WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
BUTTERFLY VALVES
INSTALLATION, OPERATION, MAINTENANCE MANUAL
TABLE OF CONTENTS
1.0 Prior to Installation………..……..Page 1
2.0 Installation………………..……...Page 1-3
3.0 Operation………………….……..Page 3-4
4.0 Maintenance……………………..Page 4-5
5.0 Troubleshooting………………….Page 6
The manual provides customers and end-users with all information with regards to the storage,
installation, operation and maintenance of Weidouli Butterfly Valves.
a) This manual should be used in conjunction with practical measures learned from both maintenance
and operational experience. Ensure that only suitably skilled and experienced personnel can handle
and maintain the valves.
b) Such information as technical data on relevant dimensions, spare parts, part material, tools, fixtures
are not covered in this manual. For such details, please refer to each purchase order and Weidouli
General Arrangement (GA) drawings.
c) If you have any doubt, queries, questions or require additional information or clarification, please
contact the Weidouli office.
WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
1
1.0 PRIOR TO INSTALLATION
Transportation and Storage
1.1 Transportation.
a) The valve and the actuator can be integrated
or separated to be placed in the plywood case(s)
suitable for transportation. Each plywood case
is marked with gross weight, net weight, case
number and other related marks.
b) While loading or unloading, check for and
adhere to any markings or arrows on the box
which may be present to indicate upward
orientation.
c) The user should select proper tools and
lifting equipment to transport the goods to
avoid damage after it has been transported to
the warehouse or outdoor storage area at the
installation site.
1.2 Storage
a) IMPORTANT: Don’t expose the valves to
dust, sand or similar materials during storage.
b) For transport and storage, the valves must
always be in the closed position and the
connection ends must be protected to prevent
damage to the seats. To prevent damage, do not
suspend the valve by its lever, gearbox or
actuator.
c) Storing in the closed position will minimize
the risk of damage to the seats
2.0 INSTALLATION
2.1 IMPORTANT: The Butterfly should be in
the full close position before valve installation.
2.2 Before installation, remove the end
protectors and clean the valve ends and bore.
Check that the valve and its accessories have
not been damaged during transportation.
2.3 Before the installation, please check the
instruction carefully and ensure conditions are
consistent with the requirements of the valve
that is being used.
2.4 If the valve has been in storage for a long
period, please ensure that the valve is properly
cleaned and tested prior to installation and that
all moving parts are able to move without
undue restraint. This is to ensure that the valve
will perform reliably and satisfactorily during
operation.
2.5 Before installing the valves, the pipes must
be flushed clean of all debris, weld slag, dirt
etc. to prevent damage to the seats and the
Butterfly surface. Failure to do so may result in
damage to the soft seat, metal seat and other
parts during operation.
2.6 The gaskets at the connecting flanges must
be installed properly. Use only joints and
gaskets made from approved materials.
WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
2
2.7 The valve body when marked with an arrow indicating the flow direction, the valves should be
installed in such a way that the actual flow direction of the medium matches the arrow on the body.
2.8 If the valve is actuated, all electrical equipment such as actuators, limit switches etc. must be
installed in flood-proof and dry locations and conditions. Pay attention to the recommended voltage
and frequency.
2.9 When installing a valve between two flanges, ensure there is adequate space to install flange seals
gaskets and ensure the counter flanges do make contact with the valve sealing surface.
2.10 Use the correct size counter flanges, gaskets and fasteners, these parts should be suitable for the
operating conditions. Flanges bolts should be tightened, using a tool to evenly load bolts.
WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
2.11 Handling Procedure
A- It is recommended that lifting straps (instead of chains or hooks) be used around the valve yoke
neck and through the flange bolt holes for pressure points.
B- Never lift or move the valve assembly using the disc, valve seat (bore) or packing follower / nut as
a pressure point.
C- Lifting of large valves. Never lift or move the valve assembly by using the actuator, tubing or other
accessories. Select proper tools and lifting equipment to transport the goods. To hoist the valve, the
actuator should not be the pick-up point.
WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
3.0 OPERATION
3.1 Prior to commissioning of the valve, the
pressure, temperature and material data sheet
on the valve should be compared to the actual
operating conditions in the piping system to
check whether the valve can withstand the
loads that occur in the system.
3.2 The valves must not be operated beyond
the limits. The actual or operating temperature
and pressure conditions of the valve should not
exceed the maximum limited temperature and
pressure. Nonobservance of this warning may
lead to personal injury or property damage.
3.3 When the valve is used in a pipeline, it
should be fully open or fully closed, and the
semi-closed or half-open state for long periods
should be avoided as this may cause damage to
sealing rings
3.4 Valves should be opened and closed slowly
to avoid hammering effect on the valve.
3.5 The handling a valve requires skilled and
experienced personnel. Human errors due to
Operator’s poor or lack of skill in operating the
valve may have serious consequences for the
entire plant, such as fluid escape, downtime of
the plant.
3.6 Before operation, the gland packing should
be checked when it is subjected to the full
