PRATHYUSHA POWERGEN PVT LTD


From: G.Uma Mahesh, General Manager-Oprns.
Date : 12th Dec,2008
Location: Hyderabad, AP, India
Contents…

               Geographical Location
               Abundance of Julia Flora
               Industry Advantage
               Raw Material - Conventional Practice
               Raw Material – Prathyusha’s Practice
               Brief Profile of Power Plant
               Salient Features
               Plant and Machinery Details
               Clean Development Mechanism CDM
               Supporting Firms
Geographical Location
Geographical Location
Geographical Location
Geographical Location
Geographical Location
Abundance of Julia Flora
1.1 Industry Advantage(s)

•   High biomass availability: Around 120-150 MT/year, corresponding to
    16’000 MW potential
•   Income tax concession of 80% depreciation on boiler
•   Zero import duty
•   Capital subsidies from Ministry of New and Renewable Energy (MNRE)
    or it’s nodal agencies
   MNRE Planning Commission currently supporting biomass by giving
    concessions to developers.
   State utilities provide special price (Rs.3.15/unit enhanced to
    Rs.4.50/unit) for power take off.
   Govt. nods ‘Go Green’ for Third Party Sales to the extent 80:20 and the
    current market rate for Third party sales is Rs.7~8 per unit. The existing
    rate is Rs.3.15/unit
   Licenses are given in a restrictive way, to avoid competition for
    biomass within an area
   Carbon Credits Available under Clean Development Mechanism-CDM
Raw Material - Conventional Practice
Cutting



          Stacking of Dressed wood




                 Transportation Unloading of Dressed Wood




                                           Chipping of Dressed wood




                                                        Consumption
Raw Material - Conventional Practice

   Cutting of wood from nearby villages.
   Cutting of wood by Labours.
   Slower rate of cutting.
   Product is ‘Dressed Wood’ in form of 1~2metres long.
   ‘Finer and Thin’ branches are under utilized or left at site, itself.
   ‘Manual Loading’ is involved for such dressed wood in trucks.
   Transportation is involved for such loaded wood to destination.
   ‘Manual Unloading’ is involved for such dressed wood from trucks
    at destination.
   Actual Chipping at destination ; wood by wood.
   Labour charges applicable for cutting, loading and unloading.
   Transportation cost includes for Moisture and Space.
   Inherent limitations on availability of labours, due to human
    factor/local cultural events.
Raw Material – Mechanization Drive
Cutting by JCB                      Chips stack management




          Inter-carting by BOBCAT             Loading of Chips at site




                  Feeding to Chipper                  Compaction




                         Chipper in action                   Ready to Use
1.3 Raw Material –Mechanization Drive


   Generating “Wood Chips” at site Advantage(s)-Wood Chips
    from wood.                           ‘Ready to use fuel’

   Raw Material and Lands- Advance  ‘Low Moisture’
    Reservation                          ‘Low Transportation Cost’
   In pursuit of efficient fuels i.e.,  ‘Dry Metric Tons’
    Older Julia Flora.                   ‘No Hidden Cost’
   Continuous R&D at in-house Lab.  ‘Full Efficiency of Boiler’
   Well organized ‘Mechanized
    Operations’
   ‘Two Tier’ System for Raw Material
    sourcing-Own & IIIrd Party.
   Spot Payments to Raw material
    Vendors
2.3 Raw Material – Prathyusha’s Practice
3.3 Raw Material – Prathyusha’s Practice
1.2 Brief Profile of Power Plant
Prathyusha Power Gen Private Limited is the 10MW Bio-
Mass Power Generation unit which is strategically located near
Tirunelvelli Substation amidst the cluster of Paper Mills, which
attracts the Raw Materials by default.
The plant has got almost all infrastructures to meet and run
indigenously for consistent power generation. The list includes
latest weigh-bridge, Chippers, best of class Equipment, Raw
Material storage yard, handling yard, water supply, office
building, guest house, security system, two-tier boundaries and
also as part of Raw Material Supply- the short-listed and
identified lands to cater the future need of Raw Material.

