SlideShare a Scribd company logo
White Card Update: Danger of Scaffolding Work




                                                                          Source : Dan DeLuca

                                   Work from any height above 2 meters is dangerous but scaffolders can fall at any stage in the
                                   erection of the scaffolding or during it’s dismantling.

                                   There is also the risk of scaffolding collapsing while workers are on or under it which can cause
                                   injury. The collar locking mechanism on scaffolds can be a hazard if operators do not engage
                                   the lock correctly.

                                   Scaffolders need to be trained and certified. Climbing from one lift of the scaffold to the next lift
                                   can also result in a climbing fall.

                                   The most common scaffold accident on construction sites seems to be external falls from the
                                   open sides and ends of a scaffold can be controlled by adopting the “sequential erection”
                                   method.

                                   According to this method only one-bay-at-a-time is erected, sequential installation of standards
                                   and guardrails or guardrails alone. This ensures that scaffolders are not required to walk further
                                   than one bay length along an exposed edge of a scaffold platform, reducing the risk of falling.

                                   Ensuring that an appropriate access system is in place can control the risk of climbing falls for
                                   scaffolders gaining access from one lift to the next. This can be in the form of a stairway or
                                   ladder access that is progressively installed as the scaffold is erected.

                                   White Card Australia




                                                                                                                                   1/1
Powered by TCPDF (www.tcpdf.org)

More Related Content

Viewers also liked

POWERS AND ROOTS 2
POWERS AND ROOTS 2POWERS AND ROOTS 2
POWERS AND ROOTS 2
Martha Ardila Ibarra
 
Trabajo final
Trabajo finalTrabajo final
Trabajo final
MARIELENA15
 
F.asombrosas avelina
F.asombrosas avelinaF.asombrosas avelina
F.asombrosas avelina
Regina Franco
 
Corpus2010
Corpus2010Corpus2010
Corpus2010
MCarmen Sánchez
 
presentacion
presentacionpresentacion
presentacion
andresmoralesmedina99
 
Jesus i'll stay awake (vv)
Jesus i'll stay awake (vv)Jesus i'll stay awake (vv)
Jesus i'll stay awake (vv)
Linnea Good
 
Scrum (1)
Scrum (1)Scrum (1)
Scrum (1)
facamposcasanova
 
Jornada da humanidade
Jornada da humanidadeJornada da humanidade
Jornada da humanidade
Jose Rosa
 
Case 1
Case 1Case 1
Case 1
Nutan Erathi
 
Diversidad cultural del callejón de huaylas
Diversidad cultural del callejón de huaylasDiversidad cultural del callejón de huaylas
Diversidad cultural del callejón de huaylas
francistrigoso
 
IBM Gets Feisty-Mobilizes Analytics For Oracle
IBM Gets Feisty-Mobilizes Analytics For OracleIBM Gets Feisty-Mobilizes Analytics For Oracle
IBM Gets Feisty-Mobilizes Analytics For Oracle
IBM India Smarter Computing
 
Human body.
Human body.Human body.

Viewers also liked (12)

POWERS AND ROOTS 2
POWERS AND ROOTS 2POWERS AND ROOTS 2
POWERS AND ROOTS 2
 
Trabajo final
Trabajo finalTrabajo final
Trabajo final
 
F.asombrosas avelina
F.asombrosas avelinaF.asombrosas avelina
F.asombrosas avelina
 
Corpus2010
Corpus2010Corpus2010
Corpus2010
 
presentacion
presentacionpresentacion
presentacion
 
Jesus i'll stay awake (vv)
Jesus i'll stay awake (vv)Jesus i'll stay awake (vv)
Jesus i'll stay awake (vv)
 
Scrum (1)
Scrum (1)Scrum (1)
Scrum (1)
 
Jornada da humanidade
Jornada da humanidadeJornada da humanidade
Jornada da humanidade
 
Case 1
Case 1Case 1
Case 1
 
Diversidad cultural del callejón de huaylas
Diversidad cultural del callejón de huaylasDiversidad cultural del callejón de huaylas
Diversidad cultural del callejón de huaylas
 
IBM Gets Feisty-Mobilizes Analytics For Oracle
IBM Gets Feisty-Mobilizes Analytics For OracleIBM Gets Feisty-Mobilizes Analytics For Oracle
IBM Gets Feisty-Mobilizes Analytics For Oracle
 
Human body.
Human body.Human body.
Human body.
 

White Card Update: Danger of Scaffolding Work

  • 1. White Card Update: Danger of Scaffolding Work Source : Dan DeLuca Work from any height above 2 meters is dangerous but scaffolders can fall at any stage in the erection of the scaffolding or during it’s dismantling. There is also the risk of scaffolding collapsing while workers are on or under it which can cause injury. The collar locking mechanism on scaffolds can be a hazard if operators do not engage the lock correctly. Scaffolders need to be trained and certified. Climbing from one lift of the scaffold to the next lift can also result in a climbing fall. The most common scaffold accident on construction sites seems to be external falls from the open sides and ends of a scaffold can be controlled by adopting the “sequential erection” method. According to this method only one-bay-at-a-time is erected, sequential installation of standards and guardrails or guardrails alone. This ensures that scaffolders are not required to walk further than one bay length along an exposed edge of a scaffold platform, reducing the risk of falling. Ensuring that an appropriate access system is in place can control the risk of climbing falls for scaffolders gaining access from one lift to the next. This can be in the form of a stairway or ladder access that is progressively installed as the scaffold is erected. White Card Australia 1/1 Powered by TCPDF (www.tcpdf.org)