surfaces.
4) Using tools and procedures to properly set bearing preload when installing the main housing.
Caterpillar Cat 385B and 385B L Excavator (Prefix FDL) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of an excavator model 385B.
The disassembly procedure involves removing 27 parts in a specific sequence, including removing the ring gear, carrier assemblies, gears, shafts and seals. The assembly procedure instructs installing 31 parts in reverse order, and describes determining the correct shim thickness between the bearing cone and coupling gear to achieve proper bearing preload. Special tools are required for several steps.
Caterpillar Cat 374F L Excavator (Prefix AP4) Service Repair Manual Instant D...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 374F L Excavator. It lists the required tools and parts. The disassembly process involves removing components like the final drive cover, ring gear, carrier assemblies, gears, shafts and housings. The assembly process specifies cleaning parts, applying sealant, installing bearings and seals, and adjusting bearing preload using shims. Precautions are given for using hydraulic cylinders and puller studs during the assembly process.
This document provides instructions for disassembling and assembling the governor and fuel injection pump housing of a 3306 vehicular engine. It describes removing over 30 individual parts in 12 steps to disassemble the governor. It then describes assembling the governor in 35 steps, noting to clean and oil all parts before assembly.
This document provides instructions for removing and installing various engine components on a Caterpillar 3054C engine, including:
- Lifter group
- Camshaft
- Camshaft bearings
- Engine oil pan
- Piston cooling jets
The instructions include lists of required tools, step-by-step procedures, torque specifications, and cautions to keep parts clean and properly support components.
The document provides instructions for removing and disassembling the transmission of a 428D Backhoe Loader. It describes 19 steps to disassemble the transmission into its major components which include removing valve groups, filters, shafts, seals and gaskets. Special tools are required and cleanliness is important when disassembling the transmission.
The document provides instructions for removing the bank valve from a 420E Backhoe Loader. It is a 19 step process that involves draining fluids, removing floor plates, disconnecting hoses and wiring, and using lifting equipment to remove the heavy bank valve unit. The bank valve is then disassembled into its individual valve components for inspection or replacement.
The document provides instructions for installing a swing frame on a 420E backhoe loader. It outlines 20 steps for the installation, which include lowering bearing temperatures, placing bars through frames, installing pins and bolts, connecting hoses and harnesses, and positioning cylinders. Tools required include levers, drivers, and lifting devices. Safety precautions are provided for working on pressurized hydraulic systems.
The document provides instructions to disassemble an axle housing, axle shaft, and wheel flange from a 420E backhoe loader. It outlines 9 steps to remove components including the axle shaft, retaining rings, locking plates, seals, bearings and bushings. Tools required include a spanner wrench, retaining ring pliers, and a combination puller. The purpose is to disassemble these components for repair or replacement.
The document provides instructions for removing and installing components related to the steering and final drive system of a Caterpillar 420E backhoe loader, including:
- Removing and installing the front tire and rim.
- Removing and installing the tie rod and steering cylinder.
- Removing the final drive planetary by draining oil and removing mounting screws.
- Disassembling the final drive planetary by using retaining ring pliers to remove the retaining ring.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 245 EXCAVATOR 95V
Configuration: 245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE
Disassembly and Assembly
26SI Series Alternator
Media Number -RENR1252-01 Publication Date -01/10/1999 Date Updated -09/10/2001
i01167081
Alternator - Disassemble
SMCS - 1405-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 6V-7070 Digital Multimeter 1
B Variable Power Supply 1
Start By:
A. Remove the alternator. Refer to Disassembly and Assembly, "Alternator - Remove" for the
machine that is being serviced.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will help to prevent dirt from entering the internal
mechanism.
1. Remove the pulley nut, the washer, the pulley, and the fan.
1/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 4 g00627796
5. Remove 2 insulated screws (6). Remove the 3 leads.
Note: The regulator and the mounting plate are coated with dielectric grease. If the grease is
removed, reapply the grease.
6. Remove nut (7) .
Illustration 5 g00627804
7. Remove grounded mounting screw (8) .
8. Remove regulator (9) .
3/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g00627808
9. Remove mounting plate (10). The mounting plate may be stuck to the regulator.
Illustration 7 g00627810
Note: The 3 output diodes (11) are located in heat sink (12). These diodes are identical in
polarity. Diode (11) has red insulation on the wire. The 3 ground diodes (13) are located in
housing (14). These diodes are identical in polarity. Diode (13) has black insulation on the
wire.