The water for the plant is supplied from the underground well
dug however in order to meet the future’s enhanced supply,
the direct pipe line from the nearby perennial river is under
active consideration.
2.2 Glimpse of Power Plant




Prathyusha   Power   Gen    Private   Limited-   Tirunelveli,
Salient Features

   Site Location : Strategically located at Tirunelveli.
   Meteorological Data:
        Max & Min Temp recorded on a day is 39.5 and 20 Deg Centigrade respectively.
        Average Maximum Temperature is 32 Deg Centigrade
        Relative Humidity (average) is 57-65 %
   Nearest Railway Station :          Rajapalayam
                                       (Virudhnagar~Tenkasi Section)
   Nearest AirPort : Madurai
   Nearest TNEB Sub-Station: Srivilliputhur 110/ 11kv
   Wind Velocity: 39mt/sec as per IS 875
   Seismic Zone: Zone II as per IS 1893
   Water Source: Open Walls- 4.30cu.m/hr
                         : Number of Bore wells- 6.36 cu.m/hr
                         Capacity of each bore well: 15ch.m/hr
   Fuel : Plenty available basically of woody biomass viz.Julia Flora and
    seco
   Power Evacuation
1.3 Plant and Machinery Details
S .No. Type of E quipment   Make                        S pec ific ation

  A    B oiler               Thermodyne Tec hnologies P ressue - 75 K g/cm2
                            (P ) L td, C hennai       Temperature - 480 deg C plus/minus 10
                                                      C apacity - 45 T P H
                                                      Bi drum Membrane Water Wall construction
                                                      Travalgrate Boiler
                                                      Drum Data :
                                                      S team Drum : S ize 1372 mm ID/80mm Tk / 5600 mm/S A 516 G r 70
                                                      Water Drum : S ize 914 mm ID/56mm T k / 5400 mm/S A 516 G r 70
                                                      S uper Heater -
                                                      P rimary :38.1 OD/4.06 /S A210 G r A
                                                      S econdary : 38.1 OD/4.06/S A 213 T 22
                                                      Inlet Header :
                                                      P rimary : 219.1 OD / 12.7 / S A 106 G r B
                                                      S econdary : 219.1 OD/12.7/ S A 106 G rB
                                                      B oiler B ank:
                                                      Tube S ize : 50.8 OD/3.66 / S A 192
                                                      E c onomis er :
                                                      Tube S ize : 38.1 OD / 3.66 / BS 3059 P II Type 360 E R W
                                                      Air P reheater :
                                                      Tube S ize :63.5 OD/2.04/BS 6323/5 E R W
2.3 Plant and Machinery Details
S .No. Type of E quipment             Make                         S pec ific ation
  B    Turbine                        S iemens                     C apacity : 10000 K W/ 7500 R P M
                                      TDP ower S ystem P vt Ltd.   AC G enerator
                                      Bangalore                    C apacity : 10000 K W/125000 K VA / 11000 V/50 Hz/4 P ole / 1500 rpm
                                                                   Type : TC 145

  C    ESP                            Thermax P vt. Ltd            2 F ield / S P M 120 mg per NM3

  D    Water S ys tem                 Doshion E xchange            R .O P lant S torage : 5 C ubic Metre
                                      ( R .O & D.M. P lant         D.M P lant S torage : 4 C ubic Metre
                                                                   Underground R aw Water S torage : 2100 cubic metre

  E    C ooling S ys tem              P aharpur C ooling Towers    Two nos WC C
                                                                   Model : 83030-4.0-02; Water flow capacity : 2800 m3/hr
                                                                   HWT 40 deg C ; C WT: 32 deg C ; WBT 27 deg C

  F    E lectrical & C ontrol Panel   Areva ( Alstom / Vintech )   Turnkey S upply
3.3 Plant and Machinery Details
S .No. Type of E quipment   Make                              S pecification
  G    F uel Handling       Inside P lant - C HIPP E R (S )   Make: S urya E nergy E ngg.P vt. Ltd. Make - 7 MT per hour
                                                              Make: S urya E nergy E ngg.P vt. Ltd. Make - 7 MT per hour
                                                              Make: S urya E nergy E ngg.P vt. Ltd. Make - 5 MT per hour Total= 19mt/hr