operating pressure and temperature for the first
time, if necessary, evenly re-tighten the nuts at
the gland flange.
3.7 The counter flanges connection and gasket
should be checked for tightness after the
application of pressure in the valve. Should a
leakage at the gasket face be observed, the
connection should be tightened evenly and
crosswise, and in a clockwise direction.
3.8 Once proper installation has been
successfully completed, gradually increase
system pressure until working pressure is
reached.
4.0 MAINTENANCE
4.11 Before removing the valve from the pipe,
the valve must be depressurized, as opening
of pressurized valve may cause and injury or
even death. Furthermore, care should be taken
that the valve under consideration and its
associated fluid has cooled down sufficiently to
prevent injury and due to scalding and burning.
4.12 Adequate care should be taken to avoid
not to damage the sealing surface of parts
during disassembly and reassembly.
4.13 Depending on the installation position,
any liquid remaining in the valve may have to
be removed. Prior to transport, the valves must
be flushed and carefully drained.
4.14 Depending on the working medium and
situation, if necessary, wear suitable protective
clothing.
4.15 If the actuator is powered by an external
source of energy such as electric, pneumatic,
hydraulic power which need to be removed or
WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
dismantled from valves, the energy supply
must be shut down prior to starting any
maintenance work.
4.16 To ensure reliable operation and to reduce
repair costs, all valves especially those which
are seldom operated or where access is difficult
should be checked periodically.
4.17 Don’t use unauthorized replacement
spares and parts.
4.18 New parts should be cleaned before
assembly.
4.19 Use grease for lubrication. The grease
should be compatible with all metal materials
and rubber and plastic parts of the Butterfly
vale as well as the working medium. When the
working medium is gas, special grease may be
used. Apply a thin film of grease onto the
surface of the mounting groove of sealing
elements, the rubber sealing elements and the
sealing and friction surfaces of the stem.
4.20 During assembly, no metal scraps, fibers,
grease (except those stated), dust or any other
impurities can pollute, adhere to or stay on the
part surfaces or enter into the inner chamber.
4.21 On-line Maintenance
The replacement of the stem packing,
fire-protection ring etc. and similar parts can be
conducted on the pipeline, without having to
disassemble the valve from the pipeline. The
disassembly order is different in accordance
with different actuator types.
4.22 Butterfly valve -replacing packing
1) Shut off the cut-off valves in the upper and
lower reaches of the Butterfly valve. Vent the
air to relieve the pressure in the pipeline
sections before and after the Butterfly valve.
2) Make the Butterfly valve fully closed.
3) Release the screw to unload the packing
gland.
4) Remove the packing with the hooked iron
wire.
5) Check the unloaded parts. Repair or
replace them in case of damage. Clean the
packing.
6) Wipe and lubricate the sealing surface of
the packing gland.
7) Load the new packing.
8) Load the packing gland in the opposite
order of unloading and then tightening the
screw.
9) Then load the first clip ring, the locking
block, the handle and the second clip ring.
10) Operate the handle to check the on-off
flexibility of the Butterfly valve.
11) Carry out the pressure test.
4.23 Off-line Maintenance---Replacing Seat, Gasket Ring, Fire-protection Ring and So on
It's very important to take the following
measures to conduct any disassembly
operations for the valve in the working state to
ensure your safety.
WEIDOULI VALVES CO., LTD. Butterfly Valves Manual
NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA
WWW.WSV-VALVE.COM
4.3.1 How to unload valve from pipeline
1) To unload a valve with an actuator, close the
valve first and then separate the auxiliary
jackets, pneumatic or electric connecting wires.
2) As for working on the valve when the
medium remains in the pipeline, ensure the
appropriate protective personal clothing (PPE)
is worn.
3) Relieve the pressure of all pipelines, empty
the fluid medium in the system, and open and
close the valve for as many times as is
necessary to exhaust any remaining pressure.
Caution!
The valve should not be disassembled in a closed state
5.0 TROUBLESHOOTING
Faults Probable cause Solution
Internal and
external leakage
Over pressure and temperature
Keep attention on maximum allowed
operating pressure and temperature.
Demands and requirements by aggressive medium Use appropriate material for related service.
Seat leakage
Impurities in medium damage seat
Disassemble, clean and replace seat
with a new one.
Disc not fully closed or past fully-closed position Check whether in correct position.
Too high medium temperature causes damages to
seat
Check suitability of seat material to the
medium and its temperature
Closing position of actuator is not properly set Adjust limit screw of actuator
Leakage from
Stem
Fixing nut or locking bolt is loose Tighten nut or bolt
Stem or top gasket is damaged Replace stem or top gasket
End face of support to mount actuator is not vertical
to axial line of stem.
Calibrate verticality of support end face to
stem axial line.
Middle flange
seal leakage
Middle flange bolt and nut are loose Tighten middle flange bolt and nut;
Flange end face of valve is unparallel
with that of pipeline.
Correct position between flanges until they
are parallel.
Working
condition over
limit
Fluid temperature is too high Check designed applicability of material;
Air supply of pneumatic valve is under-pressure
Supplement pressure of air supply to normal
value;
Operating handle is too short
Turn seat or seat seal to discharge extra
pressure.
If have Damages are caused during transportation. Replace damaged part and make a record;