10. Remove 3 nuts (15). Disconnect 3 stator phase leads. Disconnect 3 phase leads. Disconnect
6 diode leads.
Table 2
Alternator
Ground
Current Flow of the Output
Diodes
Current Flow of the Ground
Diodes
Negative
Lead to the Heat Sink Housing to the Lead
Red Wire Black Wire
4/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 8 g00627820
11. Remove the screw and insulator (16). Disconnect capacitor lead (17) .
Illustration 9 g00627832
12. Remove the 3 screws and insulators (18). Disconnect wire (19) .
13. If the "R" terminal is used, remove the following components: nut (20), lead (21), the
washer and terminal (21) .
5/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g00627840
14. Remove screw (23) and remove diode trio (24) .
15. Remove the nut and washer (25). Remove insulator (26). Remove alternator output terminal
(27) .
16. Remove separator (28) .
Illustration 11 g00627853
Note: Many of the alternator's internal components are covered with dielectric grease. If the
grease is removed, reapply the grease.
Illustration 12 g00627855
17. Remove the heat sink and diode assembly (12) from housing (14). Insulator (29) may be
stuck to heat sink (12) .
6/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 13 g00628035
Note: Do not damage exposed stator windings or field windings. Bumping the windings or
scraping the windings may break the insulation. Broken insulation may create a short circuit
or a ground.
18. Remove 4 bolts (30). Carefully separate housing (31) from housing (14) .
Illustration 14 g00628037
19. Pull apart stator (32) and housing (14). Guide the stator leads and the grommet through the
hole as the stator is removed from housing (14) .
7/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00628041
20. Remove 3 screws (33). Remove the coil and support (34) from housing (14). Guide the field
leads and the grommet through the hole as the coil is removed from housing (14) .
Illustration 16 g00628043
21. Position a small screwdriver in slot (35). Pry cap (36) from housing (14) .
Illustration 17 g00628057
8/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Note: Do not strike the bearing. Shocks from striking the housing can cause damage.
22. Wipe the excess grease from the bearing well. Press bearing (37) into the housing. Remove
the inner race.
Illustration 18 g00628063
23. Remove 4 screws (38) from housing (31) .
24. Lift rotor (39) and bearing (40) from housing (31) .
Illustration 19 g00628067
25. Pull bearing (40) from rotor (39) .
26. Pull retainer (41) from rotor (39) .
27. Pull collar (42) from rotor (39) .
9/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 20 g00628068
Note: Do not strike the bushing. Shocks from striking the housing can cause damage.
28. Press bushing (43) from housing (14) .
Note: Do not strike the diodes. The shock of such an impact can damage the diodes. Use
proper tools in order to press or pull the diodes from the mountings. As much as 890 N (200
lb) of force may be needed to remove a diode.
29. Remove 3 diodes (13) from housing (14) .
Illustration 21 g00628072
30. Remove diode (11) from heat sink (12) .
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Oct 11 09:09:50 UTC+0800 2019
10/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(S...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 245 EXCAVATOR 95V
Configuration: 245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE
Disassembly and Assembly
26SI Series Alternator
Media Number -RENR1252-01 Publication Date -01/10/1999 Date Updated -09/10/2001
i01167078
Alternator - Assemble
SMCS - 1405-016
Assembly Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Note: Do not strike the diodes. The shock of such an impact can damage the diodes. Use
proper tools in order to press the diodes in the mountings.
Illustration 1 g00628072
1. Install 3 diodes (11) in heat sink (12) .
1/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 2 g00628068
Note: Do not strike the bushing. Shocks from striking the housing can cause damage.
2. Press bushing (43) in housing (14) .
3. Install 3 diodes (13) in housing (14) .
Illustration 3 g00628067
4. Press collar (42) on rotor (39) .
5. Slide retainer (41) on rotor (39) .
6. Press bearing (40) on rotor (39) .
2/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 4 g00628063
7. Press housing (31) on rotor (39) and bearing (40) .
8. Install 4 screws (38) in housing (31) .
Illustration 5 g00628057
Note: Do not strike the bearing. Shocks from striking the housing can cause damage.
9. Install the inner race. Press bearing (37) into the housing.
3/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 6 g00628043
10. Press cap (36) in housing (14) .
Illustration 7 g00628041
11. Install the coil and support (34) in housing (14). Guide the field leads and the grommet
through the hole as the coil is installed in housing (14). Install 3 screws (33) .
Illustration 8 g00628037
12. Press the stator (32) and housing (14) together. Guide the stator leads and the grommet
through the hole as the stator is installed in housing (14) .