                            Outside Plant - C HIP PE R (S ) Make: Vermeer 1000 - 3 MT per hour
                                                            Make: Vermeer 1500 - 6 MT per hour
                                                            Make: Vermeer 1500- 6 MT per hour
                                                            Make: Bandit 1850 - - 25MT per hour Total= 40mt/hr

                            F uel Handling S ystem            Make: Hyquip P roject P vt.Ltd. Hyd:
                                                              C onveyor No 1 - 900 mm width x 46.9 m long
                                                              C onveyor No 2 - 900 mm width x 77.0 m long
1.1 CLEAN DEVELOPMENT MECHANISM

   Project Title : Prathyusha BioMass Project
   Host Country: India
   Start Date : 09.10.07
   Details       :
       Undertaken by Prathyusha PowerGen Pvt.Ltd.
       It’s a 10MW Bio Mass based Power Plant
       Located at Thivurasi village of Tirunelveli of Tamilnadu.
       Purpose: To generate electricity by Agricultural Waste available.
       The woody bio mass available in the area (Julia Flora) is also used.
       Generated Electricity is exported to TNEB and linked to local grid.

       Additional details are available at :
    http://cdm.unfccc.int/Projects/Validation/DB/XLER57KQILY1NGG3SBWXF5LR8B9RFQ/view.html
1.1 Associated Firms
Generating…


“CLEAN POWER”
    from
“GREEN EARTH”

More Related Content

Viewers also liked

Personal Protection in Galvanizing Industry
Personal Protection in Galvanizing Industry Personal Protection in Galvanizing Industry
Personal Protection in Galvanizing Industry rsmahwar
 
Credit Scores Explained. A Slideshow
Credit Scores Explained. A SlideshowCredit Scores Explained. A Slideshow
Credit Scores Explained. A Slideshowcreditexaminer
 
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2Fon Fon'
 
LogTrek
LogTrek LogTrek
LogTrek logtrek
 
Ringkasan dan jurnal penelitian penggunaan software open source
Ringkasan dan jurnal penelitian penggunaan software open sourceRingkasan dan jurnal penelitian penggunaan software open source
Ringkasan dan jurnal penelitian penggunaan software open sourceZaien Knight
 
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2Fon Fon'
 
Penggunaan software open source di kalangan mahasiswa
Penggunaan software open source di kalangan mahasiswaPenggunaan software open source di kalangan mahasiswa
Penggunaan software open source di kalangan mahasiswaZaien Knight
 
The impact of the economy of Gibraltar on the Campo de Gibraltar area
The impact of the economy of Gibraltar on the Campo de Gibraltar areaThe impact of the economy of Gibraltar on the Campo de Gibraltar area
The impact of the economy of Gibraltar on the Campo de Gibraltar areagibraltarcc
 
Kojman
KojmanKojman
KojmanKojman
 
What is Credit? An illustrated story.
What is Credit? An illustrated story.What is Credit? An illustrated story.
What is Credit? An illustrated story.creditexaminer
 

Viewers also liked (20)

Iprs
IprsIprs
Iprs
 
Ch02
Ch02Ch02
Ch02
 
Personal Protection in Galvanizing Industry
Personal Protection in Galvanizing Industry Personal Protection in Galvanizing Industry
Personal Protection in Galvanizing Industry
 
Credit Scores Explained. A Slideshow
Credit Scores Explained. A SlideshowCredit Scores Explained. A Slideshow
Credit Scores Explained. A Slideshow
 
Advertising campaign
Advertising campaignAdvertising campaign
Advertising campaign
 
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
 
LogTrek
LogTrek LogTrek
LogTrek
 
Ringkasan dan jurnal penelitian penggunaan software open source
Ringkasan dan jurnal penelitian penggunaan software open sourceRingkasan dan jurnal penelitian penggunaan software open source
Ringkasan dan jurnal penelitian penggunaan software open source
 