More Related Content

Recently uploaded

Pallawi ❣ 💓 Pallawi 09167673311 💓Call Girl in Thane Near Hiranandani Estate ...
Pallawi ❣ 💓 Pallawi  09167673311 💓Call Girl in Thane Near Hiranandani Estate ...Pallawi ❣ 💓 Pallawi  09167673311 💓Call Girl in Thane Near Hiranandani Estate ...
Pallawi ❣ 💓 Pallawi 09167673311 💓Call Girl in Thane Near Hiranandani Estate ...Pooja Nehwal
 
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...Riya Pathan
 
Fun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call Girl
Fun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call GirlFun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call Girl
Fun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call GirlApsara Of India
 
Call Girls Nikol 7397865700 Ridhima Hire Me Full Night
Call Girls Nikol 7397865700 Ridhima Hire Me Full NightCall Girls Nikol 7397865700 Ridhima Hire Me Full Night
Call Girls Nikol 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...
(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...
(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...Riya Pathan
 
Call Girls Somajiguda Sarani 7001305949 all area service COD available Any Time
Call Girls Somajiguda Sarani 7001305949 all area service COD available Any TimeCall Girls Somajiguda Sarani 7001305949 all area service COD available Any Time
Call Girls Somajiguda Sarani 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls in Nashik Bhavna 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Bhavna 7001305949 Independent Escort Service NashikCall Girls in Nashik Bhavna 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Bhavna 7001305949 Independent Escort Service Nashikranjana rawat
 
Call Girls in Faridabad 9000000000 Faridabad Escorts Service
Call Girls in Faridabad 9000000000 Faridabad Escorts ServiceCall Girls in Faridabad 9000000000 Faridabad Escorts Service
Call Girls in Faridabad 9000000000 Faridabad Escorts ServiceTina Ji
 
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130Suhani Kapoor
 
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort ServicesHi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort ServicesApsara Of India
 
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...Amil Baba Company
 
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...anamikaraghav4
 
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969Apsara Of India
 
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...Apsara Of India
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...First NO1 World Amil baba in Faisalabad
 
VIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts Service
VIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts ServiceVIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts Service
VIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts ServiceApsara Of India
 
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.comKolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.comKolkata Call Girls
 
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service GulbargaVIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service GulbargaRiya Pathan
 
Cash Payment Contact:- 7028418221 Goa Call Girls Service North Goa Escorts
Cash Payment Contact:- 7028418221 Goa Call Girls Service North Goa EscortsCash Payment Contact:- 7028418221 Goa Call Girls Service North Goa Escorts
Cash Payment Contact:- 7028418221 Goa Call Girls Service North Goa EscortsApsara Of India
 
Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...
Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...
Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...anamikaraghav4
 

Recently uploaded (20)

Pallawi ❣ 💓 Pallawi 09167673311 💓Call Girl in Thane Near Hiranandani Estate ...
Pallawi ❣ 💓 Pallawi  09167673311 💓Call Girl in Thane Near Hiranandani Estate ...Pallawi ❣ 💓 Pallawi  09167673311 💓Call Girl in Thane Near Hiranandani Estate ...
Pallawi ❣ 💓 Pallawi 09167673311 💓Call Girl in Thane Near Hiranandani Estate ...
 