4/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 9 g00628035
Note: Do not damage exposed stator windings or field windings. Bumping the windings or
scraping the windings may break the insulation. Broken insulation may create a short circuit
or a ground.
13. Join housing (31) and housing (14). Install 4 bolts (30) .
Illustration 10 g00627853
Note: Many of the alternator's internal components are covered with dielectric grease. If the
grease is removed, reapply the grease.
5/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 11 g00627855
14. Install Insulator (29). Install the heat sink and diode assembly (12) in housing (14) .
Illustration 12 g00627840
15. Install separator (28) .
16. Install alternator output terminal (27). Install insulator (26). Install the nut and washer (25) .
17. Install diode trio (24) and install screw (23) .
6/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 13 g00627832
18. Install the 3 screws and insulators (18). Connect wire (19) .
19. If the "R" terminal is used, install the following components: nut (20), lead (21), the washer
and terminal (21) .
Illustration 14 g00627820
20. Install the screw and insulator (16). Connect capacitor lead (17) .
Illustration 15 g00627810
Note: The 3 output diodes (11) are located in heat sink (12). These diodes are identical in
polarity. Diode (11) has red insulation on the wire. The 3 ground diodes (13) are located in
housing (14). These diodes are identical in polarity. Diode (13) has black insulation on the
wire.
21. Connect 6 diode leads. Connect 3 phase leads. Connect 3 stator phase leads. Install 3 nuts
(15).
Table 1
7/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Alternator
Ground
Current Flow of the Output
Diodes
Current Flow of the Ground
Diodes
Negative
Lead to the Heat Sink Housing to the Lead
Red Wire Black Wire
Illustration 16 g00627808
22. Install mounting plate (10).
Illustration 17 g00627804
23. Install regulator (9) .
24. Install grounded mounting screw (8) .
8/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 18 g00627796
25. Install 2 insulated screws (6). Connect the 3 leads.
Note: The regulator and the mounting plate are coated with dielectric grease. If the grease is
removed, reapply the grease.
26. Install nut (7) and connect the wire.
Illustration 19 g00627794
27. Install gasket (5) .
9/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 20 g00627792
28. Position cover (4). Install 7 screws (3) .
Illustration 21 g00627790
29. Position plate (2). Install 4 screws (1) .
30. Install the fan, the pulley, the washer, and the pulley nut.
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Oct 11 09:10:45 UTC+0800 2019
10/10
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(S...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 245 EXCAVATOR 95V
Configuration: 245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE
Disassembly and Assembly
SUPPLEMENT FOR HYDRAULIC TRACK MOTOR
Media Number -SENR3402-01 Publication Date -01/12/1987 Date Updated -11/10/2001
Track Motors
SMCS - 4351-015; 4351-016
Disassemble Motors (Track)
START BY:
a) Remove track motors.
1. Put identification marks on head (2) and housing (3). Remove eight bolts (1) and head from
housing. Weight of the motor is 138 kg (304 lbs.).
1/13
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 2. Remove control plate (4) from head (2). Note the location of pin (5). Grease and oil suction will
be holding control plate (4) to head (2).
3. Remove O-ring seal (6) from housing (3). Remove cylinder barrel (7) from housing.
4. Remove allen head plug (8) and disc from cylinder barrel (7).
5. Remove spring (9) and shim (10) from housing.
2/13
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. 6. Turn housing over to the drive shaft end. Remove snap ring (11).
7. Use two screwdrivers and remove cover (12) and O-ring seal.
8. Put identification marks on flange (13) to housing (3). Remove eight bolts (15) from flange
(13). The bolts were installed with loctite.
9. Use tooling (A) and remove flange (13) and rotary group (14) as an assembly from the pump
housing. Weight of flange and rotary group 50 kg (110 lbs.)
NOTE: Use heat around housing to help remove the flange and rotary group.
10. Position flange (13) and rotary group (14) as an assembly in a press. Remove ring (16) from
flange.
3/13
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
26. 11. Press rotary group (14) through flange (13). Remove shim (17) from under the flange [laying
on inner bearing race (18)].
12. Remove O-ring (19) from flange (13). Remove bearing (20).
13. Position rotary group (shaft down) along with inner bearing race on tooling (B). Remove
fourteen bolts (23). Thread lock was used on the bolts at assembly. Remove plate (21) and pistons
(22).
14. Remove spherical bushings (24).
4/13
245 EXCAVATOR 95V00471-UP (MACHINE) POWERED BY 3406 ENGINE(SEB...
2019/10/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...