3. Port Location
+ Located at
10.37.124N -
106.29.107E,
50 miles from buoy
"0" (zero)
+ Situated on the left
bank of Vam Co
Dong river
+ 1.5 km downstream of Ben Luc bridge; 12 km South-East of HCMC.
+ Central location for 12 Industrial zones in development.
4. * Road: Linking National road 1A to HCMC and Mekong Delta provinces;
Provincial road 830 to HCMC, Binh Duong, Dong Nai, Tay Ninh, Binh Phuoc
* Inland waterways: Connecting the main waterways linking HCMC to Tay Ninh,
Long An, Tien Giang and other Mekong Delta provinces .
* Sea: Maritime channel 50nm via Vam Co Dong river -> Vam Co river -> Soai Rap
river -> Vung Tau, channel average depth 6.5 m.
TransportConnection
5. Port Master plan
Total 13 ha, in which:
30,000 m2 warehouse (loaded 4T/m2)
24,000 m2 container yard
25,000 m2 open storage yard
6. Port Information
• Bourbon Ben Luc is a project of Bourbon
Group in Vietnam from 1999
• Vessel’s restrictions
LOA :120 m
Air draft : 25 m
Draft : 6 m
DWT : 5,000 T
7. Port activities
– Warehouse, Storage services
– Handling general cargoes, equipment,
bagged and bulk cargoes
– Container handling, stuffing, unstuffing,
storing, repairing
– Handling liquid gas (LPG)
– Site of Customs procedures completion
8. Wharf Length Draft Available for
A 100m 9m alongside Domestic/foreign sea-going vessels
B 50m 7m alongside inland waterway ships/barges.
C 70m 9m alongside Domestic/foreign sea-going vessels
D 265m 7m alongside Domestic/foreign sea-going vessels
Wharf Facilities
10. Advantages
• 24h/24h truck traffic.
• Distribution center from HCMC to Mekong Delta provinces and
Cambodia
• Warehouse – Yard – Port modern, safe at reasonable service price
Livestock Express Vssl arrived BBL on Sep 02nd 2013
11. More than 10 years of managing of port operation
Experiences