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
 
Fun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call Girl
Fun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call GirlFun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call Girl
Fun Call Girls In Goa 7028418221 Escort Service In Morjim Beach Call Girl
 
Call Girls Nikol 7397865700 Ridhima Hire Me Full Night
Call Girls Nikol 7397865700 Ridhima Hire Me Full NightCall Girls Nikol 7397865700 Ridhima Hire Me Full Night
Call Girls Nikol 7397865700 Ridhima Hire Me Full Night
 
(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...
(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...
(Dipika) Call Girls in Bangur ! 8250192130 ₹2999 Only and Free Hotel Delivery...
 
Call Girls Somajiguda Sarani 7001305949 all area service COD available Any Time
Call Girls Somajiguda Sarani 7001305949 all area service COD available Any TimeCall Girls Somajiguda Sarani 7001305949 all area service COD available Any Time
Call Girls Somajiguda Sarani 7001305949 all area service COD available Any Time
 
Call Girls in Nashik Bhavna 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Bhavna 7001305949 Independent Escort Service NashikCall Girls in Nashik Bhavna 7001305949 Independent Escort Service Nashik
Call Girls in Nashik Bhavna 7001305949 Independent Escort Service Nashik
 
Call Girls in Faridabad 9000000000 Faridabad Escorts Service
Call Girls in Faridabad 9000000000 Faridabad Escorts ServiceCall Girls in Faridabad 9000000000 Faridabad Escorts Service
Call Girls in Faridabad 9000000000 Faridabad Escorts Service
 
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
 
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort ServicesHi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
Hi Class Call Girls In Goa 7028418221 Call Girls In Anjuna Beach Escort Services
 
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
Amil baba in Pakistan amil baba Karachi amil baba in pakistan amil baba in la...
 
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
 
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
 
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
5* Hotel Call Girls In Goa 7028418221 Call Girls In Calangute Beach Escort Se...
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
 
VIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts Service
VIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts ServiceVIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts Service
VIP Call Girls In Goa 7028418221 Call Girls In Baga Beach Escorts Service
 
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.comKolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
Kolkata Call Girls Service +918240919228 - Kolkatanightgirls.com
 
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service GulbargaVIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
 
Cash Payment Contact:- 7028418221 Goa Call Girls Service North Goa Escorts
Cash Payment Contact:- 7028418221 Goa Call Girls Service North Goa EscortsCash Payment Contact:- 7028418221 Goa Call Girls Service North Goa Escorts
Cash Payment Contact:- 7028418221 Goa Call Girls Service North Goa Escorts
 
Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...
Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...
Russian Call Girl South End Park - Call 8250192130 Rs-3500 with A/C Room Cash...
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