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
ผู้หญิงทรงเอ กับผู้ชายทับแก้ว2
 
Penggunaan software open source di kalangan mahasiswa
Penggunaan software open source di kalangan mahasiswaPenggunaan software open source di kalangan mahasiswa
Penggunaan software open source di kalangan mahasiswa
 
Presentación 2° noun clauses
Presentación 2° noun clausesPresentación 2° noun clauses
Presentación 2° noun clauses
 
The impact of the economy of Gibraltar on the Campo de Gibraltar area
The impact of the economy of Gibraltar on the Campo de Gibraltar areaThe impact of the economy of Gibraltar on the Campo de Gibraltar area
The impact of the economy of Gibraltar on the Campo de Gibraltar area
 
Direct & indirect speech
Direct & indirect speechDirect & indirect speech
Direct & indirect speech
 
Guia acordo ort.
Guia acordo ort.Guia acordo ort.
Guia acordo ort.
 
Kojman
KojmanKojman
Kojman
 
What is Credit? An illustrated story.
What is Credit? An illustrated story.What is Credit? An illustrated story.
What is Credit? An illustrated story.
 
Small rk sb1_pp49-62
Small rk sb1_pp49-62Small rk sb1_pp49-62
Small rk sb1_pp49-62
 
Mariax dowdx
Mariax dowdxMariax dowdx
Mariax dowdx
 
Cities
CitiesCities
Cities
 
Causatives 2° modelo
Causatives 2° modeloCausatives 2° modelo
Causatives 2° modelo
 

Similar to Executive Presentation On Power Plant

NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)PRAN-RFL Group
 
Enterprise High Desity Cooling
Enterprise High Desity CoolingEnterprise High Desity Cooling
Enterprise High Desity Coolingmartyp01
 
ILS FLAMEPROOF LIGHTING INDIA
ILS FLAMEPROOF LIGHTING INDIAILS FLAMEPROOF LIGHTING INDIA
ILS FLAMEPROOF LIGHTING INDIAILS
 
ILS FLP WG 13x3 45W
ILS FLP WG 13x3 45WILS FLP WG 13x3 45W
ILS FLP WG 13x3 45WILS
 
ILS FLP WELL GLASS
ILS FLP WELL GLASSILS FLP WELL GLASS
ILS FLP WELL GLASSILS
 
Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01soetrisno
 
Water Efficiency in Thermal power Plant
Water Efficiency in Thermal power PlantWater Efficiency in Thermal power Plant
Water Efficiency in Thermal power PlantAtanu Maity
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantSWAPNILTRIVEDI6
 
Pollution control solutions prowess-2k16-1-1
Pollution control solutions prowess-2k16-1-1Pollution control solutions prowess-2k16-1-1
Pollution control solutions prowess-2k16-1-1Atul Saxena
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 

Similar to Executive Presentation On Power Plant (20)

DANA DOMESTIC WATER CHILLERS UAE OMAN QATAR BAHRAIN JORDAN SYRIA QATAR SAUDI ...
DANA DOMESTIC WATER CHILLERS UAE OMAN QATAR BAHRAIN JORDAN SYRIA QATAR SAUDI ...DANA DOMESTIC WATER CHILLERS UAE OMAN QATAR BAHRAIN JORDAN SYRIA QATAR SAUDI ...
DANA DOMESTIC WATER CHILLERS UAE OMAN QATAR BAHRAIN JORDAN SYRIA QATAR SAUDI ...
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
11 mn01 review 3
11 mn01 review 311 mn01 review 3
11 mn01 review 3
 
400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)400 bpm dual filling sytem(completed)
400 bpm dual filling sytem(completed)
 
Enterprise High Desity Cooling
Enterprise High Desity CoolingEnterprise High Desity Cooling
Enterprise High Desity Cooling
 
