This summer we spent a month refurbishing some 25 year old structures down in Gloucester. Over 450ft long these were a but of a challenge when sheeting.
2. This summer we spent a month refurbishing
some 25 year old structures down in Gloucester.
Over 450ft long these were a but of a challenge
when sheeting.
3.
4.
5.
6.
7.
8.
9.
10.
11. Thank You
Total Polytunnels
published by www.totalpolytunnels.co.uk
@Twitter
face book