weidouli-butterfly-valves-iom.pdf

  • 1. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM BUTTERFLY VALVES INSTALLATION, OPERATION, MAINTENANCE MANUAL TABLE OF CONTENTS 1.0 Prior to Installation………..……..Page 1 2.0 Installation………………..……...Page 1-3 3.0 Operation………………….……..Page 3-4 4.0 Maintenance……………………..Page 4-5 5.0 Troubleshooting………………….Page 6 The manual provides customers and end-users with all information with regards to the storage, installation, operation and maintenance of Weidouli Butterfly Valves. a) This manual should be used in conjunction with practical measures learned from both maintenance and operational experience. Ensure that only suitably skilled and experienced personnel can handle and maintain the valves. b) Such information as technical data on relevant dimensions, spare parts, part material, tools, fixtures are not covered in this manual. For such details, please refer to each purchase order and Weidouli General Arrangement (GA) drawings. c) If you have any doubt, queries, questions or require additional information or clarification, please contact the Weidouli office.
  • 2. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM 1 1.0 PRIOR TO INSTALLATION Transportation and Storage 1.1 Transportation. a) The valve and the actuator can be integrated or separated to be placed in the plywood case(s) suitable for transportation. Each plywood case is marked with gross weight, net weight, case number and other related marks. b) While loading or unloading, check for and adhere to any markings or arrows on the box which may be present to indicate upward orientation. c) The user should select proper tools and lifting equipment to transport the goods to avoid damage after it has been transported to the warehouse or outdoor storage area at the installation site. 1.2 Storage a) IMPORTANT: Don’t expose the valves to dust, sand or similar materials during storage. b) For transport and storage, the valves must always be in the closed position and the connection ends must be protected to prevent damage to the seats. To prevent damage, do not suspend the valve by its lever, gearbox or actuator. c) Storing in the closed position will minimize the risk of damage to the seats 2.0 INSTALLATION 2.1 IMPORTANT: The Butterfly should be in the full close position before valve installation. 2.2 Before installation, remove the end protectors and clean the valve ends and bore. Check that the valve and its accessories have not been damaged during transportation. 2.3 Before the installation, please check the instruction carefully and ensure conditions are consistent with the requirements of the valve that is being used. 2.4 If the valve has been in storage for a long period, please ensure that the valve is properly cleaned and tested prior to installation and that all moving parts are able to move without undue restraint. This is to ensure that the valve will perform reliably and satisfactorily during operation. 2.5 Before installing the valves, the pipes must be flushed clean of all debris, weld slag, dirt etc. to prevent damage to the seats and the Butterfly surface. Failure to do so may result in damage to the soft seat, metal seat and other parts during operation. 2.6 The gaskets at the connecting flanges must be installed properly. Use only joints and gaskets made from approved materials.
  • 3. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM 2 2.7 The valve body when marked with an arrow indicating the flow direction, the valves should be installed in such a way that the actual flow direction of the medium matches the arrow on the body. 2.8 If the valve is actuated, all electrical equipment such as actuators, limit switches etc. must be installed in flood-proof and dry locations and conditions. Pay attention to the recommended voltage and frequency. 2.9 When installing a valve between two flanges, ensure there is adequate space to install flange seals gaskets and ensure the counter flanges do make contact with the valve sealing surface. 2.10 Use the correct size counter flanges, gaskets and fasteners, these parts should be suitable for the operating conditions. Flanges bolts should be tightened, using a tool to evenly load bolts.
  • 4. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM 2.11 Handling Procedure A- It is recommended that lifting straps (instead of chains or hooks) be used around the valve yoke neck and through the flange bolt holes for pressure points. B- Never lift or move the valve assembly using the disc, valve seat (bore) or packing follower / nut as a pressure point. C- Lifting of large valves. Never lift or move the valve assembly by using the actuator, tubing or other accessories. Select proper tools and lifting equipment to transport the goods. To hoist the valve, the actuator should not be the pick-up point.
  • 5. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM 3.0 OPERATION 3.1 Prior to commissioning of the valve, the pressure, temperature and material data sheet on the valve should be compared to the actual operating conditions in the piping system to check whether the valve can withstand the loads that occur in the system. 3.2 The valves must not be operated beyond the limits. The actual or operating temperature and pressure conditions of the valve should not exceed the maximum limited temperature and pressure. Nonobservance of this warning may lead to personal injury or property damage. 3.3 When the valve is used in a pipeline, it should be fully open or fully closed, and the semi-closed or half-open state for long periods should be avoided as this may cause damage to sealing rings 3.4 Valves should be opened and closed slowly to avoid hammering effect on the valve. 3.5 The handling a valve requires skilled and experienced personnel. Human errors due to Operator’s poor or lack of skill in operating the valve may have serious consequences for the entire plant, such as fluid escape, downtime of the plant. 