ILS FLAMEPROOF LIGHTING INDIA
ILS FLAMEPROOF LIGHTING INDIAILS FLAMEPROOF LIGHTING INDIA
ILS FLAMEPROOF LIGHTING INDIA
 
ILS FLP WG 13x3 45W
ILS FLP WG 13x3 45WILS FLP WG 13x3 45W
ILS FLP WG 13x3 45W
 
ILS FLP WELL GLASS
ILS FLP WELL GLASSILS FLP WELL GLASS
ILS FLP WELL GLASS
 
Water Chillers Air-Cooled/Water-Cooled Manufacturer -UAE/AFRICA/SAUDI ARABIA...
Water Chillers Air-Cooled/Water-Cooled Manufacturer  -UAE/AFRICA/SAUDI ARABIA...Water Chillers Air-Cooled/Water-Cooled Manufacturer  -UAE/AFRICA/SAUDI ARABIA...
Water Chillers Air-Cooled/Water-Cooled Manufacturer -UAE/AFRICA/SAUDI ARABIA...
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
Ch 03-30 mpw060
Ch 03-30 mpw060Ch 03-30 mpw060
Ch 03-30 mpw060
 
Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01
 
SinkPAD Technology
SinkPAD TechnologySinkPAD Technology
SinkPAD Technology
 
Water Efficiency in Thermal Power plants
Water Efficiency in Thermal Power plants Water Efficiency in Thermal Power plants
Water Efficiency in Thermal Power plants
 
Water Efficiency in Thermal power Plant
Water Efficiency in Thermal power PlantWater Efficiency in Thermal power Plant
Water Efficiency in Thermal power Plant
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
 
Pollution control solutions prowess-2k16-1-1
Pollution control solutions prowess-2k16-1-1Pollution control solutions prowess-2k16-1-1
Pollution control solutions prowess-2k16-1-1
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 

More from Uma Mahesh Guraza

Standard Safety Instructions 2012
Standard Safety Instructions 2012Standard Safety Instructions 2012
Standard Safety Instructions 2012Uma Mahesh Guraza
 
HSE Audit Observations to Client 0611
HSE Audit Observations to Client 0611HSE Audit Observations to Client 0611
HSE Audit Observations to Client 0611Uma Mahesh Guraza
 
Presentation on 5 Year Growth Plan
Presentation on 5 Year Growth PlanPresentation on 5 Year Growth Plan
Presentation on 5 Year Growth PlanUma Mahesh Guraza
 
BBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshBBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshUma Mahesh Guraza
 

More from Uma Mahesh Guraza (7)

Standard Safety Instructions 2012
Standard Safety Instructions 2012Standard Safety Instructions 2012
Standard Safety Instructions 2012
 
Management\'s Credential
Management\'s CredentialManagement\'s Credential
Management\'s Credential
 
HSE Audit Observations to Client 0611
HSE Audit Observations to Client 0611HSE Audit Observations to Client 0611
HSE Audit Observations to Client 0611
 
Presentation on 5 Year Growth Plan
Presentation on 5 Year Growth PlanPresentation on 5 Year Growth Plan
Presentation on 5 Year Growth Plan
 
Safety Alert on Eye Injury
Safety Alert on Eye InjurySafety Alert on Eye Injury
Safety Alert on Eye Injury
 
BBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshBBS Presentation by Uma Mahesh
BBS Presentation by Uma Mahesh
 
