SlideShare a Scribd company logo
1 of 6
Download to read offline
SITE ANALYSIS
MASTER PLAN COMMENTED BY MS NORMA
MASTER PLAN (IMPROVED)
CHOOSING ELEMENTS
Examples of the furniture/elements
Coffee table
- fixed on the wooden floor
- Students can sit on the wooden floor
Floor lights
Concrete floor
- On the stage
Wooden deck
- Wooden deck on the whole site except the “stage”
Wall Fountain
- At the side of our site
Fountain
- At the middle of “stage”
Wooden rack
- Twining plants planted
Staircase
- 2 layer of stairs
Cl tutorial

More Related Content

More from Sheau Hui Tan

More from Sheau Hui Tan (20)

Theories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essayTheories of archi and urbanism comparative-essay
Theories of archi and urbanism comparative-essay
 
Synopsis Writing
Synopsis WritingSynopsis Writing
Synopsis Writing
 
Bim final documentation
Bim final documentation Bim final documentation
Bim final documentation
 
Csi proposal vivacity
Csi proposal  vivacityCsi proposal  vivacity
Csi proposal vivacity
 
Internship report
Internship reportInternship report
Internship report
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
 
Bstructure calculation
Bstructure calculationBstructure calculation
Bstructure calculation
 
Building Service final report
Building Service final reportBuilding Service final report
Building Service final report
 
Nishinoyama House Architectural Analysis
Nishinoyama House Architectural AnalysisNishinoyama House Architectural Analysis
Nishinoyama House Architectural Analysis
 
Conservation slides
Conservation slidesConservation slides
Conservation slides
 
Proposal of Adaptive Reuse
Proposal of Adaptive ReuseProposal of Adaptive Reuse
Proposal of Adaptive Reuse
 
Seminar Talk on Georgetown Conservation
Seminar Talk on Georgetown ConservationSeminar Talk on Georgetown Conservation
Seminar Talk on Georgetown Conservation
 
Bcon report
Bcon reportBcon report
Bcon report
 
Progress
ProgressProgress
Progress
 
Sketches
SketchesSketches
Sketches
 
Measured Drawings Report
Measured Drawings ReportMeasured Drawings Report
Measured Drawings Report
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Timeline on Buildings in Bukit Bintang, Kuala Lumpur
Timeline on Buildings in Bukit Bintang, Kuala LumpurTimeline on Buildings in Bukit Bintang, Kuala Lumpur
Timeline on Buildings in Bukit Bintang, Kuala Lumpur
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 

Cl tutorial

  • 2. MASTER PLAN COMMENTED BY MS NORMA MASTER PLAN (IMPROVED)
  • 4. Examples of the furniture/elements Coffee table - fixed on the wooden floor - Students can sit on the wooden floor Floor lights Concrete floor - On the stage Wooden deck - Wooden deck on the whole site except the “stage”
  • 5. Wall Fountain - At the side of our site Fountain - At the middle of “stage” Wooden rack - Twining plants planted Staircase - 2 layer of stairs