3.6 Before operation, the gland packing should be checked when it is subjected to the full operating pressure and temperature for the first time, if necessary, evenly re-tighten the nuts at the gland flange. 3.7 The counter flanges connection and gasket should be checked for tightness after the application of pressure in the valve. Should a leakage at the gasket face be observed, the connection should be tightened evenly and crosswise, and in a clockwise direction. 3.8 Once proper installation has been successfully completed, gradually increase system pressure until working pressure is reached. 4.0 MAINTENANCE 4.11 Before removing the valve from the pipe, the valve must be depressurized, as opening of pressurized valve may cause and injury or even death. Furthermore, care should be taken that the valve under consideration and its associated fluid has cooled down sufficiently to prevent injury and due to scalding and burning. 4.12 Adequate care should be taken to avoid not to damage the sealing surface of parts during disassembly and reassembly. 4.13 Depending on the installation position, any liquid remaining in the valve may have to be removed. Prior to transport, the valves must be flushed and carefully drained. 4.14 Depending on the working medium and situation, if necessary, wear suitable protective clothing. 4.15 If the actuator is powered by an external source of energy such as electric, pneumatic, hydraulic power which need to be removed or
  • 6. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM dismantled from valves, the energy supply must be shut down prior to starting any maintenance work. 4.16 To ensure reliable operation and to reduce repair costs, all valves especially those which are seldom operated or where access is difficult should be checked periodically. 4.17 Don’t use unauthorized replacement spares and parts. 4.18 New parts should be cleaned before assembly. 4.19 Use grease for lubrication. The grease should be compatible with all metal materials and rubber and plastic parts of the Butterfly vale as well as the working medium. When the working medium is gas, special grease may be used. Apply a thin film of grease onto the surface of the mounting groove of sealing elements, the rubber sealing elements and the sealing and friction surfaces of the stem. 4.20 During assembly, no metal scraps, fibers, grease (except those stated), dust or any other impurities can pollute, adhere to or stay on the part surfaces or enter into the inner chamber. 4.21 On-line Maintenance The replacement of the stem packing, fire-protection ring etc. and similar parts can be conducted on the pipeline, without having to disassemble the valve from the pipeline. The disassembly order is different in accordance with different actuator types. 4.22 Butterfly valve -replacing packing 1) Shut off the cut-off valves in the upper and lower reaches of the Butterfly valve. Vent the air to relieve the pressure in the pipeline sections before and after the Butterfly valve. 2) Make the Butterfly valve fully closed. 3) Release the screw to unload the packing gland. 4) Remove the packing with the hooked iron wire. 5) Check the unloaded parts. Repair or replace them in case of damage. Clean the packing. 6) Wipe and lubricate the sealing surface of the packing gland. 7) Load the new packing. 8) Load the packing gland in the opposite order of unloading and then tightening the screw. 9) Then load the first clip ring, the locking block, the handle and the second clip ring. 10) Operate the handle to check the on-off flexibility of the Butterfly valve. 11) Carry out the pressure test. 4.23 Off-line Maintenance---Replacing Seat, Gasket Ring, Fire-protection Ring and So on It's very important to take the following measures to conduct any disassembly operations for the valve in the working state to ensure your safety.
  • 7. WEIDOULI VALVES CO., LTD. Butterfly Valves Manual NO.20, XINGYU ROAD, AIRPORT INDUSTRIAL ZONE, WENZHOU CITY, P.R. CHINA WWW.WSV-VALVE.COM 4.3.1 How to unload valve from pipeline 1) To unload a valve with an actuator, close the valve first and then separate the auxiliary jackets, pneumatic or electric connecting wires. 2) As for working on the valve when the medium remains in the pipeline, ensure the appropriate protective personal clothing (PPE) is worn. 3) Relieve the pressure of all pipelines, empty the fluid medium in the system, and open and close the valve for as many times as is necessary to exhaust any remaining pressure. Caution! The valve should not be disassembled in a closed state 5.0 TROUBLESHOOTING Faults Probable cause Solution Internal and external leakage Over pressure and temperature Keep attention on maximum allowed operating pressure and temperature. Demands and requirements by aggressive medium Use appropriate material for related service. Seat leakage Impurities in medium damage seat Disassemble, clean and replace seat with a new one. Disc not fully closed or past fully-closed position Check whether in correct position. Too high medium temperature causes damages to seat Check suitability of seat material to the medium and its temperature Closing position of actuator is not properly set Adjust limit screw of actuator Leakage from Stem Fixing nut or locking bolt is loose Tighten nut or bolt Stem or top gasket is damaged Replace stem or top gasket End face of support to mount actuator is not vertical to axial line of stem. Calibrate verticality of support end face to stem axial line. Middle flange seal leakage Middle flange bolt and nut are loose Tighten middle flange bolt and nut; Flange end face of valve is unparallel with that of pipeline. Correct position between flanges until they are parallel. Working condition over limit Fluid temperature is too high Check designed applicability of material; Air supply of pneumatic valve is under-pressure Supplement pressure of air supply to normal value; Operating handle is too short Turn seat or seat seal to discharge extra pressure. If have Damages are caused during transportation. Replace damaged part and make a record;