Lecture Invitation
Lecture InvitationLecture Invitation
Lecture Invitation
 

Executive Presentation On Power Plant

  • 1. PRATHYUSHA POWERGEN PVT LTD From: G.Uma Mahesh, General Manager-Oprns. Date : 12th Dec,2008 Location: Hyderabad, AP, India
  • 2.
  • 3.
  • 4. Contents…  Geographical Location  Abundance of Julia Flora  Industry Advantage  Raw Material - Conventional Practice  Raw Material – Prathyusha’s Practice  Brief Profile of Power Plant  Salient Features  Plant and Machinery Details  Clean Development Mechanism CDM  Supporting Firms
  • 11. 1.1 Industry Advantage(s) • High biomass availability: Around 120-150 MT/year, corresponding to 16’000 MW potential • Income tax concession of 80% depreciation on boiler • Zero import duty • Capital subsidies from Ministry of New and Renewable Energy (MNRE) or it’s nodal agencies  MNRE Planning Commission currently supporting biomass by giving concessions to developers.  State utilities provide special price (Rs.3.15/unit enhanced to Rs.4.50/unit) for power take off.  Govt. nods ‘Go Green’ for Third Party Sales to the extent 80:20 and the current market rate for Third party sales is Rs.7~8 per unit. The existing rate is Rs.3.15/unit  Licenses are given in a restrictive way, to avoid competition for biomass within an area  Carbon Credits Available under Clean Development Mechanism-CDM
  • 12. Raw Material - Conventional Practice Cutting Stacking of Dressed wood Transportation Unloading of Dressed Wood Chipping of Dressed wood Consumption
  • 13. Raw Material - Conventional Practice  Cutting of wood from nearby villages.  Cutting of wood by Labours.  Slower rate of cutting.  Product is ‘Dressed Wood’ in form of 1~2metres long.  ‘Finer and Thin’ branches are under utilized or left at site, itself.  ‘Manual Loading’ is involved for such dressed wood in trucks.  Transportation is involved for such loaded wood to destination.  ‘Manual Unloading’ is involved for such dressed wood from trucks at destination.  Actual Chipping at destination ; wood by wood.  Labour charges applicable for cutting, loading and unloading.  Transportation cost includes for Moisture and Space.  Inherent limitations on availability of labours, due to human factor/local cultural events.
  • 14. Raw Material – Mechanization Drive Cutting by JCB Chips stack management Inter-carting by BOBCAT Loading of Chips at site Feeding to Chipper Compaction Chipper in action Ready to Use
  • 15. 1.3 Raw Material –Mechanization Drive  Generating “Wood Chips” at site Advantage(s)-Wood Chips from wood.  ‘Ready to use fuel’  Raw Material and Lands- Advance  ‘Low Moisture’ Reservation  ‘Low Transportation Cost’  In pursuit of efficient fuels i.e.,  ‘Dry Metric Tons’ Older Julia Flora.  ‘No Hidden Cost’  Continuous R&D at in-house Lab.  ‘Full Efficiency of Boiler’  Well organized ‘Mechanized Operations’  ‘Two Tier’ System for Raw Material sourcing-Own & IIIrd Party.  Spot Payments to Raw material Vendors
  • 16. 2.3 Raw Material – Prathyusha’s Practice
  • 17. 3.3 Raw Material – Prathyusha’s Practice
  • 18. 1.2 Brief Profile of Power Plant Prathyusha Power Gen Private Limited is the 10MW Bio- Mass Power Generation unit which is strategically located near Tirunelvelli Substation amidst the cluster of Paper Mills, which attracts the Raw Materials by default. The plant has got almost all infrastructures to meet and run indigenously for consistent power generation. The list includes latest weigh-bridge, Chippers, best of class Equipment, Raw Material storage yard, handling yard, water supply, office building, guest house, security system, two-tier boundaries and also as part of Raw Material Supply- the short-listed and identified lands to cater the future need of Raw Material. The water for the plant is supplied from the underground well dug however in order to meet the future’s enhanced supply, the direct pipe line from the nearby perennial river is under active consideration.
  • 19. 2.2 Glimpse of Power Plant Prathyusha Power Gen Private Limited- Tirunelveli,
  • 20. Salient Features  Site Location : Strategically located at Tirunelveli.  Meteorological Data:  Max & Min Temp recorded on a day is 39.5 and 20 Deg Centigrade respectively.  Average Maximum Temperature is 32 Deg Centigrade  Relative Humidity (average) is 57-65 %  Nearest Railway Station : Rajapalayam (Virudhnagar~Tenkasi Section)  Nearest AirPort : Madurai  Nearest TNEB Sub-Station: Srivilliputhur 110/ 11kv  Wind Velocity: 39mt/sec as per IS 875  Seismic Zone: Zone II as per IS 1893  Water Source: Open Walls- 4.30cu.m/hr  : Number of Bore wells- 6.36 cu.m/hr  Capacity of each bore well: 15ch.m/hr  Fuel : Plenty available basically of woody biomass viz.Julia Flora and seco  Power Evacuation
  • 21. 1.3 Plant and Machinery Details S .No. Type of E quipment Make S pec ific ation A B oiler Thermodyne Tec hnologies P ressue - 75 K g/cm2 (P ) L td, C hennai Temperature - 480 deg C plus/minus 10 C apacity - 45 T P H Bi drum Membrane Water Wall construction Travalgrate Boiler Drum Data : S team Drum : S ize 1372 mm ID/80mm Tk / 5600 mm/S A 516 G r 70 Water Drum : S ize 914 mm ID/56mm T k / 5400 mm/S A 516 G r 70 S uper Heater - P rimary :38.1 OD/4.06 /S A210 G r A S econdary : 38.1 OD/4.06/S A 213 T 22 Inlet Header : P rimary : 219.1 OD / 12.7 / S A 106 G r B S econdary : 219.1 OD/12.7/ S A 106 G rB B oiler B ank: Tube S ize : 50.8 OD/3.66 / S A 192 E c onomis er : Tube S ize : 38.1 OD / 3.66 / BS 3059 P II Type 360 E R W Air P reheater : Tube S ize :63.5 OD/2.04/BS 6323/5 E R W
  • 22. 2.3 Plant and Machinery Details S .No. Type of E quipment Make S pec ific ation B Turbine S iemens C apacity : 10000 K W/ 7500 R P M TDP ower S ystem P vt Ltd. AC G enerator Bangalore C apacity : 10000 K W/125000 K VA / 11000 V/50 Hz/4 P ole / 1500 rpm Type : TC 145 C ESP Thermax P vt. Ltd 2 F ield / S P M 120 mg per NM3 D Water S ys tem Doshion E xchange R .O P lant S torage : 5 C ubic Metre ( R .O & D.M. P lant D.M P lant S torage : 4 C ubic Metre Underground R aw Water S torage : 2100 cubic metre E C ooling S ys tem P aharpur C ooling Towers Two nos WC C Model : 83030-4.0-02; Water flow capacity : 2800 m3/hr HWT 40 deg C ; C WT: 32 deg C ; WBT 27 deg C F E lectrical & C ontrol Panel Areva ( Alstom / Vintech ) Turnkey S upply
  • 23. 3.3 Plant and Machinery Details S .No. Type of E quipment Make S pecification G F uel Handling Inside P lant - C HIPP E R (S ) Make: S urya E nergy E ngg.P vt. Ltd. Make - 7 MT per hour Make: S urya E nergy E ngg.P vt. Ltd. Make - 7 MT per hour Make: S urya E nergy E ngg.P vt. Ltd. Make - 5 MT per hour Total= 19mt/hr Outside Plant - C HIP PE R (S ) Make: Vermeer 1000 - 3 MT per hour Make: Vermeer 1500 - 6 MT per hour Make: Vermeer 1500- 6 MT per hour Make: Bandit 1850 - - 25MT per hour Total= 40mt/hr F uel Handling S ystem Make: Hyquip P roject P vt.Ltd. Hyd: C onveyor No 1 - 900 mm width x 46.9 m long C onveyor No 2 - 900 mm width x 77.0 m long
  • 24. 1.1 CLEAN DEVELOPMENT MECHANISM  Project Title : Prathyusha BioMass Project  Host Country: India  Start Date : 09.10.07  Details :  Undertaken by Prathyusha PowerGen Pvt.Ltd.  It’s a 10MW Bio Mass based Power Plant  Located at Thivurasi village of Tirunelveli of Tamilnadu.  Purpose: To generate electricity by Agricultural Waste available.  The woody bio mass available in the area (Julia Flora) is also used.  Generated Electricity is exported to TNEB and linked to local grid.  Additional details are available at : http://cdm.unfccc.int/Projects/Validation/DB/XLER57KQILY1NGG3SBWXF5LR8B9RFQ/view.html
  • 26. Generating… “CLEAN POWER” from “GREEN EARTH”